0% found this document useful (0 votes)
107 views25 pages

Enhanced Hooklift Container Inspection Checklist and Report (2020) Dec

This document is an inspection checklist and report for a hooklift and container. It contains 4 parts: (1) Company and driver details, (2) Equipment details, (3) Inspection details, and (4) A hooklift inspection checklist. The checklist contains over 20 inspection points for the main components of the hooklift, to indicate their condition as pass or fail. Pictures and details of any repairs made must be included.

Uploaded by

lakkekepsu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
107 views25 pages

Enhanced Hooklift Container Inspection Checklist and Report (2020) Dec

This document is an inspection checklist and report for a hooklift and container. It contains 4 parts: (1) Company and driver details, (2) Equipment details, (3) Inspection details, and (4) A hooklift inspection checklist. The checklist contains over 20 inspection points for the main components of the hooklift, to indicate their condition as pass or fail. Pictures and details of any repairs made must be included.

Uploaded by

lakkekepsu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 25

SAC Accredited Report No / Report No:

HOOKLIFT & CONTAINER


INSPECTION CHECKLIST & REPORT
PART I - COMPANY DATA

1 GENERAL

(a) Name of Inspected Company

(b) Company Address :

Tel No :

Fax No :

Email :

(c) Driver’s Name :

HP No :

PART II – EQUIPMENT DETAILS

1 VEHICLE

(a) Vehicle License No :

(b) Vehicle Brand & Model :

(c) Indicate Owner of the :


Vehicle if it is different
from Part I

(d) Date of Manufacture & :


Country of Origin

2 HOOKLIFT

(a) Hooklift Serial No :

(b) Hooklift Brand & Model :

(c) Indicate Owner of the :


Hooklift if it is different
from Part I

(d) Date of Manufacture & :


Country of Origin

3 CONTAINER

(a) Indicate Type & Serial :


No

1 Dec 2020
Pg 1 / 24
(b) Indicate Owner of the :
Container

(c) Date of Manufacture & :


Country of Origin

PART III – INSPECTION DETAILS

1 Date & Time of :


Equipment check in

(a) Date & Time Vehicle :


Inspection is carried out

(b) Date & Time Container :


Inspection is carried out

(c) Date & Time Vehicle left :


the Inspection Body’s
premises

(d) Date & Time Container :


left the Inspection Body’s
premises

2 Location/Address of :
Inspection Work
Conducted

3 Equipment / Serial No :
Used for the Inspection

Signature of Inspector, Signature of Approved Signatory,


Date (DD/MM/YY) Date (DD/MM/YY):

Name : Name :

Designation : Designation :

Company Company :

1 Dec 2020
Pg 2 / 24
PART IV – HOOKLIFT INSPECTION CHECKLIST

MAIN COMPONENTS OF HOOKLIFT

(for illustration purposes only)

1. Hook 8. Sub frame


2. Safety latch 9. Rear frame
3. Tilting arm hook 10. Bogie /stabilizer
4. Hook arm cylinder 11. 2 Rear rollers / pulley
5. Main / tipping cylinder 12. Hydraulic body lock (rear lock)
6. Control valves 13. Hydraulic tipping lock (central lock)
7. Hydraulic Tank 14. Middle frame

Indicate the following in Part IV

for Pass; for Failed; NA for Not Applicable

1 Dec 2020
Pg 3 / 24
PART IV (A) - HOOKLIFT INSPECTION CHECKLIST DETAILS

No Parts / Locations Details of Check Conditions (To indicate) Details of Failure Details of Repair /
(to be made reference with manufacturer guidelines) (To document the details) Rectification Works
 NA Carried out

1. Hook Wear and Tear, Damaged or Functional Test To be included in Part


Missing Parts, Corrosion To include the “Pass”, IV (B) if any repair /
“Failed” pictures in a rectification works are
separate Annex. carried out
To indicate the OEM original hook dimensions with pictures,
including the measured dimensions below:

2. Safety latch Wear and Tear, Damaged or Functional Test To include the “Pass”,
Missing Parts, Corrosion “Failed” pictures in a
separate Annex.

