DUPA, Slope Protection
DUPA, Slope Protection
Project : OO2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Rehabilitation Net Length (a) Road
of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Slope Protection along (b) Bridge
AS SUBMITTED AS EVALUATED
DESCRIPTION OF WORKS TO BE DONE QUANTITY UNIT
% TOTAL TOTAL DIRECT COST % TOTAL TOTAL DIRECT COST
PART A Facilities for the Engineer 0.54% 107,273.96 0.54% 107,273.96
PART B Other General Requirements 3.20% 638,214.92 3.20% 638,214.92
PART C Earthwork 30.14% 6,016,502.89 30.14% 6,016,502.89
PART D Subbase and Base Course 0.00% 0.00 0.00% 0.00
PART E Surface Courses (PLS. SEE FORM POW-2015-01C-00) 0.00% 0.00 0.00% 0.00
PART F Bridge Construction 0.00% 0.00 0.00% 0.00
PART G Drainage and Slope Protection Structures 66.13% 13,201,984.67 66.13% 13,201,984.67
PART H Miscellaneous Structures 0.00% 0.00 0.00% 0.00
PART I Provisional Sum 0.00% 0.00 0.00% 0.00
PART J Daywork 0.00% 0.00 0.00% 0.00
3. Rental of Equipment 1,744,389.99 1,744,389.99 C. Value Added Tax (5%) 1,193,873.33 1,193,873.33
(PLS. SEE FORM POW-2015-01B-00) 5. OCM and Profit 3,913,490.23 3,913,490.23 E. Eng'g & Administrative Overhead, 2.0% 511,660.00 511,660.00
8. RROW Acquisition - -
9. Physical Reserved (Contingency) - -
10.TOTAL ESTIMATED COST 25,583,000.00 25,583,000.00 H. TOTAL ESTIMATED COST 25,583,000.00 25,583,000.00
Prepared by: Checked/Submitted by: Reviewed as to Unit Cost: Recommending Approval: Approved:
JOHN NESDAM Z. VENTOCILLA FAUSTINO MARK ANTHONY S. DE LA CRUZ JUAN J. PANGANIBAN WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
Engineer II Chief, Planning & Design Section Chief, Construction Section Engineer III Assisstant District Engineer
Maintenance Section OIC - Office of the District Engineer
OIC - Office of the Assistant District Engineer
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON 2ND DISTRICT ENGINEERING OFFICE
FORM POW-2015-01-00
PROGRAM OF WORKS/BUDGET COST
Project : OO2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Rehabilitation Net Length (a) Road
of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Slope Protection along (b) Bridge
AS SUBMITTED AS EVALUATED
DESCRIPTION OF WORKS TO BE DONE QUANTITY UNIT
% TOTAL TOTAL DIRECT COST % TOTAL TOTAL DIRECT COST
PART A Facilities for the Engineer 0.54% 107,273.96 0.54% 107,273.96
PART B Other General Requirements 3.20% 638,214.92 3.20% 638,214.92
PART C Earthwork 30.14% 6,016,502.89 30.14% 6,016,502.89
PART D Subbase and Base Course 0.00% 0.00 0.00% 0.00
PART E Surface Courses (PLS. SEE FORM POW-2015-01C-00) 0.00% 0.00 0.00% 0.00
PART F Bridge Construction 0.00% 0.00 0.00% 0.00
PART G Drainage and Slope Protection Structures 66.13% 13,201,984.67 66.13% 13,201,984.67
PART H Miscellaneous Structures 0.00% 0.00 0.00% 0.00
PART I Provisional Sum 0.00% 0.00 0.00% 0.00
PART J Daywork 0.00% 0.00 0.00% 0.00
3. Rental of Equipment 1,744,389.99 1,744,389.99 C. Value Added Tax (5%) 1,193,873.33 1,193,873.33
(PLS. SEE FORM POW-2015-01B-00) 5. OCM and Profit 3,913,490.23 3,913,490.23 E. Eng'g & Administrative Overhead, 2.0% 511,660.00 511,660.00
