- The document is a daily project report for the design, supply, and build of wastewater treatment plants in Maun East and West in Botswana. - On the reported day, construction activities included building structures at the site camp and brickwork for a conservancy tank and workshop pit. - Resources listed included human resources like engineers and laborers, as well as major plant and equipment on site like excavators, rollers, and tippers. - Materials on site included concrete stones, crusher sand, and mesh. No visitors, inspections, or issues were noted.

Uploaded by

OBERT MASALILA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
635 views1 page

Daily Diary Reports-02

- The document is a daily project report for the design, supply, and build of wastewater treatment plants in Maun East and West in Botswana. - On the reported day, construction activities included building structures at the site camp and brickwork for a conservancy tank and workshop pit. - Resources listed included human resources like engineers and laborers, as well as major plant and equipment on site like excavators, rollers, and tippers. - Materials on site included concrete stones, crusher sand, and mesh. No visitors, inspections, or issues were noted.

Uploaded by

OBERT MASALILA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DAILY PROJECT REPORT FORM No.

: DPR-01

THE DESIGN, SUPPLY AND BUILD OF MAUN WASTEWATER DATE 20-Sep-22


PROJECT:
TREATMENT PLANTS (MAUN EAST AND MAUN WEST) DAY
SUN MON TUE WED THU FRI SAT SUN
CONTRACT NO. WUC 036 (2021) √
CLIENT: WATER UTILITIES CORPORATION Bright Sun Cloudy Warm Windy Hot Cold
WEATHER
CONTRACTOR: CHINA JIANGSU INTERNATIONAL BOTSWANA/ EZRA & EZRA CONSTRUCTION JV √ √ √
ENGINEER: DNK ASSOCIATES/ HAAS JOINT VENTURE Station Applicable
RAINFALL
Contract Amount Commence- Period (calendar days) (mm)
Completion Progress
(Pula) ment Contract Elapsed 08.00 hrs 14.00 hrs 17.00 hrs
TEMP. (0C)
792,901,262.32 8/2/2022 1/23/2024 540
LOCATION: MAUN EAST SITE CAMP
CONTRACTOR'S RESOURCES FOR THE PROJECT
CONSTRUCTION ACTIVITIES (including description, location and status of works in progress)
HUMAN RESOURCES MAJOR PLANT & EQUIPMENT
NUMBER NUMBER 1. Construction of kitchen, residential houses, cafeteria and ablutions at the site camp which involved erection and
DESIGNATION DESCRIPTION
PR OS WK ST welding of structural steel framework, brick work, wall cladding using ibr roofing sheets
Site Agent 1 Dozer 2. Brickwork for the conservancy tank up to final ground level and internal plastering
Site Engineer 2 Grader 3. Construction of workshop inspection pit- Brickwork
General Foreman 1 Loader
Sectional Foreman 7 Excavator 1
Surveyor 1 Roller 1
Quantity Surveyor 2 Compactor
Technician TLB Loader/Exc. 1
Sen. Support Staff Concrete Mixer 1
3
Plant Operator/ Truck 8 Tipper - 20m 1
Vehicle Driver 2 Water Bowser 1
Skilled Labourer 11 Water pumps
Unskilled Labourer 16 Welding mach. 3
SHE Officer 1 Small dumper 4

PR = Present, OS = On Site, WK = Working, ST = Standing


MATERIALS ON SITE

1. 20cu.m of 19mm concrete stones


2. 10cu.m of crusher sand
3. 6 layers of Ref 193 mesh

VISITORS
NAME ORGANISATION REMARKS

INSPECTION / TESTING / INVESTIGATION REPORT (including any site


problems encountered and steps taken)

INSTRUCTION / INFORMATION
REQUESTED BY CONTRACTOR: FROM CLIENT:

ISSUED TO CONTRACTOR: FROM ENGINEER:

SIGNED BY: ON BEHALF OF CONTRACTOR ON BEHALF OF ENGINEER


NAME: KEABETSWE MASALILA NAME:
SIGNATURE: SIGNATURE:
DESIGNATION: PROJECT ENGINEER DESIGNATION: