Check that the water valves are open before starting 1ST
molding, if the machine is not programmed to work make
sure that the water valves are closed to prevent the mold 2ND
from rusting.
3RD
1ST
Verify machine/mold and ensure that there is not air,oil 2ND
and water leaks.
3RD
Mold conditions ( Parting line clean, lube unscrewing, lube 1ST
leader pins/bushings. Verify that the mold and auxiliary 2ND
equipment is working properly. 3RD