AspenEngineeringSuite2006 5-Issues
AspenEngineeringSuite2006 5-Issues
Known Issues in
AES 2006.5
Version Number: 2006.5
October 2007
Copyright (c) 2007 by Aspen Technology, Inc. All rights reserved.
Aspen ACOL™, Aspen Adsim®, Aspen Advisor™, Aspen Aerotran®, Aspen Alarm & Event™, Aspen APLE™, Aspen
Apollo Desktop™, Aspen Apollo Online™, Aspen AssetBuilder™, Aspen ATOMS™, Aspen Automated Stock
Replenishment™, Aspen Batch Plus®, Aspen Batch.21™, Aspen BatchCAD™, Aspen BatchSep™, Aspen Calc™,
Aspen Capable-to-Promise®, Aspen CatRef®, Aspen Chromatography®, Aspen Cim-IO for ACS™, Aspen Cim-IO
for Csi VXL™, Aspen Cim-IO for Dow MIF™, Aspen Cim-IO for G2™, Aspen Cim-IO for GSE D/3™, Aspen Cim-IO for
Hewlett-Packard RTAP™, Aspen Cim-IO for Hitachi PLC (H04E)™, Aspen Cim-IO for Intellution Fix™, Aspen Cim-IO
for Melsec™, Aspen Cim-IO for WonderWare InTouch™, Aspen Cim-IO for Yokogawa Centum CS™, Aspen Cim-IO
for Yokogawa Centum XL™, Aspen Cim-IO for Yokogawa EW3™, Aspen Cim-IO Interfaces™, Aspen Cim-IO
Monitor™, Aspen Cim-IO™, Aspen Collaborative Demand Management™, Aspen Collaborative Forecasting™, Aspen
Compliance.21™, Aspen Cost Factor Manual™, Aspen Crude Manager™, Aspen Crude Margin Evaluation™, Aspen
Custom Modeler®, Aspen Data Source Architecture™, Aspen Decision Analyzer™, Aspen Demand Manager™,
Aspen Distribution Scheduler™, Aspen DMCplus® Composite, Aspen DMCplus® Desktop, Aspen DMCplus® Online,
Aspen DPO™, Aspen Dynamics®, Aspen eBRS™, Aspen Enterprise Model™, Aspen ERP Connect™, Aspen FCC®,
Aspen FIHR™, Aspen FLARENET™, Aspen Fleet Operations Management™, Aspen Framework™, Aspen FRAN™,
Aspen Fuel Gas Optimizer Desktop™, Aspen Fuel Gas Optimizer Online™, Aspen General Construction Standards™,
Aspen Hetran®, Aspen HX-Net®, Aspen Hydrocracker®, Aspen Hydrotreater™, Aspen HYSYS Amines™, Aspen
HYSYS Crude™, Aspen HYSYS Dynamics™, Aspen HYSYS OLGAS 3-Phase™, Aspen HYSYS OLGAS™, Aspen HYSYS
OLI Interface™, Aspen HYSYS Tacite™, Aspen HYSYS Upstream Dynamics™, Aspen HYSYS Upstream™, Aspen
HYSYS®, Aspen Icarus Process Evaluator®, Aspen Icarus Project Manager®, Aspen InfoPlus.21®, Aspen Inventory
Balancing™, Aspen IQ Desktop™, Aspen IQ Online™, Aspen IQmodel Powertools™, Aspen Kbase®, Aspen LIMS
Interface™, Aspen Local Security™, Aspen LPIMS™, Aspen MBO™, Aspen MIMI®, Aspen MPIMS™, Aspen
Multivariate Server™, Aspen MUSE™, Aspen NPIMS™, Aspen OnLine®, Aspen Operations Manager - Event
Management™, Aspen Operations Manager - Integration Infrastructure™, Aspen Operations Manager -
Performance Scorecarding™, Aspen Operations Manager - Role Based Visualization™, Aspen Order Credit
Management™, Aspen Orion Planning™, Aspen Orion™, Aspen PIMS Blend Model Library™, Aspen PIMS Distributed
Processing™, Aspen PIMS Enterprise Edition™, Aspen PIMS Mixed Integer Programming™, Aspen PIMS Simulator
Interface™, Aspen PIMS Solution Ranging™, Aspen PIMS Submodel Calculator™, Aspen PIMS XNLP Optimizer™,
Aspen PIMS™, Aspen PIPE™, Aspen Planning Accuracy™, Aspen Plant Planner & Scheduler™, Aspen Plant
Scheduler Lite™, Aspen Plant Scheduler™, Aspen Plus OLI Interface™, Aspen Plus®, Aspen Polymers Plus®, Aspen
PPIMS™, Aspen Process Data™, Aspen Process Explorer™, Aspen Process Manual™, Aspen Process Order™, Aspen
Process Plant Construction Standards™, Aspen Process Recipe®, Aspen Process Tools™, Aspen Product Margin &
Blending Evaluation™, Aspen Production Control Web Server™, Aspen ProFES® 2P Tran, Aspen ProFES® 2P Wax,
Aspen ProFES® 3P Tran, Aspen ProFES® Tranflo, Aspen Properties®, Aspen Pumper Log™, Aspen Q Server™,
Aspen RateSep™, Aspen RefSYS CatCracker™, Aspen RefSYS Spiral™, Aspen RefSYS™, Aspen Report Writer™,
Aspen Resource Scheduling Optimization™, Aspen RTO Watch Cim-IO Server™, Aspen RTO Watch Server™, Aspen
Scheduling & Inventory Management™, Aspen SmartStep Desktop™, Aspen SmartStep Online™, Aspen SQLplus™,
Aspen Supply Chain Analytics™, Aspen Supply Chain Connect™, Aspen Supply Planner™, Aspen Tank
