Nuvali - Rfi Log-Msi-Msi

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 10

PROJECT: TWELVE STOREY MIXED USE DEVELOPMENT WITH ONE BASEMENT RONALD

PACKAGE: STRUCTURAL, MEPF & AUXILLARY WORKS FREDDIE


NEL
RFI MONITORING LOG

ITEM QUERIES FIELD ANSWERS DATE OF RFI C/O


BATCH 1
1 May we request copy of VRF Refrigerant Piping and Equipment Location Layout. Mechanical See equipment schedule and see location on the drawing 16-Sep-21 RONALD
2 What are the duct size for the HRV? Mechanical See the callout on the drawings 16-Sep-21 RONALD
3 Mechanical TEF 1&2-100mm diam, TEF-3 -150mm diam, for Garbage Collection Room- 16-Sep-21 RONALD
What are the duct size for the TEF and Exhaust for Garbage collection room? 150mm diam.
4 Is the thermostat for VRF are wireless or hardwire? If hardwire, can you give us the location of the Mechanical Thermostat is Wired, Location as per Manufacturer recommendation. 16-Sep-21 RONALD
thermostat?
5  Are the Lighting Layout for the Museum, Retails and Residential Units are excluded from our scope Electrical 16-Sep-21 FREDDIE
of works? There are no lighting layout for the said areas
6 Can you provide us cross sectional elevation details of the building for our reference of height in Structural see attached plan 16-Sep-21 NEL
every floor?
7 May we request confirmation that clean agent (Novec) at electrical room is excluded in our scope of Fire Protection Yes, this is not included in your scope. This is for our specialty contractor 16-Sep-21 RONALD
works.
8  May we request confirmation that the pre-action system at Museum, and 2nd floor area are excluded Fire Protection This is OFCI. Part of your scope of works. 16-Sep-21 RONALD
in our scope of works
9 Do you have cross sectional details for the pump room piping layout or a blow-up detail? the Plumbing Refer to P-20 16-Sep-21 RONALD
drawings are small

BATCH 2
10 Please confirm the following below list if it is included in our scope; Not indicated on our BOQ: Fire Protection 20-Sep-21 RONALD
1.a. Novec 1230 Clean Agent on Electronics, UPS, etc. rooms Fire Protection Out of Scope, this is for our Specialty Vendor. 20-Sep-21 RONALD
1.b. Pre-action Assemblies on Museum art Areas and sensitive areas Fire Protection Part of OFCI 20-Sep-21 RONALD
1.c. Wet Chemical System for Kitchen Suppression System Fire Protection Not included. By Tenant 20-Sep-21 RONALD
11 Kindly provide us elevation for our schematic diagram Fire Protection FP-20 has Floor Elevation at Right side 20-Sep-21 RONALD
12 Please confirm if we are going to use Victaulic Flexible Hose pipes for drops of Sprinkler Heads Fire Protection We will not use Flexible Hose. 20-Sep-21 RONALD
13 Kindly provide the refrigerant pipe connections for the variable type air conditioning units. Mechanical Connection per Manufacturer. 20-Sep-21 RONALD
14 Kindly provide the size of the grille for the Smoke Exhaust Duct (typical to all floors). Mechanical 700mm x450mm 20-Sep-21 RONALD
Mechanical 20-Sep-21 RONALD

15 Mechanical For Residential use: 150mm diam PVC Pipe, For Retail as specified on the 20-Sep-21 RONALD
drawing.
Kindly confirm which will govern for the Kitchen Exhaust Duct
20-Sep-21 RONALD

Mechanical

16 Mechanical TEF 1&2-100mm diam, TEF-3 -150mm diam, for Garbage Collection Room- 20-Sep-21 RONALD
150mm diam.
Kindly provide the size of the Toilet Exhaust Ducts and their corresponding wall caps.
17 Mechanical TEF 1&2-100mm diam, TEF-3 -150mm diam, for Garbage Collection Room- 20-Sep-21 RONALD
Kindly provide the size of the flexible duct for the kitchen exhaust and toilet exhaust ducts 150mm diam. For KED - 150mm diam PVC (For Residential, For Retail as
specified on the drawing).