8. RROW Acquisition - -
9. Physical Reserved (Contingency) - -
10.TOTAL ESTIMATED COST 25,583,000.00 25,583,000.00 H. TOTAL ESTIMATED COST 25,583,000.00 25,583,000.00
Prepared by: Checked/Submitted by: Reviewed as to Unit Cost: Recommending Approval: Approved:
JOHN NESDAM Z. VENTOCILLA FAUSTINO MARK ANTHONY S. DE LA CRUZ JUAN J. PANGANIBAN WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
Engineer II Chief, Planning & Design Section Chief, Construction Section Engineer III Assisstant District Engineer
Maintenance Section OIC - Office of the District Engineer
OIC - Office of the Assistant District Engineer
OO2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Rehabilitation
of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Slope Protection along
Lagnas River, Brgy. Tumbaga I, Sariaya, Quezon
FORM POW-2015-01A-00
ITEMIZED BREAKDOWN
DIRECT COST
TOTAL UNIT COST
QUANTITY % DIRECT COST
UNIT TOTAL UNIT COST (DIRECT+INDIRECT)
ITEM NO. DESCRIPTION
AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED
A.1.1 (3) Construction of Field Office for the Engineer 1.00 1.00 lump sum 104,198.96 104,198.96 104,198.96 104,198.96 118,161.62 118,161.62 0.52% 0.52%
A.1.4(1) Provision of Progress Photographs 205.00 205.00 each 3,075.00 3,075.00 15.00 15.00 17.01 17.01 0.02% 0.02%
B.5 Project Billboard / Signboard 1.00 1.00 each 4,337.05 4,337.05 4,337.05 4,337.05 5,464.68 5,464.68 0.02% 0.02%
B.7(2) Occupational Safety and Health Program 1.00 1.00 lump sum 337,842.11 337,842.11 337,842.11 337,842.11 383,112.95 383,112.95 1.69% 1.69%
B.9 Mobilization / Demobilization 1.00 1.00 lump sum 129,455.64 129,455.64 129,455.64 129,455.64 135,928.42 135,928.42 0.65% 0.65%
B.15(1) Detour/Access Road 1.00 1.00 lump sum 166,580.12 166,580.12 166,580.12 166,580.12 209,890.95 209,890.95 0.83% 0.83%
PART C EARTHWORKS
103(1)a Structure Excavation (Common Soil) 3,860.65 3,860.65 cu.m. 902,426.94 902,426.94 233.75 233.75 294.53 294.53 4.52% 4.52%
104(2)a Embankment from Borrow (Common Soil) 7,669.58 7,669.58 cu.m. 5,114,075.95 5,114,075.95 666.80 666.80 840.17 840.17 25.62% 25.62%
TOTAL OF PART D
TOTAL OF PART E
TOTAL OF PART F
511(1)b3 Gabions (1m x 1m x 2m, PVC Coated) 5,325.00 5,325.00 cu.m. 12,973,723.50 12,973,723.50 2,436.38 2,436.38 3,069.84 3,069.84 64.99% 64.99%
511(3) Filter Cloth 2,079.26 2,079.26 sq.m. 228,261.17 228,261.17 109.78 109.78 138.32 138.32 1.14% 1.14%
TOTAL OF PART H
TOTAL OF PART I
PART J DAYWORK
TOTAL OF PART J
FORM POW-2015-01A-00
ITEMIZED BREAKDOWN
DIRECT COST
TOTAL UNIT COST
QUANTITY % DIRECT COST
UNIT TOTAL UNIT COST (DIRECT+INDIRECT)
ITEM NO. DESCRIPTION
AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED AS SUBMITTED AS EVALUATED
A.1.1 (3) Construction of Field Office for the Engineer 1.00 1.00 lump sum 104,198.96 104,198.96 104,198.96 104,198.96 118,161.62 118,161.62 0.52% 0.52%
A.1.4(1) Provision of Progress Photographs 205.00 205.00 each 3,075.00 3,075.00 15.00 15.00 17.01 17.01 0.02% 0.02%
