BICSI international standards contain information deemed to be of technical value to the industry and are published at
the request of the originating committee. The BICSI International Standards Program subjects all of its draft standards
to a rigorous public review and comment resolution process, which is a part of the full development and approval
process for any BICSI international standard.
The BICSI International Standards Program reviews its standards at regular intervals. By the end of the fifth year after
a standard’s publication, the standard will be reaffirmed, rescinded, or revised according to the submitted updates and
comments from all interested parties.
Suggestions for revision should be directed to the BICSI International Standards Program, care of BICSI.
Copyright
This BICSI document is a standard and is copyright protected. Except as permitted under the applicable laws of the
user's country, neither this BICSI standard nor any extract from it may be reproduced, stored in a retrieval system or
transmitted in any form or by any means, electronic, photocopying, recording, or otherwise, without prior written
permission from BICSI being secured.
Published by:
BICSI
8610 Hidden River Parkway
Tampa, FL 33637-1000 USA
i
--`,,```,,,,````-`-`,,`,,`,`,,`---
BICSI standards and publications are designed to serve the public interest by offering information communication and
technology systems design guidelines and best practices. Existence of such standards and publications shall not in any
respect preclude any member or nonmember of BICSI from manufacturing or selling products not conforming to such
standards and publications, nor shall the existence of such standards and publications preclude their voluntary use,
whether the standard is to be used either domestically or internationally.
By publication of this standard, BICSI takes no position respecting the validity of any patent rights or copyrights
asserted in connection with any item mentioned in this standard. Additionally, BICSI does not assume any liability to
any patent owner, nor does it assume any obligation whatever to parties adopting the standard or publication. Users of
this standard are expressly advised that determination of any such patent rights or copyrights, and the risk of
infringement of such rights, are entirely their own responsibility.
This standard does not purport to address all safety issues or applicable regulatory requirements associated with its use.
It is the responsibility of the user of this standard to review any existing codes and other regulations recognized by the
national, regional, local, and other recognized authorities having jurisdiction (AHJ) in conjunction with the use of this
standard. Where differences occur, those items listed within the codes or regulations of the AHJ supersede any
requirement or recommendation of this standard.
All warranties, express or implied, are disclaimed, including without limitation, any and all warranties concerning the
accuracy of the contents, its fitness or appropriateness for a particular purpose or use, its merchantability and its non-
infringement of any third-party’s intellectual property rights. BICSI expressly disclaims any and all responsibilities for
the accuracy of the contents and makes no representations or warranties regarding the content’s compliance with any
applicable statute, rule, or regulation.
BICSI shall not be liable for any and all damages, direct or indirect, arising from or relating to any use of the contents
contained herein, including without limitation any and all indirect, special, incidental, or consequential damages
(including damages for loss of business, loss of profits, litigation, or the like), whether based upon breach of contract,
breach of warranty, tort (including negligence), product liability or otherwise, even if advised of the possibility of such
damages. The foregoing negation of damages is a fundamental element of the use of the contents hereof, and these
contents would not be published by BICSI without such limitations.
