Production Internal Audit NC

The internal audit summary includes 5 observations from an internal audit conducted on 20.09.2022. Observation 1 notes that while production plans are available, actual production achieved needs to be updated. Observation 2 indicates that tool validation reports are only available for new tools and need to be updated for all tools. Observation 3 states that a tool list is available but a fixture list is not and needs to be created.

Uploaded by

Sabari Saravanan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
600 views2 pages

Production Internal Audit NC

The internal audit summary includes 5 observations from an internal audit conducted on 20.09.2022. Observation 1 notes that while production plans are available, actual production achieved needs to be updated. Observation 2 indicates that tool validation reports are only available for new tools and need to be updated for all tools. Observation 3 states that a tool list is available but a fixture list is not and needs to be created.

Uploaded by

Sabari Saravanan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

INTERNAL AUDIT SUMMARY

Internal Audit No: IA-01 Internal Audit Date: 20.09.2022

Sl. No Dept., Auidt Observation Corrective Action Date for NC closure Status Remarks

Production plan: Day wise plan available but actual


1 production updation of actual achieved required 21.09.2022 open
achieved should be updated in month sheet.

Tool validation report: Available for new tools only,


2 production closed
update the same for all upcoming tools.

Tool & fixture list: Tool list available, Fixture list not
3 production Updation of fixture list is required. 21.09.2022 open
available

4 production Daily output log sheet: Available verified ok. closed

5 production Kaizen: Kaizen done but documentation not available documentation for Kaizen required 22.09.2022 open
INTERNAL AUDIT SUMMARY

Internal Audit No: IA-01 Internal Audit Date: 04.06.18

Sl. No Dept., Auidt Observation Root Cause Corrective Action Status Remarks

QA and Incoming inspection report not evidenced for Actuator Missed for filling due to not shown All the report properly filling and
1 closed
Calibration bracket on time to auditor arranged for eazy to carried out

QA and Not available for before due date Will be pre plan for before 20 days for
2 Calibration not done for micrometer no-94358 closed
Calibration due to use inspection daily basis. not in use time

Production,
Missed for Skil matrix revise and
3 Maintenance Operators skill matrix not evidenced Provide and displayed Skil matrix closed
displayed
and Store

Missing for latest update due to not


4 HRD Competency matrix not evidenced Will be update and filling closed
fillling