B.5 Project Billboard / Signboard 1.00 1.00 each 4,337.05 4,337.05 4,337.05 4,337.05 5,464.68 5,464.68 0.02% 0.02%
B.7(2) Occupational Safety and Health Program 1.00 1.00 lump sum 337,842.11 337,842.11 337,842.11 337,842.11 383,112.95 383,112.95 1.69% 1.69%
B.9 Mobilization / Demobilization 1.00 1.00 lump sum 129,455.64 129,455.64 129,455.64 129,455.64 135,928.42 135,928.42 0.65% 0.65%
B.15(1) Detour/Access Road 1.00 1.00 lump sum 166,580.12 166,580.12 166,580.12 166,580.12 209,890.95 209,890.95 0.83% 0.83%
PART C EARTHWORKS
103(1)a Structure Excavation (Common Soil) 3,860.65 3,860.65 cu.m. 902,426.94 902,426.94 233.75 233.75 294.53 294.53 4.52% 4.52%
104(2)a Embankment from Borrow (Common Soil) 7,669.58 7,669.58 cu.m. 5,114,075.95 5,114,075.95 666.80 666.80 840.17 840.17 25.62% 25.62%
TOTAL OF PART D
TOTAL OF PART E
TOTAL OF PART F
511(1)b3 Gabions (1m x 1m x 2m, PVC Coated) 5,325.00 5,325.00 cu.m. 12,973,723.50 12,973,723.50 2,436.38 2,436.38 3,069.84 3,069.84 64.99% 64.99%
511(3) Filter Cloth 2,079.26 2,079.26 sq.m. 228,261.17 228,261.17 109.78 109.78 138.32 138.32 1.14% 1.14%
TOTAL OF PART H
TOTAL OF PART I
PART J DAYWORK
TOTAL OF PART J
FORM POW-2015-01C-00
As Submitted
TOTAL OF PART D
As Evaluated
OO2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Rehabilitation
of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Slope Protection along
Lagnas River, Brgy. Tumbaga I, Sariaya, Quezon
FORM POW-2015-01C-00
As Submitted
TOTAL OF PART D
As Evaluated
PART E SURFACE COURSES
As Submitted
TOTAL OF PART E
As Evaluated
PART F BRIDGE CONSTRUCTION
As Submitted
TOTAL OF PART F
As Evaluated
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES
As Submitted 64.99% 5,325.00 cu.m. 11,483,362.50 1,490,361.00 - 12,973,723.50 20% 2,594,744.70 778,423.41 16,346,891.61 3,069.84
511(1)b3 Gabions (1m x 1m x 2m, PVC Coated)
As Evaluated 64.99% 5,325.00 cu.m. 11,483,362.50 1,490,361.00 - 12,973,723.50 20% 2,594,744.70 778,423.41 16,346,891.61 3,069.84
As Submitted 1.14% 2,079.26 sq.m. 207,406.19 14,553.00 6,301.98 228,261.17 20% 45,652.23 13,695.67 287,609.07 138.32
511(3) Filter Cloth
As Evaluated 1.14% 2,079.26 sq.m. 207,406.19 14,553.00 6,301.98 228,261.17 20% 45,652.23 13,695.67 287,609.07 138.32
As Submitted 66.13% 11,690,768.69 1,504,914.00 6,301.98 13,201,984.67 2,640,396.93 792,119.08 16,634,500.68
TOTAL OF PART G
As Evaluated 66.13% 11,690,768.69 1,504,914.00 6,301.98 13,201,984.67 2,640,396.93 792,119.08 16,634,500.68
PART H MISCELLANEOUS STRUCTURES
As Submitted
TOTAL OF PART H
As Evaluated
PART I PROVISIONAL SUM
As Submitted -
As Evaluated
As Submitted
TOTAL OF PART I
As Evaluated
PART J DAYWORK
As Submitted -
As Evaluated
As Submitted
TOTAL OF PART J
As Evaluated
As Submitted 100.00% 16,361,281.96 1,858,304.49 1,744,389.99 19,963,976.44 3,913,490.23 1,193,873.33 25,071,340.00
GRAND TOTAL
As Evaluated 100.00% 16,361,281.96 1,858,304.49 1,744,389.99 19,963,976.44 3,913,490.23 1,193,873.33 25,071,340.00
PART E SURFACE COURSES
As Submitted
TOTAL OF PART E
As Evaluated
PART F BRIDGE CONSTRUCTION
As Submitted
TOTAL OF PART F
As Evaluated
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES
As Submitted 64.99% 5,325.00 cu.m. 11,483,362.50 1,490,361.00 - 12,973,723.50 20% 2,594,744.70 778,423.41 16,346,891.61 3,069.84
511(1)b3 Gabions (1m x 1m x 2m, PVC Coated)
As Evaluated 64.99% 5,325.00 cu.m. 11,483,362.50 1,490,361.00 - 12,973,723.50 20% 2,594,744.70 778,423.41 16,346,891.61 3,069.84
As Submitted 1.14% 2,079.26 sq.m. 207,406.19 14,553.00 6,301.98 228,261.17 20% 45,652.23 13,695.67 287,609.07 138.32
511(3) Filter Cloth
As Evaluated 1.14% 2,079.26 sq.m. 207,406.19 14,553.00 6,301.98 228,261.17 20% 45,652.23 13,695.67 287,609.07 138.32
As Submitted 66.13% 11,690,768.69 1,504,914.00 6,301.98 13,201,984.67 2,640,396.93 792,119.08 16,634,500.68
TOTAL OF PART G
As Evaluated 66.13% 11,690,768.69 1,504,914.00 6,301.98 13,201,984.67 2,640,396.93 792,119.08 16,634,500.68
PART H MISCELLANEOUS STRUCTURES
As Submitted
TOTAL OF PART H
As Evaluated
PART I PROVISIONAL SUM
As Submitted -
As Evaluated
As Submitted
TOTAL OF PART I
As Evaluated
PART J DAYWORK
As Submitted -
As Evaluated
As Submitted
TOTAL OF PART J
As Evaluated
As Submitted 100.00% 16,361,281.96 1,858,304.49 1,744,389.99 19,963,976.44 3,913,490.23 1,193,873.33 25,071,340.00
GRAND TOTAL
As Evaluated 100.00% 16,361,281.96 1,858,304.49 1,744,389.99 19,963,976.44 3,913,490.23 1,193,873.33 25,071,340.00
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON 2ND DISTRICT ENGINEERING OFFICE
FORM ABC-2015-02-00
OO2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Rehabilitation
of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Slope Protection along
Lagnas River, Brgy. Tumbaga I, Sariaya, Quezon
AS SUBMITTED
PART E SURFACE COURSE
AS EVALUATED
AS SUBMITTED
PART F BRIDGE CONSTRUCTION
AS EVALUATED
AS SUBMITTED
PART I PROVISIONAL SUM
AS EVALUATED
AS SUBMITTED
PART J DAYWORK
AS EVALUATED
Prepared by: Checked/Submitted by: Reviewed as to Unit Cost: Recommending Approval: Approved:
JOHN NESDAM Z. VENTOCILLA FAUSTINO MARK ANTHONY S. DE LA CRUZ JUAN J. PANGANIBAN WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
Engineer II Chief, Planning & Design Section Chief, Construction Section Engineer III Assisstant District Engineer
Maintenance Section OIC - Office of the Assistant District OIC - Office of the District Engineer
Engineer
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON 2ND DISTRICT ENGINEERING OFFICE
FORM ABC-2015-02-00
OO2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Rehabilitation
of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Slope Protection along
Lagnas River, Brgy. Tumbaga I, Sariaya, Quezon
AS SUBMITTED
PART E SURFACE COURSE
AS EVALUATED
AS SUBMITTED
PART F BRIDGE CONSTRUCTION
AS EVALUATED
AS SUBMITTED
PART I PROVISIONAL SUM
AS EVALUATED
AS SUBMITTED
PART J DAYWORK
AS EVALUATED
Prepared by: Checked/Submitted by: Reviewed as to Unit Cost: Recommending Approval: Approved:
JOHN NESDAM Z. VENTOCILLA FAUSTINO MARK ANTHONY S. DE LA CRUZ JUAN J. PANGANIBAN WILFREDO L. RACELIS MA. CHYMBELIN D. IBAL