1 Dec 2020
Pg 4 / 24
2.1 Locking Pin Wear and Tear, Damaged or Functional Test To include the “Pass”, To be included in Part
(if applicable) Missing Parts, Corrosion “Failed” pictures in a IV (B) if any repair /
separate Annex. rectification works are
carried out

Locking Pin

3. Tilting arm hook Wear and Tear, Damaged or Functional Test


Missing Parts, Corrosion
Engage & Disengage

4. Hook arm cylinder Wear and Tear, Damaged or Functional Test


Missing Parts, Corrosion
Engage & Disengage

5. Main / tipping Wear and Tear, Damaged or Functional Test


cylinder Missing Parts, Corrosion
Engage & Disengage

1 Dec 2020
Pg 5 / 24
6. Control valves Wear and Tear, Damaged or Functional Test To be included in Part
Missing Parts, Corrosion IV (B) if any repair /
rectification works are
7. Hydraulic Tank Wear and Tear, Damaged or carried out
Missing Parts, Corrosion

8. Sub frame Wear and Tear, Damaged or


Missing Parts, Corrosion

9. Rear frame Wear and Tear, Damaged or


Missing Parts, Corrosion

10. Bogie /stabilizer Wear and Tear, Damaged or Functional Test


Missing Parts, Corrosion

11. 2 Rear Wear and Tear, Damaged or Functional Test


rollers/pulley Missing Parts, Corrosion

12. Hydraulic body Wear and Tear, Damaged or Functional Test


lock Missing Parts, Corrosion
(rear lock) Engage & Disengage,
present of warning lights (if
applicable)

13. Hydraulic tipping Wear and Tear, Damaged or Functional Test


lock Missing Parts, Corrosion
(central lock) Engage & Disengage,
present of warning lights (if
applicable)

Check for damaged


proximity sensors, where
applicable (Multilift design
only)

1 Dec 2020
Pg 6 / 24
14. Middle frame Wear and Tear, Damaged or
Missing Parts, Corrosion

Others
15. Safety, Warning Present and legible To be included in Part
Decals and Serial IV (B) if any repair /
No rectification works are
16. Hydraulic Oil Check for sufficient level in tank carried out
Level
17. Inspect For Fluid Check for any external fluid leaks
Leaks
18. Mount Bolts / Present. Check for Wear and Tear, Damaged or Missing Parts,
Clamps Corrosion

19. Safety Locking Present. Check for Wear and Tear, Damaged or Missing Parts,
Devices Corrosion

20. Pins & Pin Present. Check for Wear and Tear, Damaged or Missing Parts,
Retainers Corrosion

21. Greasing Adequately grease


22. Pressure Measured pressure from the pressure gauge:

_____

Operation Hydraulic Pressure: 300 bar

1 Dec 2020
Pg 7 / 24
PART IV (B) – DETAILS OF REPAIR / RECTIFICATION WORKS CARRIED OUT

Parts / Locations Details of Repair / Rectification Works Picture of Repair / Rectification Works for the Parts / Locations
1. Hook
2. Safety latch
3. Locking Pin
4. Tilting arm hook
5. Hook arm cylinder
6. Main cylinder
7. Control valves
8. Hydraulic Tank
9. Sub frame
10. Rear frame
11. Bogie /stabilizer
12. 2 Rear rollers
13. Hydraulic body
lock
(rear lock)
14. Hydraulic tipping
lock
(central lock)
15. Middle frame
16. Others, please
specify
17.
18.
19.
20.
21.
22.

