0% found this document useful (0 votes)
391 views23 pages

Sleeper Rev1

The document provides design details for two types of concrete sleepers used to support underground pipes. It includes dimensions, loads, load combinations, and design checks for stability, bearing pressure, and foundation. Type-1 sleeper dimensions are given along with dead loads from pipe, soil, and self-weight. Load combinations are listed for stability, bearing pressure, and foundation design checks. Calculations show the sleeper satisfies factors of safety against sliding and overturning under different load combinations. Maximum and minimum bearing pressures are calculated. Reinforcement requirements for the footing are determined.

Uploaded by

Yatendra Tyagi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
391 views23 pages

Sleeper Rev1

The document provides design details for two types of concrete sleepers used to support underground pipes. It includes dimensions, loads, load combinations, and design checks for stability, bearing pressure, and foundation. Type-1 sleeper dimensions are given along with dead loads from pipe, soil, and self-weight. Load combinations are listed for stability, bearing pressure, and foundation design checks. Calculations show the sleeper satisfies factors of safety against sliding and overturning under different load combinations. Maximum and minimum bearing pressures are calculated. Reinforcement requirements for the footing are determined.

Uploaded by

Yatendra Tyagi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 23

APPENDIX-3: DESIGN OF SLEEPER

Sleeper: Type-1

Dimension
Type
A (mm) B (mm) C (mm) D (mm) E (mm) F (mm) G (mm) H (mm) Weight (kN)
1 2000 450 1100 250 1200 300 250 400 23.8

Dead load of pipe, P(DL) = 0.50 kN/m2


Content load of pipe, P(Cont.) = 2.00 kN/m2
Spacing of sleepers = 6.00 m
Length of sleepers = 2.00 m
Assuming allowable bearing pressure of soil = 100.00 kN/m2
Self weight of sleeper = 23.75 kN
Weight of soil over sleeper = 14.59 kN
Total dead load, D = 38.34 kN
Total pipe dead load, P(DL) = 6.00 kN
Total content load of pipe, P(Cont) = 24.00 kN
Total thermal load along / accross pipe, T = 4.5 kN
Seismic Base Shear Force, Fb =
Sd (T1) = Ordinate of design spectrum at period T1
T1 = fundamental period of vibration of the sleeper
m = total mass on the sleeper
T1 = 0s Assuming sleeper as rigid structure
(As per section 5.3.3.2.1 fo "RAPID-P0022-PUNJ-CVS-DES-5100-0001")
TB = 0.07 s
Since, 0 < T1 < TB
So, Sd(T1) = 0.13*(2/3+(T1/0.07)*(2.27/q-2/3))
q = 1.5 (from 5.3.3 of BS EN 1998)
OBE case is ignored as the ag value is less than 0.615 times.
Sd(T1) = 0.087
Total seismic load, V = 0.087*(38.34+6+24) = 5.92 kN
Wind load
Projected area (Maximum dia of pipe 10") = 0.1*2+0.275 = 0.475 m
***For pipe dia larger than 12" non standard sleeper will be designed.
Wind pressure = 0.65 kN/m2
Spacing of sleeper = 6m
Wind Load, W = 1.85 kN
Load combinations for stability check
Comb. D P(DL) P(Cont) T W V
LC1 0.9 0.9 0.9 1.35 1.5 0
LC2 0.9 0.9 0.9 1 0 1

Stability check
Check against sliding
Slide force
Sliding force along pipe way for LC1 = 1.35*T+1.5*W = 8.85 kN
Sliding force across pipe way for LC1 = 1.35*T = 6.08 kN
Resultant sliding force for LC1, Fslide = 10.74 kN
Sliding force along pipe way for LC2 = 1*T+1*V = 10.42 kN
Sliding force across pipe way for LC2 = 1*T+1*0.3*V = 6.28 kN
Resultant sliding force for LC1, Fslide = 12.17 kN
****Seismic force considered as Ex+0.3Ey
Resistance force
Total dead load 0.9*(D+P(DL)+P(Cont)) = 61.51 kN
Assuming friction coefficient m = 0.45
Total resistance force, Fstab = 27.68 kN
Factor of safety against sliding, FS = 2.27

Check against overturning


Overturning moment
Overturning moment for LC1, Mo = 8.85*(F+G+H)/1000 = 8.41 kN-m
Overturning moment for LC2, Mo = 10.42*(F+G+H)/1000 = 9.90 kN-m
Stabilising moment
Total stabilising moment, Ms = 61.51*E/2/1000 = 36.90 kN
Factor of safety against overturning, FS = 3.73
** Assuming the horizontal force act at top of the sleeper including seismic load consevatively.
** If dia of pipe increases, non standard sleepers will be designed .