Engineer II Chief, Planning & Design Section Chief, Construction Section Engineer III Assisstant District Engineer
Maintenance Section OIC - Office of the Assistant District OIC - Office of the District Engineer
Engineer
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
QUEZON 2ND DISTRICT ENGINEERING OFFICE
FORM ABC-2015-02A-00
OO2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Rehabilitation
of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Slope Protection along
Lagnas River, Brgy. Tumbaga I, Sariaya, Quezon
PART C EARTHWORKS
AS SUBMITTED 3,860.65 cu.m. 902,426.94 20% 180,485.39 54,145.62 234,631.01 1,137,057.95 294.53
103(1)a Structure Excavation (Common Soil)
AS EVALUATED 3,860.65 cu.m. 902,426.94 20% 180,485.39 54,145.62 234,631.01 1,137,057.95 294.53
AS SUBMITTED 7,669.58 cu.m. 5,114,075.95 20% 1,022,815.19 306,844.56 1,329,659.75 6,443,735.70 840.17
104(2)a Embankment from Borrow (Common Soil)
AS EVALUATED 7,669.58 cu.m. 5,114,075.95 20% 1,022,815.19 306,844.56 1,329,659.75 6,443,735.70 840.17
AS SUBMITTED 6,016,502.89 1,203,300.58 360,990.18 1,564,290.76 7,580,793.65
TOTAL OF PART C
AS EVALUATED 6,016,502.89 1,203,300.58 360,990.18 1,564,290.76 7,580,793.65
PART C EARTHWORKS
AS SUBMITTED 3,860.65 cu.m. 902,426.94 20% 180,485.39 54,145.62 234,631.01 1,137,057.95 294.53
103(1)a Structure Excavation (Common Soil)
AS EVALUATED 3,860.65 cu.m. 902,426.94 20% 180,485.39 54,145.62 234,631.01 1,137,057.95 294.53
AS SUBMITTED 7,669.58 cu.m. 5,114,075.95 20% 1,022,815.19 306,844.56 1,329,659.75 6,443,735.70 840.17
104(2)a Embankment from Borrow (Common Soil)
AS EVALUATED 7,669.58 cu.m. 5,114,075.95 20% 1,022,815.19 306,844.56 1,329,659.75 6,443,735.70 840.17
AS SUBMITTED 6,016,502.89 1,203,300.58 360,990.18 1,564,290.76 7,580,793.65
TOTAL OF PART C
AS EVALUATED 6,016,502.89 1,203,300.58 360,990.18 1,564,290.76 7,580,793.65
AS SUBMITTED
TOTAL OF PART F
AS EVALUATED
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES
AS SUBMITTED 5,325.00 cu.m. 12,973,723.50 20% 2,594,744.70 778,423.41 3,373,168.11 16,346,891.61 3,069.84
511(1)b3 Gabions (1m x 1m x 2m, PVC Coated)
AS EVALUATED 5,325.00 cu.m. 12,973,723.50 20% 2,594,744.70 778,423.41 3,373,168.11 16,346,891.61 3,069.84
AS SUBMITTED 2,079.26 sq.m. 228,261.17 20% 45,652.23 13,695.67 59,347.90 287,609.07 138.32
511(3) Filter Cloth
AS EVALUATED 2,079.26 sq.m. 228,261.17 20% 45,652.23 13,695.67 59,347.90 287,609.07 138.32
AS SUBMITTED 13,201,984.67 2,640,396.93 792,119.08 3,432,516.01 16,634,500.68
TOTAL OF PART G
AS EVALUATED 13,201,984.67 2,640,396.93 792,119.08 3,432,516.01 16,634,500.68
PART H MISCELLANEOUS STRUCTURES
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
TOTAL OF PART H
AS EVALUATED
PART I PROVISIONAL SUM
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
TOTAL OF PART I
AS EVALUATED
PART J DAYWORK
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
TOTAL OF PART J
AS EVALUATED
AS SUBMITTED 19,963,976.44 3,913,490.23 1,193,873.33 5,107,363.56 25,071,340.00
GRAND TOTAL
