Saudi Arabian Oil Company: SECTION 13320 Programmable Logic Controllers
Saudi Arabian Oil Company: SECTION 13320 Programmable Logic Controllers
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OW NER.
SECTION 13320
ENGG CERT
SUBSECTION INDEX
Part 1 - General
1.01 General
1.02 References and Standards
DESCRIPTION
1.03 Technical
1.04 Controls Description
1.05 Inspection and Testing
1.06 Drawings and Documentation
1.07 Packing and Shipping
1.08 Spare Parts
1.09 Site Testing
1.10 Tool and Test Equipment
1.11 Technical Services
JO/EWO
Part 2 - Products
DATE
2.01 Manufacturers
Part 3 - Execution
NO.
REV
DISCIPLINE
ENGINEER 3.01 Site Requirements
DATE:
PROJECT
ENGINEER PART 1 - GENERAL
C. The PLC units shall be supplied with central processing units (CPU), input/output
DATE:
(I/O) Scanners, input modules, output modules, all power and interface cables and
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
Section 13320
Project Specification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OW NER.
D. The system shall be provided from a manufacturer’s standard product line to the
maximum extent possible.
ENGG CERT
E. All materials used in the construction of the Programmable Logic Controller shall be
new and selected for long operating life in a harsh environment. Only heavy duty
industrial components rated to operate within the temperature ranges and other
environmental conditions specified in Section 1.03, E-8 shall be used.
F. Any conflict between this specification and any industry standards, specifications,
codes, Drawings, or forms shall be brought to the attention of Saudi Aramco for
resolution.
DESCRIPTION
The materials, design and construction of the programmable logic controller shall conform
to this specification and latest edition of applicable standards and codes.
D. Industrial Standards:
DATE:
OPERATIONS
SAMSS - Saudi Aramco Material System Specifications
SAIP - Saudi Aramco Inspection Requirements
DATE: ISA - Instrument Society of America
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
Section 13320
Project Specification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OW NER.
1.03 Technical
ENGG CERT
A. General:
2. A minimum 20% installed spare I/O, based on I/O points shall be provided
with minimum of one spare module of each type.
DESCRIPTION
3. PLC shall be easily programmable from personnel IBM computer. A lap top
PC (IBM compatible Pentium IV minimum 2.66 GHZ, 256 MB RAM, 40 GB
hard disc and disc drive) shall be provided for each PLC with programmable
software for logic.
B. Electrical Requirements:
2. Input digital modules shall all be 24 VDC with a voltage variance of + 10%.
JO/EWO
3. Digital output modules shall be 120 VAC, 5 Amps suitable for operating
DATE
contactors.
4. Analog input modules shall be 4-20 mA, 24 VDC type and shall accept
NO.
REV
DATE:
5. All control function shall be performed by CPU and no special modules shall
PROJECT
ENGINEER be used for this purpose.
1. All hardware inputs and outputs shall be grounded adopting the grounded
DATE:
CONSTRUCTION
system philosophy.
AGENCY
D. Application Program:
DATE:
OPERATIONS
1. A ladder logic program shall be provided that performs the functions as shown
on the Drawings and described in these Specifications. The vendor shall fully
DATE: understand the control requirements to provide logic program.
CONTROL NUMBER
VERIFICATION
2. Ladder logic program shall be compatible with vendors latest revision program
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
3. The ladder logic program will be loaded and tested per these Specifications.
THIS INDICATES THAT REV. NO.__________
ICATE
00
OF THIS DRAWING IS COVERED, FOR ALL
Section 13320
Project Specification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OW NER.
E. PLC Cabinet:
ENGG CERT
1. The PLC cabinet shall be NEMA-1 type enclosure suitable for mounting
indoors, single door construction and completely enclosed with all
components and accessories mounted and wired in accordance with the
requirements of this specification. Necessary bracing shall be provided for
added strength to hold heavy pieces of components. All components
including field terminal blocks shall be mounted in the cabinet.
3. All enclosures hardware (hinges, latches, handles, bolts and nuts) shall be of
316 stainless steel.
4. The doors shall be fitted with neoprene seals for dust exclusion. It shall not
be necessary to use tools to operate the door latches.
5. All the hardware, control devices and terminal blocks shall be properly tagged
with nameplates. Tagging on I/O housing and I/O modules shall be provided
by Vendor. Each input and output point on the I/O modules shall be
JO/EWO
numbered.
DATE
6. Key for door lock shall be removable with the doors either locked or unlocked.
7. Terminals for incoming and outgoing cables shall be so located that they are
NO.
REV
G. EMI Generation: Each item of equipment shall not generate radiated electromagnetic
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
requirement.
THIS INDICATES THAT REV. NO.__________
ICATE
00
OF THIS DRAWING IS COVERED, FOR ALL
Section 13320
Project Specification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OW NER.
1.04 Controls Description
ENGG CERT
A. This section of the specifications defines the operations and controls philosophy
requirements in conjunction with design drawings including P&ID and elementary
wiring diagram.
