0% found this document useful (0 votes)
21 views7 pages

Automatic Train Gate Controlling System

Uploaded by

Sreshta Mannam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views7 pages

Automatic Train Gate Controlling System

Uploaded by

Sreshta Mannam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

MICRO PROJECT

“ AUTOMATIC RAILWAY GATE


CONTROLLING SYSTEM ”

BY:
A.NAGA CHAITANYA- 20R21A1261
K.SHASHANK- 20R21A1279
SRESHTA.M- 20R21A1289
IDEA :
✓ Mainidea is to make the railway gate
controlling system automatic to reduce man
power and accurately closing the gates to
reduce the accidents while crossing.
PROBLEM STATEMENT:
➢ This Project explicitly deals with one of the
most common problem that is traffic jams
besides a Railway crossing.
➢ Since gates of Railway crossing are usually
manually operated, for most of the times,
gates are kept closed for no reason
increasing road traffic.
➢ Moreover in our country accidents at rail
road crossing are increasing day by day and
the train accidents cause severe damage to
life and property.
➢ To solve the above problem, we have come
with an idea that would automatically
control the Railway gates at junctions.
COMPONENTS REQUIRED:
➢ Arduino UNO
➢ Servo motors(2)
➢ IR sensors(2)
➢ Toy train
➢ Jumper wires
➢ Bread board
➢ USB cable for uploading code
into Arduino UNO
Arduino UNO Bread Board

IR Sensors Servo Motors


TECHNOLOGY:
➢ In this micro project, the IR sensor(1) detects the
movement of the train and send the signal to
the Arduino UNO.
➢ Then the Servo Motors which are used as gates will
close by which the vehicles(and people) will not
able to pass and avoid accidents.
➢ After the train passes away the IR sensor(2) will
detects the movements and opens the gates.
CONCLUSION:
➢ By using automatic railway gate
controlling system we can avoid accidents.
➢ To save the human life and vehicles from
miserable train accidents is a challenge of the era
of modern science and technology.
➢ Consequently, this is able to play a great
contribution to the railway gate automation with
reliability and lower cost.
➢ In the future we can control the railway
gate system using transmitter and receiver.
➢ In future this developed working model will be
equipped with GPS to navigate the position of the
train and the track to avoid collision between two
trains.

You might also like