--`,,```,,,,````-`-`,,`,,`,`,,`---
ii
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
Data Center Design and Implementation Best Practices
TABLE OF CONTENTS
1 Introduction ..................................................................................................................................... 1
1.1 General ............................................................................................................................................................ 1
1.2 Purpose ............................................................................................................................................................ 1
1.2.1 Users Within IT .......................................................................................................................................... 1
1.2.2 Users Within Facilities Group .................................................................................................................... 1
1.2.3 Staff Outside IT and Facilities Groups ....................................................................................................... 2
1.3 Categories of Criteria..................................................................................................................................... 2
2 Scope ............................................................................................................................................... 2
iii
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
ANSI/BICSI 002-2019
iv
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
Data Center Design and Implementation Best Practices
7 Architectural .................................................................................................................................. 81
7.1 Facilities Planning ........................................................................................................................................ 81
7.1.1 General Overview ..................................................................................................................................... 81
7.1.2 Site Selection ............................................................................................................................................ 81
7.1.3 Data Center Location Relative to Ground Level ...................................................................................... 82
7.2 General Design Concepts ............................................................................................................................. 82
7.2.1 Levels of Reliability ................................................................................................................................. 82
7.2.2 Facility Purpose ........................................................................................................................................ 82
7.2.3 Multiuser Versus Single User Groups ...................................................................................................... 83
7.2.4 Equipment Change Cycle ......................................................................................................................... 83
7.2.5 Occupied Versus Unoccupied Data Centers ............................................................................................. 83
7.2.6 Data Center Location Within Building ..................................................................................................... 83
7.2.7 Type of Building ....................................................................................................................................... 84
7.2.8 Multitenant Buildings ............................................................................................................................... 84
7.2.9 24/7 Operation of Data Center .................................................................................................................. 84
7.2.10 Temperature and Humidity Control.......................................................................................................... 84
7.2.11 Materials ................................................................................................................................................... 84
7.3 General Paths of Access ............................................................................................................................... 85
7.3.1 General Access ......................................................................................................................................... 85
7.3.2 Data Center Access ................................................................................................................................... 85
7.3.3 Equipment Access .................................................................................................................................... 85
7.3.4 Telecommunications Access Provider Entry into Computer Rooms ........................................................ 86
7.3.5 Vendor Access .......................................................................................................................................... 86
7.3.6 Support Equipment Service Access .......................................................................................................... 86
7.4 Planning Detail ............................................................................................................................................. 86
7.4.1 Entry ......................................................................................................................................................... 86
7.4.2 Command Center and Personnel Areas .................................................................................................... 86
7.4.3 Printer Room ............................................................................................................................................ 87
7.4.4 Media Storage Room ................................................................................................................................ 87
7.4.5 Restrooms and Break Rooms.................................................................................................................... 87
7.4.6 Computer Room ....................................................................................................................................... 87
7.4.7 Entrance Rooms ........................................................................................................................................ 87
7.4.8 Mechanical Equipment Space................................................................................................................... 88
7.4.9 Electrical Room and UPS Room .............................................................................................................. 88
7.4.10 Battery Room............................................................................................................................................ 88
7.4.11 Fire Suppression Room ............................................................................................................................ 89
7.4.12 Circulation ................................................................................................................................................ 89
7.4.13 Equipment Staging and Storage................................................................................................................ 89
