The proposed projects are the subject of subsurface soil exploration work including
Geotechnical Report.
TOTAL 59.00
A. GENERAL
1. The Consultant shall be responsible for carrying out the necessary subsurface
Soil exploration works in respect to the project stated.
2. After the receipt of Notice to Proceed (NTP), the consultant shall coordinate
with the Planning and Design Section, Ifugao Second District Engineering
Office, particularly on the site of the project.
4. The Consultant shall be responsible for the reliability of the report presented.
B. THE SERVICES
A. LOCATION
Before the conduct of Subsurface Soil Exploration Works, The Consultant shall
coordinate with the Ifugao Second District Engineering Office, for proper
coordination on the location of the project.
B. SCOPE OF PROJECT
2. Depth of Borings
Shall be equal to the 15 meters or extend if necessary depending on the soil
classification
3. Procedure
In sand, clay and slit materials, the boreholes shall be advanced by the wash
boring method in between sampling sections using side discharged chopping
bits. Whenever necessary, N-size casings shall be utilized. The washed
section shall be cleaned thoroughly before each sampling run ensuring,
however, that the underlying soil is not disturbed.
Sampling shall be done at one meter interval from the river bed to hard
strata using 50 cm. Split spoon sampler. In a soft cohesive layer, disturbed
sample using thin walled tube samplers shall be obtained hydraulically.
Core drilling shall be carried out by a diamond rotary drill method in gravely
on rock formation. Core samples shall be undertaken wherever solid
information is encountered.
4. Equipment
a. Drilling Machine
The consultant shall utilized at least two (2) drilling machine and set them up
at the project site. The drilling machine shall be in good working condition
and shall be of such capacity as to maintain satisfactory progress of work.
b. Bits
The Consultant shall have an example supply of different types of bits to
adapt to varying conditions. Bottom discharge and stepped bits shall also be
available.
C. Core Barrels
Double tube swivel type core barrels in good condition and obtaining
maximum core recovery shall be used.
d. Casing
The consultant shall, at his own expense and responsibility, provide casings
as required to ensure the stability of the borehole walls. The casings shall be
at least of N-size and shall be in good condition. After a hole has been
finished the casings shall be retrieved.
The test shall be carried out through ordinary soil encountered to the depths
specified above. Standard penetration test shall be performed using 5.0 cm. (2.0 in.)
outside diameter split spoon sampler, driven by a 63.6 kg. (140 lbs.) Hammer falling
76.0 cm (30 in.) at 1.50 meter interval or closer if necessary.
The water level shall be measured daily (before and after) whenever encountered in
a borehole.
The preparation of samples for testing shall be made in accordance with AASHTO.
The following test shall be made on samples obtained from boring, drilling.
1. Split-Spoon Analysis
a. Visual Soil Description
b. Mechanical Analysis, AASHTO Designation T88
c. Liquid Limit, Plastic Limit and Plasticity Index, AASHTO Designation T89
and T90
d. Group Index and Soil Classification, use Unified Soil Classification
C. REPORT OUTPUTS/DELIVERABLES
1. Final Report
Other Data to be submitted by the Consultant along with the Final Report are the
following:
Boring Logs
Photographs
Photographs showing the borehole drilling and sampling at each proposed sites shall be
taken by the consultant and Incorporated in the report, photographs shall be taken at
each borehole location depicting the following:
1. Equipment used
2. Core drilling operation
3. Water level measurements
4. Performance of SPT and Shelby tube sampling
5. All cores in the core boxes, SPT and Shelby tube samples
6. Date photographs was taken
III. IMPLEMENTATION
The following experts/professionals and their member shall be required to carry out the
Consulting Services for the project and should have appropriate educational degree, relevant
training and adequate years of experience in the conduct of sub-surface soil exploration.
Position/Key
Detailed Tasks/ Required
Staff No. of Staff
Responsibilities Qualifications
Overall guidance, BS in Civil
direction, supervision Engineering; MS
and coordination of or Doctoral
members of the degree is an
Team added
Collection and advantage;
evaluation of Duly
Team Leader 1 geological information licensed/register
on the project sites ed civil
Study and engineer;
determination of At least 10-year
items and method of experience on
soil investigation and soil, sub-surface
laboratory test and
Perform necessary geotechnical
subsoil investigations survey and
on representative study of roads,
sections of the road bridges and
with samples to be related
taken at suitable structures;
intervals
Investigate the
physical properties of
materials to facilitate
the design of
structures
The Consultant shall provide technical and administrative support staff as may
required.
B. CONTRACT PERIOD
The consultant’s contract period for undertaking the detailed engineering design shall be
sixty (60) calendar days and the Consultant shall commence work after receipt of Notice
to proceed.
The DPWH shall ensure that the Consultant has access to all relevant information
necessary to the performance of the above services. The Consultant is expected to provide
office space and equipment and all other resources for completing the service.
Prepared by:
FROILAN A. MACADAEG
Asst. Chief, Planning and Design Section
Approved by: