Always manage our operations in the safest manner, by recognizing and assessing
hazards and applying effective controls.
Always comply with health and safety legislation and guidelines.
Ensure our managers and supervisors provide the tools, supervision, training and
resources needed for our employees to work safely.
Ensure our employees and others on Mega Transport worksites work safely.
Involve all employees in our health and safety management system.
Review our health and safety performance regularly, evaluate performance
information and communicate performance to all employees.
Learn from our experiences to prevent future incidents.
Ensure that our formalized health and safety management system remains current
with industry best practices.
Signature:____________________
Name:_______________________
President/ Chief Executive Officer /
Owner
Date:______________________
1. Ensuring all personnel has complete working requirements prior to work as prescribed by
OSH Standards
2. Ensuring to conduct daily toolbox meetings
3. Ensuring all personnel undergone Safety Orientation before starting to work
4. Identifying potential hazard and provide control measures
5. Developing and implementing Safety and Health Program
6. Establishing and enforcing all necessary safe work procedures, rules & regulations
7. Establishing a system of follow-up & periodic assessment to check program effectiveness
8. Consistent adherence to safe operating practices and procedures,
9. Conscientious observance of the client’s safety requirements.
XIII. Name and address of Emergency Health Provider (any person or organization
who is certified or recognized by the Department of Health and who can provide?
the same or equivalent emergency health services as an emergency hospital,
including emergency treatment or workers on site, emergency transport and care
during transport of injured workers to the nearest hospital, with adequate personnel,
supplies and facilities for the complete immediate treatment of injuries or illnesses)
Name :
Designation :
Members
Name : Engr. Jerry Salapare
Designation : Project-in-Charge
4.2 Duties of the CSH Committee shall include but are not limited to the following:
4.2.1 Plans, develops and oversees the accident prevention programs for the construction
project;
4.2.2 Directs the accident prevention efforts of the establishment in accordance with the
safety programs and performance and government regulations in order to prevent accidents
from occurring in the worksite;
4.2.3 Conducts safety meetings at least once a month. The committee will
hold a safety meeting every 3rd week of the month;
4.2.4 Submits reports to the project manager on its meetings and activities on day after the
meeting:
4.2.5 Reviews reports of inspection, accident investigation and implementation of program;
4.2.6 Provides necessary assistance to government inspecting authorities
in the proper conduct of their activities specifically on the enforcement of the provision of
DOLE’s OSHS;
4.2.7 Submits the monthly the following safety and health reports to the
DOLE Regional Office having jurisdiction over the project:
4.2.7.1 Summary of all safety and health committee meeting agreements;
The assigned Safety Officer, Mr./Ms. Granny Juancho will coordinate the conduct of this
orientation. We ensure that they receive instruction and training regarding the general safety
and health measures we plan to implement for this project, specifically:
6.1.1 basic rights and duties of workers at the jobsite;
6.1.2 means of access and egress both during normal work and in emergency Situation;
6.1.3 measures for good housekeeping;
6.1.4 location and proper use of welfare amenities and first–aid facilities;
6.1.5 proper care of PPEs and other protective clothing;
6.1.6 general measures for personal hygiene and health protection;
6.1.7 fire precautions to be taken;
6.1.8 action to be taken in case of any emergencies;
6.1.9 requirements of relevant health and safety rules and regulations. Below is the list of
workers who have undergone the DOLE prescribed safety and health trainings and
orientation:
- Construction
- JCR ESH Consultancy
Occupational Safety
Inc. March 8-12, 2021
Health Held using the ZOOM
Platform
Section 6 of D.O. No. 13 requires that every employer shall, at his own expense, furnish his workers
with protective equipment for eyes, face, hands, feet, lifeline, safety belt/harness, protective shields
and barriers whenever necessary by reason of the hazardous work process or environment, chemical
or radiological or other mechanical
irritants or hazards capable of causing injury or impairment in the function or any part of the body
through absorption, inhalation or physical agent. Provision of PPE shall be in accordance with Rule
1080 of the OSHS (must include Rule 1070 for noise). The equivalent cost for the provision of PPE
(life span, depreciation, replacement,
etc.) shall be an integral part of the project cost
MEGATRANSPORT INC. 11 |
Page
Occupational Safety and Health Program
11.1.3 Areas where there are potential risks of falling (if applicable, attach sample picture of
this signage that you plan to use for this project);
11.1.4 Areas where explosives and flammable substances are used or store (if applicable,
attach sample picture of this signage that you plan to use for this project);
11.1.5 Areas where there are tripping or slipping hazards (if applicable, attach sample picture
of this signage that you plan to use for this project);
11.1.6 Approaches to working areas where danger from toxic or irritant airborne
contaminants/substance may exist which should indicate the name of the
contaminant/substance involved and the type of respiratory
equipment to be worn (if applicable, attach sample picture of this signage that you plan to use
for this project);
11.1.7 All places where contact with or proximity to electrical/facility equipment can cause
danger (if applicable, attach sample picture of this signage that you plan to use for this
project);
11.1.8 All places where workers may come in contact with dangerous moving parts of the
machineries or equipment (if applicable, attach sample picture of this signage that you plan to
use for this project);
11.1.9 Location of the fire alarms and fire-fighting equipment (attach sample picture of this
signage that you plan to use for this project);
11.1.10 Instructions on the usage of specific construction equipment (if applicable, attach
sample picture of this signage that you plan to use for this project);
11.1.11 Periodic updating of man-hours lost.
11.2 Inspection and Maintenance of Safety Signages
We will regularly inspect and maintain in good condition all safety signages that we will be
providing for this project. The person/s in charge in inspecting is/are Richard Nueve,RN of
AC safety officer of Management team and Mark De Jemel AC safety officer Inspection will
be carried out on a daily basis Our Safety Team will remove and replace any signages that are
damaged, illegible, or no longer apply with the current hazard.
EARTHMOVING PILING
MEGATRANSPORT INC. 12 |
Page
Occupational Safety and Health Program
SCAFFOLD FORM WORKS
WELDING ELECTRICAL
HVAC PLUMBING
NOISE VENTILATION
MEGATRANSPORT INC. 13 |
Page
Occupational Safety and Health Program
BLOOD OR OTHER BODY FLUIDS FUNGI
BACTERIA AND VIRUSES PLANTS
14.2.4 Ergonomic hazards occur when the type of work, body position and working
conditions put strain on the body. They are the hardest to spot since one does not immediately
notice the strain on your body or the harm these hazards pose. Short-term exposure may result
in “sore muscles” on the
days following exposure, but long-term exposure can result in serious musculoskeletal
injuries. The ergonomic hazards that we identified for this project includes but not limited to
the following: (please check on the box all that applies)
(Enumerate control measures to address identified hazards, use additional sheet if necessary)
MEGATRANSPORT INC. 14 |
Page
Occupational Safety and Health Program
OF ELECTRICAL INTEGRITY AND
REPLACEMENT (WHEN
APPROPRIATE)
INSULATION AND EARTHING
PROTECTION
DAILY TOOLBOX SAFETY
REMINDER’S.
MEGATRANSPORT INC. 15 |
Page
Occupational Safety and Health Program
TO NAMED, AUTHORIZED PERSONNEL;
DESIGNING WORK PROCESSES AND
ENGINEERING CONTROL MEASURES TO
PREVENT OR MINIMIZE THE RELEASE OF
BIOLOGICAL AGENTS INTO THE
WORKPLACE
INSECT BITES (MOSQUITO) THE BEST WAY TO CONTOL
MOSQUITOES IS TO REMOVE POTENTIAL
EGG LAYING SITES.
REMOVE ANY SOURCES OF STANDING
WATER.
KEEP WEEDS AND OTHER VEGETATION
MOWED AND TRIMMED TO MINIMIZE
SHELTER FOR ADULT MOSQUITOES
PERSONAL PROTECTION.
PEST CONTROL PROGRAM
EXERTION OF FORCE, FREQUENT 1. REDUCE OR ELIMINATE POTENTIALLY
LIFTING, REPETITIVE MOTION, HAZARDOUS CONDITIONS USING
AWKWARD MOVEMENTS ENGINEERING CONTROLS SUCH AS:
CHANGE THE WAY MATERIALS, PARTS
AND PRODUCTS ARE TRANSPORTED,
REDUCE THE NEED FOR MANUAL
LIFTING OR USE OF MANUAL FORCE, USE
ADJUSTABLE HEIGHT WORK STATIONS
AND MATERIALS CONTAINERS, MODIFY
WORK STATIONLAYOUT TO KEEP TOOLS
AND MATERIALS WITHIN SHORT
REACHING DISTANCES, IMPROVE TOOL
DESIGN
EXECUTION OF WORKS
Welding and cutting
1. Each welding and cutting opearation must obtain hot work permit prior to start
2. The major hazards associated with welding and cutting operations are: heat and fire, electrical
shock, toxic gases and fumes, intense light, ultraviolet or infrared rays and restricted visibility
while working.
3. Proper care of welding and burning equipment is a requisite for minimizing hazards.
4. Gas cylinders shall always be stored, transported, used and secured in an upright position.
Valve keys must be on cylinder when in use.
5. All gas cylinders shall have their contents clearly labelled
6. Gas hoses shall be regularly checked for abrasion, cuts, leaky joints or other damage. Welding
cables shall be similarly checked for external damage and for properly connected and
insulated
joints. In running hoses and cables to work, preferably they should be located overhead. If not
possible, and particularly in heavy traffic areas, protective cover should be provided when run
on the ground.
7. Never use grease or oil on equipment (cylinders, hoses, and torches) handling oxygen.
8. Oxygen shall not be used for ventilation or cooling, blowing dust or cleaning work.
9. Frames of electric welding machines are to be grounded
10. In preparing for welding and burning, it shall be ensured that:
a. Sparks or molten metal will not fall on people or on combustible materials particularly
from work at elevation location.
b. Work is screened or isolated to preclude exposure of adjacent workmen to welding flash
c. Work is properly grounded for electric welding. Pipe containing oil, gas or other
combustible material and conduits and structures for electricity transmissions shall not be
used for grounds.
d. Fire extinguishers should be available within the work area.
e. Work location is adequately ventilated. For welding or burning materials containing zinc,
lead, cadmium, chromium or beryllium, respirators or fresh air mask are required for
poorly ventilated or confined workspaces.
f. While doing the work, welders and burners must use the personal protective equipment
required for the job. Normally, this will include tinted eye protection which greatly
restricts the user’s visibility.
MEGATRANSPORT INC. 17 |
Page
Occupational Safety and Health Program
6. Maintain tools in the good operating condition.
a. Prevent mushrooming
b. Keep handles secure and safe
c. Keep hand tool cutting edges sharp
7. Never climb ladders with tools in your hands
8. Never carry a tool by cord or hose.
9. Protect the cutting /sharp edges of tools when carrying them.
10. Keep your hand tools clean
11. Do not remove guards.
12. Inspect, repair and lubricate tools to maintain in a safe condition.
Safe Handling of Materials
Workers should train on proper and safe materials handling techniques either manually or by using
mechanical means. The use of correct handling techniques is one of the ways to help reduce injuries.
Pointers:
1. There should be regular maintenance systems for checking and repair of conveyor chains,
elevator chains and cables, hoist, etc., there should also be a lubrication program, regular
inspection is mandatory if materials being handled is abrasive.
2. When using a hand cart, push rather than pull the cart.
3. Drivers should not leave their forklifts with their running or leaving the forks elevated.
4. No smoking in the storage areas.
5. No hitch hiking on the fork.
6. Training /orientation should include techniques on:
a. Carrying materials up and down stairs
b. Placing the materials
c. Pushing and pulling
d. Storing materials
e. Preparing for the forklift
f. Carrying the materials
Site clearing
The first step prior to site clearing we must ensure the permits required prior to mobilize. Project
management should coordinate for the local government units for additional requirement s needed and
other policies implementing on the covered area.
1. Temporary fencing or board up must be provided for public protection.
2. Secure permits required from local government.
3. Must be familiar on-site location.
4. Orientation to all personnel regarding the activity.
5. Identification of existing facilities (if any).
6. Provide planning for the work.
7. Monitored by designated supervisor.
8. Wear appropriate PPE for activity.
9. Equipment to be used must be in good condition and the operator should be certified.
10. Hand tools and power tools to be used must be appropriate for the job and properly
maintained.
Excavation
MEGATRANSPORT INC. 18 |
Page
Occupational Safety and Health Program
Excavation work is an essential part of the construction process and one of the hazardous activities.
The project team should be identified different hazards and controls prior to the activity. These
guidelines will serve as reference to help the team on site to make a safe working place during
excavation work.
1. Conduct joint site safety inspection with client/owner, consultant and company
representative
2. Identify & locate underground facilities/utilities (i.e. water, oil/gas pipelines, electric
power lines, telephone lines, sanitary sewer line,
3. Secure permits from local government.
4. Proximity of adjacent structures.
5. Weather and moisture condition.
6. Source of vibration.
7. Adjacent Road footpaths.
8. Method of excavation.
9. Soil testing
10. Protection system depends on soil condition.
11. During excavation provision on access and egress must be provided.
12. Workers must be properly trained
13. PPE required on the activity
14. Location of excavated materials must be piled in a manner that it cannot rollback into the
excavation. It must never be closer than 1m from edge of excavation.
15. Equipment or heavy machinery shall not be place near the edge of excavation at least 1/3
depth.
16. 16.Public protection and traffic control should be provided.
17. 17Excavation work must be properly planned, managed, supervised and carried out to
prevent accidents and ill to health to workers.
Scaffolding
These guidelines are to be fully implemented in all areas consistent with the activities in the area.
Designated personnel responsible for the implementation or the head shall review these guidelines and
establish implementation measures. These measures shall achieve continuing awareness of personnel
on the guidelines such as thorough orientation training, regular meetings and use of signages and
instructive posters and ensure enforcement through regular inspection and implementation of
preventive and corrective action:
1. Scaffoldings shall be a good construction, sound materials and strength for the purpose for
which they are intended.
2. All materials and parts of scaffoldings not in use or intended for re-use shall be kept under
good condition and separate from other materials unsuitable for scaffolds.
3. At height over 20m, the structural metal used should be designed by a structural engineer and
duly approved by appropriate authority.
4. Structural steel when used as load bearing member of scaffoldings shall be distressed at
welded or bent joints and designed for construction as approved by the proper authorities.
5. Scaffolds shall be erected, added, altered or dismantled only under the supervision of the
person in charge of the construction.
6. All scaffolds shall be properly maintained and every part shall be kept. Fixed and secured in
position to prevent displacement.
7. No partly dismantled scaffolds shall be used unless it is rendered stable, strong and safe for
the purpose.
8. Scaffoldings left standing for four (4) months shall not be in used until damaged members are
placed and the whole structure returned to its original strength.
MEGATRANSPORT INC. 19 |
Page
Occupational Safety and Health Program
9. No scaffold or false work with a height of more than 3.0 meters shall be used on the project
without being inspected and approved by the competent scaffolder.
10. After being satisfied that all safety requirements have been met, the competent scaffolder
shall issue scaffold tag “SAFE TO US” at prominent position.
11. A scaffold permit will not be valid for more than 7 days. Before that period ends the scaffold
shall be reinspect to ensure that it is still safe, that it has not been altered and that no parts are
missing or loose. The results of this re-inspection shall be entered in the scaffolding permit to
extend the validity.
Formworks
1. Formworks and re-shores shall be certified structurally safe by a professional Engineer and
shall be properly braced or tied to together so as to maintain position and shape.
2. A designated person shall supervise the erection of the formwork including the shores, braces
and other support.
3. Upon the erection of formworks, the designated person shall make a through inspection to
ensure that the formworks are safe
4. Secure necessary permit required before proceeding to the activity.
5. Stripping of forms shall not commence until the concrete has fully set in accordance with the
QC department specification and approved by him/her prior to such activity.
6. Stripped forms shall be removed or stockpiled promptly in all areas in which persons are
required to work.
7. Protruding nails, wire-ties and other form of accessories not yet necessary to subsequent work
shall be pulled, cut or otherwise made safe.
8. Formwork materials to be lift shall be secure tied and must be in order to its sizes.
9. Stripping in confined space must be properly coordinated to the safety officer for additional
orientation.
10. Provision on working at heights must be strictly observe and implemented.
Concreting
1. Formworks and re-shores shall be certified structurally safe by a professional engineer and
shall be properly braced or tied together so as to maintain position in shape.
2. Prior to inspect and concrete pouring it shall have sufficient catwalks or working platform
provided.
3. Prior to concrete pouring the project team will conduct inspection on the area to be pour to
assess the stability of structure, provision of safety protection etc.
4. Designated entry and exit point for trucks to avoid traffic obstruction.
5. Ensure the PPE of concreting crew must be worn properly.
Rebar Works
1. Workers work more than 1.8 meters (6 ft) above placing and tying reinforcing steel in walls,
piers, columns, etc., shall be provided with proper work platforms with a guardrails system.
2. Full body harness must be worn and securely fixed or anchor when they work on heights and
on the perimeter of slab provided their lifeline. (use ¾ diameter manila rope)
3. Employee shall not be permitted to work above vertically protruding reinforcing steel unless
it has been bent over of capped.
4. Reinforcing steel for walls, piers, column and similar vertical form work structures shall be
guide and supported to prevent collapse and to guard against possible wind pressures.
5. All excess rebar shall not be placed near the perimeter of slab.
6. Provide on working platform.
MEGATRANSPORT INC. 20 |
Page
Occupational Safety and Health Program
Guarding on floor openings/Perimeter slab
1. Proper precautions must be taken to ensure that the floor; roof wall and platform openings as
well as open sided floors are guarded or covered to prevent personnel material and tools are
guarded or covered to prevent personnel material and tools from falling down. This includes
the installation of temporary handrails, toe board screening, planking, safety net and other
measures. The following safety rules shall apply.
a. Temporary floor openings are to be either attended by someone at all times, covered over
with suitable decking, or enclosed with temporary standard decking, or enclosed with
temporary standard railings.
b. Scaffold boards exterior plywood or other suitable material can be used for barricade tape
to warn of a tripping hazard.
2. temporary standard railings shall be composed of a top rail approximately 1.0m in height and
mid-rail approximately halfway between the landing and the top rail. Sufficient post shall be
provided so the railing is sturdy enough t resist 200 kilograms of weight applied to the top rail
at any point.
3. Standard toe board shall be as minimum of 6” in height. The purpose of the toe board is to
prevent material from being kicked off the scaffold or work platform.
4. Standard handrails shall be provided around the perimeter of all open floors above the ground
floor.
5. All whole covers shall be clearly marked with “HOLE COVER” sign.
Working at heights and prevention of falling objects
The guidelines are to be fully implemented in all areas consistent with the activities in the
areas. Designated personnel responsible for implementation or the head shall review these
guidelines and established implementation measures. These measures shall achieve
continuing awareness personnel the guidelines such as through orientation training, regular
use of signages and instructive poster and ensure enforcement through regular inspection and
implementation of preventive and corrective action. The statutory requirements for working at
height and prevention of falling object are laid down in the OSHS and National Building
Code of the Philippines.
Working at height
1. Suitable fencing barriers of height shall be at least 1 meter to protect any open edges from
which a person is liable to fall a vertical distance of more than 2m.
2. Work scaffolds hall be erected in accordance with manufacturer’s instructions and shall
comply with the prevailing statutory safety requirements.
3. Platforms, gangways or runs from any of which a person is liable to fall a vertical distance of
more than 2m shall either be closely boarded, planked or plated.
4. Every board or plank forming part of a working platform shall be sound construction,
adequate strength and free from patent defect. Each board or plank shall not be less than
200mm in width and not less than 25mm in thickness.
5. Every board or plank shall rest securely and evenly on its support. No board or plank shall
project beyond its end support to a distance exceeding 150mm unless it is sufficiently secured
to prevent tipping.
6. Any working platform from which a person is liable to fall a distance of more than 2m shall
be at least 400mm in width
7. Any gangway or run from any part of which a person is liable to fall a distance of more than
2m shall be at least 400mm wide if it is used for the passage of persons only. Its width shall
be extended to at least 650mm wide if it used for passage of materials
MEGATRANSPORT INC. 21 |
Page
Occupational Safety and Health Program
8. A competent person (safety inspector) shall inspect scaffold within the immediately preceding
month and also after any such exposure to weather conditions, such as typhoon, likely to have
affected their strength or stability.
9. Workers working at height where erection of fencing barriers are impracticable shall be
provided with suitable full body harnesses and suitable and sufficient safe anchorage points or
life line system for securing the safety of the workers. Safety netting shall also be used as
appropriate. Refer to national building code of the Philippines for details.
10. Stairways must be protected by temporary hand-railings.
Lifting operation
1. In all the operations shall be properly planned and safety carried out in accordance with the
requirements of OSHS and DOLE DAO #98-13.
2. For each major lifting operation or activity, a dedicated rigger shall assist/supervise lifting
operations.
3. All operators of cranes and other lifting appliances, as well as riggers and bunks men shall be
adequately trained and competent in their work. All crane operators should hold TESDA or
any third-party certificate accredited by DOLE.
4. Each crane control must be clearly marked to show the motion and the direction of
movement, which it controls. Wherever practicable the controls should be arranged or
designed so that accidental displacement is prevented.
5. Before starting to operate the crane, the driver /operator must ensure that he will have clear
view of operations.
6. When handling loads which are approaching the maximum safe working load, or when
working at or near the maximum radius, all crane motions must be operated with special care.
7. Each load must initially be lifted just clear off-the ground and then lowered to rest and slings,
balance of the load, and stability, checked before proceeding with the lift.
8. Care must be taken to prevent snatching or excessive swinging of the load.
9. On cranes which are not equipped for continuous full circle slewing, care must be exercised
that the maker’s stipulated number of turns in on direction is not exceeded. It is strongly
recommended that such cranes be lifted with a slewing revolution counter, which can be read
crane driver’s position.
Working at Unprotected Elevated Working Platform & Surfaces
Fall related accident is one of the most common causes of fatality in the construction industry.
The project management shall be responsible for preventing the accident to occur.
The following guidelines shall be fully implemented on site where is high probability or high risk
of falling:
1. Workers shall be given clear instructions and trainings beforehand for them to easily
identify conditions in which falling hazard is potential.
2. Trainings on effective controls on falling hazards shall be given to all employee involved
on high work place.
3. Proper wearing of full body harness shall be strictly implemented on site.
4. Fall restraining and fall arrest apparatus shall be provided for employees exposed on
falling hazards.
5. Materials shall not be allowed to be placed near the open edges of the structures and to
avoid tripping, and slipping hazards.
6. Proper housekeeping shall also be included to avoid tripping and slipping hazards.
7. Standard temporary hand rails shall also be provided.
8. Safety signs and other means of early warning equipment shall be posted on area wherein
there is high probability of falling.
MEGATRANSPORT INC. 22 |
Page
Occupational Safety and Health Program
Temporary Electrical Wiring Installation
The project management shall regulate and strictly enforce the compliance of standards on
temporary electrical connection connections and installations to assure that the condition of building
wirings is safe and sound.
Implementation Guidelines:
1. All electrical works shall be in accordance with the Philippine Electric Code.
2. Ground Fault Circuit interrupters shall be used in all temporary electrical services.
3. Extension cords shall be of proper wiring with outer insulation intact. Repair of the outer
insulation jacket must assure repair is as strong as the original materials.
4. Cables, extension cords, or wires of any type passing through work areas shall be elevated
to a minimum of seven feet (7’) or protected so as to prevent damage to the conductors
and eliminate tripping hazard.
5. Warning signs and suitable barriers shall be maintained when energized part of electrical
equipment are exposed.
6. Temporary field electrical panels will be posted with warning signs and protected by
suitable barriers.
7. Only certified electrical personnel are authorized to reset tripped breakers.
8. Transformers shall be protected by individual integrated housing or by an enclosure
(fence)
9. Access to equipment shall be secured by lock or other fasteners requiring the use tools to
open them. Signs indicating danger will be posted on the housing or enclosure.
10. All temporary wiring shall be effectively grounded.
11. No powder take-off from temporary lighting circuits will be allowed.
12. Boxes for disconnecting means shall be implemented during the power shut down and/or
repair of electrical connections, tools and equipment.
13. LOCK OUT-TAG OUT system shall be implemented during power shut down and or
repair of electrical connections, tools and equipment.
Gas and Electric Welding and Cutting Operations
Implementation Guide:
The guidelines are fully implemented in all areas consistent with the activities in the area.
Designated personnel responsible for implementation or the head shall review these guidelines and
establish implementation measures. These measures intend to achieved continuing awareness of
personnel on the guidelines through orientation training, regular use of signages and instructive
posters and ensure enforcement through regular inspection and implementation of preventive and
corrective action.
1. All persons engage in the operation, maintenance and operation of apparatus and equipment
shall be qualified by experienced personnel or property instructed on safe methods before
they are allowed engage in such operation.
2. All apparatus and equipment shall be completely inspected before these are placed in service
and every week thereafter. Defective apparatus and equipment shall be removed from
services, replace, or repaired and re-inspected before they are again place in service.
3. Cylinders saws placed in the open shall be protected against direct rays of the sun.
4. Cylinders shall be stored in a definite and enclosed place, free from falling objects and
secured from passing workers to avoid cylinders from stumbling down.
5. Cylinders containing oxygen shall be stored well away from cylinders containing combustible
gases.
MEGATRANSPORT INC. 23 |
Page
Occupational Safety and Health Program
6. Cylinders permitted inside the building shall be stored in well protected, ventilated and dry,
location, away from highly combustible materials such as oil or excelsior and or other sources
of heat.
7. Valve – protector caps shall always be in place, hand tight except when cylinder is in use or
connected for used.
8. Oxygen shall not be used as substitute for compressed air in pneumatic tools, in oil preheating
burner, to start inter-combustion engines, to blow out pipelines to “dust” clothing or work, to
create pressure, or for ventilation.
9. Fuel gas cylinder valve shall be opened only when so specifically designed for a certain
purpose. Oxygen cylinders, the valves of which cannot be turned by hand shall be set aside
and the supplier notified.
10. Tampering with safety devices in cylinder or valves is prohibited.
11. A suitable platform shall be used when handling cylinders using a crane or derrick. Sling or
electric magnets shall not use.
12. Suitable trucks, chain or steadying devices shall be used to keep cylinder from being
knocking over while in use.
13. Fuel gases or oxygen cylinder will not be used without first attaching a regulator to the
cylinder valve.
14. Cylinder valves not provide with fixed hand wheels shall have keys or handled on valve
spindles or stem while cylinder is in service.
15. Operator shall be required to follow the procedures outlines by the manufacturer of the
apparatus in use, in so far as they deal with the sequence of the operations in lighting,
adjusting and extinguishing blowpipes flames and connecting the apparatus to sources of gas
supply. An acetylene cylinders valve shall not reach them.
16. Cylinders shall be kept in sufficient distance from actual welding or cutting operations so that
sparks, hot slug, or flamed will not reach them.
17. Cylinder valves shall be closed when work is finished or before moving cylinder. Valves of
empty cylinder shall be closed.
18. Empty cylinder shall be mark “MT” and segregated from full cylinders.
19. No one shall attempt to mix gasses in a cylinder, refill a cylinder, or use its purposes, other
than those intended by supplier.
20. Fuel gas cylinders found to have leaky valve or fittings shall be taken into the open, away
from any source of ignition, and drained. Cylinder will be tagged and the owner notified.
21. Keep oxygen cylinder and fitting away from greasy substances and shall not be handled with
oily hand or gloves. Oxygen cylinder should never be handled on the same platform with oil
or placed in position where oil or grease is likely to fall upon them. A jet of oxygen should
never be directed at oily surface, greasy cloth, or into a fuel or other storage tanks.
22. Flames shall not be used to detect leaks.
23. When parallel length of oxygen and acetylene hose are topped together, not more than four
(4) inches out of eight (8) shall be covered with taped. Hose shall not be crimped or kinked.
24. Hose connection shall be connected to substantial fitting and clamped or otherwise securely
fastened so as to withstand, without leakage, a pressure twice as great as the maximum
pressure.
Working in confined space
The guidelines are to be fully implemented in all areas consistent with the activities in the
area. Designated personnel responsible for implementation or the head shall review these
guidelines and established implementation measures. These measures shall achieve continuing
awareness personnel on the guidelines such as through orientation training, regular use of signage
MEGATRANSPORT INC. 24 |
Page
Occupational Safety and Health Program
and instructive poster and ensure enforcement through regular inspection and implementation of
preventive and corrective action.
1. The confined space must be defined. Warning signs shall be posted in all entrance & exit
points.
2. All employees shall be trained in the procedures and hazards of the confined space.
3. All people entering the area shall wear appropriate PPE and should entry permit with the
safety officer.
4. Prior to entry, the air in the confined space must be measured for oxygen level and possible
air contaminants.
5. Provision of the safety entrance and exit point in the work area.
6. Working or walking under suspended loads should be avoided.
7. Employee on foot should be extra cautions and stay clear from the operating equipment
8. Be familiar with escape routes during emergencies.
9. Working or walking space should be free from loose equipment, tools and materials.
10. Entry should not be allowed when the hazardous condition detected.
11. Rescue, retrieval equipment and personnel must be readily available.
12. An attended worker on standby outside the confined space should be employed. The attendant
workers shall be trained in rescue operation. He shall be posted within the site or call of the
entrant and remain outside the confined space under any circumstances and have means to
summon assistance. He shall be issued a megaphone armed with siren.
13. If the siren sounds, all personnel inside the confined space shall leave the area immediately
with caution.
Precast Installation
1. Review precast installation methodology coming from precast department.
2. Coordinate with precast in-charge on site regarding the methodology.
3. Delivery on site /unloading of precast on designated area must be properly coordinated to the
project manager to prepare the requirements needed. Follow the given time schedule for
delivery.
4. “ROAD CLOSE” signages to given warning to all passing vehicles to avoid traffic
congestion.
5. Driver and his helper are required to wear PPE’S while inside the jobsite.
6. Orientation for newly hired employees/workers (secured all requirements)
7. Check the stability of PRECAST (possible, stand cracks by visual inspection and anchorage
point before lifting operation). Damage precast is not allowed to lift.
8. Ensure valid certification of riggers, welders and operators.
9. Hot works activity must be request hot works permits to Safety Department signed by
contractor’s safety officer and operation in charge.
10. Provide access for sealant, other repair and retouching activity.
11. Secure MSDS for chemicals used for sealant application.
Mechanical Gondola
MEGATRANSPORT INC. 25 |
Page
Occupational Safety and Health Program
1. PROJECT SAFETY & HEALTH PROGRAM
1.1. This Safety Manual sets forth the safety requirement, for all Personnel and visiting
the jobsite respectively.
1.2. The Supervisor has the responsibility of enforcing all jobsite safety and any specific
instruction or directive from the proponent affecting work.
1.3. Periodically, the Client Safety Representative will conduct safety inspection to assess
the implementation of the safety program.
1.4. This Safety Manual does not supersede the Client Construction Safety Manual.
2. SAFETY TO THE GENERAL PUBLIC WITHIN THE VICINITY OF THE
CONSTRUCTION SITE
2.1. In order to promote and maintain safety consciousness among employees and workers,
construction sites shall have adequate fire, emergency or danger signs and posters and
visible signs to direct drivers of motorized vehicles within the construction site, as well as,
safety instructions/bulletins/warnings visible at all times for the guidance of the workers,
employees and visitors.
2.2. All manhole openings shall be provided with manhole covers/guardrails/toe board.
2.3. Stairwell/ladder openings shall be guarded on exposed sides with permanent railings.
2.4. Stumbling hazards shall be removed like protruding nails, bolts, projecting pipes and other
projections or obstructions.
2.5. Wider openings shall be guarded securely by bars and grilles to prevent persons from falling
through.
2.6. Elevator openings shall be guarded by removable railing with toe boards on all exposed
sides.
2.7. Safe walkways shall be constructed along the shortest/important route of the construction site
and guarded by railings on exposed sides.
2.8. Work executions shall be conducted in a safe manner to avoid the risk of bodily harm to
persons or damage to property or loss to process. All precautionary measures will be
adopted. All work areas will be continuously inspected to discover unsafe condition and
correction will be made.
2.9. Regular toolbox meeting to be conducted by foreman and safety representative will be
documented showing the topic discussed and list of names of attendees.
2.10. All visitors visiting the work site will be briefed on the site safety procedures. They will be
provided with proper personal protective equipment. Safety bulletins, Accident Statistics,
Safety Signs, Posters and Slogans will be posted conspicuously on bulletin boards.
3. ENVIRONMENTAL CONTROL
3.1. The company is adamant in maintaining and controlling the working environment in a
healthy, safe and comfortable condition for the main health of its employee and workers.
3.2. Proper ventilation shall be provided in every working area to ensure clean air is supplied and
all air pollutants and contaminants are exhausted.
3.3. Sufficient lighting/illumination shall be installed to prevent accident due to eye
strain/fatigue.
MEGATRANSPORT INC. 26 |
Page
Occupational Safety and Health Program
3.4. Noise control shall be observed while workers exposed to noise shall be provided with proper
PPE during his work shift to reduce noise reception.
4. PERSONNEL PROTECTIVE EQUIPMENT
4.1. The company shall provide and furnish all its workers with protective equipment for the eyes,
face, head, hands, feet, protective barriers and shields whenever necessary by reason of
hazardous nature of the work and environment.
5.1. Fire detection and alarm system shall be provided and installed to alert workers/employees,
call the Local Fire Department and avail of the facility fire extinguishing device. The system must
be tested regularly.
5.2. Portable fire extinguishers shall be provided, selected and distributed according to the classes
of expected or probable fires that may occur and on the magnitude of hazard with would
affect their use.
MEGATRANSPORT INC. 27 |
Page
Occupational Safety and Health Program
5.3. Location of fire extinguishers shall be clearly marked. Inspection, maintenance, testing by a
supplier or competent person shall be implemented.
5.5. Fire-fighting equipment will be installed at strategic locations. All personnel will be
oriented/familiarize on the use of Fire Extinguishing equipment.
5.6. Weekly inspection of Fire Protection equipment shall be conducted and any deficiency or
unsafe condition shall be corrected immediately. Fire protection inspection will include but
not limited to the following:
5.6.1. Proper handling, storage and disposal of combustible materials, liquids and wastes.
5.6.2. Work operations which can create fire hazards.
5.6.3. Access to fire-fighting equipment.
5.6.4. Type, number, and locations of trash containers
5.6.5. General Housekeeping.
MEGATRANSPORT INC. 28 |
Page
Occupational Safety and Health Program
3rd Shift from (am/pm) to (am/pm)
Check on the shift and indicate the break for the shift that applies.
