PlanView Project Charter
PlanView Project Charter
Sample
<Company>
Date: <MM/DD/YYYY>
gantthead.com Project Charter Draft
Project Description
The PlanView implementation is sponsored by Mr. Jones, Vice President of Information
Systems, who is responsible for determining the success or failure of the system in
meeting the project objectives. The system is being implemented in the information
services and information technology departments of <Company> The departments
collectively consist of approximately 13 managers and 70 team members. The
information services departments support their respective business segment, whereas
the information technology groups support all business segments for their respective
area of technology. Projects routinely cross the various information services and
information technology groups. During the implementation of PlanView, project
management processes and procedures will be improved and standardized for all the
groups. XYZ Division will be the first group to be converted to PlanView; the other
groups will then follow.
Development – Install, initialize and test the PlanView software, identify the system
interface requirements, develop the Procedures Guide, develop user training, train
the implementation team.
Execute – Migrate existing projects into PlanView’s central repository, train users,
rollout PlanView to production environment; and
Finish – wrapup activities of the project will be performed to conclude the project
such as post-implementation support and project assessment.
Objectives
Business Objectives for the project are as follows:
All current information services and information technology projects will be loaded
and maintained in a central repository.
All information services and information technology time will be tracked for all project,
support, and administrative activities.
All required project and time reports will be available to team members and
management.
Scope
The scope of the project includes:
©2007 gantthead.com 2
gantthead.com Project Charter Draft
PlanView, Inc. staff to train and mentor up to ten (10) Customer Implementation staff
in use of the software.
Load PlanView repository with structures and approximately 300 projects containing
an average of 10 work entities per project.
Assumptions
We will have the full cooperation and participation of the five information services
and information technology groups involved in the project.
37 days of consulting time with PlanView, Inc. will be adequate for installation,
training, and other implementation assistance.
PlanView will provide training for up to ten (10) Implementers; the Implementers will
then train the other groups.
<Company> staff will act as mentors for the various groups implementing PlanView.
<Company> will schedule the PlanView, Inc. staff using the Project Approach as
defined in the PlanView Consulting Services Engagement Management Approach
document.
©2007 gantthead.com 3
gantthead.com Project Charter Draft
Project Components
There are three major components to any project. <Company> has chosen
RESOURCES as the most important component for the project.
Sc
e
he
op
d
Sc
ule
Resources
Project Approach
The major items of work for the project are
Summary Schedule
The following is a very high level schedule of the major components of this project.
6 ImplementPortico 0d 9/28/98 8:
©2007 gantthead.com 4
gantthead.com Project Charter Draft
Constraints
The system must be cut over into production at the end of an accounting month.
<Company> has a code freeze each year from mid-December until mid-January. This code
freeze is not related to fiscal year-end, which is March 31 for <Company> The current
planned implementation date is September 28.
Holidays and other work schedule issues: Jean Jones is on holiday from July 30 to Aug 24,
Caroline Smith is not in the office on Fridays, Julie Anderson on holiday from June 13 to
June 21.
The final test database location for the Trial and Pilot has not been determined.
Project Duration
Key Project Milestones:
Project Deliverables
Deliverables for this project are:
Project Charter
Environmental Assessment
PlanView Software installed on Servers and five (5) Clients by PlanView Staff
Project Risks
Risks associated with this project are as follows:
The <Company> Support Team staff is turning over. There are only two staff
members and both are leaving in June. No replacements have been selected as of
yet. Recruitment, training and retention of the Support Team could have a significant
impact on <Company>’s implementation. During the implementation PlanView
software support requirements will increase substantially.
Project Authorization
<Company> Authorization:
©2007 gantthead.com 7
gantthead.com Project Charter Draft
<Title> Date:
<Name>
<Title> Date:
<Name>
©2007 gantthead.com 8