Load combinations for bearing pressure check


Comb. D P(DL) P(Cont) T W V
LC1 1 1 1 1 1 0
LC2 1 1 1 1 0 1
Check for bearing pressure
Total vertical load, P = 1*(D+P(DL)+P(Cont)) = 68.34 kN
Total horizontal load, LC1 = 1*T+1*W = 6.35 kN
Total horizontal load, LC2 = 1*T+1*V = 10.42 kN
Total moment along pipe way = 10.42*(F+G+H)/1000 = 9.90 kN-m
Total moment across pipe way = (4.5+5.92*0.3)*(F+G+H)/1000 = 5.96 kN-m

Maximum pressure, pmax. = = 56.56 kN/m2


(68.34/2/1.2)+(9.9*6/2/1.2/1.2)+(5.96*6/1.2/2/2)
Minimum pressure, pmin. = = 0.39 kN/m2
(68.34/2/1.2)-(9.9*6/2/1.2/1.2)-(5.96*6/1.2/2/2)

Load combinations for foundation design


Comb. D P(DL) P(Cont) T W V
LC1 1.35 1.35 1.35 1.35 1.5 0
LC2 1 1 1 1 0 1

LC1
Total vertical load, P = 1.35*(D+P(DL)+P(Cont)) = 92.26 kN
Total horizontal load, LC1 = 1.35*T+1.5*W = 8.85 kN
Total moment along pipe way = 8.85*(F+G+H)/1000 = 8.41 kN-m
Total moment across pipe way = 1.35*T*(F+G+H)/1000 = 5.77 kN-m
Maximum pressure, pmax. = = 63.18 kN/m2
(92.26/2/1.2)+(8.41*6/2/1.2/1.2)+(5.77*6/1.2/2/2)
Minimum pressure, pmin. = = 13.71 kN/m2
(92.26/2/1.2)-(8.41*6/2/1.2/1.2)-(5.77*6/1.2/2/2)

LC2
Total vertical load, P = (D+P(DL)+P(Cont)) = 68.34 kN
Total horizontal load, LC2 = 1*T+1*V = 10.42 kN
Total moment along pipe way = 10.42*(F+G+H)/1000 = 9.90 kN-m
Total moment across pipe way = (T+0.3*V)*(F+G+H)/1000 = 5.96 kN-m
Maximum pressure, pmax. = = 56.56 kN/m2
(68.34/2/1.2)+(9.9*6/2/1.2/1.2)+(5.96*6/1.2/2/2)
Minimum pressure, pmin. = = 0.39 kN/m2
(68.34/2/1.2)-(9.9*6/2/1.2/1.2)-(5.96*6/1.2/2/2)
LC1 govern.
Design of footing
Maximum moment at face of pedestal, M Ed = 7.13 kN-m
fck = 35.00 N/mm2
fyk = 500.00 N/mm2
Effective depth, d = 250-75-5 = 170.00 mm
Required reinforcement, Ast = 101.45 mm2
Asmin. = 0.26*fctm*b*d > 0.0013Ac = 325.1 mm2
Spacing of 10dia. reinforcement = 241.4 mm c/c.

Hence, provide 10 dia bar @ 200mm c/c in wall and footing on each face.
Provide 8 dia bar @ 200mm c/c as distribution reinforcement on each face.

Checking for transverse shear


Design transverse shear force at distance "d" from pedestal face, V Ed = = 19.3 kN
63.18*0.305
Design shear resistance of concrete
CRd,c = 0.18/gc = 0.12
k= 1+√200/d = 2.00
r1 = Asl/(bd) = 0.0023 <0.02
Ignoring scp
VRd,c = 81.87 kN
Minimum shear resistance

vmin = 0.035*k2/3*fck1/2 = 55.88 kN


Here VEd < VRd,c. Hence, no shear reinforcement is required.
APPENDIX-3: DESIGN OF SLEEPER

Sleeper: Type-2

Dimension
Type
A (mm) B (mm) C (mm) D (mm) E (mm) F (mm) G (mm) H (mm) Weight (kN)
2 2500 550 1400 250 1200 300 250 400 29.7

Dead load of pipe, P(DL) = 0.50 kN/m2


Content load of pipe, P(Cont.) = 2.00 kN/m2
Spacing of sleepers = 6.00 m
Length of sleepers = 2.50 m
Assuming allowable bearing pressure of soil = 100.00 kN/m2
Self weight of sleeper = 29.69 kN
Weight of soil over sleeper = 18.24 kN
Total dead load, D = 47.93 kN
Total pipe dead load, P(DL) = 7.50 kN
Total content load of pipe, P(Cont) = 30.00 kN
Total thermal load along / accross pipe, T = 5.63 kN
Seismic Base Shear Force, Fb =
Sd (T1) = Ordinate of design spectrum at period T1
T1 = fundamental period of vibration of the sleeper
m = total mass on the sleeper
T1 = 0s Assuming sleeper as rigid structure
(As per section 5.3.3.2.1 fo "RAPID-P0022-PUNJ-CVS-DES-5100-0001")
TB = 0.07 s
Since, 0 < T1 < TB
So, Sd(T1) = 0.13*(2/3+(T1/0.07)*(2.27/q-2/3))
q = 1.5 (from 5.3.3 of BS EN 1998)
OBE case is ignored as the ag value is less than 0.615 times.
Sd(T1) = 0.087
Total seismic load, V = 0.087*(47.93+7.5+30) = 7.40 kN
Wind load
Projected area (Maximum dia of pipe 10") = 0.1*2.5+0.275 = 0.525 m
***For pipe dia larger than 12" non standard sleeper will be designed.
Wind pressure = 0.65 kN/m2
Spacing of sleeper = 6m
Wind Load, W = 2.05 kN
Load combinations for stability check
Comb. D P(DL) P(Cont) T W V
LC1 0.9 0.9 0.9 1.35 1.5 0
LC2 0.9 0.9 0.9 1 0 1

