11 KV Panel Check List

This pre-commissioning test report summarizes functional and simulation checks performed on electrical equipment for a power distribution project. It lists 4 items that were checked: 1) operation of breakers in different positions, 2) indicator circuits for breaker status and alarms, 3) annunciation of issues like overcurrent trips, and 4) testing of metering and AC/DC power circuits. The tests confirmed everything was functioning as specified in the design documents.

Uploaded by

imran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
208 views2 pages

11 KV Panel Check List

This pre-commissioning test report summarizes functional and simulation checks performed on electrical equipment for a power distribution project. It lists 4 items that were checked: 1) operation of breakers in different positions, 2) indicator circuits for breaker status and alarms, 3) annunciation of issues like overcurrent trips, and 4) testing of metering and AC/DC power circuits. The tests confirmed everything was functioning as specified in the design documents.

Uploaded by

imran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

PRE-COMMISSIONING TEST REPORT FOR

FUNCTIONAL& SIMULATION CHECK

Date:

Client WEST ZONE POWER DISTRIBUTION CO. LTD. (WZPDCL)


Project
Feeder Detail

SL.NO. CHECK DESCRIPTION REMARK


1 OPERATION CHECK
BREAKER CLOSE IN TEST POSITION
BREAKER TRIP IN TEST POSITION
BREAKER CLOSE IN SERVICE POSITION
BREAKER TRIP IN SERVICE POSITION
BREAKER TRIP THROUGH MATSER RELAY
SPRING CHARGE THROUGH MOTOR
OPEN OPERATION FROM RELAY
TRIP OPERATION FROM RELAY
2 INDICATION CIRCUIT
SPRING CHARGE
BREAKER ON
BREAKER OFF
TRIP CKT-1 HEALTHY
TRIP CKT-2 HEALTHY
AUTO TRIP
BREAKER IN SERVICE
BREAKER IN TEST
BREAKER SEMAPHORE CLOSE STATUS
BREAKER SEMAPHORE OPEN STATUS
PANEL SPACE HEATER SUPPLY ON
LAMP TEST
3 ANNUNCIATION CIRCUIT
DC SUPPLIES TRIPPED
AC SUPPLIES TRIPPED
OVERCURRENT TRIP
EARTH FAULT TRIP
50BF OPERATED
NUMERICAL RELAY WATCHDOG OPERATED

TCS-1 UNHEALTHY
TESTED BY: WITNESS BY: WITNESS BY
( ) ( ) (WZPDCL)
NAME
:
SIGN:

Page 1 of 2
PRE-COMMISSIONING TEST REPORT FOR
FUNCTIONAL& SIMULATION CHECK

Date:
TCS-2 UNHEALTHY

4 METERING CIRCUIT
AMMETER
VOLTMETER
NUMREICAL RELAY

4 AC & DC CIRCUIT
LAMP
SPACE HEATER
SOCKET SUPPLY
DC SUPPLY

Remarks: The Functional and simulation checked and found as per the As Built Drawing.

TESTED BY: WITNESS BY: WITNESS BY


( ) ( ) (WZPDCL)
NAME
:
SIGN:

Page 2 of 2