CMT Multiple Choice Questions
CMT Multiple Choice Questions
Feasible solution
Unbounded solution
Infeasible function
Multiple Optimal Solution
16. If the linear programming problem has larger number of variables,
the suitable method for solving is _________ ( a )
Simplex Method
Graphical method
Statistical method
Objective method
17. If all the variables in a solution are non negative, it is called as( b )
Basic solution
Basic feasible solution
Unbounded solution
Multiple Optimal Solution
18. The very first thing you should do if you are the first to witness or
discover an accident on the job site is to: ( d )
Go find at least one co-worker to help you so you can work as a team
Go to the scene and help the person(s) injured
Find and fill out the necessary forms to document the incident
Activate the emergency response system
19. The following is indirect cost of accident ( c )
Money paid for treatment of worker
Compensation paid to worker
Cost of lost time of injured worker
All the above
20. Check list for Job Safety Analysis (JSA) consists of ( a )
Work area, material, machine, tools
Men, machine, material, tools
Men, machine, work area, tools
Men, work area. Material, tools
21. A feasible solution to a Linear Programming problem ( a )
Must satisfy all of the problem’s constraints simultaneously
Need not satisfy all of the constraints, only some of them
Must be a corner point of the feasible region
Must optimize the value of the objective function
22. Which of the following statements is true with respect to optimal
solution of a Linear Programming problem ( d )
Every LP problem has an optimal solution
Optimal solution of an LP problem always occurs at an extreme point
At optimal solution all resources are completely used
If an optimal solution exists, there will always be at least one at a
corner
23. An iso-profit line represents ( b )
An infinite number of solution all of which yield the same cost
An infinite number of solutions all of which yield the same profit
An infinite number of optimal solutions
A boundary of the feasible region
24. If two constraints do not intersect in the positive quadrant of the
graph, then ( c )
The solution is unbounded
One of the constraints is redundant
The problem is infeasible
None of the above
25. Which of these causes the most construction site fatalities? ( c )
Electrocution
Trench collapses
falls
Contact with chemicals
26. What does the E in PPE stand for? ( b )
Effort
Equipment
Excellence
Edges
27. How deep can you dig a trench before you need to install a
protective system of some kind? ( a )
5 feet
10 feet
15 feet
20 feet
28. What is the closest you can generally build a scaffold near a
power line? ( c )
3 feet
6 feet
10 feet
100 feet
29. Where can you safely store dirt removed from a trench or hole?(a)
2 or more feet from the edge
anywhere you can find space
In piles right near the trench exits
Wherever is most convenient
30. A worker falls off a working surface that is 16' off the
ground. How long would it take for them to hit the ground? ( a )
1 second
3 seconds
0.1 seconds
5 seconds