1st Shift from 11:30 (am/pm) to 1 (am/pm)
2nd Shift form (am/pm) to (am/pm)
3rd Shift from (am/pm) to (am/pm)
21.0 Penalties/Sanctions
For every offenses and violation of any safety rules, regulations and general practices
promulgated by the project and/or the company, the company recommended the following
penalties and sanctions for violation of CSH program: (Please attach company
MEGATRANSPORT INC. 29 |
Page
Occupational Safety and Health Program
permission suspension suspension
10. Fighting & provoking 5-day DISMISSAL
others suspension
11. Working under the DISMISSAL
influence of
drugs and liquor
12. Possession of illegal DISMISSAL
drugs, deadly
weapon & gambling
paraphernalia
13. Pilferage and robbery DISMISSAL
14. Illegal entry/exit DISMISSAL
15. Refusal to surrender ID DISMISSAL
& giving false
representation
I. ALCOHOL PROHIBITED
4. Near Miss- An incident which could have led to any injury or fatality of employees and/or
considerable damage to the employer had it not been curtailed.
6. Random Testing- A form of alcohol test assessment conducted by the Company Employees
may be selected at random for alcohol testing at any interval determined by the company.
7. Workplace – Any office or property owned, leased or operated by the Company or at any
other place where an employee performs work for the Company.
MEGATRANSPORT INC. 30 |
Page
Occupational Safety and Health Program
The ARQUEE CONSTRUCTION MANAGEMENT. shall post in conspicuous place and notify
in writing all its employees of this policy and shall establish an alcohol-free workplace policy
awareness program. The contents of such awareness program are as follows:
1. Dangers involved in the use, possession, solicitation or sale of alcohol in the workplace;
2. Policy of maintaining an alcohol-free workplace;
3. Available employee assistance program; and
4. Imposable penalties for employees found guilty for violation of alcohol-free workplace
policy.
A. Cause-Test
1. If an employee’s demeanour caused the Company to suspect that he is using, possessing,
soliciting or selling alcohol in the workplace, the latter will request the former to submit
himself to a cause-test. If the employee objects to subject himself to cause-test, he must
state his objection and the reason thereof in writing. The Company shall immediately
decide whether the ground for objection is valid or not. Should the Company found that
the objection is not valid and the employee still refused to submit himself to the cause-
test, the refusal will be considered as a ground for disciplinary action; and
2. If the cause-test showed a positive result, the employee will be referred to the assessment
team for further examination. However, if the employee still disagrees with the result of
the assessment team, he will be subjected to another alcohol testing at the nearest medical
facility.
B. Post-Accident-Test
2. If the cause-test showed a positive result, the employee will be referred to the assessment
team for further examination. The findings of the assessment team shall be considered
final.
C. Random Test
1. At any time during the working hours, the Company may conduct a random alcohol test
with its employees. If the employee objects to subject himself to cause-test, he must state
his objection and the reason thereof in writing. The Company shall immediately decide
whether the ground for objection is valid or not. Should the Company found that the
objection is not valid and the employee still refused to submit himself to the cause-test,
the refusal will be considered as a ground for disciplinary action; and
2. If the cause-test showed a positive result, the employee will be referred to the assessment
team for further examination. However, if the employee still disagrees with the result of
the assessment team, he will be subjected to another alcohol testing at the nearest medical
facility.
MEGATRANSPORT INC. 31 |
Page
Occupational Safety and Health Program
V. CONFIDENTIALITY
The Assessment Team shall determine whether or not an employee found addicted to alcohol
would need referral for treatment and/or rehabilitation in a Department of Health-Accredited Center.
This benefit is only given to employees who seek help from the assessment team.
The implementation of the alcohol-free workplace policy and program shall be monitored and
evaluated periodically by the Assessment Team to ensure that the goal of an alcohol-free workplace is
met.
3. If an employee found to have been guilty for violation of this policy, repeatedly violated
the provisions thereof shall be subjected to a disciplinary action with a penalty of three
(3) months suspension or dismissal from service.
IX. EFFECTIVITY
DATE__________________
23.0 Smoke-free Workplace Policy and Program
Pursuant to Section 6 of Republic Act No. 9211 which specifically prohibits indoor smoking
and protects people against second hand smoke, this company policy is hereby issued to protect its
employees and clients against the hazard brought about by smoking.
MEGATRANSPORT INC. 32 |
Page
Occupational Safety and Health Program
Smoke-free workplaces protect non-smokers from the dangers of secondhand smoke and also
encourage staff to either quit smoking or reduce their cigarette consumption. Successful
implementation of this policy will depend on both the management and employees support.
I. PREVENTIVE STRATEGIES
ARQUEE CONSTRUCTION MANAGEMENT. shall notify all employees of this policy and
shall establish a smoke-free workplace policy awareness program. This will also be a part of
orientation for newly-hired employees. A “NO SMOKING SIGN” shall be conspicuously displayed
at floor areas which were designated as a NO SMOKING AREA. The roof top and the parking area
are the only areas in the office in which employees will be allowed to smoke.
Capacity building for speakers’ bureau, counsellors and the general workers population will
be part of staff development program of the company.
The ill-effects of smoking will be discussed during the training/orientation of employees
which will be spearheaded by the Health and Safety Committee.
II. IMPLEMENTATION
Worksite smoking policies aim mainly to protect non-smokers from Environmental Tobacco
Smoke, (ETS), while the objective of worksite cessation program is to help employees who do smoke
to give up the habit. The use of support groups of former smokers, HRDS staff, and medical staff that
may act as educators/counsellors and support for workers to enable them in their wish of quitting the
habit. Programs should be coordinated with managed-care providers’ offerings of tobacco assessment
and counselling. Internally, physical activity, nutrition, and stress management will assist smokers to
quit and to stay abstinent.
Networking with health professionals, experts and organizations with the same advocacy is
also being encouraged to create a partnership of sort. This may lead to better program implementation
as their best practices may be replicated.
Strengthening workers participation may encourage ownership of the program. Team Leaders
per Department maybe assigned, he/she may assign secret marshals who would monitor the no
smoking policy in their workplaces. Team leaders would also monitor the smoker’s diary (mandatory
to smokers enrolled in the program) and the progress of the implementation of the smoking program
in their office.
Employees who wish to quit smoking shall be referred by the committee to DOH accredited
smoking cessation clinics.
III. MONITORING AND EVALUATION
The implementation of the smoke-free workplace policies and programs shall be monitored
and evaluated periodically by the employer to ensure that the goal of an alcohol-free workplace is
met. The Health and Safety Committee or other similar Committee shall be tasked for this purpose.
IV. EFFECTIVITY
All concerned shall comply with all the provisions of this company policy effective
immediately.
MEGATRANSPORT INC. 33 |
Page
Occupational Safety and Health Program
Ar. Alex Balean Granny E. Juancho
Owner/Manager Employees’ Representative
DATE: __________________
In compliance with Article V of Republic Act No. 9165, otherwise known as the
Comprehensive Dangerous Drugs Act of 2002, and its Implementing Rules and Regulations
and DOLE Department Order No. 53-03, series of 2003 (Guidelines for the Implementation
of a Drug-Free Workplace Policies and Programs for the Private Sector), ARQUEE
CONSTRUCTION MANAGEMENT., hereby adopts the following policies and programs to
achieve a drug-free workplace:
Being impaired or under the influence of dangerous drugs away from the company,
if such impairment or influence adversely affects the employee's work performance, the
safety of the employee or of others, or puts at risk the company's reputation.
Possession, use, solicitation for, or sale of dangerous drugs away from the company
premises, if such activity or involvement adversely affects the employee's work
performance, the safety of the employee or of others, or puts at risk the company's
reputation.
The presence of any detectable amount of dangerous drugs in the employee's system
while at work, while on the premises of the company, or while on company business.
"Dangerous Drugs" include those listed in the Schedules annexed to the 1961 Single
Convention on Narcotic Drugs, as amended by the 1972 Protocol, and in the Schedules
annexed to the 1971 Single Convention on Psychotropic Substances as enumerated in
the attached annex of R.A. 9165.
1. To ensure that only those qualified shall be screened and recruited to prevent the
detrimental effects (e.g. lower productivity; poor decision making; increased
accidents; more compensation claims; and reduced team effort) which drug use and
abuse may cause in the workplace, the conduct of mandatory drug test shall be
required for pre-employment.
MEGATRANSPORT INC. 34 |
Page
Occupational Safety and Health Program
C. ARQUEE CONSTRUCTION MANAGEMENT. may also conduct drug testing under any of
the following circumstances:
1. All drug tests shall employ, among others, two (2) testing methods, the screening test
which will determine the positive result as well as the type of the drug used and the
confirmatory test which will confirm a positive screening test. Where the
confirmatory test turns positive, the company’s Assessment Team shall evaluate the
results and determine the level of care and administrative interventions that can be
extended to the concerned employee.
.
2. ARQUEE CONSTRUCTION MANAGEMENT. Shall inform the officer/employee
who was subjected to a drug test of the test-results whether positive or negative.
1. An officer/employee who, for the first time, is found positive of drug use, shall be
referred for treatment and/or rehabilitation in a DOH accredited center. For this
purpose, SAN ARQUEE CONSTRUCTION MANAGEMENT shall provide a list of
at least three (3) accredited facilities which an employee who was tested positive for
drugs may choose from.
3. All costs for the treatment and rehabilitation of the drug dependent employee shall be
charged to his account. The period during which the employee is under treatment or
rehabilitation shall be considered as authorized leaves.
MEGATRANSPORT INC. 35 |
Page
Occupational Safety and Health Program
4. Repeated drug use even after ample opportunity for treatment and rehabilitation shall
be dealt with the corresponding penalties under R.A. 9165 and is a ground for
dismissal.
2. All officers and employees shall enjoy the right to due process, absence of which will
render the referral procedure ineffective.
MEGATRANSPORT INC. 36 |
Page
Occupational Safety and Health Program
1. Any officer or employee who uses, possesses, distributes, sells or attempts to sell,
tolerates, or transfers dangerous drugs or otherwise commits other unlawful acts as
defined under Article II of RA 9165 and its Implementing Rules and Regulations
shall be subject to the pertinent provisions of the said Act.
2. Any officer or employee found positive for use of dangerous drugs shall be dealt with
administratively in accordance with the provisions of Article 282 of Book VI of the
Labor Code and under RA 9165.
1. The implementation of these policies and programs shall be monitored and evaluated
periodically by management to ensure a drug-free workplace. For this purpose, an
Assessment Team shall be constituted in accordance with D.O. 53-03.
I. EFFECTIVITY.
1. The provisions of these policies and programs shall be immediately effective after its
ratification by the management and the employee’s representatives and its posting in
the company’s bulletin board.
________________________ __________________________
Owner/Manager Employees’ Representative
DATE: __________________
Scope
This program applies to all ARQUEE CONSTRUCTION MANAGEMENT work sites and
employees regardless of employment duration or position within its property.
Responsibilities
Safety Manager
• Responsible for the implementation and enforcement of this program.
• Ensure that disciplinary actions are adequate enough to ensure program effectiveness.
Be conduct disciplinary action procedures in accordance with this program.
Supervisors
• Assist the safety manager in enforcing this program.
• Ensure that employees are aware of what constitutes a safety violation and follow on
actions.
• Report all safety violations to the safety manager who will determine what action
items should follow the violation.
• Support the safety manager in disciplinary action procedures.
Employees
• Comply with all parts of this program.
• Help prevent incidents by reporting safety violations to your supervisor.