Management™, Aspen TASC-Mechanical™, Aspen TASC™, Aspen Teams®, Aspen Terminals Management™, Aspen
TICP™, Aspen Transition Manager™, Aspen Turbo PIMS™, Aspen Utilities™, Aspen Voice Fulfillment Management™,
Aspen Watch Desktop™, Aspen Watch Server™, Aspen Web Fulfillment Management™, Aspen WinRace Database™,
Aspen XPIMS™, Aspen Zyqad Development Version™, Aspen Zyqad™, SLM™, SLM Commute™, SLM Config
Wizard™, the aspen leaf logo, and Plantelligence are trademarks or registered trademarks of Aspen Technology,
Inc., Burlington, MA.
All other brand and product names are trademarks or registered trademarks of their respective companies.
This document is intended as a guide to using AspenTech's software. This documentation contains AspenTech
proprietary and confidential information and may not be disclosed, used, or copied without the prior consent of
AspenTech or as set forth in the applicable license agreement. Users are solely responsible for the proper use of
the software and the application of the results obtained.
Although AspenTech has tested the software and reviewed the documentation, the sole warranty for the software
may be found in the applicable license agreement between AspenTech and the user. ASPENTECH MAKES NO
WARRANTY OR REPRESENTATION, EITHER EXPRESSED OR IMPLIED, WITH RESPECT TO THIS DOCUMENTATION,
ITS QUALITY, PERFORMANCE, MERCHANTABILITY, OR FITNESS FOR A PARTICULAR PURPOSE.
Contents..................................................................................................................1
Introduction ............................................................................................................4
Aspen ACOL.............................................................................................................5
Aspen CatRef.........................................................................................................14
Contents 1
Aspen FIHR ...........................................................................................................23
Aspen FiredHeater.................................................................................................24
Aspen FRAN...........................................................................................................26
Aspen HTFS+.........................................................................................................29
Aspen Hydrotreater...............................................................................................32
Aspen HYSYS.........................................................................................................33
Aspen HX-Net........................................................................................................35
Aspen Kbase..........................................................................................................42
2 Contents
Aspen Open Object Model Framework (OOMF)......................................................51
Aspen PIPE............................................................................................................52
Aspen Plate+.........................................................................................................55
Aspen Properties...................................................................................................57
Aspen RefSYS........................................................................................................62
Aspen Tasc+..........................................................................................................68
Aspen Zyqad..........................................................................................................70
Contents 3
Introduction
Note: For additional information about Known Issues, see the AspenTech
Support web site (http://support.aspentech.com). For additional information
about issues relevant to the complete product line, see the AspenOne Known
Issues on the documentation DVD.