Stability check
Check against sliding
Slide force
Sliding force along pipe way for LC1 = 1.35*T+1.5*W = 10.67 kN
Sliding force across pipe way for LC1 = 1.35*T = 7.59 kN
Resultant sliding force for LC1, Fslide = 13.09 kN
Sliding force along pipe way for LC2 = 1*T+1*V = 13.03 kN
Sliding force across pipe way for LC2 = 1*T+1*0.3*V = 7.85 kN
Resultant sliding force for LC1, Fslide = 15.21 kN
****Seismic force considered as Ex+0.3Ey
Resistance force
Total dead load 0.9*(D+P(DL)+P(Cont)) = 76.88 kN
Assuming friction coefficient m = 0.45
Total resistance force, Fstab = 34.60 kN
Factor of safety against sliding, FS = 2.27

Check against overturning


Overturning moment
Overturning moment for LC1, Mo = 10.67*(F+G+H)/1000 = 10.13 kN-m
Overturning moment for LC2, Mo = 13.03*(F+G+H)/1000 = 12.38 kN-m
Stabilising moment
Total stabilising moment, Ms = 76.88*E/2/1000 = 46.13 kN
Factor of safety against overturning, FS = 3.73
** Assuming the horizontal force act at top of the sleeper including seismic load consevatively.
** If dia of pipe increases, non standard sleepers will be designed .

Load combinations for bearing pressure check


Comb. D P(DL) P(Cont) T W V
LC1 1 1 1 1 1 0
LC2 1 1 1 1 0 1
Check for bearing pressure
Total vertical load, P = 1*(D+P(DL)+P(Cont)) = 85.43 kN
Total horizontal load, LC1 = 1*T+1*W = 7.67 kN
Total horizontal load, LC2 = 1*T+1*V = 13.03 kN
Total moment along pipe way = 13.03*(F+G+H)/1000 = 12.38 kN-m
Total moment across pipe way = (5.63+7.4*0.3)*(F+G+H)/1000 = 7.45 kN-m

Maximum pressure, pmax. = = 55.07 kN/m2


(85.43/2.5/1.2)+(12.38*6/2.5/1.2/1.2)+(7.45*6/1.2/2.5/2.5)
Minimum pressure, pmin. = = 1.88 kN/m2
(85.43/2.5/1.2)-(12.38*6/2.5/1.2/1.2)-(7.45*6/1.2/2.5/2.5)

Load combinations for foundation design


Comb. D P(DL) P(Cont) T W V
LC1 1.35 1.35 1.35 1.35 1.5 0
LC2 1 1 1 1 0 1

LC1
Total vertical load, P = 1.35*(D+P(DL)+P(Cont)) = 115.33 kN
Total horizontal load, LC1 = 1.35*T+1.5*W = 10.67 kN
Total moment along pipe way = 10.67*(F+G+H)/1000 = 10.13 kN-m
Total moment across pipe way = 1.35*T*(F+G+H)/1000 = 7.21 kN-m
Maximum pressure, pmax. = = 61.10 kN/m2
(115.33/2.5/1.2)+(10.13*6/2.5/1.2/1.2)+(7.21*6/1.2/2.5/2.5)
Minimum pressure, pmin. = = 15.78 kN/m2
(115.33/2.5/1.2)-(10.13*6/2.5/1.2/1.2)-(7.21*6/1.2/2.5/2.5)

LC2
Total vertical load, P = (D+P(DL)+P(Cont)) = 85.43 kN
Total horizontal load, LC2 = 1*T+1*V = 13.03 kN
Total moment along pipe way = 13.03*(F+G+H)/1000 = 12.38 kN-m
Total moment across pipe way = (T+0.3*V)*(F+G+H)/1000 = 7.45 kN-m
Maximum pressure, pmax. = = 55.07 kN/m2
(85.43/2.5/1.2)+(12.38*6/2.5/1.2/1.2)+(7.45*6/1.2/2.5/2.5)
Minimum pressure, pmin. = = 1.88 kN/m2
(85.43/2.5/1.2)-(12.38*6/2.5/1.2/1.2)-(7.45*6/1.2/2.5/2.5)
LC1 govern.
Design of footing
Maximum moment at face of pedestal, MEd = 6.89 kN-m
fck = 35.00 N/mm2
fyk = 500.00 N/mm2
Effective depth, d = 250-75-5 = 170.00 mm
Required reinforcement, Ast = 98.12 mm2
Asmin. = 0.26*fctm*b*d > 0.0013Ac = 325.1 mm2
Spacing of 10dia. reinforcement = 241.4 mm c/c.

Hence, provide 10 dia bar @ 200mm c/c in wall and footing on each face.
Provide 8 dia bar @ 200mm c/c as distribution reinforcement on each face.

