0% found this document useful (0 votes)
212 views9 pages

Drilling and Core Handling Flow Chart

The document outlines 11 steps for drilling project planning, execution, and reporting. It includes site preparation, drilling, core handling and logging, sample preparation and analysis, and reporting. Key steps involve planning approvals, drilling and rig operations, core processing including geological logging and sampling, sample dispatch for analysis, and final reporting. The planning ensures all necessary approvals, environmental/safety protocols, and operational details are in place before drilling commences.

Uploaded by

Nikos Nestorov
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
212 views9 pages

Drilling and Core Handling Flow Chart

The document outlines 11 steps for drilling project planning, execution, and reporting. It includes site preparation, drilling, core handling and logging, sample preparation and analysis, and reporting. Key steps involve planning approvals, drilling and rig operations, core processing including geological logging and sampling, sample dispatch for analysis, and final reporting. The planning ensures all necessary approvals, environmental/safety protocols, and operational details are in place before drilling commences.

Uploaded by

Nikos Nestorov
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Drill Project Planning Site Preparation Drilling Rehabilitation Core shed Logging Cutting & Sampling Sample Preparation

Logging Cutting & Sampling Sample Preparation Sample Dispatch Sample Analysis Reporting

Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 Step 11

6.1 Geological summary 7.1 Cutsheet with QC 10.1 Receive assays 11.1 Daily drill project
1.1 Planning and GIS 2.1 Site Preparation 3.1 Drill rig arrival 4.1 Site rehabilitation 5.1 Core tray acceptance 8.1 Crushing 9.1 Sample packing
sheet insertion from analytical Lab progress report

7.5 Core Photos 8.2 Every 20 samples 9.2 Analytical Lab 11.2 Weekly drill project
1.2 Land owners 2.2 Survey 3.2 SHE Daily site audit 4.2 Post drilling Photo 5.2 Core photos 6.2 Geological Logging 10.2 Load in DB
(Dry and Wet) collect a CRD submission form progress report

6.4 Sample Interval 10.3 Prepare QAQC 11.3 Monthly drill


1.3 Forestry 2.3 Environmental 3.3 Drill Plod 5.3 Core re-assembly 7.2 Core cutting 8.3 Pulverizing 9.3 Dispatch form
definition report project progress report

3.4 Recovery / RQD / 8.4 Every 20 samples 9.4 Batch pick up


1.4 Archaeology 2.4 Pre-Drilling Photos 5.4 Core mark up 6.5 Geotechnical logging 7.3 Core sampling 11.4 Daily H&S report
IRS / Summary Log collect a PRD request

Did the batch pass


QAQC?

3.5 Core tray


1.5 Plan Approval 5.5 Cut line 6.6 UCS tests 7.4 Sample weighing 8.5 Prepare final batch 9.5 Load batch on truck 11.5 Weekly H&S report
consigment

7.5 Half Core Photos (Yes) 11.6 Monthly H&S


3.6 Downhole survey 5.6 Systematic pXRF 6.7 Point load tests 8.6 Prepare final batch 9.6 Dispatch
(Dry and Wet) 10.4 Accept assays report

(No) 11.7 Monthly QAQC


5.7 Systematic MagSus 7.6 Core storage
10.5 Request re-assays report
Does the drill pad
have another hole?

5.8 Systematic 11.8 End of project


TerraSpec QAQC report
(Yes)
3.7 Start drilling the next
hole
5.9 Systematic SG
measurements

(No)
Is there another
pad?

(Yes)
3.8 Move rig to the next
pad and start drilling

(No)
3.9 Drill rig departure
Planned Drill hole details
Note: This object is used to create planned drill holes with proposed coordinates

Filter by Project View Mode

Edit Mode
Search

Project 1 Project Code


Project 2 Project 1
Project 3
.
Planned Hole ID Planned depth (m) Planned date Planned by
.
DDH0572 550 21-Dec-2017 Jonh.Smith
.
.
Hole ID Purpose
DDH0572 Exploration

Filter by Hole ID
Local Planned Coordinates Country Planned Coordinates Global Planned Coordinates Planned hole orientation
Local X 00000.000 Local X 00000.000 Local X 00000.000
Search
Local Y 00000.000 Local Y 00000.000 Local Y 00000.000 Azimuth 0 -360
Drill hole 1 Local Z 00000.000 Local Z 00000.000 Local Z 00000.000 Dip From -90 to +90
Drill hole 2
Drill hole 3
.
Comments: Refresh
.
.
. Accept

Refresh

Data visualization window


Drill hole details
Note: This object is used to update drill hole information

Filter by Project View Mode

Edit Mode
Search

Project 1 Project Code Planned Hole ID Planned depth (m) Planned date Planned by Purpose
Project 2 Project 1 DDH0572 550 21-Dec-2017 Jonh.Smith Exploration
Project 3
. Local Planned Coordinates Country Planned Coordinates Global Planned Coordinates Planned hole orientation
. Local X 00000.000 Local X 00000.000 Local X 00000.000
. Local Y 00000.000 Local Y 00000.000 Local Y 00000.000 Azimuth 0 -360
. Local Z 00000.000 Local Z 00000.000 Local Z 00000.000 Dip From -90 to +90

Hole ID Status Date started Date completed EOH Depth (m)


Filter by Hole ID
DDH0572 Completed 21-Dec-2019 22-Dec-2019 0,000.0

Search
Local Actual Coordinates Country Actual Coordinates Global Actual Coordinates Actual hole orientation
Drill hole 1 Local X 00000.000 Local X 00000.000 Local X 00000.000 Azimuth 0 -360
Drill hole 2 Local Y 00000.000 Local Y 00000.000 Local Y 00000.000 Dip From -90 to +90
Drill hole 3 Local Z 00000.000 Local Z 00000.000 Local Z 00000.000 Method Total Station
.
Method Total Station Method Calculated Method Calculated
.
.
.
Comments: Refresh

Accept
Refresh

Data visualization window


Shift Details
Note: This object is used to capture the drilling information

Filter by Project View Mode

Edit Mode
Search

Project 1 Project Code Drill Rig Date Shift Crew


Project 2 Project 1 G021A 21-Dec-2017 2 Name Title
Project 3
. Name1 Surname 1 Driller 1
Hole ID Drill From (m) Drill To (m) Meters drilled
.
DDH0572 341.2 356.2 15 Name2 Surname 2 Driller 2
.
. Name1 Surname 1 Assistant 1
Contractor Comments:
Name2 Surname 2 Assistant 2

Filter by Hole ID

Search

Drill hole 1 Supervision Comments:


Drill hole 2
Drill hole 3
.
Refresh
.
.
. Accept

Refresh

Data visualization window


Daily Drilling
Note: This object is used to capture the drilling information

Filter by Project View Mode

Edit Mode
Search

Project 1 Hole ID
Project 2 DDH0572
Project 3
.
Drill From (m) Drill To (m) Fluid return Core barrel
.
DDH0572 341.2 % HQ
.
.
Comments:

Filter by Hole ID

Search

Drill hole 1
Drill hole 2
Drill hole 3
.
Refresh
.
.
. Accept

Refresh

Data visualization window


Geological Logging
Note: This object is used to capture geological information

Filter by Project View Mode

Edit Mode
Search
Hole ID
Project 1
DDH0572
Project 2
Project 3 Lithology Lithology comments: Refresh
.
From (m) 0,000.00
. Accept
To (m) 0,000.00
.
. Lithology LithoCode1
Logged by John.Smith
Logged Date 21-Dec-2019

Filter by Hole ID
Mineralization Mineralization comments: Refresh
Search From (m) 0,000.00
Accept
To (m) 0,000.00
Drill hole 1
Type TypeCode1
Drill hole 2
Drill hole 3 Mineral 1 MinCode1 %
. Mineral 2 MinCode1 %
. Mineral 3 MinCode1 %
. Mineral 4 MinCode1 %
. Logged by John.Smith
Logged Date 21-Dec-2019

Refresh
Alteration Alteration comments: Refresh
From (m) 0,000.00
Accept
To (m) 0,000.00
Type TypeCode1
Mineral 1 MinCode1 %
Mineral 2 MinCode1 %
Mineral 3 MinCode1 %
Mineral 4 MinCode1 %
Logged by John.Smith
Logged Date 21-Dec-2019

Data visualization window


Structural Logging
Note: This object is used to capture structural information

Filter by Project View Mode

Edit Mode
Search
Hole ID
Project 1
DDH0572
Project 2
Project 3 Structure Structure comments: Refresh
.
From (m) 0,000.00
. Accept
To (m) 0,000.00
.
. Structure StructCode1
Logged by John.Smith
Logged Date 21-Dec-2019

Filter by Hole ID
Orientation Orientation comments: Refresh
Search Depth (m) 0,000.00
Accept
Structure StructCode1
Drill hole 1
A angle (deg) 000o
Drill hole 2
Drill hole 3
.
.
.
.

Refresh

Data visualization window


Geotech Logging
Note: This object is used to capture geotech information

Filter by Project View Mode

Edit Mode
Search
Hole ID
Project 1
DDH0572
Project 2
Project 3 Structure Geotech comments: Refresh
.
From (m) 0,000.00
. Accept
To (m) 0,000.00
.
. Interval (m) 0.00
TCR 0.00 %
RQD 0.00 %
IRS IRSCode1
Filter by Hole ID
Diameter HQ
Refresh
Logged by John.Smith
Search
Logged Date 21-Dec-2019 Accept
Drill hole 1
Drill hole 2
Drill hole 3
.
.
.
.

Refresh

Data visualization window


Drill hole Sampling
Note: This object is used to define the sampling intervals and the insertion of QC material

Filter by Project View Mode

Edit Mode
Search
Hole ID
Project 1
DDH0572
Project 2
Project 3 Structure Total Samples Sampling comments:
.
From (m) 0,000.00 HCore 28
.
To (m) 0,000.00 Blanks 2
.
. Sample ID 1025617 Standards 4
Type HCore F Dup 0
RQD 0.00 C Dup 1
IRS IRSCode1 P Dup 1
Filter by Hole ID
Diameter HQ 36 Refresh
Sampled by John.Smith
Search
Sampled Date 21-Dec-2019 Accept
Drill hole 1
Drill hole 2
Drill hole 3
.
.
.
.

Refresh

Data visualization window

You might also like