BATCH 2
10 Please confirm the following below list if it is included in our scope; Not indicated on our BOQ: Fire Protection 20-Sep-21 RONALD
1.a. Novec 1230 Clean Agent on Electronics, UPS, etc. rooms Fire Protection Out of Scope, this is for our Specialty Vendor. 20-Sep-21 RONALD
1.b. Pre-action Assemblies on Museum art Areas and sensitive areas Fire Protection Part of OFCI 20-Sep-21 RONALD
1.c. Wet Chemical System for Kitchen Suppression System Fire Protection Not included. By Tenant 20-Sep-21 RONALD
11 Kindly provide us elevation for our schematic diagram Fire Protection FP-20 has Floor Elevation at Right side 20-Sep-21 RONALD
12 Please confirm if we are going to use Victaulic Flexible Hose pipes for drops of Sprinkler Heads Fire Protection We will not use Flexible Hose. 20-Sep-21 RONALD
13 Kindly provide the refrigerant pipe connections for the variable type air conditioning units. Mechanical Connection per Manufacturer. 20-Sep-21 RONALD
14 Kindly provide the size of the grille for the Smoke Exhaust Duct (typical to all floors). Mechanical 700mm x450mm 20-Sep-21 RONALD
Mechanical 20-Sep-21 RONALD
15 Mechanical For Residential use: 150mm diam PVC Pipe, For Retail as specified on the 20-Sep-21 RONALD
drawing.
Kindly confirm which will govern for the Kitchen Exhaust Duct
20-Sep-21 RONALD
Mechanical
16 Mechanical TEF 1&2-100mm diam, TEF-3 -150mm diam, for Garbage Collection Room- 20-Sep-21 RONALD
150mm diam.
Kindly provide the size of the Toilet Exhaust Ducts and their corresponding wall caps.
17 Mechanical TEF 1&2-100mm diam, TEF-3 -150mm diam, for Garbage Collection Room- 20-Sep-21 RONALD
Kindly provide the size of the flexible duct for the kitchen exhaust and toilet exhaust ducts 150mm diam. For KED - 150mm diam PVC (For Residential, For Retail as
specified on the drawing).
BATCH 3
18 Kindly provide the size and details for EAF 1. (Sheet no.: M 03) Mechanical
22-Sep-21 RONALD
19 Kindly provide the duct and grille size for EAF 3. (Sheet no.: M 03) Mechanical 22-Sep-21 RONALD
EAF is wall mounted Fan for the Pump Room. For Garbage collection room 22-Sep-21 RONALD
fan, EAF 4, same as residential Garbage Room fans. Exhaust duct of 150mm
diam with 150mm grille. Verify sleeve requirement with structural.
20 Kindly provide the size and details for FA 1. (Sheet no.: M 04) Mechanical 22-Sep-21 RONALD
Capacity is indicated on the equipment schedule. For the dimension, it is 22-Sep-21 RONALD
brand dependent. Different brand may have different sizes. Follow
equipment schedule for capacity to determine the dimension base on brand
catalog. Refer to the specification on the brand.
21 Kindly provide the duct sizes for the following ducts: (Sheet no.: M 05) Mechanical 22-Sep-21 RONALD
Mechanical Duting and fans for By Tenant. Fans, duct indicated on the plans are for 22-Sep-21 RONALD
electrical considerations only and reference for future tenants on locations.
Please consider only here the quotation for Fresh Air Grille installation.
Mechanical Duting and fans for By Tenant. Fans, duct indicated on the plans are for 22-Sep-21 RONALD
electrical considerations only and reference for future tenants on locations.
Please consider only here the quotation for Fresh Air Grille installation.
Mechanical Duting and fans for By Tenant. Fans, duct indicated on the plans are for 22-Sep-21 RONALD
electrical considerations only and reference for future tenants on locations.
Please consider only here the quotation for Fresh Air Grille installation.
Mechanical Duting and fans for By Tenant. Fans, duct indicated on the plans are for 22-Sep-21 RONALD
electrical considerations only and reference for future tenants on locations.
Please consider only here the quotation for Fresh Air Grille installation.
Mechanical Duting and fans for By Tenant. Fans, duct indicated on the plans are for 22-Sep-21 RONALD
electrical considerations only and reference for future tenants on locations.
Please consider only here the quotation for Fresh Air Grille installation.
22 Kindly provide the sizes of the following marked objects. (Sheet no.: M 07 & M08) Mechanical 22-Sep-21 RONALD
Mechanical 22-Sep-21 RONALD
23 Kindly confirm if this louver is part of our scope. (Sheet no.: M 03) Mechanical 22-Sep-21 RONALD
Mechanical Not included this is by Others. 22-Sep-21 RONALD
24 kindly check the Mechanical plan as there is no Refrigerant layout (copper pipe sizes and route) for Mechanical Kindly use for Coil Suction 5/8" diam and Coil Liquid -3/8" diam, 5/8" diam 22-Sep-21 RONALD
for Drain but use 1" diam for Condensate Drain
the VRF units
25 Fire Protection See the specifications. 22-Sep-21 RONALD
Kindly confirm type of connections to be used for all areas if butt weld including risers. Do we need to provide
flange for pipe risers connection?
26 Please provide complete pipe sizes for Waterline (potable and non-potable). Plumbing 24-Sep-21 RONALD
27 Please provide Isometric lay-out of Toilet. Plumbing 24-Sep-21 RONALD
28 Please confirm if there will be revised Residential load schedules. Circuit Numbers reflected in layout are not Electrical 24-Sep-21 FREDDIE
matched with the description of the load sched. Please see photo for reference
Electrical 24-Sep-21 FREDDIE
Electrical 24-Sep-21 FREDDIE
29 Please provide schematic/single line for MTS of Residential Units. Electrical 24-Sep-21 FREDDIE
30 Please provide Emergency Panel. Electrical 24-Sep-21 FREDDIE
31 Please confirm if MC-3 Panel is included since Unit Panels is also reflected in Meter Center at Basement 3. Electrical 24-Sep-21 FREDDIE
Electrical 24-Sep-21 FREDDIE
COMPLETED
QUEST-AIR BB2/ Sept. 23, 2021
COMPLETED
QUEST-AIR BB2/ Sept. 23, 2021
COMPLETED
QUEST-AIR BB2/ Sept. 23, 2021
COMPLETED
QUEST-AIR BB2/ Sept. 23, 2021
COMPLETED
QUEST-AIR
QUEST-AIR
PENDING
QUEST-AIR COMPLETED
QUEST-AIR
COMPLETED
QUEST-AIR COMPLETED
QUEST-AIR
COMPLETED
QUEST-AIR COMPLETED
QUEST-AIR
COMPLETED
QUEST-AIR
COMPLETED
QUEST-AIR
COMPLETED
QUEST-AIR
COMPLETED
QUEST-AIR
COMPLETED
QUEST-AIR COMPLETED
QUEST-AIR
PENDING
QUEST-AIR COMPLETED
QUEST-AIR
COMPLETED
Ervil Innovation
COMPLETED
QUEST-AIR
PENDING
QUEST-AIR PENDING
QUEST-AIR PENDING
QUEST-AIR
PENDING
QUEST-AIR
PENDING
QUEST-AIR
PENDING
QUEST-AIR PENDING
QUEST-AIR PENDING
QUEST-AIR PENDING
QUEST-AIR
PENDING
QUEST-AIR
PENDING
QUEST-AIR
PENDING
PENDING
PENDING
PENDING