Activity: Date:

8/6/2022
General & Demolition Works

JOB SAFETY
ANALYSIS Engineer: Supervisor: Analysis by:

Ahmed Ghabra Naser Aqib Raza

Company: Location: Department: Reviewed By ( HSE Department ):

MBL Zone 6 Civil

Recommended Personal Protective Equipment: Approved By ( Project Manager ):

Abdul Rehman Qamar

Sequence of Basic Task Steps Existing and Potential Hazards Recommended Action or Procedure

 The trailer(s) transporting the


equipment must be suitable to the
activity.
 The operator prior to transport the
equipment must be briefed about his
Collision hazard destination and existing structures.
Mobilizing the equipment Struck by hazard  The operator must inspect his trailer
Collapse of load for any deficiencies.
 Speed limits to be followed.
 All nearby structures must be
protected by means of barricade and
signage.
 Size of cut-out panels shall be
minimized.
 Panel shall be removed along with
beams.
 Wind speed shall be considered. Work
shall be suspended if wind speed
Panel blown by wind. exceeded 32 km/h
Removal of corrugated sheets Panel falling  Crane operator to make sure lowering
Material falling directly the sheets.
 Panels shall not be stored on top of
the roof.
 Panels to be controlled by taglines.
 Close supervision by assigned
engineer / foreman.
 Close supervision by rigger level I.
 Crane capacity to be checked.
 Load chart to be studied.
 Critical lift plan to be prepared by
rigger level I, when needed.
 beams shall be hanged by the crane
Beam falling prior cutting out the corrugated sheets
Removal of beams:
Crane collapse  Prior lifting the beams, the workers on
manlift shall be away.
 Wind speed shall be considered.
 Close supervision by assigned
engineer / foreman.
 Close supervision by rigger level I.

 Stadium shall be completely excluded


Collapse of steel structure and only bulldozer operator to be
Removal of truss beams with corrugated
Twisting of structure allowed working inside.
sheet (as one structure)
Struck by personnel / equipment  Rigger level I shall inspect all lifting
gears and pulling wires prior being
used.
 truss beams will be kept connected
and will be dismantled as 1 structure.
 Dismantling of 1 truss beam is not
allowed.
 Corrugated sheets will be cut out
along with supporting beams and
never without them.
 The cut location of the corrugated
sheet shall be studied with the
engineer prior.
 Rigger level I will make sure that
distance between cranes Is respected
(based on the working radius). ▪ Area
to be excluded.
 No personnel will be allowed to enter
the exclusion zone (manmachine
interface).
 Bulldozer will be positioned in vertical
angle with the structure. Respecting
the center line.
 Wires will be connected only to the
truss hooking point and not other
location
Fire Hazard Health and physical injuries such as burns  Toolbox meeting shall be conducted at
inhalation of toxic fumes site to highlight the related hazards
and control measures.
 No smoking policy will be enforced
unless in designated smoking areas.
 The operator will make sure not to
keep any chemicals and/or petroleum
material in his cabinet such as paint,
diesel container, etc.
 Any hot work to be initiated such as
torch cutting, welding, etc. for
equipment repair will be made only
after making sure that no combustible
and/or flammable material are near.
 No operator or any employee other
than competent welder will be allowed
to do the hot work activity.
 Fire extinguisher to be available
always at all times. Training will be
given to all involved personnel
regarding the proper usage of the fire
extinguisher.
 The location of the fire extinguisher
will be of 2m minimum and 5m
maximum away from the source of
ignition.
 The fire points will be free from
obstacles at all times.
 Fire extinguisher will be inspected on a
monthly basis (or otherwise needed),
tagged and registered.
 All combustible materials must not be
allowed to accumulate on site,
practice good housekeeping
techniques.
 Clean all oil / fuel spills immediately.
 In case a fire occurred, the trained
workers will extinguish it by using the
nearby fire extinguisher, if the fire is
big than all workers will evacuate to
the nearest designated assembly area.
 All workers will put masks if available
to avoid inhaling the emitted smoke or
to put their shirts or any other similar
mean in order to prevent inhaling the
emitted smoke until they are out from
the fire area.
 The diesel tanker shall be inspected on
a daily basis by the driver prior to start
the work.
 Smoking and usage of cell phones
while driving the diesel tanker or
refueling is strictly prohibited.
 The diesel tanker shall be grounded
while refueling.