1 Dec 2020
Pg 8 / 24
PART V – PORTABLE COMPACTOR INSPECTION CHECKLIST

MAIN COMPONENTS OF PORTBALE COMPACTOR


(for illustration purposes only)
B A

A
E E

M
G

I H O N L

A. Pickup Bow (diameter)


B. Pickup Bow (height)
C. Girder (external width)
D. Girder (internal width)
E. Pickup Bow (width)
F. Tunnel Clearance
G. Front Panel
H. Side Wall (left)
I. Side Wall (right)
J. Rear Door Locking Mechanism
K. Rear Door
L. Rollers – provision for 2 at rear
M. Door Hinges
N. Longitudinal Girder
O. Cross members

Indicate the following in Part V

for Pass;  for Failed; NA


for Not Applicable

1 Dec 2020
Pg 9 / 24
EXAMPLES OF PORTABLE COMPACTORS

1 Dec 2020
Pg 10 / 24
PART V (A) PORTABLE COMPACTOR INSPECTION CHECKLIST DETAILS

No Parts / Dimension Check Conditions Details of Failure Repair / Rectification Other Remarks
Locations (To indicate) (To document the Works Carried out
DIN 30722-1 DIN 30722-2 details)
Roller contact tipper Roller contact tipper  NA
vehicles, roller vehicles, roller
containers - Part 1: containers - Part 2:
Roller contact tipper Roller contact tipper
vehicles up to 26 t, vehicles up to 32 t,
roller containers roller containers
type 1570 made from type 1570 made from
steel steel

A. Pickup Bow 50 (±2mm) 60 (±2mm) To include the “Pass”, To be included in Part V (B) if
(diameter) “Failed” pictures in a any repair / rectification
Measured dimension: Measured dimension: separate Annex. works are carried out

_____ _____

B. Pickup Bow 1570mm (±5 mm) 1570mm (±5 mm) To include the “Pass”,
(height) “Failed” pictures in a
Measured dimension: Measured dimension: separate Annex.

_____ _____

C. Girder (external 1065mm (±5 mm) 1065mm (±5 mm) To include the “Pass”,
width) “Failed” pictures in a
Measured dimension: Measured dimension: separate Annex.

_____ _____

1 Dec 2020
Pg 11 / 24
D. Girder (internal min 901mm (±5 mm) min 901mm (±5 mm) To include the “Pass”,
width) “Failed” pictures in a
Measured dimension: Measured dimension: separate Annex.

_____ _____

E. Pickup Bow 250mm (±2mm) 250mm (±2mm) To include the “Pass”,


(width) “Failed” pictures in a
Measured dimension: Measured dimension: separate Annex.

_____ _____

F. Tunnel min 150mm (±10mm) min150mm (±10mm) To include the “Pass”,


Clearance “Failed” pictures in a
Measured dimension: Measured dimension: separate Annex.

_____ _____

Physical Check
A. Pickup Bow Structural wear and tear, alignment. To be included in Part V (B) if
G. Front Panel Structural wear and tear, alignment. any repair / rectification
H. Side Wall (left) Structural wear and tear, alignment. works are carried out
I. Side Wall (right) Structural wear and tear, alignment.
J. Rear Door Structural wear and tear, alignment, functional.
Locking Ensure proper latching and secured
Mechanism
K. Rear Door Structural wear and tear, alignment, functional.
L. 2 Rear rollers Structural wear and tear, alignment, functional.
M. Door Hinges Structural wear and tear, alignment, functional.
N. Longitudinal Structural wear and tear, alignment. To be included in Part V (B) if
Girder any repair / rectification
O. Cross Member Structural wear and tear, alignment. works are carried out

Overall Compactor Integrity


Check for Wear and Tear, Damaged or Missing
Parts, Corrosion

1 Dec 2020
Pg 12 / 24
PART V (B) – DETAILS OF REPAIR / RECTIFICATION WORKS CARRIED OUT

No Parts / Locations Details of Repair / Rectification Works Picture of Repair / Rectification Works for the Parts / Locations
A. Pickup Bow
(diameter)
B. Pickup Bow
(height)
C. Girder (external
width)
D. Girder (internal
width)
E. Pickup Bow
(width)
F. Tunnel Clearance

A. Pickup Bow
G. Front Panel
H. Side Wall (left)
I. Side Wall (right)
J. Rear Door
Locking
Mechanism
K. Rear Door
L. 2 Rear rollers
M. Door Hinges
N. Longitudinal
Girder
O. Cross Member
P. Others, please
specify