BATCH 3
 
18 Kindly provide the size and details for EAF 1. (Sheet no.: M 03) Mechanical
22-Sep-21 RONALD

19 Kindly provide the duct and grille size for EAF 3. (Sheet no.: M 03) Mechanical 22-Sep-21 RONALD
EAF is wall mounted Fan for the Pump Room. For Garbage collection room 22-Sep-21 RONALD
fan, EAF 4, same as residential Garbage Room fans. Exhaust duct of 150mm
diam with 150mm grille. Verify sleeve requirement with structural.

20 Kindly provide the size and details for FA 1. (Sheet no.: M 04) Mechanical 22-Sep-21 RONALD
Capacity is indicated on the equipment schedule. For the dimension, it is 22-Sep-21 RONALD
brand dependent. Different brand may have different sizes. Follow
equipment schedule for capacity to determine the dimension base on brand
catalog. Refer to the specification on the brand.
21 Kindly provide the duct sizes for the following ducts: (Sheet no.: M 05) Mechanical 22-Sep-21 RONALD
Mechanical Duting and fans for By Tenant. Fans, duct indicated on the plans are for 22-Sep-21 RONALD
electrical considerations only and reference for future tenants on locations.
Please consider only here the quotation for Fresh Air Grille installation.

Mechanical Duting and fans for By Tenant. Fans, duct indicated on the plans are for 22-Sep-21 RONALD
electrical considerations only and reference for future tenants on locations.
Please consider only here the quotation for Fresh Air Grille installation.

Mechanical Duting and fans for By Tenant. Fans, duct indicated on the plans are for 22-Sep-21 RONALD
electrical considerations only and reference for future tenants on locations.
Please consider only here the quotation for Fresh Air Grille installation.

Mechanical Duting and fans for By Tenant. Fans, duct indicated on the plans are for 22-Sep-21 RONALD
electrical considerations only and reference for future tenants on locations.
Please consider only here the quotation for Fresh Air Grille installation.

Mechanical Duting and fans for By Tenant. Fans, duct indicated on the plans are for 22-Sep-21 RONALD
electrical considerations only and reference for future tenants on locations.
Please consider only here the quotation for Fresh Air Grille installation.

22 Kindly provide the sizes of the following marked objects. (Sheet no.: M 07 & M08) Mechanical 22-Sep-21 RONALD
Mechanical 22-Sep-21 RONALD

23 Kindly confirm if this louver is part of our scope. (Sheet no.: M 03) Mechanical 22-Sep-21 RONALD
Mechanical Not included this is by Others. 22-Sep-21 RONALD

24 kindly check the Mechanical plan as there is no Refrigerant layout (copper pipe sizes and route) for Mechanical Kindly use for Coil Suction 5/8" diam and Coil Liquid -3/8" diam, 5/8" diam 22-Sep-21 RONALD
for Drain but use 1" diam for Condensate Drain
the VRF units
25 Fire Protection See the specifications. 22-Sep-21 RONALD
Kindly confirm type of connections to be used for all areas if butt weld including risers. Do we need to provide
flange for pipe risers connection?
26 Please provide complete pipe sizes for Waterline (potable and non-potable). Plumbing 24-Sep-21 RONALD
27 Please provide Isometric lay-out of Toilet. Plumbing 24-Sep-21 RONALD
28 Please confirm if there will be revised Residential load schedules. Circuit Numbers reflected in layout are not Electrical 24-Sep-21 FREDDIE
matched with the description of the load sched. Please see photo for reference
Electrical 24-Sep-21 FREDDIE
Electrical 24-Sep-21 FREDDIE

29 Please provide schematic/single line for MTS of Residential Units. Electrical 24-Sep-21 FREDDIE
30 Please provide Emergency Panel. Electrical 24-Sep-21 FREDDIE
31 Please confirm if MC-3 Panel is included since Unit Panels is also reflected in Meter Center at Basement 3. Electrical 24-Sep-21 FREDDIE
Electrical 24-Sep-21 FREDDIE

