Job Safety Analisys: Project Name Job Activity
Job Safety Analisys: Project Name Job Activity
Job Safety Analisys: Project Name Job Activity
TASK HAZARD RISK WHO IS EXPOSED? RISK ASSESS ADDITIONAL CONTROLS RISK ASSESS
HE P RV Risk Level Action required HE P RV Risk Level Action required
~ Make sure the area is barricaded
and nobody is working beneath.
~ Appropriate PPE must be warn
such as hard hat, gloves, safety
boots and safety harness.
falling objects, lifting fatality / Injury / Property EXTREMELY ~ If ladder is in use should not be
Antenna Installation Employees / Public 4 4 16 detailed SOP required 2 4 8 HIGH RISK Control Plan Required
objects, dropping objects Damage HIGH RISK damaged and no self built.
~ No alone working.
~ No night time working.
TASK HAZARD RISK WHO IS EXPOSED? RISK ASSESS ADDITIONAL CONTROLS RISK ASSESS
HE P RV Risk Level Action required HE P RV Risk Level Action required
~ Approprate PPE such as gloves,
glasses, hard harts and safety
MODERATE
Cabling tripping, falling injury employees 2 3 6 Control Plan Required boots should be used, 1 3 3 LOW RISK Review at next opportunity
RISK
~ All cable restraints fixings to be
free of sharp edges.
~ Approprate PPE such as gloves,
glasses, hard harts and safety
boots should be used.
~ Provide sufficient lighting during
poor visibility,
~ Cranes and trucks should have
reversing alarms,
Cranes tipping, loads ~ Operators should have valid
Lifting equipment to roof Fatality, Injury, property EXTREMELY Control Plan / Further Risk Reduction MEDERATE
falling, struck by moving Employees / Public 4 3 12 certificate, 2 3 6 Control Plan Required
top damage HIGH RISK Mesures Required if practicable RISK
parts, ~ All cranes should have periodical
inspection records,
~ Slings and other lifting devices
should be in good condition and
SWL should be indicated.
~ All lifting operations should be
done by competent people,
~ Determine the possible reaction
areas for complaints before move.
~ Clear and early communication
with landlords, tenants, closed
neighbours to notify nature of
MODERATE
Execution public reaction injury Employees / Public 2 4 8 HIGH RISK Control Plan Required work. 1 4 4 Review at next opportunity
RISK
~ Considering the people in terms
of noise, waste, sensitivitıes and
visibility of themselves.