Checking for transverse shear


Design transverse shear force at distance "d" from pedestal face, VEd = = 18.6 kN
61.1*0.305
Design shear resistance of concrete
CRd,c = 0.18/gc = 0.12
k= 1+√200/d = 2.00
r1 = Asl/(bd) = 0.0023 <0.02
Ignoring scp
VRd,c = 81.87 kN
Minimum shear resistance

vmin = 0.035*k2/3*fck1/2 = 55.88 kN


Here VEd < VRd,c. Hence, no shear reinforcement is required.
APPENDIX-3: DESIGN OF SLEEPER

Sleeper: Type-3

Dimension
Type
A (mm) B (mm) C (mm) D (mm) E (mm) F (mm) G (mm) H (mm) Weight (kN)
3 3000 650 1700 250 1200 300 250 400 35.6

Dead load of pipe, P(DL) = 0.50 kN/m2


Content load of pipe, P(Cont.) = 2.00 kN/m2
Spacing of sleepers = 6.00 m
Length of sleepers = 3.00 m
Assuming allowable bearing pressure of soil = 100.00 kN/m2
Self weight of sleeper = 35.63 kN
Weight of soil over sleeper = 21.89 kN
Total dead load, D = 57.51 kN
Total pipe dead load, P(DL) = 9.00 kN
Total content load of pipe, P(Cont) = 36.00 kN
Total thermal load along / accross pipe, T = 6.75 kN
Seismic Base Shear Force, Fb =
Sd (T1) = Ordinate of design spectrum at period T1
T1 = fundamental period of vibration of the sleeper
m = total mass on the sleeper
T1 = 0s Assuming sleeper as rigid structure
(As per section 5.3.3.2.1 fo "RAPID-P0022-PUNJ-CVS-DES-5100-0001")
TB = 0.07 s
Since, 0 < T1 < TB
So, Sd(T1) = 0.13*(2/3+(T1/0.07)*(2.27/q-2/3))
q = 1.5 (from 5.3.3 of BS EN 1998)
OBE case is ignored as the ag value is less than 0.615 times.
Sd(T1) = 0.087
Total seismic load, V = 0.087*(57.51+9+36) = 8.88 kN
Wind load
Projected area (Maximum dia of pipe 10") = 0.1*3+0.275 = 0.575 m
***For pipe dia larger than 12" non standard sleeper will be designed.
Wind pressure = 0.65 kN/m2
Spacing of sleeper = 6m
Wind Load, W = 2.24 kN
Load combinations for stability check
Comb. D P(DL) P(Cont) T W V
LC1 0.9 0.9 0.9 1.35 1.5 0
LC2 0.9 0.9 0.9 1 0 1

Stability check
Check against sliding
Slide force
Sliding force along pipe way for LC1 = 1.35*T+1.5*W = 12.48 kN
Sliding force across pipe way for LC1 = 1.35*T = 9.11 kN
Resultant sliding force for LC1, Fslide = 15.45 kN
Sliding force along pipe way for LC2 = 1*T+1*V = 15.63 kN
Sliding force across pipe way for LC2 = 1*T+1*0.3*V = 9.42 kN
Resultant sliding force for LC1, Fslide = 18.25 kN
****Seismic force considered as Ex+0.3Ey
Resistance force
Total dead load 0.9*(D+P(DL)+P(Cont)) = 92.26 kN
Assuming friction coefficient m = 0.45
Total resistance force, Fstab = 41.52 kN
Factor of safety against sliding, FS = 2.27

Check against overturning


Overturning moment
Overturning moment for LC1, Mo = 12.48*(F+G+H)/1000 = 11.85 kN-m
Overturning moment for LC2, Mo =15.63*(F+G+H)/1000 = 14.85 kN-m
Stabilising moment
Total stabilising moment, Ms = 92.26*E/2/1000 = 55.36 kN
Factor of safety against overturning, FS = 3.73
** Assuming the horizontal force act at top of the sleeper including seismic load consevatively.
** If dia of pipe increases, non standard sleepers will be designed .

Load combinations for bearing pressure check


Comb. D P(DL) P(Cont) T W V
LC1 1 1 1 1 1 0
LC2 1 1 1 1 0 1
Check for bearing pressure
Total vertical load, P = 1*(D+P(DL)+P(Cont)) = 102.51 kN
Total horizontal load, LC1 = 1*T+1*W = 8.99 kN
Total horizontal load, LC2 = 1*T+1*V = 15.63 kN
Total moment along pipe way = 15.63*(F+G+H)/1000 = 14.85 kN-m
Total moment across pipe way = (6.75+8.88*0.3)*(F+G+H)/1000 = 8.94 kN-m

Maximum pressure, pmax. = = 54.07 kN/m2


(102.51/3/1.2)+(14.85*6/3/1.2/1.2)+(8.94*6/1.2/3/3)
Minimum pressure, pmin. = = 2.88 kN/m2
(102.51/3/1.2)-(14.85*6/3/1.2/1.2)-(8.94*6/1.2/3/3)

Load combinations for foundation design


Comb. D P(DL) P(Cont) T W V
LC1 1.35 1.35 1.35 1.35 1.5 0
LC2 1 1 1 1 0 1

LC1
Total vertical load, P = 1.35*(D+P(DL)+P(Cont)) = 138.39 kN
Total horizontal load, LC1 = 1.35*T+1.5*W = 12.48 kN
Total moment along pipe way = 12.48*(F+G+H)/1000 = 11.85 kN-m
Total moment across pipe way = 1.35*T*(F+G+H)/1000 = 8.66 kN-m
Maximum pressure, pmax. = = 59.71 kN/m2
(138.39/3/1.2)+(11.85*6/3/1.2/1.2)+(8.66*6/1.2/3/3)
Minimum pressure, pmin. = = 17.17 kN/m2
(138.39/3/1.2)-(11.85*6/3/1.2/1.2)-(8.66*6/1.2/3/3)