• Formally report any disciplinary / corrective actions that you believe are unfair or
discriminatory to your supervisor immediately.
Requirements
Employee safety is extremely important to the owners and management of ARQUEE
CONSTRUCTION MANAGEMENT., Not following safety rules or procedures in considered
unacceptable and complying with ARQUEE CONSTRUCTION MANAGEMENT., safety programs,
rules and procedures is mandatory. Safety violations include but are not limited to:
• Intentional disregard of safety rules, procedures or guidelines required by SAN
CARLOS COMMERCIAL., or its clients
• Horseplay or other actions that compromise safety and health
• Non‐compliance with PPE program requirements or other written requirements
• Using or possessing alcohol or illegal drugs during work hours or ARQUEE
CONSTRUCTION MANAGEMENT, premises
• Possessing firearms or other weapons while on ARQUEE CONSTRUCTION
MANAGEMENT premises
• Not reporting incidents as required by ARQUEE CONSTRUCTION
MANAGEMENT
• Attempted or actual physical force to cause injury, threatening statements or other
actions to cause an employee to feel they are at risk of injury.
• Harassing, threatening or otherwise putting the health and safety of other employees at
risk.
MEGATRANSPORT INC. 38 |
Page
Occupational Safety and Health Program
Procedure
The following disciplinary action procedures shall be applied after a safety violation notice has been
issued:
• 1st Safety Violation: The first safety violation will result in a verbal warning. However,
a copy of the safety violation notice shall be issued and kept on record for the duration
of the employee’s employment. The supervisor or safety manager shall inform the
employee of which safety rules or procedures were violated and recommend corrective
actions or actions to prevent re‐occurrence. The employee’s direct supervisor and or
other applicable persons shall also be notified of the violation and shall receive a copy
of the safety violation notice.
• 2nd Safety Violation: The second safety violation shall result in a written disciplinary
action form and possible training on the safety violation subject matter. The
disciplinary action form shall include the issue date, name and signature of employee,
name and signature of supervisor, violation number, violation description and
disciplinary / corrective actions which were taken or are to be taken.
• 3rd Safety Violation: The third safety violation shall result in another disciplinary
action form but must include temporary layoff for a duration which shall be
determined in collaboration between the safety manager, supervisor and / or other
applicable personnel. The severity of the violation is to be considered when
disciplinary action is applied.
• 4th Safety Violation: The fourth safety violation shall result in termination of
employment unless there is a compelling reason to retain the employee which is to be
determined by the safety manager, supervisor and other applicable personnel.
* The affected employee may submit a written rebuttal at any time before, during or after the
disciplinary period. * Safety violations shall expire 12 months after the date of occurrence.
* All disciplinary actions are subject to change based on the severity or degree of negligence.
For example, if an employee physically harms another employee, intentionally commits an
unsafe act that results in harm, potential harm, damage or potential damage that places
ARQUEE CONSTRUCTION MANAGEMENT or its employees at significantly higher level
of risk or results in losses that are considered serious; the employee could be terminated
without having multiple safety violations. Therefore, the degree of disciplinary action will
often be determined on a case‐by‐case basis and will vary depending on the violation severity
or effects of the violation.
Recordkeeping
All safety violation documentation shall be kept on file for 2 years after his or her employment is
terminated. In cases where the disciplined or terminated employee claims discriminatory or unfair
disciplinary / corrective action or termination; the employee’s entire employee file (including all
safety violation documentation) shall be kept for 3 years after his or her employment is terminated.
MEGATRANSPORT INC. 39 |
Page
Occupational Safety and Health Program
WARNING!
Safety Violation Notice
Employee __________________________________
Name: __
Supervisor __________________________________
Name: __
Department __________________________________
: __
Violation __________________________________
No: __
Violation __________________________________
Description __
:
Supervisor __________________________________
Signature: __
MEGATRANSPORT INC. 40 |
Page
Occupational Safety and Health Program
Safety Violation / Disciplinary Action Form
Violation
Description:
Disciplinary /
Corrective Actions:
Additional
Comments:
MEGATRANSPORT INC. 41 |
Page
Occupational Safety and Health Program
26.0 Disaster Emergency Preparedness Contingency Plan
Emergency Response Teams (ERT)
In the event of a disaster, or eminent emergency situation, several emergency response teams
(formed soon after the contingency plan is initially implemented) will be responsible for
properly activating, and administering the disaster plan in conjunction with the ERT
Coordinator (person chosen at the time the contingency plan is adopted). Some teams, and
their responsibilities, deserving due consideration, but not necessarily contained in every plan
include *:
A. Security Teams
1. Alerting and warning
2. Incident recording and reporting
3. Law enforcement
4. Movement / evacuation supervision
B. Fire Control Teams
1. Small fire fighting
2. Hazardous materials management
C. First Aid Teams
1. CPR Skills
2. Basic first aid skills / some advanced first aid skills
D. Damage Assessment and Recovery Teams
1. Securing shelter for temporary operations
2. Building inspection
3. Construction recovery
4. Engineering recovery
E. Service Teams
1. Public notification systems
2. Transportation services
3. Equipment services
4. Emergency shelter designation
5. Edp/vital records management
F. Supplies Teams
1. Medical supplies
2. Food, water, candles, tape, blankets
3. New equipment supplies
4. Sanitation supplies
MEGATRANSPORT INC. 42 |
Page
Occupational Safety and Health Program
EVACUATION ROUTINE
The goal of this function is to evacuate people, and move resources out of the threatened area.
Depending on the emergency circumstances, evacuation of the building, site or area may
require provisions for completing a number of sequential actions. All interactions among
these responses must be identified, and thought out in a systematic fashion so that a proper
sequence can be established to insure that operations flow smoothly, and that no unnecessary
risks occur. This section of the plan should have provisions for:
MEGATRANSPORT INC. 43 |
Page
Occupational Safety and Health Program
4. Makes arrangement with the proper authorities like the Philippine National local and national
disaster operations center and local fire department and other sources to ensure that
appropriate training courses and disaster drills are set-up.
5. Arranges for posting on appropriate bulletin boards (or otherwise publicizes within the
establishment) a roster of organization of personnel who have responsibilities for in-shelter or
other emergency operations.
6. Takes all necessary actions to insure that the facility’s organization operates safety and
efficiently in emergencies.
DEPUTY MARSHALL – serves as the principal assistant to the chairman and acts for him in his
absence.
WARNING & ISOLATION TEAM
1. Receives warning information from authoritative sources and disseminates such warning to
all offices and personnel.
2. Maintains appropriate communication link with the offices and personnel.
The peak months of storm/ typhoon activity fall between Octobers to January. This
preparedness, however, is something that should be a year-long concern. Therefore, the
activities necessary for such preparedness should be part of the overall disaster recovery and
contingency plan implemented in the project.
The most dangerous period of catastrophe weather activity for an area is between late October
and December. This means that the activities for bad weather preparedness should be
completed by the close of August (these dates may change according to individual location).
Activities that should be completed before the start of the typhoon / storm season include:
I. Meeting of the ERT Coordinator, and the ERT Chairmen sometime before
the middle of August to review the existing plan, and make changes as
necessary
II. Memo drawn up soon after the aforementioned meeting, and distributed to all
employees summarizing the new plans for contingency operations
III. Take inventory and re-supply necessary items prior to September 1 (items
may include the completion of emergency kit and paraphernalia, first aid kit,
flash lights/ candles, etc.)
IV. Review and update the evacuation routine, and equipment transportation
plan, making any necessary changes (also before September 1)
VI. Review these procedures with all employees and ERT Teams, and possibly
test procedures during the first week of September.
In preparing for storm/typhoon season year-round, the amount of work required to be carried out
during the actual season itself, becomes less of a burden. This will also suggest a greater sense of
security and perhaps eliminate undesirable, panic-stricken situations. During the actual hurricane
season itself, the following procedures should be maintained:
MEGATRANSPORT INC. 45 |
Page
Occupational Safety and Health Program
If there are tropical storms in the area, but they do not pose an immediate threat (this would
include storms outside a 500-mile radius from site location, or landfall 36-48 hours from the
area):
i. Meeting of the ERT Coordinator and Team Chairmen to discuss the
storm track, preparations for landfall, and the time for contingency plan
activation
ii. Maintain a continuous watch on the National Weather Service, as well as
on the local networks
iii. Alert employees to the proposed plan of action
In the event of development that threaten or a possible landfall during a weekend, the ERT
Coordinator will be responsible for gathering Team Members for office preparation
All ERT Team Chairmen should cooperate to immediately assemble all employees/ workers
into the safe assembly area or send them home.
FIRE PREPAREDNESS
As construction industries continue to push forward, overhauling and updating engineering systems,
there is a greater risk for electrical fire. In addition many companies maintain a vast amount of
combustible and flammable materials in the work place. With this in mind, everyone must be aware
of what to do in the event that fire is ignited. There are two specific cases that need to be addressed:
MEGATRANSPORT INC. 46 |
Page
Occupational Safety and Health Program
Upon discovery of a fire, the following procedures should be followed:
A. Immediately dial local BFP hotline and report the fire to the local fire department.
B. If the fire is small in size, an attempt should be made to extinguish it with the use of portable
extinguisher.
NOTE: HOWEVER, THAT IF THE FIRE IS LARGE, AND
RAPIDLY SPREADING, DO NOT TRY TO EXTINGUISH
IT - LEAVE THE BUILDING!!!
C. Notify anyone in the office or building of the fire, and instruct them to exit the building
immediately.
D. The manual alarms should be activated at this time. The employees should be aware of the
location of these alarms.
E. If the fire cannot be extinguished locally, exit the building by way of the nearest stairwell.
In the event of a bomb, biological or chemical threat, there are a few procedures that, if
adhered to properly, will help alleviate some of the panic and confusion normally associated
with such an evacuation procedure. There are two different situations to plan for:
This section will consider all types of dangerous and threatening situations that may face the
company and its personnel. These would include such examples as irate and disoriented
customers or employees, as well as armed and unstable individuals off the street. Due to the
fact that there are many circumstances that may be placed in this category, it would be
virtually impossible to address them all. Therefore, the following is a list of suggested
procedures to be utilized in one of these crisis situations. (It is ultimately the responsibility of
management to decide how a specific set of circumstances should be handled.). Some things
to consider are:
I. Have someone (more than one person is suggested) designated to alert the local
authorities of the problem.
II. Have someone notify the building security (if one exists).
III. Make sure that everyone is always prepared for this type of crisis (the last thing
needed is a panicked state that may "light the fuse" of this person).
IV. Make it known that the employees should never argue with these people, in fact
it is recommended that the employees keep a smile on their face and do
everything in their power to appease them.
V. An attempt should be made to reason with the person and portray a feeling of
understanding towards them.
VI. Consideration should be given to the possibility of evacuating the building.
VII. Having people seek shelter is a final option.
This section of the Contingency Plan is designed for the protection and preservation of all
vital information and critical data, both in electronic and hard copy forms. This would
include any important papers and / or files, as well as any vital information that is saved on
usb. These operations should be coordinated by the ERT Service Team. Once a disaster is
eminent and the Contingency Plan has been activated, many of the following procedures
should be initiated and completed:
MEGATRANSPORT INC. 48 |
Page
Occupational Safety and Health Program
The ERT Service Team should be informed of the existing situation and
immediately begin the gathering and transferring process (to either an off-site
storage area, or the emergency operations center)
OTHER ACTIONS:
All windows should be taped and blinds down, (unless otherwise instructed by
building management) to help minimize glass shattering and blowing water or
debri
All doors should be closed, but not locked
POLITICAL DISASTERS
This part of the contingency plan will take into consideration such events as strikes, riots,
civil disturbances and other similar circumstances. In the event that one of the
aforementioned situations is encountered the following procedures should be followed:
Notify the ERT Coordinator, or one of the ERT Chairmen, of the situation so the necessary
actions can be planned for the following day.