7.4.14 Equipment Repair Room .......................................................................................................................... 89
--`,,```,,,,````-`-`,,`,,`,`,,`---
v
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
ANSI/BICSI 002-2019
8 Structural ........................................................................................................................................97
8.1 Building Code Compliance and Coordination ........................................................................................... 97
8.1.1 Requirements ............................................................................................................................................ 97
8.1.2 Additional Information ............................................................................................................................. 97
8.2 Impact of Site Location on Structural Loading ......................................................................................... 97
8.2.1 Introduction ............................................................................................................................................... 97
8.2.2 Recommendations ..................................................................................................................................... 97
8.3 Structural Concerns Specific to Data Center Design ................................................................................ 97
8.3.1 Floor Load ................................................................................................................................................ 97
8.3.2 Raised Access Floors ................................................................................................................................ 98
8.3.3 Mission Critical Equipment in Seismically Active Areas ......................................................................... 98
8.3.4 Wind ......................................................................................................................................................... 99
8.3.5 Earthquake ................................................................................................................................................ 99
8.3.6 Blast and Terrorist Attack ....................................................................................................................... 100
8.3.7 Ice Shard Impact ..................................................................................................................................... 100
vi
--`,,```,,,,````-`-`,,`,,`,`,,`---
--`,,```,,,,````-`-`,,`,,`,`,,`---
9.6.6 Cooling Systems ..................................................................................................................................... 173
9.6.7 Mounting ................................................................................................................................................ 174
9.7 Automation and Control ............................................................................................................................ 174
9.7.1 Introduction ............................................................................................................................................ 174
9.7.2 Monitoring .............................................................................................................................................. 174
9.7.3 Control .................................................................................................................................................... 175
9.7.4 System Integration .................................................................................................................................. 175
9.8 Lighting ....................................................................................................................................................... 175
9.8.1 Introduction ............................................................................................................................................ 175
9.8.2 General Recommendations ..................................................................................................................... 176
9.8.3 Computer Rooms .................................................................................................................................... 176
9.8.4 Support Areas ......................................................................................................................................... 177
9.9 Bonding, Grounding, Lightning Protection, and Surge Suppression .................................................... 177
9.9.1 Introduction ............................................................................................................................................ 177
9.9.2 General Recommendations ..................................................................................................................... 182
9.9.3 Lightning Protection ............................................................................................................................... 183
9.9.4 Surge Suppression/Surge Protective Devices (SPDs) ............................................................................. 183
9.9.5 Telecommunications Surge Protection ................................................................................................... 185
9.9.6 Building Ground (Electrode) Ring ......................................................................................................... 186
9.9.7 Supplementary Bonding and Grounding ................................................................................................ 186
9.9.8 Information Technology Equipment Interconnections ........................................................................... 192
9.9.9 Power System Bonding and Grounding.................................................................................................. 195
9.10 Labeling and Signage ................................................................................................................................. 200
9.10.1 Introduction ............................................................................................................................................ 200
9.10.2 Requirements .......................................................................................................................................... 200
9.10.3 Recommendations .................................................................................................................................. 201
9.11 Testing and Quality Assurance ................................................................................................................. 202
9.11.1 Requirements .......................................................................................................................................... 202
9.11.2 Recommendations .................................................................................................................................. 202
vii
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
ANSI/BICSI 002-2019
viii
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
Data Center Design and Implementation Best Practices
ix
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
ANSI/BICSI 002-2019
12 Security ........................................................................................................................................277
