SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
Pre-cast Duct banks, Manholes and QC Personnel to review 100% of the drawings according
Handholes Shop Drawing Review (Offsite to Aramco Engineering Standards, Standard Drawings
1.1
Fabrication) (Ductbank
SAIC-P-3334 SAIC-P-3334 H R and International Standards as applicable, prior to
Fabrication (Pre-Cast and Cast in Place)) release for site reference.
Page 1 of 4
03/09/2022 3:35 PM
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - MARCH 2013) Rev 7 31-Mar-13
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
3.0 INSTALLATION
Page 2 of 4
03/09/2022 3:35 PM
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - MARCH 2013) Rev 7 31-Mar-13
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
Direct Buried Conduit QC hold point for conduit mandrel test and inspection of
3.2
Visual Inspection
SAIC-P-3331 SAIC-P-3331 H W1 installed conduit prior to backfilling.
Jobsite Fabricated
Electrical Duct Banks, QC hold point for inspection of formwork, rebar, conduit
3.3 Manholes, and Handholes SAIC-P-3334 SAIC-P-3334 H W2 spacers, and embedded hardware prior to concrete
Initial Visual Inspection for Duct Bank placement.
Fabrication
Jobsite Fabricated
Electrical Duct Banks, QC hold point for inspection of formwork, rebar, conduit
3.4 Manholes, and Handholes SAIC-P-3335 SAIC-P-3335 H W2 spacers, and embedded hardware prior to concrete
Initial Visual Inspection for Manhole / placement.
Handhole Fabrication
Jobsite Fabricated
Electrical Duct Banks, QC hold point for inspection of formwork, rebar, conduit
3.5 Manholes, and Handholes SAIC-P-3337 SAIC-P-3337 H W2 spacers, and embedded hardware prior to concrete
Initial Visual Inspection for Duct Bank placement.
Grounding and Bonding
Page 3 of 4
03/09/2022 3:35 PM
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - MARCH 2013) Rev 7 31-Mar-13
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
Conduit Identification and Termination SA PID shall be notified on start of this activity for each
3.10
Visual Inspection
SAIC-P-3336 SAIC-P-3336 H W2 duct bank.
4.0 PRE-COMMISSIONING
See
4.1 Ground Resistance Testing See Remarks SATIP-P-111-01 Grounding and Bonding
Remarks
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1
levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3
representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative
4
in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
H Hold Point for QC Inspection/ Test (See Note) R Review of Documents
W1 100% Witness Inspection/Test RH Review and Approval of Documents
W2 Sample Witness Inspection/Test I 100% Contractor Inspection
S Surveillance Note: Aramco user to change in type of activity.
Page 4 of 4