AS EVALUATED 19,963,976.44 3,913,490.23 1,193,873.33 5,107,363.56 25,071,340.00
Preparation and Submission: Evaluation:
AS SUBMITTED
TOTAL OF PART F
AS EVALUATED
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES
AS SUBMITTED 5,325.00 cu.m. 12,973,723.50 20% 2,594,744.70 778,423.41 3,373,168.11 16,346,891.61 3,069.84
511(1)b3 Gabions (1m x 1m x 2m, PVC Coated)
AS EVALUATED 5,325.00 cu.m. 12,973,723.50 20% 2,594,744.70 778,423.41 3,373,168.11 16,346,891.61 3,069.84
AS SUBMITTED 2,079.26 sq.m. 228,261.17 20% 45,652.23 13,695.67 59,347.90 287,609.07 138.32
511(3) Filter Cloth
AS EVALUATED 2,079.26 sq.m. 228,261.17 20% 45,652.23 13,695.67 59,347.90 287,609.07 138.32
AS SUBMITTED 13,201,984.67 2,640,396.93 792,119.08 3,432,516.01 16,634,500.68
TOTAL OF PART G
AS EVALUATED 13,201,984.67 2,640,396.93 792,119.08 3,432,516.01 16,634,500.68
PART H MISCELLANEOUS STRUCTURES
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
TOTAL OF PART H
AS EVALUATED
PART I PROVISIONAL SUM
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
TOTAL OF PART I
AS EVALUATED
PART J DAYWORK
AS SUBMITTED
AS EVALUATED
AS SUBMITTED
TOTAL OF PART J
AS EVALUATED
AS SUBMITTED 19,963,976.44 3,913,490.23 1,193,873.33 5,107,363.56 25,071,340.00
GRAND TOTAL
AS EVALUATED 19,963,976.44 3,913,490.23 1,193,873.33 5,107,363.56 25,071,340.00
Preparation and Submission: Evaluation:
PROJECT: OO2: Protect Lives and Properties Against Major Floods, Flood Management Program,
Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal
Rivers, Construction of Slope Protection along Lagnas River, Brgy. Tumbaga I, Sariaya, Quezon
PART C EARTHWORKS
103(1)a Structure Excavation (Common Soil)
Qty. = 3,860.65 cu.m. (SEE QUANTITY SHEET)
FILTER CLOTH
511(3)
STATION LENGTH
HEIGHT AREA
0+000.00 19.306
0+020.00 20.00 18.006 373.12
0+040.00 20.00 16.703 347.09
0+060.00 20.00 15.399 321.02
0+080.00 20.00 16.706 321.05
0+100.00 20.00 14.100 308.06
0+120.00 20.00 14.101 282.01
0+129.00 9.00 14.100 126.91
PREPARED BY:
PREPARED BY:
PROJECT : OO2: Protect Lives and Properties Against Major Floods, Flood Management Program,
Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and
Principal Rivers, Construction of Slope Protection along
LOCATION : Lagnas River, Brgy. Tumbaga I, Sariaya, Quezon
AMOUNT: P 25,583,000.00
By interpolation:
170 C.D. - 139 C.D. X CD - 139 CD
=
50M - 20M 25M -20M
X = 144.17 calendar days
Prepared by:
MONTH
DESCRIPTION JAN FEB MAR APR MAY JUN JUL AUG SEP TOTAL
SUNDAYS 4 4 4 4 4 4 4 4 3 35
NATIONAL HOLIDAYS 1 2 2 1 1 1 1 1 0 10
RAINY DAYS 2 2 3 0 1 3 1 1 2 15
Item no./Description : A.1.1 (3) Construction of Field Office for the Engineer
Unit of Measurement : lump sum
Output per hour - As Submitted : 1.00
Output per hour - As Evaluated : 1.00
No. of No. of
Designation Hourly Rate Amount (Php)
Person/s Hour/s
A.1 Labor
a. Foreman 1 40 101.45 4,058.00
b. Skilled Laborer 3 40 73.29 8,794.80
c. Unskilled Laborer 5 40 56.46 11,292.00
Structural Concrete:
Volume:
L W H Q
Footing 0.6 0.6 0.2 6 0.432 Cement 43 bags
Column 0.2 0.2 1.6 6 0.384 Sand 2 cu.m.
WF 0.35 10.4 0.15 1 0.546 Gravel 4 cu.m.
Slab 6 3 0.1 1 1.8
CHB Mortar Cement 10.00 Sand 0.57
CHB Plaster Cement 4.00 Sand 0.21
3.162
Reinforcing Steel Bar:
w/m
Footing x 10 mmØ 0.6165 0.6 4 6 8.88
Footing y 10 mmØ 0.6165 0.6 4 6 8.88
Column 12 mmØ 0.8878 2 4 6 42.62
Stirrups 10 mmØ 0.6165 0.58 9 6 19.31
WF 10 mmØ 0.6165 10.4 1 1 6.41
Slab 10 mmØ 0.6165 10 3 1 18.50
10 mmØ 0.6165 5 6 1 18.50
Hor. Vert.
For CHB 10 mmØ 0.6165 27.95 20.8 30.06
153.14 kgs.
100mm Thk. Concrete Hollow Blocks
Ht. L
Area: 1.25 10.4 13 sq.m.
163 pcs.
1 x 20 watts FLF
Quantity: 3 set
No. of No. of
Designation Hourly Rate Amount (Php)
Person/s Hour/s
A.1 Labor
No. of No. of
Designation Hourly Rate Amount (Php)
Person/s Hour/s
A.1 Labor
a. Foreman 1 4 101.45 405.80
b. Skilled Labor 1 4 73.29 293.16
c. Unskilled Labor 2 4 56.46 451.68
No. of
Designation No. of Person/s Daily Rate Amount (Php)
Hour/s
A.1 Labor
a. Safety Practitioner/Officer (Full Time) 1 1640 62.50 102,500.00
b. Health Officer (Full Time) 1 1640 35.00 57,400.00
c. Sanitation Aide 1 1640 35.00 57,400.00
ITEM NO./DESCRPTION OUTPUT NO. OF SAFETY SAFETY SAFETY WORKING RAIN DUST/GAS BODY RUBBER EYE
QUANTITY WORKERS DAYS MAN-DAYS EAR MUFF LANYARD TOTAL COST
PER HOUR PERSONNEL HELMET SHOES VEST GLOVES COATS MASK HARNESS BOOTS GOOGLES
Foreman 1 24.13 24.13 24.13 24.13 24.13 24.13
103(1)a Structure Excavation (Common Soil) 3,860.65 20.00 Skilled Laborer - - - - - - -
Unskilled Laborer 3 24.13 72.39 72.39 72.39 72.39 72.39
Foreman 1 19.17 19.17 19.17 19.17 19.17 19.17
Embankment from Borrow (Common
104(2)a 7,669.58 50.00 Skilled Laborer - - - - - - -
Soil)
Unskilled Laborer 3 19.17 57.51 57.51 57.51 57.51 57.51
Foreman 1 266.25 266.25 266.25 266.25 266.25 266.25
Gabions (1m x 1m x 2m, PVC
511(1)b3 5,325.00 2.50 Skilled Laborer 2 266.25 532.50 532.50 532.50 532.50 532.50
Coated)
Unskilled Laborer 8 266.25 2,130.00 2,130.00 2,130.00 2,130.00 2,130.00
Foreman 1 2.60 2.60 2.60 2.60 2.60 2.60
511(3) Filter Cloth 2,079.26 100.00 Skilled Laborer 2 2.60 5.20 5.20 5.20 5.20 5.20
Unskilled Laborer 8 2.60 20.80 20.80 20.80 20.80 20.80
No. of
Designation No. of Hour/s Hourly Rate Amount (Php)
Person/s
A.1 Labor
No. of No. of
Designation Hourly Rate Amount (Php)
Person/s Hour/s
A.1 Labor
No. of No. of
Designation Hourly Rate Amount (Php)
Person/s Hour/s
A.1 Labor
No. of No. of
Designation Hourly Rate Amount (Php)
Person/s Hour/s
A.1 Labor
No. of No. of
Designation Hourly Rate Amount (Php)
Person/s Hour/s
A.1 Labor
No. of
Designation No. of Hour/s Hourly Rate Amount (Php)
Person/s
A.1 Labor