In the event that a disaster strike is eminent, there are a number of things that need due
consideration both before the strike, and, immediately afterwards. These would include
construction repairs, moving to and from the temporary site, notifying the employees, public
and clients of your pre- and post-disaster plans, and perhaps most importantly, re-establishing
the operational capabilities of the company in the aftermath of the disaster. In order to
alleviate many of these problems, it is highly recommended that a complete and thorough
telephone list be developed and updated on a regular basis. With this list the ERT Teams can
MEGATRANSPORT INC. 49 |
Page
Occupational Safety and Health Program
properly and efficiently complete their respective responsibilities. Important telephone
numbers to include on this list are:
EMERGENCY CONTACTS
The need for a workplace mental wellbeing policy mental ill health and stress are associated
with many of the leading causes of disease and disability in our society. Promoting and
protecting the mental wellbeing of the workforce is important for individuals’ physical health,
social wellbeing and productivity.
Many factors in the workplace influence the mental wellbeing of individual employees,
particular departments or organisations as a whole. Understanding and addressing the factors
which affect people’s mental wellbeing at work have a wide range of benefits, both for
individuals and the organisation.
Mental wellbeing in the workplace is relevant to all employees and everyone can contribute to
improved mental wellbeing at work. Addressing workplace mental wellbeing can help
strengthen the positive, protective factors of employment, reduce risk factors for mental ill
health and improve general health. It can also help promote the employment of people who
have experienced mental health problems, and support them once they are at work.
This workplace mental wellbeing policy covers the following aspects of mental health and
wellbeing:
Promotion of mental wellbeing
Promoting the mental wellbeing of all staff through:
providing information and raising awareness about mental wellbeing
providing opportunities for employees to look after their mental wellbeing
promoting policies and practices that promote wellbeing.
MEGATRANSPORT INC. 50 |
Page
Occupational Safety and Health Program
Management skills
Developing skills for managers and supervisors to:
• promote the mental wellbeing of employees
• deal with issues around mental health and stress effectively.
Support
Providing support to employees through:
• providing a work environment that promotes and supports mental wellbeing for all employees
• offering assistance, advice and support to people who experience a mental health problem while in
employment
• Support for staff returning to work after a period of absence due to mental health problems.
Employment
Helping people get back to work after a period of absence due to mental illness through:
• Recruitment practices
• making reasonable adjustments
• retaining staff who develop a mental health problem.
Objectives
To tackle workplace factors that may negatively affect mental wellbeing, and to develop management
skills to promote mental wellbeing and manage mental health problems effectively.
As an employer we aim to create and promote a workplace environment that supports and promotes
the mental wellbeing of all employees. We acknowledge that certain working conditions and practices
can negatively affect employees’ mental wellbeing, including aspects of work organisation and
management, and environmental and social conditions that have the potential for psychological as
well as physical harm.
Policy actions:
• Give employees information on and increase their awareness of mental wellbeing.
• Provide opportunities for employees to look after their mental wellbeing, for example through
physical activity, stress-buster activities and social events.
• Offer employees flexible working arrangements that promote their mental wellbeing.
• Give all staff the opportunity to influence how they do their jobs, scope for varying their working
conditions as far as possible, and opportunities to develop and fully utilise their skills.
• Set employees realistic targets that do not require them to work unreasonable hours.
• Ensure all staff have clearly defined job descriptions, objectives and responsibilities and provide
them with good management support, appropriate training and adequate resources to do their job.
• Manage conflict effectively and ensure the workplace is free from bullying and harassment,
discrimination and racism.
• Establish good two-way communication to ensure staff involvement, particularly during periods of
organisational change.
• To develop a culture based on trust, support and mutual respect within the workplace.
• As an employer we aim to create and promote a culture where employees are able to talk openly
about their job and mental health problems and to report difficulties without fear of discrimination
or reprisal.
Scope
Mental health problems and stress can affect anyone, regardless of their position in the organisation.
This policy applies equally to all employees.
The implementation of this policy will also be supported by other health and safety policies,
eg, sickness absence, alcohol, drug and substance abuse, and bullying and harassment.
MEGATRANSPORT INC. 51 |
Page
Occupational Safety and Health Program
Aim of the policy
To create a workplace environment that promotes the mental wellbeing of all employees.
The objectives should be clear and SMART: Specific, Measurable, Achievable, and Realistic and
where possible Time-specific. See the
‘Policy actions’ – to meet the objectives.
Policy actions:
• Give non-judgemental and proactive support to individual staff who experience mental health
problems.
• Deal sympathetically with staff suffering from mental health problems due to circumstances outside
the workplace, and who consequently find it difficult to do their jobs properly.
• Give new employees a comprehensive induction programme providing an understanding of the
organisation, the established policies and procedures, and the role they are expected to carry out.
Policy actions:
• Ensure individuals suffering from mental health problems are treated fairly and consistently and are
not made to feel guilty about their problems.
• Encourage staff to consult the occupational health department (if there is one), their own GP, or a
counsellor of their choice.
• Investigate the contribution of working conditions and other organisational factors to mental ill
health and remedy this where possible.
• In cases of long-term sickness absence, put in place, where possible, a graduated return to work.
• Make every effort to identify suitable alternative employment, in full discussion with the employee,
where a return to the same job is not possible due to identified risks or other factors.
• Treat all matters relating to individual employees and their mental health problems in the strictest
confidence and share on a ‘need to know’ basis only with consent from the individual concerned.
To positively encourage the employment of people who have experienced mental health problems by
providing fair and non-discriminatory recruitment and selection procedures.
As an employer we recognise that people who have or have had mental health problems may have
experienced discrimination in recruitment and selection procedures. This may discourage them from
seeking employment. While some people will acknowledge their experience of mental health issues
openly, others may fear that stigma will jeopardise their chances of getting a job. Given appropriate
support, the vast majority of people who have experienced mental health problems continue to work
successfully, as do many with ongoing issues.
Policy actions:
• Show a positive and enabling attitude to employees and job applicants with mental health issues.
This includes having positive statements in recruitment literature.
• Ensure that all staff involved in recruitment and selection are briefed on mental health issues and the
Disability Discrimination Act, and are trained in appropriate interview skills.
• Make it clear, in any recruitment or occupational health check undertaken, that people who have
experienced mental health issues will not be discriminated against and that disclosure of a mental
health problem will enable both employee and employer to assess and provide the right level of
support or adjustment.
• Do not make assumptions that a person with a mental health problem will be more vulnerable to
workplace stress or take more time off than any other employee or job applicant. • Ensure all line
managers have information and training about managing mental health in the workplace.
MEGATRANSPORT INC. 52 |
Page
Occupational Safety and Health Program
• To recognise that workplace stress is a health and safety issue, and acknowledge the importance
of identifying and reducing workplace stressors.
Policy actions:
• Identify all workplace stressors and conduct risk assessments to eliminate stress or control the risks
from stress. These risk assessments will be regularly reviewed.
• Consult with trade union safety representatives on all proposed action relating to the prevention of
workplace stress.
• Provide training in good management practices, including those related to health and safety and
stress management.
• Provide confidential counselling for staff affected by stress caused by either work or external factors.
• Provide adequate resources to enable managers to implement the organisations agreed workplace
mental wellbeing policy.
Responsibilities
Everyone has a responsibility to contribute to making the workplace mental wellbeing policy
effective.
Managers have a responsibility to:
• Monitor the workplace, identify hazards and risks and take steps to eliminate or reduce these as far
as is reasonably practicable.
• Ensure good communication between management and staff, particularly where there are
organisational and procedural changes.
• Assist and support employees who are known to have mental health problems or are experiencing
stress outside work – for example due to bereavement or separation.
• Ensure staff are provided with the resources and training required to carry out their job.
• Monitor workloads to ensure that people are not overloaded.
• Monitor working hours and overtime to ensure that staff are not overworking, and monitor holidays
to ensure that staff are taking their full entitlement.
• Ensure staff are provided with meaningful developmental opportunities.
• In addition, senior management will ensure that staff performing a management or supervisory
function have sufficient competence to discharge that function in a manner consistent with the
maintenance of mental health in the workplace.
Review and monitoring the human resources department (or an individual as appropriate) will be
responsible for reviewing the workplace mental wellbeing policy and for monitoring how effectively
the policy meets its aims and objectives.
Indicators to measure effectiveness could include:
• Working hours and patterns
• Accidents at work
• Staff complaints
• Staff sickness levels
• Staff turnover
• use of occupational health or counselling services
• The employee survey
• Early retirement through ill health
• exit interviews.
The policy will be reviewed six months from implementation and then annually after that to ensure
that it remains relevant.
MEGATRANSPORT INC. 54 |
Page
Occupational Safety and Health Program
DATE: __________________
In conformity with Republic Act No. 8504 otherwise known as the Philippine AIDS
Prevention and Control Act of 1998 which recognizes workplace-based programs as a potent tool in
addressing HIV/AIDS as an international pandemic problem, this company policy is hereby issued for
the information and guidance of the employees in the diagnosis, treatment and prevention of
HIV/AIDS in the workplace.
This policy is also aimed at addressing the stigma attached to HIV/AIDS and ensures that the
workers’ right against discrimination and confidentiality is maintained.
I. IMPLEMENTING STRUCTURE
The ARQUEE CONSTRUCTION MANAGEMENT. HIV/AIDS Program shall be managed
by its health and safety committee consists of representatives from the different divisions and
departments.
II. BASIC INFORMATION ON HIV/AIDS
What is HIV/AIDS?
It is a disease caused by a virus called HIV (Human Immunodeficiency Virus). This virus
slowly weakens a person’s ability to fight off other diseases by attaching itself to and destroying
important cells that control and support the human immune system.
Is there a cure?
No. However, there are antiretroviral drug combinations that are available when properly
used, result in prolonged survival of people with HIV. Holistic care of people living with HIV-AIDS
and comprehensive treatment of opportunistic infections also dramatically improve quality of life.
III. COVERAGE
MEGATRANSPORT INC. 55 |
Page
Occupational Safety and Health Program
This Program shall apply to all employees regardless of their employment status.
IV. GUIDELINES
A. Preventive Strategies
1. Conduct of HIV-AIDS Education.-
a. Who will conduct?
The Medical Clinic of ARQUEE CONSTRUCTION MANAGEMENT in
coordination with the Health and Safety Committee shall conduct HIV-AIDS
education to all employees for free. This shall also form part of the orientation of
newly hired employees. The standardized information package developed by the
Department of Labor and Employment (DOLE) may be used for this purpose.
b. How will it be conducted?
The HIV-AIDS education will be conducted through distribution and posting of IEC
materials, lectures, counselling and training and information on adherence to standard
or universal precautions in the workplace
2. Screening, Diagnosis, Treatment and Referral to Health Care Services
a. Screening for HIV as a prerequisite to employment is not mandatory.
b. The company shall encourage positive health seeking behavior through Voluntary
Counseling and Testing.
c. The company shall establish a referral system and provide access to diagnostic
and treatment services for its workers. Referral to Social Hygiene Clinics of LGU
for HIV screening shall be facilitated by the company’s medical clinic staff.
d. The company shall likewise facilitate access to livelihood assistance for the
affected employee and his/her families, being offered by other government
agencies.
B. SOCIAL POLICY
1. Non-discriminatory Policy and Practices
a. Discrimination in any form from pre-employment to post- employment, including
hiring, promotion or assignment, termination of employment based on the actual,
perceived or suspected HIV status of an individual is prohibited.
b. Workplace management of sick employees shall not differ from that of any other
illness.
c. Discriminatory act done by an officer or an employee against their
co-officer or co-employee shall likewise be penalized.