1 Dec 2020
Pg 13 / 24
PART VI – OPEN-TOP-CONTAINER (OTC) INSPECTION CHECKLIST

MAIN COMPONENTS OF OPEN-TOP-CONTAINER (OTC)


(for illustration purposes only)

F
E
E

F
B
C

A. Pickup Bow (diameter) O


B. Pickup Bow (height)
C. Girder (external width) N
D. Girder (internal width)
E. Pickup Bow (width)
A
F. Tunnel Clearance
G. Front Panel I
H. Foot step / Hand rail
I. Side Wall (left) G M
J. Side Wall (right) J
K. Rear Door Locking Mechanism H L K
L. Rear Door
M. Rollers – provision for 2 at rear
N. Door Hinges
O. Base Plate
P. Longitudinal Girder
Q. Cross Member
P Q
Indicate the following in Part V

for Pass;  for Failed; NA


for Not Applicable

1 Dec 2020
Pg 14 / 24
EXAMPLES OF OPEN-TOP CONTAINERS

1 Dec 2020
Pg 15 / 24
PART VI (A) CONTAINER INSPECTION CHECKLIST DETAILS

No Parts / Dimension Check Conditions (indicate) Details of Failure Repair / Rectification Other Remarks
Locations DIN 30722-1 DIN 30722-2 Works Carried out
Roller contact tipper Roller contact tipper  NA
vehicles, roller vehicles, roller
containers - Part 1: containers - Part 2:
Roller contact tipper Roller contact tipper
vehicles up to 26 t, vehicles up to 32 t,
roller containers roller containers
type 1570 made from type 1570 made from
steel steel

A. Pickup Bow 50 (±2mm) 60 (±2mm) To include the “Pass”, To be included in Part VI (B)
(diameter) “Failed” pictures in a if any repair / rectification
Measured dimension: Measured dimension: separate Annex. works are carried out

_____ _____

B. Pickup Bow 1570mm (±5 mm) 1570mm (±5 mm) To include the “Pass”,
(height) “Failed” pictures in a
Measured dimension: Measured dimension: separate Annex.

_____ _____

C. Girder (external 1065mm (±5 mm) 1065mm (±5 mm) To include the “Pass”,
width) “Failed” pictures in a
Measured dimension: Measured dimension: separate Annex.

_____ _____

1 Dec 2020
Pg 16 / 24
D. Girder (internal min 901mm (±5 mm) min 901mm (±5 mm) To include the “Pass”,
width) “Failed” pictures in a
Measured dimension: Measured dimension: separate Annex.

_____ _____

E. Pickup Bow 250mm (±2mm) 250mm (±2mm) To include the “Pass”,


(width) “Failed” pictures in a
Measured dimension: Measured dimension: separate Annex.

_____ _____

F. Tunnel min 150mm (±10mm) min 150mm (±10mm) To include the “Pass”,
Clearance “Failed” pictures in a
Measured dimension: Measured dimension: separate Annex.

_____ _____

Physical Check
A. Pickup Bow Structural wear and tear, alignment. To be included in Part VI (B)
G. Front Panel Structural wear and tear, alignment. if any repair / rectification
H. Foot step / Hand Structural wear and tear, alignment. works are carried out
rail
I. Side Wall (left) Structural wear and tear, alignment.
J. Side Wall (right) Structural wear and tear, alignment.
K. Rear Door Structural wear and tear, alignment, functional.
Locking Ensure proper latching and secured
Mechanism
L. Rear Door Structural wear and tear, alignment, functional.
M. 2 Rear rollers Structural wear and tear, alignment, functional.
N. Door Hinges Structural wear and tear, alignment, functional.
O. Base Plate Structural wear and tear, alignment. To be included in Part VI (B)
P. Longitudinal Structural wear and tear, alignment. if any repair / rectification
Girder works are carried out
Q. Cross Member Structural wear and tear, alignment.