4 Introduction
Aspen ACOL
Aspen ACOL 5
Aspen Acol+
6 Aspen Acol+
Aspen Adsim
Aspen Adsim 7
Installation Issues Workaround/Comment
8 Aspen Adsim
Aspen Aerotran
Aspen Aerotran 9
Aspen APLE
10 Aspen APLE
Aspen Batch Plus
Note: For additional known issues related to running BatchSep within Aspen
Plus, see the Aspen Plus known issues.
12 Aspen BatchSep
Aspen Case Analysis
14 Aspen CatRef
Aspen COMThermo
Workbench
16 Aspen Chromatography
No known issues Not applicable
The Help button does not work on the Open online Help from the Help menu
following forms: and navigate to appropriate entry in
Aspen Chromatography Contents:
• Cycle Organizer form • Chromatographic Processes | Cyclic
• Triangle Theory form Operation
• Streams Configuration form in • Chromatographic Processes |
Chrom_CCC_Separator model Simulated Moving Bed Processes |
Triangle Theory
• Chromatographic Processes |
Simulated Moving Bed Processes |
Streams Configuration form
This issue will be fixed in the next
cumulative patch.
The new Global Data feature for viewing None
stream values on the flowsheet does not
work correctly when used within
hierarchy blocks
Aspen Chromatography 17
Aspen Custom Modeler
If you export a file in Aspen Model Always save your file as a .acmf file
Runner (.amrf) format, the file may not before exporting is as a .amrf file
be exported correctly if you have not
first saved the input file to a .acmf file.
Sep, Sep2, RYield and Rstoic blocks give Use a mixer block when multiple feeds
incorrect results for true component are required.
electrolyte support if there are multiple
inlet streams.
RGibbs is not supported for true None
component electrolytes.
If ValidPhases is specified as “Vapor- Change Valid Phases to “Vapor-only” for
Liquid” but results are vapor only in a this block.
block where chemistry is defined using
true components, a fatal error may occur
on export, or the simulation may fail to
converge in dynamics.
20 Aspen Dynamics
General Usability Issues Workaround/Comment
Compr model may not converge for true Turn off chemistry in Compr.
component electrolyte simulation.
MCompr model does not work for true Turn off chemistry in MCompr.
component electrolyte simulation.
RPlug and Pipe currently have None
convergence difficulties with true
component electrolytes.
Pressure relief models do not work for
true component electrolyte simulation.
Reverse Flow is not supported for true None
component electrolyte simulations.
Empty scripts are not available for true None
component electrolyte simulations.
True component electrolytes: Missing Provide missing parameters for the solid
parameters reported for solid components.
components. This occurs because
properties system is attempting to
compute liquid and vapor phase
fugacitities for all components including
solid components
True component electrolytes: For MHeatX Run simulation until it lines out and run in
with multiple zones, the initial condition steady state mode.
may not be at steady state resulting in a
temperature transient until the process
lines out
True component electrolytes: Feed Reconcile the feed stream changing the
streams on a mass flow basis give basis to mole fraction and total mole
incorrect mole flow. flow.
Aspen Dynamics 21
Aspen FCC
22 Aspen FCC
Aspen FIHR
Aspen FIHR 23
Aspen FiredHeater
24 Aspen FiredHeater
Aspen FLARENET
Previous versions of Flarenet abort the In version 2006, this check has been
calculations if the analysis of the disabled to allow an attempted solution
network topography discovers a for such configurations. The solution
separator unit operation within the body algorithm itself is unchanged and is not
of a looped circuit. (This configuration is expected to be applicable to all possible
indicated by a separator whose fluid scenarios where a looped system is
flow direction is unknown until after modelled. Particularly, you may
calculations are complete.) encounter problems if there is a
significant liquid dropout at the
separator.
Aspen FLARENET 25
Aspen FRAN
26 Aspen FRAN
Aspen Hetran
Aspen Hetran 27
Aspen HTFS
28 Aspen HTFS
Aspen HTFS+
Aspen HTFS+ 29
Aspen HTFS+ Research
Network
Aspen Hydrocracker 31
Aspen Hydrotreater
32 Aspen Hydrotreater
Aspen HYSYS
Aspen HYSYS 33
Aspen HYSYS Upstream
Aspen Hydraulics 2006 does not work If you require both versions to work on
when installed together with Aspen the same machine, contact Aspentech
hydraulics 2006.5. customer support.