2. Confidentiality/Non-Disclosure Policy
a. Access to personal data relating to a worker’s HIV status shall be bound by the
rules of confidentiality consistent with provisions of R.A. 8504 and the ILO Code of
Practice.
b. Job applicants and workers shall not be compelled to disclose their
HIV/AIDS status and other related medical information.
c. Co-employees shall not be obliged to reveal any personal information relating to the
HIV/AIDS status of fellow workers.
3. Work-Accommodation and Arrangement
a. The company shall take measures to reasonably accommodate
employees with AIDS related illnesses.
MEGATRANSPORT INC. 56 |
Page
Occupational Safety and Health Program
b. Agreements made between the company and employee’s representatives shall reflect
measures that will support workers with HIV/AIDS through flexible leave
arrangements, rescheduling of working time and arrangement for return to work.
VI. EFFECTIVITY
This Policy shall take place effective immediately and shall be made known to every
employee.
___________________________ _______________________________
Ar. Alex Balean Granny E. Juancho
Owner/Manager Employees’ Representative
MEGATRANSPORT INC. 57 |
Page
Occupational Safety and Health Program
DATE: _________________
PURPOSE:
To address the stigma attached to TB and to ensure that the worker’s right against
discrimination, brought by the disease, is protected.
I. IMPLEMENTING STRUCTURE
II. COVERAGE
This Program shall apply to all employees regardless of their employment status.
III. GUIDELINES
MEGATRANSPORT INC. 58 |
Page
Occupational Safety and Health Program
A. Preventive Strategies
a. The company shall establish a referral system and provide access to diagnostic and
treatment services for its employees. The company shall make arrangements with the
nearest Direct Observed Treatment (DOT) facility.
b. The company’s adherence to the DOTS guidelines on the diagnosis and treatment is highly
encouraged.
B. MEDICAL MANAGEMENT
1. The company shall adopt the DOTS strategy in the management of workers with
tuberculosis. TB case finding, case holding and Reporting and Recording shall be in
accordance with the Comprehensive Unified Policy (CUP) and the National Tuberculosis
Control Program.
2. The company shall at the minimum refer employees and their family members with TB to
private or public DOTS centers.
C. SOCIAL POLICY
MEGATRANSPORT INC. 59 |
Page
Occupational Safety and Health Program
a. There shall be no discrimination of any form against employees from pre to post
employment, including hiring, promotion, or assignment, on account of their TB status.
(ILO C111)
b. Workplace management of sick employees shall not differ from that of any other illness.
Persons with TB related illnesses should be able to work for as long as medically fit.
a. Agreements made between the company and employee’s representatives shall reflect
measures that will support workers with TB through flexible leave arrangements,
rescheduling of working time and arrangement for return to work.
b. The employee may be allowed to return to work with reasonable working arrangements as
determined by the Company Health Care provider and/or the DOTS provider.
D. COMPENSATION
The company shall provide access to Social Security System and Employees
Compensation benefits under PD 626 to an employee who acquired TB infection in the
performance of his/her duty.
A. Employer’s Responsibilities
1. The Employer, together with workers/ labor organizations, company focal personnel for
human resources, safety and health personnel shall develop, implement, monitor and
evaluate the workplace policy and program on TB.
2. Provide information, education and training on TB prevention for its workforce.
4. Ensure confidentiality of the health status of its employees and the access to medical
records is limited to authorized personnel.
5. The Employer, through its Human Resources Department, shall see to it that their
company policy and program is adequately funded and made known to all employees.
MEGATRANSPORT INC. 60 |
Page
Occupational Safety and Health Program
6. The Health and Safety Committee, together with employees/ labor organizations shall
jointly review the policy and program and continue to improve these by networking with
government and organizations promoting TB prevention.
B. Employees’ Responsibilities
The Safety and Health Committee or its counterpart shall periodically monitor and evaluate
the implementation of this Policy and Program.
VI. EFFECTIVITY
This Policy shall take place effective immediately and shall be made known to every employee.
DATE: _________________
MEGATRANSPORT INC. 61 |
Page
Occupational Safety and Health Program
30.0 Workplace Policy and Program on Hepatitis B
I. Implementing Structure
The ARQUEE CONSTRUCTION MANAGEMENT.’s Hepatitis B workplace policy and program
shall be managed by its health and safety committee. Each division or department of the Company
shall be duly represented.
II. Guidelines
A. Education
1. Coverage. All employees regardless of employment status may avail of hepatitis B
education services for free;
2. Hepatitis B shall be conducted through distribution and posting of IEC materials and
counselling and/ or lectures; and
MEGATRANSPORT INC. 62 |
Page
Occupational Safety and Health Program
3. Hepatitis B education shall be spearheaded by the (name of company) Medical Clinic in
close coordination with the health and safety committee.
B. Preventive Strategies
1. All employees are encouraged to be immunized against Hepatitis B after securing clearance
from their physician.
2. Workplace sanitation and proper waste management and disposal shall be monitored by the
health and safety committee on a regular basis.
3. Personal protective equipment shall be made available at all times for all employees; and
4. Employees will be given training and information on adherence to standards or universal
precautions in the workplace.
1. The company shall take measures to reasonably accommodate employees who are Hepatitis
B positive or with Hepatitis B - related illnesses.
2. Through agreements made between management and employees’ representative, measures
to support employees with Hepatitis B are encouraged to work through flexible leave
arrangements, rescheduling of working time and arrangement for return to work.
MEGATRANSPORT INC. 63 |
Page
Occupational Safety and Health Program
1. The company shall establish a referral system and provide access to diagnostic and
treatment services for its employees for appropriate medical evaluation/ monitoring and
management.
2. Adherence to the guidelines for healthcare providers on the evaluation of Hepatitis B
positive employees is highly encouraged.
3. Screening for Hepatitis B as a prerequisite to employment shall not be mandatory.
E. Compensation
The company shall provide access to Social Security System and Employees Compensation
benefits under PD 626 to an employee contracted with Hepatitis B infection in the performance of his
duty.
IV. Roles and Responsibilities of Employers and Employees
A. Employer’s Responsibilities
B. Employees Responsibilities
MEGATRANSPORT INC. 64 |
Page
Occupational Safety and Health Program
1. The employees’ organization is required to undertake an active role in educating and
training their members on Hepatitis B prevention and control. The IEC program must also
aim at promoting and practicing a healthy lifestyle with emphasis on avoiding high risk
behavior and other risk factors that expose employees to increased risk of Hepatitis B
infection, consistent with the standardized basic information package developed by the
Hepatitis B TWG.
2. Employees shall practice non-discriminatory acts against co-employees on the ground of
Hepatitis B status.
3. Employees and their organizations shall not have access to personnel data relating to an
employee’s Hepatitis B status. The rules of confidentiality shall apply in carrying out union
and organization functions.
4. Employees shall comply with the universal precaution and the preventive measures.
5. Employees with Hepatitis B may inform the health care provider or the company
physician on their Hepatitis B status, that is, if their work activities may increase the risk of
Hepatitis B infection and transmission or put the Hepatitis B positive at risk for aggravation.
Within the establishment, the implementation of the policy and program shall be monitored
and evaluated periodically. The safety and health committee or its counterpart shall be tasked for this
purpose.
VI. EFFECTIVITY
This Policy shall take effect immediately and shall be made known to all employees.
______________________ ___________________________
Ar. Alex Balean Granny E. Juancho
Owner /Manager Employees’ Representative
MEGATRANSPORT INC. 65 |
Page
Occupational Safety and Health Program
31.0 COVID-19 Protocols
Following the most recent Government guidelines on the lifting of the Enhanced Community
Quarantine (ECQ) and the implementation of the Modified ECQ (MECQ) in some areas,
Arquee Construction Management (ACM) shall be upholding strict procedures to prevent
contamination and maintain the safety on all its project sites.
Further, in line with the DOH, DTI and DOLE Interim Guidelines on workplace Prevention
and Control of COVID 19 OSH Standard, these are the following Safety and Security
Protocol of ACM. The assigned contractor per respective site is expected to be in charge of all
the necessary preparations prior to any resumption of site activities.
Pre-mobilization
1. SCREENING OF MANPOWER
A. All personnel must undergo health background checking, to be executed by the contractor, to
check their health condition for the past two weeks. (See ANNEX for Health Background Checklist)
I. If the symptoms pertaining to COVID19 are present or has been experienced within the last
two weeks, the person will not be allowed to enter and work at the project site. The project
nurse/safety officer will recommend 14th days of self-quarantine and the person in question
will be subject for COVID-19 testing.
II. The health background checking may be communicated through email by the contractor to
the workers so the checking may be accomplished prior to resumption of work
MEGATRANSPORT INC. 66 |
Page
Occupational Safety and Health Program
III. In order to minimize personnel present on site, work-from-home arrangements are highly
encouraged particularly for the administrative and support staff.
IV. Assessment and validation of personnel background check shall only be done at the
designated area on site
V. Any false claims pertaining to symptoms and/or exposure disclosed in the Health
Background Checklist shall be subject to disciplinary measures by ACM in coordination with
the administration.
B. Employers are highly encouraged to allow work-from-home arrangements for At-risk Personnel
and vulnerable groups (more than 60 years old, any age with co-morbidities or pre-existing illness,
i.e., hypertension, diabetes, cancer or with immune compromised health status; or with high risk
pregnancy)
I. Personnel below 20 years old are not allowed to work at site during MECQ / ECQ period
II. Should the work-from-home arrangement not be available for the At-risk Personnel, they
will be not allowed to work temporarily for safety reasons
III. Final screening will be done by management upon receipt of the accomplished Health
Background Checklist in line with the Safety and Health Protocol for COVID-19.
IV. In case a modification of manpower is necessary, the contractor may present an updated
list provided with an accomplished Health Background Checklist of each personnel.
2. BARANGAY CERTIFICATION
A. All workers returning to the site shall provide Barangay Certification as proof that they did
not contract the virus in the entirety of the ECQ and that they are fit to work
3. COVID-19 TESTING
A. The contractor shall test workers for COVID-19 prior to resumption of work. Testing kits
to be used and procured shall be the responsibility of the contractor. DOH protocols shall be
followed for the testing of workers and interpretation of results in accordance with DOH
Department memorandum No.2020-0180: Revised Interim Guidelines on Extended Testing
for COVID-19, 16 April 2020 and DOH Administrative Order No.2020-0014: Guidelines in
Securing a License Policy on COVID-19 testing shall be formulated and agreed upon by
employer and workers in conformity with DOH protocols.
B.Workers with negative results will be allowed to work. They should be given appropriate
advice and instruction once they develop any health complications or symptoms. The
company OSH personnel shall continue to monitor all workers.
A mandatory 14-day quarantine period shall be implemented to personnel should the COVID-
19 test kit be unavailable due to limited supplies
a. Quarantine period of 14 days may be implemented at contractor’s barracks or
designated isolated barracks at project site.
MEGATRANSPORT INC. 67 |
Page
Occupational Safety and Health Program
b. The Safety officer/project nurse will be inspecting the barracks for compliance of
Safety and Health Protocol for COVID-19.
A. All work spaces and other areas on site, including but not limited to temporary facilities,
workers’ barracks, comfort rooms, clinic, conference rooms, etc. shall be disinfected before
the resumption of work.
B. All offices and job sites should disinfect the following at least twice a day:
i. Door Handles
ii. Railings
iii. Ladders
iv. Switches Controls
v. Shared Equipment
vi. Common Areas
vii. Pantry and Areas for Eating
viii. Personal Work Stations
C. Contractors should provide cleaning and disinfection materials needed on site. The list of
materials and equipment shall be provided by respective management per site.