12.1 Introduction ................................................................................................................................................ 277
12.2 Definitions ................................................................................................................................................... 278
12.3 Data Center Security Plan ......................................................................................................................... 279
12.3.1 Introduction ............................................................................................................................................. 279
12.3.2 Recommendations ................................................................................................................................... 279
12.3.3 Physical Security Plan............................................................................................................................. 280
12.3.4 IT/Cyber Security Plan ........................................................................................................................... 280
12.3.5 Disaster Recovery Plan ........................................................................................................................... 280
12.3.6 Emergency and Other Required Plans .................................................................................................... 280
12.4 Design and the Data Center Security Plan ............................................................................................... 281
12.4.1 Introduction ............................................................................................................................................. 281
12.4.2 General .................................................................................................................................................... 281
12.4.3 Access Control ........................................................................................................................................ 281
12.4.4 Signage and Display Policy and Procedures ........................................................................................... 282
12.4.5 Fire Prevention, Detection, and Suppression .......................................................................................... 282
12.4.6 Monitoring and Alarms Policy and Procedures ...................................................................................... 282
12.4.7 Material Control and Loss Prevention .................................................................................................... 283
12.4.8 Surveillance Policy and Procedure ......................................................................................................... 283
12.5 Building Site Considerations ..................................................................................................................... 283
12.5.1 Introduction ............................................................................................................................................. 283
12.5.2 General Recommendations ..................................................................................................................... 283
12.5.3 Lighting................................................................................................................................................... 284
12.5.4 Perimeter Fencing and Barriers............................................................................................................... 284
12.5.5 Automotive Threats and Concerns .......................................................................................................... 285
12.5.6 Threat History ......................................................................................................................................... 286
12.5.7 Natural Threats and Concerns ................................................................................................................. 286
12.5.8 Chemical, Biological, Radiological, Nuclear, and Explosives................................................................ 286
12.5.9 Medical Disasters and Epidemics ........................................................................................................... 287
12.5.10 Crime Prevention Through Environment Design.................................................................................... 287
12.6 Data Center Elements ................................................................................................................................ 288
12.6.1 Barriers ................................................................................................................................................... 288
12.6.2 Lighting................................................................................................................................................... 297
12.6.3 Access Control ........................................................................................................................................ 298
12.6.4 Alarms..................................................................................................................................................... 306
12.6.5 Surveillance ............................................................................................................................................ 307
12.6.6 Time Synchronization ............................................................................................................................. 309
12.7 Building Shell .............................................................................................................................................. 310
12.7.1 General Recommendations ..................................................................................................................... 310
12.7.2 Doorways and Windows ......................................................................................................................... 311
12.7.3 Signage and Displays .............................................................................................................................. 311
12.7.4 Construction ............................................................................................................................................ 311
12.7.5 Elevators ................................................................................................................................................. 311
12.7.6 Emergency Exits ..................................................................................................................................... 312
12.7.7 Utilities ................................................................................................................................................... 312
12.7.8 Hazardous Material Storage .................................................................................................................... 312
12.8 Computer Room and Critical Facility Areas Special Considerations .................................................... 312
12.8.1 General .................................................................................................................................................... 312
12.8.2 Construction ............................................................................................................................................ 313