In the new feature that allows the The extension of this new feature to
transfer of a Heat Exchanger Network include process stream splitters will be
from an Excel table fix format to Aspen addressed in successive Aspen HX-Net
HX-Net, networks that contain process 2006.5 patches and in the next release
stream splitters are not transferred. of Aspen HX-Net.
Aspen HX-Net 35
Aspen Icarus Evaluation
Technology
Aspen Icarus 2006.5 does not support Installation will succeed but Aspen Icarus
installation in a Terminal Server products will not function properly.
environment.
When a user other than the user who This is by design and the process should
installed Aspen Icarus 2006.5 first be allowed to complete without hitting
launches an Aspen Icarus product a the Cancel button. The dialog should
dialog appears saying Aspen Icarus only appear the first time an Aspen
2006.5 is configuring itself. Icarus product is launched. This occurs
typically with a Restricted User since the
Restricted User is not the one who
installed Aspen Icarus 2006.5.
Values not converted when Drag/Drop The values that are in any customized
item From/To project with Custom Units units of measure are not converted and
of Measure specified. the value is set to 0 in the destination
field. Only workaround at this time is to
not use customized unit specs in projects
that the Drag/Drop feature is expected
to be used.
In German Windows XP, when a project Proceed to evaluate a second time and
is opened, and evaluated for the first work with the estimate.
time, it crashes; subsequent evaluations
do no produce a crash
A “Server Busy” dialog from Windows is Press the Retry button, wait a bit and if
displayed when multiple applications are necessary repeat. If the issue is not
interchanging data. This is most resolved press the “Switch To” button
common on less capable hardware and once and then repeat the first steps.
when many applications are active.
Examples of when this issue is most
likely are when running the Icarus-
Teams interface, running the simulator
import interface or costing within the
simulators for Aspen Plus or Hysys.
Hysys simulations after Version 2.2 with Remove the unit op before loading, since
a Surge Controller unit op will fail to this is a controller block, it is not
Cannot save project after sizing shell The object database engine that is
and tube heat exchanger using HTFS+ launched during Teams sizing does not
Teams. close and prevents the project from
being saved. The user can shutdown the
database engine manually. In the
Windows taskbar the user will see an
application with “CST_RSLT” in the title
bar. Click on this application and click
the “shut down” button. Click “OK” on
the dialog box that appears. This will
shut down the database engine. After
that the project can be saved.
Not all EN/DIN/JIS materials can be All materials in ICARUS have been
imported from Teams to Kbase when mapped to appropriate ASME materials
sizing shell and tube heat exchangers in Teams. This mapping is not complete
using Teams. for EN/DIN/JIS materials. If user chooses
a material from these databanks in
Teams, they may not be properly
imported into ICARUS. The Teams
design, weight and cost information will
be imported irrespective of the material
selection in Teams. However the user
may not see the appropriate material
name in ICARUS since the material may
not be mapped.
LO11011 Error message appears when The issue seems to be intermittent. As a
using the “Send to” feature in HYSYS or workaround, try performing the action
while using the Utility feature in Aspen again. If a similar result occurs please
Icarus products on a Vista machine. contact support with details of the
actions taken that caused the error
message to occur.
Opening or Attaching a Volumetric The values are saved to the file when
Model Library item with specifications initially specified but are being lost when
for Pipe Item Detail line sizing fields re-opened or attached. No workaround
does not show the values in the GUI. exists.
A “Server Busy” dialog from Windows is Press the Retry button, wait a bit, and if
displayed when multiple applications are necessary repeat this step. If the issue is
interchanging data. This is most not resolved press the “Switch To”
common on less capable hardware and button once and then repeat the first
when many applications are active. steps.
Examples of when this issue is most
likely are when running the Icarus-
Teams interface, running the simulator
import interface or costing within the
simulators for Aspen Plus or Hysys.
Cannot save project after sizing shell The object database engine that is
and tube heat exchanger using HTFS+ launched during Teams sizing does not
Teams. close and prevents the project from
being saved. The user can shutdown the
database engine manually. In the
Windows taskbar the user will see an
application with “CST_RSLT” in the title
bar. Click on this application and click the
“shut down” button. Click “OK” on the
dialog box that appears. This will shut
down the database engine. After that the
project can be saved.