Electrical 24-Sep-21 FREDDIE

32 Electrical 24-Sep-21 FREDDIE


If MC-3 is included, please confirm if it is fed from 250AT Plug-In which is not reflected in SLD and layout.
BATCH 4
33 Mechanical 23-Sep-21 RONALD
May we request the refrigerant piping layout of FCU's interconnected to ACCU's and schematic
diagram if available? As per drawings, no reflected copper piping.
34 Mechanical 23-Sep-21 RONALD
On your Bid Bulletin No. 2, item no. 4 your responded connection per manufacturer,  we want to
clarify that the refrigerant piping works for VRF will be scope of client choice manufacturer?
35 Mechanical 23-Sep-21 RONALD
Manufacturer will provide the final refrigerant pipe sizing however, we need to see the pipe layout to
determine the connection of FCU to ACCU as well as the routing of the pipes. Kindly provide as
requested.
23-Sep-21 RONALD
BIDDER STATUS ISSUETO BIDDERS

Ervil Innovation COMPLETED BB1/ Sept. 20, 2021


Ervil Innovation COMPLETED BB1/ Sept. 20, 2021
Ervil Innovation BB1/ Sept. 20, 2021
COMPLETED
Ervil Innovation BB1/ Sept. 20, 2021
COMPLETED
Ervil Innovation
PENDING
Ervil Innovation BB1/ Sept. 20, 2021
COMPLETED
Ervil Innovation BB1/ Sept. 20, 2021
COMPLETED
Ervil Innovation BB1/ Sept. 20, 2021
COMPLETED
Ervil Innovation BB1/ Sept. 20, 2021
COMPLETED

QUEST-AIR COMPLETED BB2/ Sept. 23, 2021


QUEST-AIR COMPLETED BB2/ Sept. 23, 2021
QUEST-AIR COMPLETED BB2/ Sept. 23, 2021
QUEST-AIR COMPLETED BB2/ Sept. 23, 2021
QUEST-AIR COMPLETED BB2/ Sept. 23, 2021
QUEST-AIR COMPLETED BB2/ Sept. 23, 2021
QUEST-AIR COMPLETED BB2/ Sept. 23, 2021
QUEST-AIR COMPLETED BB2/ Sept. 23, 2021
QUEST-AIR BB2/ Sept. 23, 2021

COMPLETED
QUEST-AIR BB2/ Sept. 23, 2021
COMPLETED
QUEST-AIR BB2/ Sept. 23, 2021

COMPLETED
QUEST-AIR BB2/ Sept. 23, 2021
COMPLETED
QUEST-AIR BB2/ Sept. 23, 2021

COMPLETED

QUEST-AIR
QUEST-AIR

PENDING
QUEST-AIR COMPLETED
QUEST-AIR

COMPLETED
QUEST-AIR COMPLETED
QUEST-AIR

COMPLETED
QUEST-AIR COMPLETED
QUEST-AIR

COMPLETED
QUEST-AIR

COMPLETED
QUEST-AIR

COMPLETED
QUEST-AIR

COMPLETED
QUEST-AIR

COMPLETED
QUEST-AIR COMPLETED
QUEST-AIR

PENDING
QUEST-AIR COMPLETED
QUEST-AIR

COMPLETED
Ervil Innovation
COMPLETED
QUEST-AIR
PENDING
QUEST-AIR PENDING
QUEST-AIR PENDING
QUEST-AIR
PENDING
QUEST-AIR

PENDING
QUEST-AIR

PENDING
QUEST-AIR PENDING
QUEST-AIR PENDING
QUEST-AIR PENDING
QUEST-AIR

PENDING
QUEST-AIR

PENDING
QUEST-AIR
PENDING

5-Top Builders &


Industrial Sale Corp
PENDING

PENDING

PENDING

PENDING

You might also like