LC2
Total vertical load, P = (D+P(DL)+P(Cont)) = 102.51 kN
Total horizontal load, LC2 = 1*T+1*V = 15.63 kN
Total moment along pipe way = 15.63*(F+G+H)/1000 = 14.85 kN-m
Total moment across pipe way = (T+0.3*V)*(F+G+H)/1000 = 8.94 kN-m
Maximum pressure, pmax. = = 54.07 kN/m2
(102.51/2.5/1.2)+(14.85*6/2.5/1.2/1.2)+(8.94*6/1.2/2.5/2.5)
Minimum pressure, pmin. = = 2.88 kN/m2
(102.51/3/1.2)-(14.85*6/3/1.2/1.2)-(8.94*6/1.2/3/3)
LC1 govern.
Design of footing
Maximum moment at face of pedestal, MEd = 6.74 kN-m
fck = 35.00 N/mm2
fyk = 500.00 N/mm2
Effective depth, d = 250-75-5 = 170.00 mm
Required reinforcement, Ast = 95.89 mm2
Asmin. = 0.26*fctm*b*d > 0.0013Ac = 325.1 mm2
Spacing of 10dia. reinforcement = 241.4 mm c/c.

Hence, provide 10 dia bar @ 200mm c/c in wall and footing on each face.
Provide 8 dia bar @ 200mm c/c as distribution reinforcement on each face.

Checking for transverse shear


Design transverse shear force at distance "d" from pedestal face, VEd = = 18.2 kN
59.71*0.305
Design shear resistance of concrete
CRd,c = 0.18/gc = 0.12
k= 1+√200/d = 2.00
r1 = Asl/(bd) = 0.0023 <0.02
Ignoring scp
VRd,c = 81.87 kN
Minimum shear resistance

vmin = 0.035*k2/3*fck1/2 = 55.88 kN


Here VEd < VRd,c. Hence, no shear reinforcement is required.
APPENDIX-3: DESIGN OF SLEEPER

Sleeper: Type-4

Dimension
Type
A (mm) B (mm) C (mm) D (mm) E (mm) F (mm) G (mm) H (mm) Weight (kN)
4 4000 800 2400 250 1200 300 250 400 47.5

Dead load of pipe, P(DL) = 0.50 kN/m2


Content load of pipe, P(Cont.) = 2.00 kN/m2
Spacing of sleepers = 6.00 m
Length of sleepers = 4.00 m
Assuming allowable bearing pressure of soil = 100.00 kN/m2
Self weight of sleeper = 47.50 kN
Weight of soil over sleeper = 29.18 kN
Total dead load, D = 76.68 kN
Total pipe dead load, P(DL) = 12.00 kN
Total content load of pipe, P(Cont) = 48.00 kN
Total thermal load along / accross pipe, T = 9.00 kN
Seismic Base Shear Force, Fb =
Sd (T1) = Ordinate of design spectrum at period T1
T1 = fundamental period of vibration of the sleeper
m = total mass on the sleeper
T1 = 0s Assuming sleeper as rigid structure
(As per section 5.3.3.2.1 fo "RAPID-P0022-PUNJ-CVS-DES-5100-0001")
TB = 0.07 s
Since, 0 < T1 < TB
So, Sd(T1) = 0.13*(2/3+(T1/0.07)*(2.27/q-2/3))
q = 1.5 (from 5.3.3 of BS EN 1998)
OBE case is ignored as the ag value is less than 0.615 times.
Sd(T1) = 0.087
Total seismic load, V = 0.087*(76.68+12+48) = 11.85 kN
Wind load
Projected area (Maximum dia of pipe 10") = 0.1*4+0.275 = 0.675 m
***For pipe dia larger than 12" non standard sleeper will be designed.
Wind pressure = 0.65 kN/m2
Spacing of sleeper = 6m
Wind Load, W = 2.63 kN
Load combinations for stability check
Comb. D P(DL) P(Cont) T W V
LC1 0.9 0.9 0.9 1.35 1.5 0
LC2 0.9 0.9 0.9 1 0 1

Stability check
Check against sliding
Slide force
Sliding force along pipe way for LC1 = 1.35*T+1.5*W = 16.10 kN
Sliding force across pipe way for LC1 = 1.35*T = 12.15 kN
Resultant sliding force for LC1, Fslide = 20.17 kN
Sliding force along pipe way for LC2 = 1*T+1*V = 20.85 kN
Sliding force across pipe way for LC2 = 1*T+1*0.3*V = 12.55 kN
Resultant sliding force for LC1, Fslide = 24.33 kN
****Seismic force considered as Ex+0.3Ey
Resistance force
Total dead load 0.9*(D+P(DL)+P(Cont)) = 123.02 kN
Assuming friction coefficient m = 0.45
Total resistance force, Fstab = 55.36 kN
Factor of safety against sliding, FS = 2.27

Check against overturning


Overturning moment
Overturning moment for LC1, Mo = 16.10*(F+G+H)/1000 = 15.29 kN-m
Overturning moment for LC2, Mo = 20.85*(F+G+H)/1000 = 19.80 kN-m
Stabilising moment
Total stabilising moment, Ms = 123.02*E/2/1000 = 73.81 kN
Factor of safety against overturning, FS = 3.73
** Assuming the horizontal force act at top of the sleeper including seismic load consevatively.
** If dia of pipe increases, non standard sleepers will be designed .