Not all EN/DIN/JIS materials can be All materials in ICARUS have been
imported from Teams to Kbase when mapped to appropriate ASME materials
sizing shell and tube heat exchangers in Teams. This mapping is not complete
using Teams. for EN/DIN/JIS materials. If user chooses
a material from these databanks in
Teams, they may not be properly
imported into ICARUS. The Teams
design, weight and cost information will
be imported irrespective of the material
selection in Teams. However the user
may not see the appropriate material
name in ICARUS since the material may
not be mapped.
Custom Model does not work in Aspen Icarus 2006 is not supported in a
Restricted User with Aspen Icarus 2006 Restricted User environment and should
and Aspen Icarus 2006.5 installed. not be installed. Registering the
ICAPICOM.dll (typically in Program
Files/AspenTech/Aspen Icarus
2006.5/Program/Sys) after 2006 is
uninstalled is a possible workaround.
Another possible workaround is to
perform a Repair installation on Aspen
Icarus 2006.5 after 2006 is uninstalled.
42 Aspen Kbase
General Usability Issues Workaround/Comment
As a default, when a PID drawing is The user can use the options menu to
opened, in Kbase, the gridlines should show the gridlines and use the view
be turned on and the drawing view 'zoom in' property to display the drawing
properties should be set so drawing better, but these options are not saved
details cover the entire screen. when another drawing is opened.
Currently, in the 2006.5 Icarus builds
when a PID drawing is opened no
gridlines appear and the drawing is
'smaller'. This appearance is different
from previous Icarus releases (2004,
2004.2, and 2006).
A “Server Busy” dialog from Windows is Press the Retry button, wait a bit, and if
displayed when multiple applications are necessary repeat this step. If the issue is
interchanging data. This is most not resolved press the “Switch To”
common on less capable hardware and button once and then repeat the first
when many applications are active. steps.
Examples of when this issue is most
likely are when running the Icarus-
Teams interface, running the simulator
import interface or costing within the
simulators for Aspen Plus or Hysys.
When a value is set with the Icarus API Pass a non-Double or Double value
function ValueWithConversion using a rounded to only a few(For example 2
Double as the argument and the value decimal places)
has many decimal places, the value is
not rounded correctly. This may impact
values set using the Zyqad Cost Mapper
interface.
The Total cost for non-Design models is None
not returned to the Zyqad Cost Mapper
interface. Non-Design models(Models
that start with E - IE EVS etc) typically
have less than 11 fields on the input
forms
Cannot save project after sizing shell The object database engine that is
and tube heat exchanger using HTFS+ launched during Teams sizing does not
Teams. close and prevents the project from
being saved. The user can shutdown the
database engine manually. In the
Windows taskbar the user will see an
application with “CST_RSLT” in the title
bar. Click on this application and click the
“shut down” button. Click “OK” on the
dialog box that appears. This will shut
down the database engine. After that the
project can be saved.
Aspen Kbase 43
General Usability Issues Workaround/Comment
Not all EN/DIN/JIS materials can be All materials in ICARUS have been
imported from Teams to Kbase when mapped to appropriate ASME materials
sizing shell and tube heat exchangers in Teams. This mapping is not complete
using Teams. for EN/DIN/JIS materials. If you choose
a material from these databanks in
Teams, they may not be properly
imported into ICARUS. The Teams
design, weight and cost information will
be imported irrespective of the material
selection in Teams. However you may
not see the appropriate material name in
ICARUS since the material may not be
mapped.
Opening or Attaching a Volumetric The values are saved to the file when
Model Library item with specifications initially specified but are being lost when
for Pipe Item Detail line sizing fields re-opened or attached. No workaround
does not show the values in the exists.
application interface.
In some projects, deleting a contractor Only workaround at this time is to export
from a project with multiple contractors the project into a specs file, edit it and
causes a crash upon reopening the import the file again.
contractor tree. However, it does not
happen in all projects
In German Windows XP, when a project Proceed to evaluate a second time and
is opened, and evaluated for the first work with the estimate.
time, it crashes; subsequent evaluations
do no produce a crash
In IPS, first attempt to schedule a This is a Primavera issue, and no solution
project causes error messages; is known at this time.
subsequently, scheduling works Generate the schedule a second time,
correctly. this should correct the issue.