12.8.3 Eavesdropping ........................................................................................................................................ 313
--`,,```,,,,````-`-`,,`,,`,`,,`---
x
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
Data Center Design and Implementation Best Practices
xi
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
ANSI/BICSI 002-2019
xii
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
Data Center Design and Implementation Best Practices
xiii
--`,,```,,,,````-`-`,,`,,`,`,,`---
--`,,```,,,,````-`-`,,`,,`,`,,`---
16.8.2 Training Schedules ................................................................................................................................. 434
16.8.3 Position or Task Training........................................................................................................................ 434
xiv
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
Data Center Design and Implementation Best Practices
--`,,```,,,,````-`-`,,`,,`,`,,`---
B.10 Other Reliability Alternatives ................................................................................................................... 465
B.11 Reliability Planning Worksheet ................................................................................................................ 465
xv
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
ANSI/BICSI 002-2019
xvi
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
Data Center Design and Implementation Best Practices
INDEX OF FIGURES
--`,,```,,,,````-`-`,,`,,`,`,,`--- xvii
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
ANSI/BICSI 002-2019
Figure 9-19 Multiple-Module UPS Bypass – Multiple Bypass Sources - Inputs to Rectifiers and Static
Bypass from Primary Source, and Input to Maintenance Bypass from a Second Source............. 131
Figure 9-20 Topology Inside an UPS Unit ....................................................................................................... 131
Figure 9-21 An Example of an Approach to UPS Output Switchboard Load Management ............................ 135
Figure 9-22 PDU Configuration: Single-Corded and Poly-Corded Devices.................................................... 136
Figure 9-23 Example of a Power Strip for Mounting in ITE Cabinets ............................................................ 137
Figure 9-24 Automatic Static Transfer Switches ............................................................................................. 138
Figure 9-25 System Capacities at Various Stages of the Electrical Distribution System ................................. 145
Figure 9-26 Class F0 and F1 Circuit Mapping ................................................................................................. 146
Figure 9-27 Class F2 Circuit Mapping ............................................................................................................. 147
Figure 9-28 Class F3 Circuit Mapping (Manual Operations)........................................................................... 149
Figure 9-29 Class F3 Circuit Mapping (Automated Operations) ..................................................................... 150
Figure 9-30 Class F4 Circuit Mapping ............................................................................................................. 151
Figure 9-31 Class F3 50 to 600 VDC Circuit Mapping ..................................................................................... 152
Figure 9-32 Class F4 50 to 600 VDC Circuit Mapping ..................................................................................... 152
Figure 9-33 Example Organization of an EPO System .................................................................................... 154
--`,,```,,,,````-`-`,,`,,`,`,,`---
Figure 9-34 Sample Power Circuits for a Class F3 Mechanical System .......................................................... 156
Figure 9-35 Sample Power Circuits for a Class F4 Mechanical System .......................................................... 156
Figure 9-36 Example Critical Facility Bonding and Grounding Diagram for Class F2 and Lower ................. 179
Figure 9-37 Example of Critical Facility Bonding and Grounding Diagram for Class F3 ............................... 180
Figure 9-38 Example Class F4 Bonding and Grounding Diagram (Two MGB and Two Entrance
Facilities) ...................................................................................................................................... 181
Figure 9-39 Typical Data Center Grounding Schema (shown with raised floor) ............................................. 187
Figure 9-40 Typical Configuration of Flat Strip-Type SBG Within a Mesh-BN ............................................. 189
Figure 9-41 Adjacent Rolls Of Flat-Strip-Type SBG Being Exothermically-Welded Together ...................... 189
Figure 9-42 Data Center Grounding Infrastructure (Room Level) Example ................................................... 190
Figure 9-43 Example of Equipment Rack Bonding to a Mesh-BN .................................................................. 191
Figure 9-44 Examples of Inappropriate Equipment Rack Bonding to a Mesh-BN .......................................... 192
Figure 9-45 Examples of a Rack Bonding Conductor and Rack Grounding Busbar Mounting....................... 193
Figure 9-46 Example of Bonding of Cabinet Side Panel and Door ................................................................. 194
Figure 9-47 Telecommunications Bonding and Grounding Infrastructure ...................................................... 196
Figure 9-48 Similarity of Recommended Grounding for AC and DC Power Systems and Load Equipment .. 197
Figure 9-49 DC Power System Showing a Single-Point Grounded Return ..................................................... 198
Figure 9-50 Information Technology Equipment Showing Grounding of DC Power Input (Return Is
Insulated) ...................................................................................................................................... 198
Figure 9-51 Common Bonding Network ......................................................................................................... 199
Figure 9-52 Isolated (Insulated) Bonding Network.......................................................................................... 199
Figure 9-53 Sample Equipment Nameplate ..................................................................................................... 201
Figure 9-54 Example Arc Flash Warning Label (United States) ..................................................................... 201
xviii
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
Data Center Design and Implementation Best Practices
--`,,```,,,,````-`-`,,`,,`,`,,`---
Figure 10-25 Class F4 Piping and Valve Redundancy Example ........................................................................251
Section 12 Security
Figure 12-1 Security Measures .........................................................................................................................277
Figure 12-2 Security Layers..............................................................................................................................278
Figure 12-3 Levels of Access Control ..............................................................................................................298
Figure 12-4 Example of an Access Control System Topology .........................................................................303
xix
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
ANSI/BICSI 002-2019
xx
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
Data Center Design and Implementation Best Practices
Section 16 Commissioning
Figure 16-1 General Commissioning Phases Flow Chart .................................................................................419
Figure 16-2 Pre-Design Commissioning Phase Flow Chart .............................................................................420
Figure 16-3 Design Commissioning Phase Flow Chart ....................................................................................421
Figure 16-4 Construction Commissioning Phase Flow Chart ...........................................................................422
Figure 16-5 Occupancy and Operations Commissioning Phase Flow Chart .....................................................423
Appendix C Alignment of Data Center Services Reliability with Application and System
Architecture (Informative)
Figure C-1 Class A0 and A1 Application Architecture ...................................................................................470
Figure C-2 Class A2 Application Architecture................................................................................................471
Figure C-3 Class A3 and A4 Application Architecture ...................................................................................472
Figure C-4 Class S0 and S1 Systems Architecture ..........................................................................................474
Figure C-5 Class S2 Systems Architecture ......................................................................................................474
Figure C-6 Class S3 Systems Architecture ......................................................................................................475
Figure C-7 Class S4 Systems Architecture ......................................................................................................476
--`,,```,,,,````-`-`,,`,,`,`,,`---
Appendix G Design for Energy Efficiency (Informative)
Figure G-1 Example of Data Center Electricity Utilization.............................................................................503
xxi
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
ANSI/BICSI 002-2019
xxii
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
Data Center Design and Implementation Best Practices
INDEX OF TABLES
Section 7 Architectural
Table 7-1 Minimum Fire Rating of Spaces .....................................................................................................91
Table 7-2 Computer Room Access Floor Performance Specifications ...........................................................93
Table 7-3 Suspended Ceiling Infrastructure Mounting Recommendations .....................................................95
--`,,```,,,,````-`-`,,`,,`,`,,`---
Table 9-14 Class Requirements for Temperature Sensors ...............................................................................174
Table 9-15 SPD Locations as per Class ...........................................................................................................184
Table 9-16 Grounding and Bonding Connection Schedule .............................................................................190
Table 9-17 Electrical Systems Availability Classes ........................................................................................203
xxiii
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
ANSI/BICSI 002-2019
Section 12 Security
Table 12-1 Minimum Lighting Levels ............................................................................................................ 284
Table 12-2 Thickness of Concrete Wall for Projectile Protection .................................................................. 289
Table 12-3 Vehicle Barrier Comparison ......................................................................................................... 290
Table 12-4 Speed Of Concrete Wall Penetration ............................................................................................ 291
Table 12-5 Time to Penetrate Industrial Pedestrian Doors ............................................................................. 292
Table 12-6 Time to Penetrate Windows ......................................................................................................... 293
xxiv
--`,,```,,,,````-`-`,,`,,`,`,,`---
Appendix C Alignment of Data Center Services Reliability with Application and System
Architecture (Informative)
Table C-1 Tactics for Class A0 and A1 .........................................................................................................470
Table C-2 Tactics for Class A2 ......................................................................................................................471
Table C-3 Tactics for Class A3 and A4 .........................................................................................................472
Table C-4 Tactics for Class S0 and S1 ...........................................................................................................473
Table C-5 Tactics for Class S2 .......................................................................................................................474
Table C-6 Tactics for Class S3 .......................................................................................................................475
Table C-7 Tactics for Class S4 .......................................................................................................................476
--`,,```,,,,````-`-`,,`,,`,`,,`---
xxv
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
ANSI/BICSI 002-2019
xxvi
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
Data Center Design and Implementation Best Practices
PREFACE
Revision History
June 18, 2010 First publication of this standard, titled BICSI 002-2010, Data Center Design and
Implementation Best Practices
March 15, 2011 Revision of BICSI 002-2010 published as ANSI/BICSI 002-2011, Data Center Design and
Implementation Best Practices
Minor revisions include: definitions, updating of graphics for printing and readability, other editorial corrections
December 9, 2014 Revision of ANSI/BICSI 002-2011 published as ANSI/BICSI 002-2014, Data Center Design
and Implementation Best Practices
xxvii
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
ANSI/BICSI 002-2019
• Updated Section 10, Mechanical, to reflect expanded ASHRAE guidelines for temperature and humidity.
• Updated Section 11, Fire Protection section to reflect changes in NFPA 75 and NFPA 76.
• Updated Section 14, Telecommunications, to reflect updates to ISO, TIA, and CENELEC data center cabling
standards including cable types (removed OM1 and OM2, recommend OM4, added Category 8) and addition
of intermediate distributor.
• Revised content regarding zinc whiskers and moved to Section 7, Architectural.
• Added content on testing equipment, system testing, acceptance testing, equipment operations and
maintenance manuals, and system training to Section 16, Commissioning.
• Revised and moved system availability information to Appendix B, Reliability and Availability. (content
formerly in Section 17, Maintenance).
• Added new content on maintenance plans and service contracts in Section 17, Maintenance.
• General content relocation and editorial corrections to improve readability and reduce ambiguity.
May 1, 2019 Revision of ANSI/BICSI 002-2014 published as ANSI/BICSI 002-2019, Data Center Design
and Implementation Best Practices
--`,,```,,,,````-`-`,,`,,`,`,,`---
• Expansion of equipment access and pathway (e.g., ramps) requirements and recommendations within Section
6, Space Planning and Section 7, Architectural
• Update to access floors requirements for seismically active areas in Section 8, Structural
• Addition of lithium ion (Li-ion) batter information within multiple sections
• Alignment of telecommunications bonding and grounding terminology to international usage in Section 9,
Electrical Systems
• Revision of equipment cabinet and rack bonding in Section 9, Electrical Systems
• Addition of oxygen deletion systems and fire alarm systems and an update to gaseous fire suppression systems
in Section 11, Fire Protection
• Addition of time synchronization in Section 12, Security
• Expansion of content related to entrance facilities, entrance rooms, and meet-me rooms in multiple sections
• Addition of ICT infrastructure requirements for supporting and non-computer room systems
• Revision to permissible backbone and horizontal cabling media and addition of optical fiber connector
cleaning in Section 14, Telecommunications Cabling, Infrastructure, Pathways and Spaces
xxviii
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
Data Center Design and Implementation Best Practices
This standard has the following usability features as aids to the user:
• Additions and changes, other than those for editorial purposes, are indicated with a vertical rule within the left
page margin.
• Deletion of one or more paragraphs is indicated with a bullet (•) between the content that remains
NOTE: The relocation of content within or between sections (e.g., Section 10, Mechanical Systems, Section 12,
Security) related to structure, readability, or content alignment is not indicated.
Translation Notice
This standard may have one or more translations available as a reference for the convenience of its readers. As that act
of translation may contain inconsistencies with the original text, if differences between the translation and the published
English version exist, the English text shall be used as the official and authoritative version.
--`,,```,,,,````-`-`,,`,,`,`,,`---
xxix
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
ANSI/BICSI 002-2019
--`,,```,,,,````-`-`,,`,,`,`,,`---
xxx
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
Data Center Design and Implementation Best Practices
1 Introduction
1.1 General
This standard is written with the expectation that the reader is familiar with the different facets of the design process
(See Appendix A). The reader should understand from which role and point of view he or she intends to use this
document (e.g., information technology, facilities, other corporate internal or external to the owner). Refer to Sections
1.2.1 – 1.2.3 below.
1.2 Purpose
This standard provides a reference of common terminology and design practice. It is not intended to be used by architects
and engineers as their sole reference or as a step-by-step design guide, but may be used by such persons to determine
design requirements in conjunction with the data center owner, occupant, or consultant.
This standard is intended primarily for:
• Data center owners and operators
• Telecommunications and information technology (IT) consultants and project managers
• Telecommunications and IT technology installers
Additionally, individuals in the following groups are also served by this standard.
1.2.1 Users Within IT
1.2.1.1 IT and Telecommunications Designers
IT and telecommunications designers and consultants may use BICSI 002 in conjunction with the appropriate local
telecommunications infrastructure standard (e.g., ANSI/TIA-942-B, AS/NZS 2834-1995 Computer Accommodation,
CENELEC EN 50173 Series, ISO/IEC 24764) to design the telecommunications pathways, spaces, and cabling system
for the data center. The telecommunications designer/consultant should work with the data center architects and
engineers to develop the IT and telecommunications equipment floor plan using guidelines specified in this standard.
1.2.1.2 IT and Telecommunications Management
IT and telecommunications management may use BICSI 002 as an aid in defining initial data center design requirements
based on required levels of security, reliability, and availability. IT and telecommunications should work with
information protection management, the business continuity group, and end user departments to determine the required
levels of security, reliability, and availability.
1.2.1.3 IT Operations Management
Working with facilities groups, IT operations managers may use BICSI 002 to guide the requirements they specify to
outsource suppliers who provide computing services and server room IT operations.
1.2.1.4 Information Security
Information security personnel may use BICSI 002 as a guide in defining and implementing information protection and
security and assisting in the development of standard policies and operating procedures.
1.2.2 Users Within Facilities Group
1.2.2.1 Technical Representatives Within Facilities Group Capital Projects
Facilities group technical representatives may use BICSI 002 as a guide during the project planning phase as they
estimate costs, prepare preliminary design and construction schedules, and prepare requests for professional services
(RFPS) for the design and construction of new or renovated IT facilities. Thus, after the method of project delivery is
determined, BICSI 002 becomes a referenced document in the RFPS that the facilities group prepares and issues to
architecture and engineering (A/E) and design-build (D/B) firms. These companies, in turn, bid on the design and
construction of the IT facilities.
1.2.2.2 Facilities Management Representatives Within Facilities Group
Facilities operations and management may use BICSI 002 as a guide in planning the operation and maintenance of
corporate IT facilities so that these facilities maintain defined levels of reliability and availability. For example, BICSI
002 provides guidance in defining training needs and maintenance schedules of critical equipment for operations and
maintenance personnel.
--`,,```,,,,````-`-`,,`,,`,`,,`---
1
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
ANSI/BICSI 002-2019
2 Scope
This standard provides best practices and implementation methods that complement TIA, CENELEC, ISO/IEC and
other published data center standards and documents. It is primarily a design standard, with installation requirements
and guidelines related to implementing a design. The standard includes other installation requirements and guidelines
for data centers where appropriate.
--`,,```,,,,````-`-`,,`,,`,`,,`---
2
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
Data Center Design and Implementation Best Practices
ASTM International
• ASTM E84, Standard Test Method for Surface Burning Characteristics of Building Materials
BICSI
• ANSI/BICSI 005, Electronic Safety and Security (ESS) System Design and Implementation Best Practices
• ANSI/BICSI 006, Distributed Antenna System (DAS) Design and Implementation Best Practices
• ANSI/BICSI 007, Information Communication Technology Design and Implementation Practices for
Intelligent Buildings and Premises
• ANSI/BICSI 008, Wireless Local Area Network (WLAN) Systems Design and Implementation Best Practices
3
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
ANSI/BICSI 002-2019
--`,,```,,,,````-`-`,,`,,`,`,,`---
• IEEE 484, IEEE Recommended Practice for Installation Design and Installation of Vented Lead-Acid Batteries
for Stationary Applications
• IEEE 1100 (The IEEE Emerald Book), IEEE Recommended Practice for Powering and Grounding Electronic
Equipment
• IEEE 1106, IEEE Recommended Practice for Installation, Maintenance, Testing, and Replacement of Vented
Nickel-Cadmium Batteries for Stationary Applications
• IEEE 1115, IEEE Recommended Practice for Sizing Nickel-Cadmium Batteries for Stationary Applications
• IEEE 1184, IEEE Guide for Batteries for Uninterruptible Power Supply Systems
• IEEE 1187, IEEE Recommend Practice for Installation Design and Installation of Valve-Regulated Lead-Acid
Batteries for Stationary Applications
• IEEE 1188, IEEE Recommended Practice for Maintenance, Testing, and Replacement of Valve-Regulated
Lead-Acid (VRLA) Batteries for Stationary Applications
• IEEE 1189, IEEE Guide for the Selection of Valve-Regulated Lead-Acid (VRLA) Batteries for Stationary
Applications
• IEEE 1491, IEEE Guide for Selection and Use of Battery Monitoring Equipment in Stationary Applications
• IEEE 1578, IEEE Recommended Practice for Stationary Battery Electrolyte Spill Containment and
Management
4
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,
Data Center Design and Implementation Best Practices
Telcordia
• Telcordia GR-63-CORE, NEBS Requirements: Physical Protection
• Telcordia GR-139, Generic Requirements for Central Office Coaxial Cable
• Telcordia GR-3028-CORE, Thermal Management in Telecommunications Central Offices
5
Provided by IHS Licensee=/, User=,
No reproduction or networking permitted without license from IHS Not for Resale,