Load combinations for bearing pressure check


Comb. D P(DL) P(Cont) T W V
LC1 1 1 1 1 1 0
LC2 1 1 1 1 0 1
Check for bearing pressure
Total vertical load, P = 1*(D+P(DL)+P(Cont)) = 136.68 kN
Total horizontal load, LC1 = 1*T+1*W = 11.63 kN
Total horizontal load, LC2 = 1*T+1*V = 20.85 kN
Total moment along pipe way = 20.85*(F+G+H)/1000 = 19.80 kN-m
Total moment across pipe way = (9+11.85*0.3)*(F+G+H)/1000 = 11.93 kN-m

Maximum pressure, pmax. = = 52.83 kN/m2


(136.68/4/1.2)+(19.80*6/4/1.2/1.2)+(11.93*6/1.2/4/4)
Minimum pressure, pmin. = = 4.12 kN/m2
(136.68/4/1.2)-(19.80*6/4/1.2/1.2)-(11.93*6/1.2/4/4)

Load combinations for foundation design


Comb. D P(DL) P(Cont) T W V
LC1 1.35 1.35 1.35 1.35 1.5 0
LC2 1 1 1 1 0 1

LC1
Total vertical load, P = 1.35*(D+P(DL)+P(Cont)) = 184.52 kN
Total horizontal load, LC1 = 1.35*T+1.5*W = 16.10 kN
Total moment along pipe way = 16.10*(F+G+H)/1000 = 15.29 kN-m
Total moment across pipe way = 1.35*T*(F+G+H)/1000 = 11.54 kN-m
Maximum pressure, pmax. = = 57.98 kN/m2
(184.52/4/1.2)+(15.29*6/4/1.2/1.2)+(11.54*6/1.2/4/4)
Minimum pressure, pmin. = = 18.90 kN/m2
(184.52/4/1.2)-(15.29*6/4/1.2/1.2)-(11.54*6/1.2/4/4)

LC2
Total vertical load, P = (D+P(DL)+P(Cont)) = 136.68 kN
Total horizontal load, LC2 = 1*T+1*V = 20.85 kN
Total moment along pipe way = 20.85*(F+G+H)/1000 = 19.80 kN-m
Total moment across pipe way = (T+0.3*V)*(F+G+H)/1000 = 11.93 kN-m
Maximum pressure, pmax. = = 52.83 kN/m2
(136.68/4/1.2)+(19.80*6/4/1.2/1.2)+(11.93*6/1.2/4/4)
Minimum pressure, pmin. = = 4.12 kN/m2
(136.68/4/1.2)-(19.80*6/4/1.2/1.2)-(11.93*6/1.2/4/4)
LC1 govern.
Design of footing
Maximum moment at face of pedestal, MEd = 6.54 kN-m
fck = 35.00 N/mm2
fyk = 500.00 N/mm2
Effective depth, d = 250-75-5 = 170.00 mm
Required reinforcement, Ast = 93.11 mm2
Asmin. = 0.26*fctm*b*d > 0.0013Ac = 325.1 mm2
Spacing of 10dia. reinforcement = 241.4 mm c/c.

Hence, provide 10 dia bar @ 200mm c/c in wall and footing on each face.
Provide 8 dia bar @ 200mm c/c as distribution reinforcement on each face.

Checking for transverse shear


Design transverse shear force at distance "d" from pedestal face, VEd = = 17.7 kN
57.98*0.305
Design shear resistance of concrete
CRd,c = 0.18/gc = 0.12
k= 1+√200/d = 2.00
r1 = Asl/(bd) = 0.0023 <0.02
Ignoring scp
VRd,c = 81.87 kN
Minimum shear resistance

vmin = 0.035*k2/3*fck1/2 = 55.88 kN


Here VEd < VRd,c. Hence, no shear reinforcement is required.
APPENDIX-3: DESIGN OF SLEEPER

Sleeper: Type-5

Dimension
Type
A (mm) B (mm) C (mm) D (mm) E (mm) F (mm) G (mm) H (mm) Weight (kN)
5 5000 1000 3000 250 1200 300 250 400 59.4

Dead load of pipe, P(DL) = 0.50 kN/m2


Content load of pipe, P(Cont.) = 2.00 kN/m2
Spacing of sleepers = 6.00 m
Length of sleepers = 5.00 m
Assuming allowable bearing pressure of soil = 100.00 kN/m2
Self weight of sleeper = 59.38 kN
Weight of soil over sleeper = 36.48 kN
Total dead load, D = 95.86 kN
Total pipe dead load, P(DL) = 15.00 kN
Total content load of pipe, P(Cont) = 60.00 kN
Total thermal load along / accross pipe, T = 11.25 kN
Seismic Base Shear Force, Fb =
Sd (T1) = Ordinate of design spectrum at period T1
T1 = fundamental period of vibration of the sleeper
m = total mass on the sleeper
T1 = 0s Assuming sleeper as rigid structure
(As per section 5.3.3.2.1 fo "RAPID-P0022-PUNJ-CVS-DES-5100-0001")
TB = 0.07 s
Since, 0 < T1 < TB
So, Sd(T1) = 0.13*(2/3+(T1/0.07)*(2.27/q-2/3))
q = 1.5 (from 5.3.3 of BS EN 1998)
OBE case is ignored as the ag value is less than 0.615 times.
Sd(T1) = 0.087
Total seismic load, V = 0.087*(95.86+15+60) = 14.81 kN
Wind load
Projected area (Maximum dia of pipe 10") = 0.1*5+0.275 = 0.775 m
***For pipe dia larger than 12" non standard sleeper will be designed.
Wind pressure = 0.65 kN/m2
Spacing of sleeper = 6m
Wind Load, W = 3.02 kN
Load combinations for stability check
Comb. D P(DL) P(Cont) T W V
LC1 0.9 0.9 0.9 1.35 1.5 0
LC2 0.9 0.9 0.9 1 0 1

