0% found this document useful (0 votes)
267 views12 pages

Upgrade Procedure - ReadSoft - PDAP 7.10 - v1.0

This document provides instructions for upgrading Process Director to version AP 7.10. It includes steps to check for required OSS notes, import necessary transport requests, manage namespaces, execute the SAP load generator, and set the buffer size. The transports should be imported one by one into any SAP client. Namespaces /COCKPIT/, /EBY/, and /RSE/ need to be set as modifiable in the development system. The SAP load generator is used to generate the objects of an imported transport request. Finally, the buffer size is set using transaction RZ11, with a recommended size of 400000 or higher.

Uploaded by

R.J. Umabalan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
267 views12 pages

Upgrade Procedure - ReadSoft - PDAP 7.10 - v1.0

This document provides instructions for upgrading Process Director to version AP 7.10. It includes steps to check for required OSS notes, import necessary transport requests, manage namespaces, execute the SAP load generator, and set the buffer size. The transports should be imported one by one into any SAP client. Namespaces /COCKPIT/, /EBY/, and /RSE/ need to be set as modifiable in the development system. The SAP load generator is used to generate the objects of an imported transport request. Finally, the buffer size is set using transaction RZ11, with a recommended size of 400000 or higher.

Uploaded by

R.J. Umabalan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 12

PROCEDURE

Process Director AP 7.10 upgrade

This document is strictly private and confidential and may not be copied nor its contents passed to any third party without the
prior written approval of VISEO
Procedure Process Director AP 7.10 upgrade

Martin Fofack 02.05.2022

Document approval

Role Name Date Signature

Author S2P Consultant Martin Fofack 02.05.2022

Verified by

Validated by

Versioning
Version Author Date Observations

v1.0 Martin Fofack 02.05.2022 Creation

2
Procedure Process Director AP 7.10 upgrade

Martin Fofack 02.05.2022

Table of contents

1 OSS notes......................................................................................................................................- 4 -
2 Transport requests.......................................................................................................................- 7 -
3 Namespace management.............................................................................................................- 9 -
3.1 Checking the namespace............................................................................................................- 9 -
3.2 Set the namespace to modifiable................................................................................................- 9 -
4 SAP load generator....................................................................................................................- 11 -
5 Setting the buffer size................................................................................................................- 12 -

3
Procedure Process Director AP 7.10 upgrade

Martin Fofack 02.05.2022

1 OSS NOTES

Check if the following OSS notes have to be applied.


If necessary, apply them and add below the OSS notes that have been applied in the system.

4
Procedure Process Director AP 7.10 upgrade

Martin Fofack 02.05.2022

5
Procedure Process Director AP 7.10 upgrade

Martin Fofack 02.05.2022

The following notes were implemented:


- To be completed

6
Procedure Process Director AP 7.10 upgrade

Martin Fofack 02.05.2022

2 TRANSPORT REQUESTS

The following transport requests need to be imported:

TR Description Comment
FQAK904169 01-KofaxProcessDirector_AP_7_10_ERP_6_0_EhP
FQAK902104 02 - Kofax_Namespaces
FQAK904172 03-KofaxProcessDirector_7_10_ERP_6_0_EhP

Important: It is recommended that you import the transports separately, one at a time, unless an error
caused by interdependencies occurs. If a return code greater than 4 is returned after importing a transport,
do not import any further transport requests! Contact VISEO for assistance and provide details about the
return code.

The import can be done into any SAP client.

Note: In systems with Enhancement Pack 5 or later, when trying to import the ReadSoft PROCESS
DIRECTOR transports, you may get the “n of n requests do not match the component version of the target
system” error message, which results in the import not being carried out. If this happens, activate the
Ignore Invalid Component Version option in the Import Transport Request dialog box. See SAP Note
1742547 for more information.

To import the transports, complete the following steps:


1. Extract the ZIP file in the SAP transport folder (...\TRANS\)
2. The transport files are already in the correct COFILES and DATA subfolders
If it is not possible to extract the transport files directly into the SAP transport folders (for
example, if there is no direct access to the file system in the SAP application server), you have to
use a binary method to transfer the files (for example, FTP). See OSS note 2050.

7
Procedure Process Director AP 7.10 upgrade

Martin Fofack 02.05.2022

3. Start the STMS SAP transaction (or use the command line using the TP program)
4. Open the import queue of the SAP system
5. Go to Extras > Other requests > Add
6. Add the required transport requests one-by-one to the import queue, in the order listed below

8
Procedure Process Director AP 7.10 upgrade

Martin Fofack 02.05.2022

3 NAMESPACE MANAGEMENT

3.1 CHECKING THE NAMESPACE

The namespaces should have already been created and activated, but it is recommended that you check
these settings.

To check the namespace settings, complete the following steps:


1. Start the SE03 SAP transaction
2. In the Administration folder, double-click Display/Change Namespaces

Namespace /COCKPIT/
Namespace role C – Recipient
Correction license 13375972671823267744
Short text PROCESS DIRECTOR - Kofax Deutschland Technologies GmbH
Owner Kofax DE Techn. GmbH

Namespace /EBY/
Namespace role C – Recipient
Correction license 05790374410114137903
Short text PROCESS DIRECTOR - Kofax Deutschland Technologies GmbH
Owner Kofax DE Techn. GmbH

Namespace /RSE/
Namespace role C – Recipient
Correction license 30855220083629765661
Short text PROCESS DIRECTOR - Kofax Deutschland Technologies GmbH
Owner Kofax DE Techn. GmbH

3.2 SET THE NAMESPACE TO MODIFIABLE

The namespaces /COCKPIT/, /EBY/ and /RSE/ need to be set as modifiable in the development system
only:
1. Start the SE03 SAP transaction
2. In the Administration folder, double-click Set System Change Option

9
Procedure Process Director AP 7.10 upgrade

Martin Fofack 02.05.2022

Set the modifiable field to X Modifiable

10
Procedure Process Director AP 7.10 upgrade

Martin Fofack 02.05.2022

4 SAP LOAD GENERATOR

To execute the load generator, complete the following steps:


1. Start the SGEN SAP transaction
2. Select Generate the objects of a transport request and click Continue
3. Select the ReadSoft PROCESS DIRECTOR transport request and click Continue

11
Procedure Process Director AP 7.10 upgrade

Martin Fofack 02.05.2022

5 SETTING THE BUFFER SIZE

To set the buffer size, complete the following steps:


1. Start the RZ11 SAP transaction
2. Enter the abap/buffersize parameter and click Display
3. A value of 400000 or higher is recommended. Ask the SAP system administrator to increase the
value, if necessary. This requires a restart of the SAP system.

12

You might also like