7. SITE PREPARATION
a. All project sites must allocate a proper hand washing area. Location and quantity of hand
washing area may be assigned by the respective management per site.
b. All hand washing areas must have posters or guidelines on proper hand washing.
c. Strict implementation of hand washing before entering the site premises shall be practiced.
d. All project sites shall provide an isolation area in the event that a personnel shall exhibit
symptoms during resumption of work.
During work
A. All personnel must be subjected to temperature checking prior to work. This shall be done
per contractor: by safety representative and/or supervisor, and per trade contractor. No
workers shall be allowed to work unless his or her temperature has been checked.
i. If a person has fever-like symptoms, he/she shall not be allowed to work and shall
be transferred to the isolation area for monitoring.
ii. A trained team personnel from the Safety and Health Department shall be
monitoring the isolated person.
B. Thermal scanning shall be done at the gate, prior to entering and going out of the site.
MEGATRANSPORT INC. 68 |
Page
Occupational Safety and Health Program
2. HEALTH CARD MONITORING
A. Every personnel must have a Health Card monitoring form. This shall be done with the
Safety Officer or Project Nurse who will be monitoring the health status of a personnel prior
to work.
A. All workers must wear the prescribed clothing and/or equipment of the DOLE-OSHC.
Kindly refer to the list below:
i. Shirt with sleeves;
ii. Pants;
iii. Closed-toe boots;
iv. Hard-hat and high-visibility vests;
v. Other necessary Personal Protective Equipment (i.e. gloves, goggles, etc.)
A. All safety representatives and or supervisors per contractor must monitor their respective
staff and manpower and must strictly implement the control measures to avoid any
transmission or spreading of the virus.
9. STAY-IN WORKERS
A. All personnel entering the site for delivery shall undergo thermal scanning and hand
washing.
B. All personnel entering the site for delivery must wear face masks at all times.
C. Disinfection of delivery vehicles is required at the gate prior to entering the site.
D. Materials/supplies are subject to disinfection: if materials will be stored at warehouse or
temporary facilities, it must undergo disinfection; if materials will be stored outside,
precautionary disinfection at entrance may apply.
E. Deliveries shall be unloaded at designated areas and sanitized and disinfected before they
are transferred and stored at project warehouse.
F. Receiving crew should wear gloves and eye protection in handling and sanitizing the
delivered items.
G. Delivery receipts should be placed in a plastic envelope.
H. A receiving crew that is permanently designated for each project shall be communicated
beforehand to the office
A.Physical gatherings and meetings must be avoided or minimized at this time. Alternatively,
participants may opt to use other means of communication such as messaging and
conferencing applications.
B. If physical meetings are absolutely necessary and unavoidable, stringent social distancing
must be practiced
A. Safety officers / representatives from the contactors must hold tool box meetings per trade
contractor to limit the attendees. Social distancing must be practiced at all times.
B. General toolbox meeting is prohibited at this time. However information must be properly
disseminated through messaging platforms and other applicable means of communication.
13. HOUSEKEEPING
A. Overtime for all staff on site must be avoided to prevent over fatigue
B. Shifting may be implemented on site subject to approval of respective management per site
A. Users of hoisting equipment / elevators shall practice social distancing of at least one
meter
B. Project management shall limit the number of personnel allowed to alight the
hoisting equipment / elevators based on the capacity of the hoisting equipment/elevator
C. Hoisting equipment must be disinfected at least every 2 hours.
D. All staff working within the construction premises are encouraged to use fire exits and
other available accesses to minimize the use of hoisting equipment
1. Strict implementation of social distancing shall be practiced during break time at mess hall/
canteen.
2. The canteen/mess hall shall be disinfected before, during, and after break time.
3. All utensils, containers, and appliances used in the preparation of food shall be disinfected
before use
4. The use of disposable utensils and food containers is highly encouraged.
5. All canteen personnel must strictly follow the safety and security protocol at site.
6. Canteen/mess hall inspection of the management will be done daily.
7. Appropriate disciplinary action will be given to any personnel who exhibit non-compliance
on the implemented safety and security protocol.
8. Stringent housekeeping and proper segregation of waste shall be practiced.
9. Daily disposal of waste will be implemented.
1 .All project sites must implement curfew for personnel coming in and out of the site
premises during the community quarantine.
A. Workers will not be allowed to leave the site premises from 8:00pm to 5:00am s.
B. All stay-in manpower shall stay in their barracks or temporary facility during
curfew and avoid roaming around the site.
C. Workers caught disobeying the rules may be penalized and will be given proper
disciplinary action. Necessary sanction to be determined by respective site
management.
Detection
1. If someone working within the site displays symptoms such as, fever, cough, difficulty of
breathing he/she will be transferred to an isolation area for further monitoring.
2. In the event that there would be a confirmed positive case within the site, all work will
automatically cease. All man power shall be subject for self-quarantine. Disinfection and
other safety protocols prescribed by OSH and DOH will be strictly implemented.
Other measures
1. Posters portraying reminders for COVID 19 transmission and how to avoid it shall be present at all
public areas including but not limited to temfacil, hallway, gate clinic, and any area visible to the
workers.
2. Alcohol or sanitizer dispensers shall be placed in strategic locations within the office and must be
refilled regularly.
3. Frequent and thorough cleaning of work stations shall be implemented
4. Safety officers and/or nurse per project site must regularly update the status of manpower and any
other health-related occurrences
5. A limited number of gate passes shall be available to control manpower going in and out of site
premises
A. For buying food and other basic essentials needed, only one authorized person per
contractor may request for gate pass.
6. News about COVID-19 at site must be constantly updated and disseminated on site through various
communication channels
7. Clear signages on health and safety measures are posted at site entry points as constant reminders
8. As much as possible, all workers should exercise safety practices for reducing the risk of
transmission as identified by the DOH particularly proper hygiene and social distancing
A. Proper hand washing with use of soap and water or any alcohol-based hand sanitizer,
whichever is available
B. Avoid touching your eyes, nose, and mouth.
C. Cover your mouth with tissue or arm (if tissue is unavailable) when sneezing or coughing.
D. Use and remove PPE with care.
E. Avoid sharing personal belongings such as phones, pens, PPEs.
F. Physical contact is highly discouraged (e.g. handshakes, hugs).
9. The site supervisors and safety officers are expected to conduct daily audits, and safety reports to
management in order to make sure that the appropriate measures are implemented and followed.
10. Access shall be segregated: one gate is to be used for entrance and another for exit of all
personnel.
11. Checking and testing of major equipment like tower cranes, construction lift, etc. shall be done
regularly
12. Shoe disinfection shall be installed in all facility entrances.
MEGATRANSPORT INC. 72 |
Page
Occupational Safety and Health Program
13. General cleaning and disinfection shall be carried out daily after office hours at office premises
including but not limited to chairs and tables, meeting rooms, hallways, toilet, pantry, etc.
14. All front liners (Security guards, Safety Engineers, Physicians, Nurses and others) involved in
entrance screening and those at high risk of infection, must take extra safety measures such as strict
hand hygiene and use of suitable PPE (N95 mask, and face shield). In case of probable exposure to
COVID- 19, use disposable latex gloves and impermeable gowns.
15. A trained team that will serve as front liners including but not limited to security personnel,
project nurse, or anyone duly appointed by the Project Manager, will execute the screening of all
personnel. They shall check the temperature of all personnel, workers, and staff.
16. All workers shall wash their hands thoroughly before and after work.
17. All visitors, including applicants, suppliers, guests, or anyone not employed by the project, shall
not be allowed to enter the project premises. The use of various communication platforms are
recommended.
18. If the visit is of utmost importance and is absolutely necessary, the visitor/s shall undergo the
standard health screening protocol.
19.The visitor shall be made aware of the Safety and Health Protocol while inside the project
premises.
20.Before resumption of any activity, all hazards, due to the halting of work, must be reviewed and
controlled.
Implementation Guidelines
1. All contractors must agree with this Safety and Health protocols and must commit to its strict
implementation and compliance to protect everyone in the construction site.
2. The ACM Safety and Health Protocol shall take effect immediately after the ECQ is lifted and
work is allowed in the construction sector.
3. These Safety and Health Protocols can be revised or amended as situations develop or when
required by the national or local government units where the project is located.
4. These construction Protocols shall be explained in layman’s terms and/or in Tagalog to all workers
for their full understanding and appreciation.
5. These work Protocols comply with all government agencies directives and guidelines to ensure a
safe workplace environment and prevent contamination and transmission of COVID 19 virus once
work in a project site resumes.
6. The Owner is fully responsible for implementation of this Protocol.
7. The success of the protocol relies on joint implementation of all Contractors
8. These protocols are in line with the Government’s mandates related to COVID-19.
Impact on project
1. These work protocols comply with all government agencies’ directives and guidelines to ensure a
safe work environment and prevent contamination and transmission of COVID 19 virus once work in
a project site resumes.
2. Additional measures to augment these work Protocols due to COVID 19 in ensuring the safety and
health of the workers and all personnel in the project are not included in the Construction Agreement
but are deemed to be done to serve the best interests of the Client and its other stakeholders to ensure
the completion of the project.
Listed below are the non-exhaustive list of potential events that needs to be mitigated jointly on best
effort basis by all contractors
1. Government stoppage of operation at the project site due hoaxes of COVID-19 occurrence outbreak
at site.
2. Re-imposition of total lockdown by the government due to COVID-19 second outbreak.
MEGATRANSPORT INC. 73 |
Page
Occupational Safety and Health Program
3. Work stoppage requested by adjacent property Owner due to suspected COVID-19 outbreak at site
4. Lack of financial support from the client on the financial requirement of the project.
5. Indecisiveness of client representative at project site on matters related to work priority and
sequencing.
6. Lack of cooperation from client direct contractors and client’s direct suppliers as to compliance to
government requirements to COVID-19 prevention protocols.
7. Government mandates that will affect productivity, logistics and other resources due continuous
threat of COVID-19.
HOTLINES
OHS/ACM Project Director (A. Balean) (+63) 917 876 8597
ACM Project Manager (P.M Javier) (+63) 9065340601
Safety Officer (G.Juancho) (+63) 9532432646
PD Manager (M. Azuela) (+63) 935 337 0872
ED Manager (S.K Napeña) (+63) 917 833 5077
AO/SD (L. Buscuit) (+63) 977 824 8899
AO/TC (H. Portez) (+63) 966 563 7551
HRD-Manager (Y. Salazar) (+63) 998 567 7008
HO (T. Aguilos) (+63) 998 567 7008
ABBREVIATIONS
ACM Arquee Construction Management
OHS Occupational Health and Safety
PD Procurement Department
ED Engineering Department
AO Administrative Officer
SD Security Department
TC Testing & Commissioning
MEGATRANSPORT INC. 74 |
Page
Occupational Safety and Health Program
HRD Human Resources Department
HO Head Office
PANGALAN TRABAHO
MEGATRANSPORT INC. 75 |
Page
Occupational Safety and Health Program
3. IKAW BA AY NA- 7. IKAW BA AY MAY SAPAT
OSPITAL NITONG MGA NA TULOG AT PAHINGA
NAKALIPAS NA ARAW NITONG MGA NAKALIPAS NA
O LINGGO? ARAW?
Signature
Within the establishment, the implementation of the policy and program shall be monitored and
evaluated periodically. The safety and health committee or its counterpart shall be tasked for this
purpose.
II. EFFECTIVITY
This Policy shall take effect immediately and shall be made known to all employees.
MEGATRANSPORT INC. 76 |
Page
Occupational Safety and Health Program
______________________ ___________________________
Ar. Alex Balean Granny E. Juancho
Owner /Manager Employees’ Representative