1 Dec 2020
Pg 17 / 24
Overall Container Integrity
Check for Wear and Tear, Damaged or Missing
Parts, Corrosion

1 Dec 2020
Pg 18 / 24
PART VI (B) – DETAILS OF REPAIR / RECTIFICATION WORKS CARRIED OUT

Parts / Locations Details of Repair / Rectification Works Picture of Repair / Rectification Works for the Parts / Locations
A. Pickup Bow
(diameter)
B. Pickup Bow
(height)
C. Girder (external
width)
D. Girder (internal
width)
E. Pickup Bow
(width)
F. Tunnel Clearance

A. Pickup Bow
G. Front Panel
H. Foot step / Hand
rail
I. Side Wall (left)
J. Side Wall (right)
K. Rear Door
Locking
Mechanism
L. Rear Door
M. 2 Rear rollers
N. Door Hinges
O. Base Plate
P. Longitudinal
Girder
Q. Cross Member

1 Dec 2020
Pg 19 / 24
R. Others, please
specify

1 Dec 2020
Pg 20 / 24
Inspection Labels Specification (Hook-lift)

Accredited Workshop : Name of


Inspection Body, E.g. “ABC Pte Ltd”
Date of Manufacture : DD/MM/YYYY To follow Date, Month, Year format
e.g. 01/09/2014
Serial No (Hooklift): ABC XH e.g. 01/09/2014 – 31/08/2015
Inspection Validity Period:
DD/MM/YYYY – DD/MM/YYYY

To follow Serial No Format


• ABC Pte Ltd denotes Name of
• Red Border (4mm thickness)
inspection body.
• Red Text over White Background
Note: Inspection body is to
• Font Size: 24
inform NEA on the serial no
• Font Type: Calibri
that they are using for the
• Dimension: 13 cm x 7 cm
inspection labels before use
• Weather Resistant Sticker
• X is the running number of the
Sample of the label to be submitted to NEA for approval
hook-lift inspected/certified.
• H denotes Hooklift

1 Dec 2020
Pg 21 / 24
Inspection Labels Specification (OTC)

Accredited Workshop : Name of


Inspection Body, E.g. “ABC Pte Ltd”
Date of Manufacture : DD/MM/YYYY To follow Date, Month, Year format
e.g. 01/09/2014
Serial No (OTC) : ABC XC e.g. 01/09/2014 – 31/08/2015
Inspection Validity Period:
DD/MM/YYYY – DD/MM/YYYY
To follow Serial No Format
• ABC Pte Ltd denotes Name of
• Red Border (4mm thickness) inspection body.
• Red Text over White Background Note: Inspection body is to
• Font Size: 24 inform NEA on the serial no
• Font Type: Calibri that they are using for the
• Dimension: 13 cm x 7 cm inspection labels before use
• Aluminium Plate • X is the running number of the
Sample of the label to be submitted to NEA for approval OTC inspected/certified.
• C denotes OTC

1 Dec 2020
Pg 22 / 24
Inspection Labels Specification (Compactor)

Accredited Workshop : Name of


Inspection Body, E.g. “ABC Pte Ltd”
Date of Manufacture :DD/MM/YYYY To follow Date, Month, Year format
e.g. 01/09/2014
Serial No (Compactor) : ABC XC1 e.g. 01/09/2014 – 31/08/2015
Inspection Validity Period:
DD/MM/YYYY – DD/MM/YYYY

To follow Serial No Format


• ABC Pte Ltd denotes Name of
• Red Border (4mm thickness)
inspection body.
• Red Text over White Background
Note: Inspection body is to
• Font Size: 24
inform NEA on the serial no
• Font Type: Calibri
that they are using for the
• Dimension: 13 cm x 7 cm
inspection labels before use
• Aluminium Plate
• X is the running number of the
Sample of the label to be submitted to NEA for approval
compactors
inspected/certified.
• C1 denotes Compactors

1 Dec 2020
Pg 23 / 24
Inspection Labels Position

Hook-lift: Driver side, middle of the hook arm (as shown)

OTCs, Compactors: Driver side (as shown)

1 Dec 2020
Pg 24 / 24

You might also like