Stability check
Check against sliding
Slide force
Sliding force along pipe way for LC1 = 1.35*T+1.5*W = 19.72 kN
Sliding force across pipe way for LC1 = 1.35*T = 15.19 kN
Resultant sliding force for LC1, Fslide = 24.89 kN
Sliding force along pipe way for LC2 = 1*T+1*V = 26.06 kN
Sliding force across pipe way for LC2 = 1*T+1*0.3*V = 15.69 kN
Resultant sliding force for LC1, Fslide = 30.42 kN
****Seismic force considered as Ex+0.3Ey
Resistance force
Total dead load 0.9*(D+P(DL)+P(Cont)) = 153.77 kN
Assuming friction coefficient m = 0.45
Total resistance force, Fstab = 69.20 kN
Factor of safety against sliding, FS = 2.27

Check against overturning


Overturning moment
Overturning moment for LC1, Mo = 19.72*(F+G+H)/1000 = 18.74 kN-m
Overturning moment for LC2, Mo = 26.06*(F+G+H)/1000 = 24.75 kN-m
Stabilising moment
Total stabilising moment, Ms = 153.77*E/2/1000 = 92.26 kN
Factor of safety against overturning, FS = 3.73
** Assuming the horizontal force act at top of the sleeper including seismic load consevatively.
** If dia of pipe increases, non standard sleepers will be designed .

Load combinations for bearing pressure check


Comb. D P(DL) P(Cont) T W V
LC1 1 1 1 1 1 0
LC2 1 1 1 1 0 1
Check for bearing pressure
Total vertical load, P = 1*(D+P(DL)+P(Cont)) = 170.86 kN
Total horizontal load, LC1 = 1*T+1*W = 14.27 kN
Total horizontal load, LC2 = 1*T+1*V = 26.06 kN
Total moment along pipe way = 26.06*(F+G+H)/1000 = 24.75 kN-m
Total moment across pipe way = (11.25+14.81*0.3)*(F+G+H)/1000 = 14.91 kN-m

Maximum pressure, pmax. = = 52.09 kN/m2


(170.86/5/1.2)+(24.75*6/5/1.2/1.2)+(14.91*6/1.2/5/5)
Minimum pressure, pmin. = = 4.87 kN/m2
(170.86/5/1.2)-(24.75*6/5/1.2/1.2)-(14.91*6/1.2/5/5)

Load combinations for foundation design


Comb. D P(DL) P(Cont) T W V
LC1 1.35 1.35 1.35 1.35 1.5 0
LC2 1 1 1 1 0 1

LC1
Total vertical load, P = 1.35*(D+P(DL)+P(Cont)) = 230.65 kN
Total horizontal load, LC1 = 1.35*T+1.5*W = 19.72 kN
Total moment along pipe way = 19.72*(F+G+H)/1000 = 18.74 kN-m
Total moment across pipe way = 1.35*T*(F+G+H)/1000 = 14.43 kN-m
Maximum pressure, pmax. = = 56.94 kN/m2
(230.65/5/1.2)+(18.74*6/5/1.2/1.2)+(14.43*6/1.2/5/5)
Minimum pressure, pmin. = = 19.94 kN/m2
(230.65/5/1.2)-(18.74*6/5/1.2/1.2)-(14.43*6/1.2/5/5)

LC2
Total vertical load, P = (D+P(DL)+P(Cont)) = 170.86 kN
Total horizontal load, LC2 = 1*T+1*V = 26.06 kN
Total moment along pipe way = 26.06*(F+G+H)/1000 = 24.75 kN-m
Total moment across pipe way = (T+0.3*V)*(F+G+H)/1000 = 14.91 kN-m
Maximum pressure, pmax. = = 52.09 kN/m2
(170.86/5/1.2)+(24.75*6/5/1.2/1.2)+(14.91*6/1.2/5/5)
Minimum pressure, pmin. = = 4.87 kN/m2
(170.86/5/1.2)-(24.75*6/5/1.2/1.2)-(14.91*6/1.2/5/5)
LC1 govern.
Design of footing
Maximum moment at face of pedestal, MEd = 6.42 kN-m
fck = 35.00 N/mm2
fyk = 500.00 N/mm2
Effective depth, d = 250-75-5 = 170.00 mm
Required reinforcement, Ast = 91.44 mm2
Asmin. = 0.26*fctm*b*d > 0.0013Ac = 325.1 mm2
Spacing of 10dia. reinforcement = 241.4 mm c/c.

Hence, provide 10 dia bar @ 200mm c/c in wall and footing on each face.
Provide 8 dia bar @ 200mm c/c as distribution reinforcement on each face.

Checking for transverse shear


Design transverse shear force at distance "d" from pedestal face, VEd = = 17.4 kN
56.94*0.305
Design shear resistance of concrete
CRd,c = 0.18/gc = 0.12
k= 1+√200/d = 2.00
r1 = Asl/(bd) = 0.0023 <0.02
Ignoring scp
VRd,c = 81.87 kN
Minimum shear resistance

vmin = 0.035*k2/3*fck1/2 = 55.88 kN


Here VEd < VRd,c. Hence, no shear reinforcement is required.
APPENDIX-3: DESIGN OF SLEEPERS

Dimension
Type
A (mm) B (mm) C (mm) D (mm) E (mm) F (mm) G (mm) H (mm) Weight (kN)
1 5000 1000 3000 250 600 300 250 400 40.6

Dead load of pipe = 0.50 kN/m2


Live load of pipe (filled with content) = 2.00 kN/m2
Spacing of sleepers = 6.00 m
Length of sleepers = 5.00 m
Assuming allowable bearing pressure of soil = 100.00 kN/m2

Pipe dead load = 15.00 kN


Self weight of sleeper = 40.63 kN
Weight of soil over sleeper = 13.44 kN
Total dead load = 69.07 kN
Total live load = 60.00 kN
Total horizontal load along pipe due to thermal load = 7.5 kN
Total horizontal load accross pipe due to thermal load = 7.5 kN
Total moment along pipe due to thermal load = 7.13 kN-m
Total moment accross pipe due to thermal load = 7.13 kN-m

Stability check
Check against sliding
Slide force
Sliding force due to thermal load (g Q = 1.1), Fslide = 8.25 kN
Resistance force
Total dead load (gG = 0.9) = 62.16 kN
Assuming friction coefficient m = 0.45
Total resistance force, F stab = 27.97 kN
Factor of safety against sliding, FS = 3.39 Ok

Check against overturning


Overturning moment
Overturning moment due to thermal load (g Q = 1.1), Mdst. = 7.84 kN
Stabilising moment
Total stabilising moment (g G = 0.9), Mstb = 18.65 kN
Factor of safety against overturning, FS = 2.38 Ok
**** For stability check weight of soil is ignored.

Check for bearing pressure


Total dead load = 69.07 kN
Total live load = 60.00 kN
Total moment along pipe due to thermal load = 7.13 kN-m
Total moment accross pipe due to thermal load = 7.13 kN-m
Maximum pressure, pmax. = 69.62 kN/m2 Ok
Miniimum pressure, pmin. = 16.42 kN/m2 Ok

As there is small moment in footing minmum reifocement to be provided.


Asmin. = 325 mm2
Spacing of 10dia. reinforcement = 241.538 mm c/c.

As there is small moment in footing and wall minmum reifocement to be provided.


Asmin. = 325 mm2
Spacing of 10dia. reinforcement = 241.538 mm c/c.
Hence, provide 10 dia bar @ 200mm c/c in wall and footing.
Provide 8 dia bar @ 200mm c/c as distribution reinforcement.
Input data Design value Supplementary reinforcement

Nominal Concrete
Equivale Thread Max. PJC W edge Bolt Tension Shear Vertical Horizontal
H see note t (Min.) Pitch, s capasity capasity supplementary supplementary
Bolt type nt Dia (S) 1 (Square) distance, (min.) (max.) (max.) reinforcement reinforcement
(d) c (min.)

(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (kN) (kN) (No of bar - φdia) (No of bar - φdia)
20 130 300 330 50 12 200 125 48.66 19.00 4-10 2-10
24 130 350 330 80 12 200 125 56.55 28.00 4-10 2-10
30 140 400 355 80 16 200 125 84.82 43.00 4-10 2-10
36 165 450 380 100 16 200 150 89.00 63.00 4-12 2-12
R
42 180 500 380 120 19 200 160 162.86 85.00 4-16 2-16
48 200 550 430 140 19 200 190 217.15 112.00 4-16 2-16
56 255 600 530 180 25 250 250 289.53 152.00 6-16 3-16
64 280 1370 580 200 32 250 270 289.53 152.00 6-16 3-16

Type Insert plate Lugs Load carrying Capacity


L (mm) W (mm) tp (mm) No.of lugs Dia (mm)Length (mm)
Tension (kN) Shear (kN)
Type 1 180 140 12 2 10 125 12 25
Type 2 260 260 16 4 10 125 24 50
Type 3 360 300 20 4 12 125 30 72
Type 4 360 300 20 6 12 125 45 108
Type 5 500 360 25 6 16 150 49 193
Type 6 500 360 25 8 16 150 74 257
Type 7 610 360 32 8 16 150 100 321

Type Dimension
A (mm) B (mm) C (mm) D (mm) E (mm) F (mm) G (mm) H (mm) Weight (kN)
1 2000 450 1100 250 600 300 250 400 16.3
2 2500 550 1400 250 600 300 250 400 20.3
3 3000 650 1700 250 600 300 250 400 24.4
4 4000 800 2400 250 600 300 250 400 32.5
5 5000 1000 3000 250 600 300 250 400 40.6