44 Aspen Kbase
Aspen Model Runner
46 Aspen MUSE
Aspen OLI Interface
48 Aspen OnLine
Aspen Online Deployment
52 Aspen PIPE
Aspen Plus
Microsoft SQL Express installation will Before installing Aspen Plus on Windows
fail on Windows 2000 if MDAC 2.8 SP1 is 2000, verify that the required version of
not installed. MDAC is installed. Use Windows Update
to update MDAC, or download from:
http://www.microsoft.com/downloads/
details.aspx?FamilyID=78cac895-efc2-
4f8e-a9e0-3a1afbd5922e&
DisplayLang=en
The property databases for Aspen If possible (enough disk space exists),
Properties Enterprise Database are not uncompress the drive by navigating to
created if the drive where they are the drive in Windows Explorer. Right-
installed is compressed. You may get click it and select Properties, and clear
the following message if you try to the checkbox Compress drive to save
restore them manually: disk space.
The file "C:\Documents and Settings\All
Users\Application Data\AspenTech\APED
2006.5\AP065.MDF" is compressed but
does not reside in a read-only database
or filegroup. The file must be
decompressed.
Context sensitive help does not work on The topic BatchSep Reference in the Unit
the BatchSep forms when using the Operations Reference help for Aspen
BatchSep block in Aspen Plus. Plus has links to the relevant sections of
BatchSep help.
Time profiles for key results variables in This is planned to be added in
BatchSep are not available. Cumulative Patch 1 for version 2006.5.
A BatchSep column within Aspen Plus An effort will be made to address this
Aspen Plus 53
takes 2 to 5 times longer to solve than issue in the next version.
an identical column in Aspen BatchSep.
Consistency checking for connecting It is recommended that you attach at
streams is not supported. BatchSep will least one stream to each of the Pot
run without any streams attached. Charge, Final Column Contents, and
Distillate Streams ports.
Accessing BatchSep variables as Block- Use Block-Var to access each element of
Vec in operations such as Design-Specs the vector individually.
is not supported.
Some BatchSep columns initialized at This will be addressed in the next
Empty may fail to converge when run version.
inside Aspen Plus.
Documentation asks users to use the This program is no longer needed, and is
regcounit.exe program to register Visual no longer delivered. Use regsvr32 to
Basic CAPE-OPEN unit operation models, register Visual Basic CAPE-OPEN unit
but the file is not delivered. operation models, in the same way that
is described for C++ models in chapter
26 of Aspen Plus User Models.
Alternatively, use one of the other
methods in that chapter for Visual Basic
models besides regcounit.exe.
You cannot connect to the Aspen Configure the server for SQL Server
Properties Enterprise Database server if and Windows authentication mode.
it is not configured for SQL Server and Detailed instructions are in the topic
Windows authentication mode. This Troubleshooting Connections to a
problem occurs when a pre-existing Database Server in the
server not installed by the Aspen Troubleshooting section of the Aspen
installer is used. Properties Database Manager help.
You cannot connect to the Aspen Microsoft SQL Server Express uses a
Properties Enterprise Database server modified server name. Instead of
when Microsoft SQL Server Express is localhost, use .\SQLEXPRESS as the
used as the server. name of the local server. For a remote
server, add \SQLEXPRESS after the
computer name.
When using Aspen Properties Enterprise A patch from Microsoft will allow you to
Database on Microsoft SQL Server 2005 connect to the server. Visit:
or Microsoft SQL Server Express on a http://www.microsoft.com/downloads/
remote server, if only Microsoft SQL details.aspx?FamilyId=D09C1D60-A13C-
Server 2000 and/or MSDE is installed 4479-9B91-9E8B9D835CDC&
locally, you may be unable to connect to displaylang=en
the server, with this error:
Download the Microsoft SQL Server 2005
Linking to the server failed. Check your Backward Compatibility Components,
input for Login Name, Password, and and install the component SQLDMO from
Server. this package.
Copy-paste links of data into Excel do This issue is expected to be fixed in
not update the values in Excel when the 2006.5 CP1.
data changes in Aspen Plus.
54 Aspen Plus
Aspen Plate+
Aspen Plate+ 55
Aspen Process Tools
The property databases for Aspen If possible (enough disk space exists),
Properties Enterprise Database are not uncompress the drive by navigating to
created if the drive where they are the drive in Windows Explorer. Right-
installed is compressed. You may get click it and select Properties, and clear
the following message if you try to the checkbox Compress drive to save
restore them manually: disk space.
The file "C:\Documents and Settings\All
Users\Application Data\AspenTech\APED
2006.5\AP065.MDF" is compressed but
does not reside in a read-only database
or filegroup. The file must be
decompressed.
You cannot connect to the Aspen Configure the server for SQL Server
Properties Enterprise Database server if and Windows authentication mode.
it is not configured for SQL Server and Detailed instructions are in the topic
Windows authentication mode. This Troubleshooting Connections to a
problem occurs when a pre-existing Database Server in the
server not installed by the Aspen Troubleshooting section of the Aspen
installer is used. Properties Database Manager help.
Aspen Properties 57
58 Aspen Properties
General Usability Issues Workaround/Comment
You cannot connect to the Aspen Microsoft SQL Server Express uses a
Properties Enterprise Database server modified server name. Instead of
when Microsoft SQL Server Express is localhost, use .\SQLEXPRESS as the
used as the server. name of the local server. For a remote
server, add \SQLEXPRESS after the
computer name.
When using Aspen Properties Enterprise A patch from Microsoft will allow you to
Database on Microsoft SQL Server 2005 connect to the server. Visit:
or Microsoft SQL Server Express on a http://www.microsoft.com/downloads/
remote server, if only Microsoft SQL details.aspx?FamilyId=D09C1D60-A13C-
Server 2000 and/or MSDE is installed 4479-9B91-9E8B9D835CDC&
locally, you may be unable to connect to displaylang=en
the server, with this error:
Download the Microsoft SQL Server 2005
Linking to the server failed. Check your Backward Compatibility Components,
input for Login Name, Password, and and install the component SQLDMO from
Server. this package.
Aspen Properties 59
Aspen Polymers Plus
Petroleum Properties with the same Use “Copy Properties” button to transfer
name as user properties will not be the properties from user properties to
imported from PIMS assay. petroleum properties.
Oil Manager oil when imported to Use “Assay Manipulator” to refine TBP
RefSYS petroleum assay has a curves and property curves.
discrepancy in TBP and property curves.
62 Aspen RefSYS
Plots in Column Calibration do not Not Available.
update when performing manual tuning.
Spurious inconsistency errors around Re-flash recycle outlet stream by
recycle outlet streams. modifying its operating conditions.
A PIMS assay can be imported only for Not Available.
the default fluid package.
The No Creep and Abort buttons do not Manually create a dmo.msg to turn the
always show up for the FCC, Reformer, creep steps off or abort the run.
and Hydrocracker models. At times,
when they do show up, they can’t get
control from OOMF so they are
ineffective.
The hydrocracker currently does not For operations where you think the
transfer metals or concarbon. For many metals or concarbon will not be
units, this approximation is fine, but for completely removed, you can use an
some units, it is important to have real assay manipulator to reset the curves.
values.
Aspen RefSYS 63
Aspen Remote Simulation
Service
Get ‘Excel waiting’ dialog after clicking Excel may be waiting for you to complete
Enable button. the Aspen Registration dialog which
sometimes is hidden behind Excel. Use
the Alt-Tab key combination to switch to
the registration dialog.
Unexpected simulation failures when This can be caused by exhaustion of
running cases remotely. Windows desktop heap allocated to the
Aspen Remote Simulation Service. See
Microsoft Knowledge Base articles
126962 and 184802.
More desktop heap is available if the
service configuration is changed to
a) “Logon as System” and
b) Enable “Interact with desktop”
Aspen TASC 67
Aspen Tasc+
68 Aspen Tasc+
Aspen Teams
Aspen Teams 69
Aspen Zyqad
70 Aspen Zyqad
General Usability Issues Workaround/Comment
Some customers have Enable automatic retry. To do so, you must set, on
reported issues with multiple the client computer, the following registry keys in:
client connections to a server HKEY_LOCAL_MACHINE\SOFTWARE\AspenTech\A
in network environments spen Zyqad\14.1\ClientTools
where user authentication
tends to be a slow process.
Aspen Zyqad 71