1. For sanitary lift station, there are 2 pumps running on a duty-stand-by mode.
The duty pump will run in auto mode if the level arrives to H, and stop. If the
level arrives to L (low level). If the duty pump fails to start or switched off, the
second pump will start as duty. Two (2) respective PITs on the discharge of
the two pumps will maintain the pressure. Guided wave radar level transmitter
will control the operation and make the shutdown of pump in case of low level.
2. For the sodium hypochlorite skid, it is Vendor work. All the operation work is
the Vendor responsibility except wiring from the skid (junction boxes/local
JO/EWO
3. For oily water lift station, the sets of pumps will be there and these two sets
will run in auto mode as duty-standby. Each pipe will have one PIT and one
PI. Two guided waved radar level transmitter will control the operation and
NO.
REV
Sequence of Operation:
DATE:
PROJECT
ENGINEER H4 Alarm @ 2800 mm – actuate H1 H1 level alarm in PLC (fourth level)
H5 @ 1500 mm – maximum flow duty pump starts, normal flow pump
DATE: stops (third level)
CERTIFIED
H2 @ 1000 mm – actuate HI level alarm in PLC (second level)
H1 @ 800 mm – normal flow duty pump starts (first level)
DATE:
CONSTRUCTION
LL @ 600 mm – all pumps stop (low level)
AGENCY
Vendor shall provide system checkouts, which will include cabinet assembly
CERTIFCATION
APPROVAL/CERTIFICATION REQUIREMENTS,
verification, power ground, and I/O tests. In addition, Saudi Aramco’s specific control
THIS INDICATES THAT REV. NO.__________
ICATE
00
OF THIS DRAWING IS COVERED, FOR ALL
strategy configuration will be loaded and executed. The control will be “Final
10-00167-0007-001 _
(DCC) NO. ____________________
REVISIONCERTIFI
Section 13320
Project Specification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OW NER.
Flowed” by connecting signal sources and loads which simulate the various input
levels to verify the operation of the control scheme.
ENGG CERT
The vendor has to come up with the plan for Factory Acceptance Test (FAT) that
meet Saudi Aramco approval.
Any failure experienced prior to the completion of 720 hours (30 days) uninterrupted
field operation will void the test and will require a restart of the field reliability test
after all necessary repairs have been made.
A. The vendor shall provide the “Revised Vendor’s Documentation” as per 34-SAMSS-
830, section 10.1. The documentation, written in English and bound shall be
organized in to manuals in a “Top Down” format covering the following minimum
JO/EWO
required topics:
DATE
DISCIPLINE
ENGINEER 3. Theory or operation (to component level)
DATE:
4. Operating and adjustment procedures
PROJECT
ENGINEER
APPROVAL/CERTIFICATION REQUIREMENTS,
addition, the following shall apply, the method of preparation for shipping of the
THIS INDICATES THAT REV. NO.__________
ICATE
00
OF THIS DRAWING IS COVERED, FOR ALL
Section 13320
Project Specification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OW NER.
corrosion, dampness, breakage, shock or vibration damage that might be
encountered in transportation and handling by sea, land, or air to final destination in
ENGG CERT
A. All spare parts shall be certified and must go through the same manufacturing, burn-
in and testing (including Hot/Cold Dynamic Test) procedures.
DESCRIPTION
The vendor shall provide spare modules including I/O, CPU, PS and all necessary
interface modules as specified on drawings. Minimum one module of each type shall
be provided in each PLC cabinet.
The vendor shall supply start-up spare parts subject to Company approval for all
subsystems provided. In addition, the vendor shall recommend stocking level,
including and escalation schedule based upon parts quantity for two years of
continuous operations.
A. The vendor shall be required to provide a Site Acceptance Test (SAT) Procedure. A
DATE
draft SAT Plan and Procedure shall be submitted for Saudi Aramco review a
minimum of 60 days prior to the scheduled start of the SAT.
NO.
REV
A. Vendor shall supply all diagnostic tools and test equipment necessary for the
DATE:
Programmable Logic Controller.
PROJECT
ENGINEER
DATE:
CONTROL NUMBER
PART 2 - PRODUCTS
VERIFICATION
EDSD
2.01 Manufacturers
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
ICATE
00
OF THIS DRAWING IS COVERED, FOR ALL
Section 13320
Project Specification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OW NER.
PART 3 - EXECUTION
ENGG CERT
C. The Contractor shall list all changes and prepare "As-Built" Drawings which shall be
delivered to Saudi Aramco as a permanent record of all works as installed or
modified.
D. The Contractor's personnel shall be fully conversant with the types of manufacturer's
equipment to be installed and tested.
E. If the Contractor needs assistance to check out the PLC system, he may request the
Vendor Representative to assist in the check out on a cost plus basis to the Buyer.
JO/EWO
- END OF SECTION -
NO. DATE
REV
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
CERTIFCATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
ICATE
00
OF THIS DRAWING IS COVERED, FOR ALL
Section 13320
Project Specification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION