303 billion tones of coal vs 0.621 billion tons of crude says it all. We need about
520 MTOE in total energy and only coal can meet this demand for more than 100
years. Crude internal resource can meet for 4 years and gas for six years ( for an
extended capacity)
Coal compression
Gasification Input for Methanol
and gas (Automobile Fuel)
conditioning
Synthesis gas
(CO+H2) Input for
Chemical/Fertilizer
plants as feed
The work carried out in India since late nineties and last five years has given a
confidence that Fluid Bed Gasification is the best option for HAIC.
MNRE
RSIL
500 kW coal Gasification facility EIL Gurgaon 1 MW coal Gasification facility Thermax Pune
CHT
Confidential. Thermax Ltd.
R&D Testing Facilities…
Hydrocarbons Peaks
Confidential. Thermax Ltd.
LEARNINGS FROM THE INDSUTRIAL PILOT SCALE PLANTS
1. Fluid bed design for India’s coal is operable with few critical
parameters. Continuous sustainability is possible but with
lowering the pressure of operation 4-10 bar and then use the
booster compressor to meet the end utility requirements
3. Fluid bed CFBC will enable to get the char free ash and
enhance the overall efficiency
Fluegas
Gasifier
(Circulating Air/
Steam Heat
Fluegas Char Air
fluidized bed) Exchanger Combustor
Air/
Water
ASH
Fluidized
Bed Gasifier
Syngas
Cooler Dust Separation
syngas to burners
for heating
Handles Wide
Variety of Coal applications
(Type and Size)
Effective Heat
Recovery for
Enhancing
Efficiency
Ash
Gas clean-up R&D
Gasification
island Catalysis R&D
• Performance evaluation &
Gas clean-up optimization
Gas island • Effect of operating parameters,
cooling kinetics
Particulate
Separation Acid gas /
trace metal
removal
MeOH Reactor
Hydrodynamics & Reactor Island
Engineering R&D