Amo Renewal Caap Findings Compliance Report Final 3

Download as pdf or txt
Download as pdf or txt
You are on page 1of 14

CEBU OVERHAULING STATION:

MATCI TOOLROOM /STOCKROOM:


CONDEMNED PARTS (MATCI DAVAO BASE)
MAMACAO STOCK ROOM:
(SERVICEABLE, REPAIRABLE AND CONDEMNED ITEMS)
INSTALLED HYGROMETER ON STOCKROOM
MATCI CABINET FLAMMABLE ITEMS:
(MATCI BASE, MAMACAO BASE AND CEBU BASE)

DAVAO

MAMACAO
CEBU
FOR CALIBRATED EQUIPMENTS:

1.) ULTRASONIC FLAW DETECTOR TESTER AT CALIBRATION ON PROCESS:


2.) UPDATED EQUIPMENT LISTING for Axle Weigher Serial Numbers:
3.) Periodic Calibration of ELT Tester (2 yrs.) As per Equipment Operation Manual
MATCI MPM: INTERNAL AUDIT CALENDAR:
MCP TABLE OF CONTENTS:
QAR REVISED- FEEDBACKS ON THE CORRECTIVE ACTIONS SHOULD INCLUDE THE ACCOUNTABLE MANAGER: