Pig Receiver Data Sheet 91303 - 8 Inch

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

INSTALATION OF NEW 8" PIPELINE

FROM NGL-1200 TO MANIFOLD- 900

ENGG. & DESIGN AFFAIRS NATIONAL IRANIAN SOUTH OIL


OIL & GAS PROECTS DIVISION COMPANY

PROJECT NO.: 91303 DOC. NO REV. PAGE1/4


Document Description: 91303-G1-PI-DS-308 0
PIG RECEIVER DATA SHEET

PIG RECEIVER DATA SHEET

REV DATE PREPARED CHECKED APPROVED AUTHORIZED


0 92/5/20 A.MOASHERI F.ALIPOOR F.PARVIN G.BADIZADEH
INSTALATION OF NEW 8" PIPELINE
FROM NGL-1200 TO MANIFOLD- 900

ENGG. & DESIGN AFFAIRS NATIONAL IRANIAN SOUTH OIL


OIL & GAS PROECTS DIVISION COMPANY
PROJECT NO. 91303 DOC. NO REV. PAGE2/4
Document Description: 91303-G1-PI-DS-308 0
PIG RECEIVER DATA SHEET

DESIGN DATA MATERIAL


ANSI B31.4
CODE & STANDARDS IPS-M-PI-130 BARREL/SPOOL API 5L GRB - PSL2
ASME SEC. VIII DIV.1

OUTDOOR/
INSTALATION REDUCER ……….
HORIZONTAL

CONTAINED FLUID NGL NOZZLE FLANGES ………

NOZZLE NECKS ……….

SPECIFIC GRAVITY 0.7 @ 60 ˚F BOLT/NUT ……….

FITTINGS …………

GASKETS/ SPIRAL WOUNDED/


1330
DESIGN O-RING SUITABLE
PRESSURE (PSI)
1100 SUPPORTS ……..
OPERAT.

MIN. 0 MAX. 85 END CLOSURE ………


DESIGN
TEMPERATURE(˚C)
15-50 REINFORCING PLATES ………….
OPERAT.

MIN. AMBIENT TEMP. (˚C) 0 DIMENSIONAL DATA


BARREL DIA.(IN) /
MAX. SUN TEMP. (˚C) 85 ……….
MIN. THK.(mm)
CORROSION ALLOWANCE SPOOL DIA. (IN) /
1.6 ……………
(mm) MIN. THK.(mm)

EARTHQUAKE ZONE IRANIAN CODE 2800 ECC. REDUCER SIZE (IN) 10*8

WIND SPEED 160 KM/H PIPELINE SPECIFICATION


SIZE (IN) / WALL THK.
SURFACE PREPARATION SA 21/2 8" / 9.5
(mm)
7D ACC TO IPS-E-TP-
PAINTING MATERIAL/TYPE API 5L GR B PSL2
100
INSULATION NO FLANGE ANSI RATING 600
INSTALATION OF NEW 8" PIPELINE
FROM NGL-1200 TO MANIFOLD- 900

ENGG. & DESIGN AFFAIRS NATIONAL IRANIAN SOUTH OIL


OIL & GAS PROECTS DIVISION COMPANY
PROJECT NO.91303 DOC. NO REV. PAGE3/4
Document Description: 91303-G1-PI-DS-308 0
PIG RECEIVER DATA SHEET

NOZZLE SPECIFICATION SPARE PARTS

NO DESCRIPTION SIZE CALSS FLANGE DESCRIPTION QUANTITY ( % )


TYPE
8 600 WN/RF
N1
MAIN LINE CONN. GASKET 100

BALANCE LINE 2 600 WN/RF


N2 O-RING 100
CONN.
….. ….. ……
N3 VENT BOLT & NUT 100

….. ….. ……
N4 VENT
….. ….. ……
N5 TRV CONN.
…. …. ……
N6 PI CONN.
….. ….. ……
N7 KICK OFF CONN.
….. …… …….
N8 DRAIN

…… …… ……. DOCUMENTS
N9 DRAIN DOCUMENT SETS TO BE SUBMITTED BY MANUFACTURER BEFORE
SHIPMENT
HARD
DOCUMENT NAME COPY CD

ACCESORIES DRAWINGS (OVERALL & DETAILS) 2 2


2 2
CALCULATION BOOK
QUICK OPENNING TYPE
END CLOSURE ACC. TO ASME SEC.VIII CODES AND STANDARDS 2 2
DIV. 1 , PART UG 35 COMPLIANCE CERTIFICATES
REQUIRED , 2 2
INSTALLATION,OPERATION AND
MECHCANICAL,
MAINTENANCE MANUALS
PIG SIGNALLER BIDIRECTIONAL ,FLAG
TYPE 2 2
INSPECTION CERTIFICATE

FINAL FACTORY TEST CERTIFICATES 2 2


CRANE NOT REQUIRED

TROLLEY NOT REQUIRED PART LIST AND SPARE PART 2 2


INSTALATION OF NEW 8" PIPELINE
FROM NGL-1200 TO MANIFOLD- 900

ENGG. & DESIGN AFFAIRS NATIONAL IRANIAN SOUTH OIL


OIL & GAS PROECTS DIVISION COMPANY
PROJECT NO.91303 DOC. NO REV. PAGE
Document Description: 91303-G1-PI-DS-308 0 4/4
PIG RECEIVER DATA SHEET

GENERAL NOTES REFERENCES


1-STANDARD IPS-M-PI-130(1)
1-THE TRAPS SHALL BE SUITABLE FOR INTELLIGENT 2-STANDARD DRAWING S4L-6516/B
PIGS 3-SCOPE OF INSPECTION FOR SHOP FABRICATED PIG
2-FABRICATING SHALL BE ACCORDING TO NIOC TRAP SOI-007
STANDARD DRAWING NO.S4L-6516/B “ PIPELINE PIG 4- SPEC NO. 91303-PL-RE-401 FOR WALL THICKNESS
TRAPS” OF 7.1 mm FOR PIPELINE 8"
3-IN ALL STEPS OF MANUFACTURING AND DELIVERY
NIOC STANDARD IPS-M-PI-130 SHALL BE APPLIED.
4-DESIGN LOADING (NORMAL/SHEAR FORCES AND
MOMENTS) SHALL BE CALCULATED FOR
OPERATING, HYDROTEST AND EARTHQUAKE
SITUATION.
5-CALCULATION BOOK AND DRAWINGS SHALL BE
APPROVED BY CLIENT.
6-END CLOSURE SHALL BE OF THE QUICK OPENING
TYPE ACCORDING TO ASME SEC. VIII, DIV.1
INCLUDING SUITABLE DAVIT AND SAFETY DEVICE
TO PREVENT OPENING OF THE DOOR UNDER
PRESSURE.
6-THIRD PARTY INSPECTION SHALL WITNESS THE
MANUFACTURING AND TESTING AND ISSUE
CERTIFICATES ACCORDING TO INSPECTION SCOPE
NO. SOI-007(LEVEL 2 OF THIRD PARTY INSPECTION)
7-MANUFACTURING SHALL BE PERFORMED IN SHOP
BY APPROVED MANUFACTURER.FABRICATION IN
SITE IS NOT ALLOWED.
8-WHEN SOUR SERVICE IS SPECIFIED IN THIS DATA
SHEET, ALL WETTED PARTS OF TRAP SHALL BE
ACCORDING TO NACE MR-0175/ISO 15156 STANDARD.
9-ITEMS ARE NOT FILLED SHALL BE COMPLETED BY
THE VENDOR.