Pour Card
Pour Card
Programme of concreting
Reference
1
Document/Drawings
2 Type of Structure : Location:
3 Levels From: To:
4 Grade of concrete/Approved design mix:
Brand name, Grade and Batch no. of
5
cement
6 Estimated volume of concrete
7 Quantity of cement required
8 Reinforcement Checking Details:
No. Dia. Length
a. Laps
a. Separators
a. Chairs
a. Any other
Remarks:
9 Pre pour inspection details Checked by SGN Checked by WIPL NA
a. Survey/Layout
a. Sub-soil compaction
a. Cleanliness
a. Cover to reinforcement
a. Anchor Bolts
a. Sleeves/Pockets
a. Formwork
a. Slopes
a. Construction/Expansion joints
a. Admixtures
a. Any other
Remarks:
Clearance for Electrical/Mechanical
10 works required/ not required: Electrical: Mechanical:
4 Details of abnormality
(Precautions taken for <50C Normal Abnormal
and >400C, rainy season)
5 Number of cubes taken
6 Quantity of concrete poured
7 Pour completion time AM/PM Date:
POST POUR CONCRETING
Curing
Traditional
Compound
1 Curing Method
Blankets/foils/
Others (specify)
Gunny bags
2 Period for removal of formwork:
3 Any defect(s) observed during concreting