Pour Card

This document summarizes the details of an upcoming concrete pour, including the contractor, location, concrete grade, estimated volume, reinforcement details, pre-pour inspection results, required clearances, pour start and end times, curing method, and observations during and after the pour. It provides a record of the pour for quality control purposes.

Uploaded by

suchendra singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
129 views2 pages

Pour Card

This document summarizes the details of an upcoming concrete pour, including the contractor, location, concrete grade, estimated volume, reinforcement details, pre-pour inspection results, required clearances, pour start and end times, curing method, and observations during and after the pour. It provides a record of the pour for quality control purposes.

Uploaded by

suchendra singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

CONCRETE POUR CARD Format No: ****/…../…..

Programme of concreting

Contractor: M/s___________________ Client: *******************************.

Name of Work: ____________________________________________________________

Reference
1
Document/Drawings
2 Type of Structure : Location:
3 Levels From: To:
4 Grade of concrete/Approved design mix:
Brand name, Grade and Batch no. of
5
cement
6 Estimated volume of concrete
7 Quantity of cement required
8 Reinforcement Checking Details:
No. Dia. Length
a. Laps
a. Separators
a. Chairs
a. Any other
Remarks:
9 Pre pour inspection details Checked by SGN Checked by WIPL NA
a. Survey/Layout
a. Sub-soil compaction
a. Cleanliness
a. Cover to reinforcement
a. Anchor Bolts
a. Sleeves/Pockets
a. Formwork
a. Slopes
a. Construction/Expansion joints
a. Admixtures
a. Any other
Remarks:
Clearance for Electrical/Mechanical
10 works required/ not required: Electrical: Mechanical:

The above structure is finally inspected on ____________________ at


11
________AM/PM and found/not found satisfactory for concreting.
Remarks, if any
Observations During Concreting
1 Machinery mobilization Nos. Stand By
a. Mixer machine
a. Ready Mixed concrete
dumpers
a. Vibrators
a. Pumps
a. Hoists
2 Pour start time AM/PM Date:
3 W/c Ratio
Type of weather

4 Details of abnormality
(Precautions taken for <50C Normal Abnormal
and >400C, rainy season)
5 Number of cubes taken
6 Quantity of concrete poured
7 Pour completion time AM/PM Date:
POST POUR CONCRETING
Curing
Traditional
Compound
1 Curing Method
Blankets/foils/
Others (specify)
Gunny bags
2 Period for removal of formwork:
3 Any defect(s) observed during concreting

4 AGE OF CASTING NO.OF DAYS


5 PROPS ARE SAFE TO REMOVE
6 CONCRETE SURFACE FINISH AFTER SHUTTERING REMOVAL
a FINISHING SURFACE
b SHRINKAGE CRACKS
c STRUCTURAL CRACKS
d HONEY COMBING
4 REMEDY ACTION TAKEN
METHODOLOGY USED DESCRIPTION:
MATERIAL USED FOR
PRECAUTIONS TAKEN FOR FUTURE
Remarks, if any

(Contractor) (Consultant) Client/Owner

Name: Name: Name:

Designation: Designation: Designation:


Date: Date: Date: