0% found this document useful (0 votes)
152 views1 page

UNITOP SANTA ROSA-Layout1

This document contains 10 sheets of mechanical drawings and notes for a building project. Sheet M-1 provides general notes and outlines the contents of the mechanical drawings. It includes abbreviations and symbols used in the drawings. The mechanical works must comply with Philippine building code regulations and all equipment must be installed with vibration isolators and drainage for condensate water. Pipes are to be seamless copper. Testing and commissioning is required.

Uploaded by

alvin tolentino
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
152 views1 page

UNITOP SANTA ROSA-Layout1

This document contains 10 sheets of mechanical drawings and notes for a building project. Sheet M-1 provides general notes and outlines the contents of the mechanical drawings. It includes abbreviations and symbols used in the drawings. The mechanical works must comply with Philippine building code regulations and all equipment must be installed with vibration isolators and drainage for condensate water. Pipes are to be seamless copper. Testing and commissioning is required.

Uploaded by

alvin tolentino
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SHEET NO.

SHEET CONTENT
1. ALL MECHANICAL WORKS SHALL BE DONE IN ACCORDANCE WITH THE LATEST REQUIREMENTS OF THE GENERAL NOTES
PHILIPPINE BUILDING CODE REGULATIONS.
M-1 TABLE OF CONTENTS
2. THE TOTAL SCOPE OF WORK SHALL INCLUDE ALL THE WORKS DESCRIBE IN PLANS AND LISTED IN LEGENDS & ABBRV., SYMBOLS
THE TECHNICAL SPECIFICATION FOR MECHANICAL WORKS.
3. ALL EQUIPMENT SHALL BE PROVIDED W/ VIBRATION ISOLATOR. M-2 EQUIPMENT SCHEDULE
4. ALL AIR-CONDITIONING UNITS SHALL BE PROVIDED W/ DRAINING MEANS OF CONDENSATE WATER.
M-3 ROOF DECK SMOKE EVACUATION PLAN
5. REFRIGERANT PIPES SHALL BE SEAMLESS COPPER PIPE HARD DRAWN TYPE L OR SOFT DRAWN 0.032" THICK.
6. ALL AIR-CONDITIONING UNITS SHALL BE PROVIDED WITH ELECTRICAL WORKS BETWEEN AIR-CONDITIONING UNITS M-4 5TH FLOOR SMOKE EVACUATION PLAN
UP TO THEIR RESPECTIVE CIRCUIT BREAKER.
7. ALL EQUIPMENT SHALL BE PROVIDED WITH ELECTRICAL DISCONNECTING MEANS. M-5 4TH FLOOR SMOKE EVACUATION PLAN
8. TEST FOR DUCT LEAKAGES. THE CONTRACTOR SHALL TEST, BALANCE AND COMMISSION THE ENTIRE INSTALLATION.
9. DIMENSIONS ARE IN MILLIMETERS, UNLESS OTHERWISE NOTED. M-6 3RD FLOOR SMOKE EVACUATION PLAN

M-7 2ND FLOOR A SMOKE EVACUATION PLAN

M-8 2ND FLOOR A SMOKE EVACUATION PLAN

M-9 GROUND FLOOR SMOKE EVACUATION PLAN

M-10 SMOKE EVACUATION SCHEMATIC DIAGRAM

ABBRV. & SYMB. DESCRIPTION


SEF SMOKE EVACUATION FAN
SISW SINGLE INLET SINGLE WIDTH
CENTRIFUGAL INLINE FAN

EQUIPMENT TAG

SISW CENTRIFUGAL FAN

FOR COORDINATION

ENGINEER PROJECT TITLE PROJECT OWNER NOTES SHEET CONTENTS REVISIONS DESIGNED BY : AJDT SHEET NO.

CADD BY : AJDT
ENGR. NELSON PASAMONTE , PME
PROFESSIONAL MECHANICAL ENGINEER
UNITOP SANTA ROSA
GENERAL NOTES
TABLE OF CONTENTS
DATE DRAWN : 8/15/2022
M-1
CHECKED BY : ENGR. ROBERTO ROSALES
REG. # : : PTR # :
LEGENDS & ABBRV., SYMBOLS
TIN : : DATE ISSUED : APPROVED BY : ENGR. ROBERTO ROSALES REV. NO.
11/F RR BLDG.. BLOCK 16 LOT 2, PRES. D. MACPAGAL AVE. ASEANA, PARANAQUE CITY PH 1700
RES. CERT. PLACE ISSUED : LOCATION: Francisco A. Canicosa Ave, Balibago, Santa Rosa, Laguna DATE APPROVED : - - - SCALE:

You might also like