KBR009 SLD

The document is a diagram of a GE telecom cabinet showing the power distribution layout. It includes labels for 16 circuit breakers providing power to various telecom equipment from multiple sources including DC-Feed A, eBands 1-4, CBNL PWRs 1-5, RTN950A3 PWRs A and B, RTN950A4 PWRs A and B, ATN980C PWRs A and B, and eBand 2. There is also a legend defining various symbols used on the diagram.

Uploaded by

Ghufran Ud Din
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
450 views1 page

KBR009 SLD

The document is a diagram of a GE telecom cabinet showing the power distribution layout. It includes labels for 16 circuit breakers providing power to various telecom equipment from multiple sources including DC-Feed A, eBands 1-4, CBNL PWRs 1-5, RTN950A3 PWRs A and B, RTN950A4 PWRs A and B, ATN980C PWRs A and B, and eBand 2. There is also a legend defining various symbols used on the diagram.

Uploaded by

Ghufran Ud Din
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GE TELECOM CABINET

POWER DISTRIBUTION GE TELECOM CABINET

DC - FEED A
1P, 6A 42 42

1 eband 3
41 41

1P, 6A
2 eband 1 40 40

1P, 6A
3 CBNL PWR 1 39 39

1P, 6A 38
POWER CONNECTOR - DIN RAIL 38

eband 4
4
37 37 SURVEY DRAWING REFERENCE
1P, 6A SSEM
5 36 36

1P, 16A 35 35

6 zain sara pwr1


1P, 16A 34 34

7 zain sara pwr2


33 33

1P, 16A POWER DISTRIBUTION BREAKERS


8 zain sara pwr3 32 32

1P, 16A
9 zain sara pwr4 31 31

30 30
1P,32A
10 RTN950A3 PWR A
29 29

1P,32A POWER CONNECTOR - DIN RAIL


RTN950A3 PWR B
11 28 28

1P,32A 27 27

12 RTN950A 4 PWR A
26 26

1P,32A RTN950A 4 PWR B


13 LEGEND:
14
1P,32A
CBNL PWR 2
25
ATN 25

24
Circuit Breaker
24
1P,32A
15 CBNL PWR3

ODF
23 23
1P,32A
2 - Conductor Plug
16 CBNL PWR4 22

Un Interruptible
22

1P,32A UPS
17 CBNL PWR5 Power Supply
RTN 4
21 21

1P,32A
18 ATN980C PWR B 20 20 MDB Main Distribution Box
1P,32A
19 ATN980C PWR A 19 19 LLVD Low Load Voltage Disconnect
1P,32A
eband 2 BLVD Battery Load Voltage
RTN 3
20 18 18

Disconnect
17 17

FACP Fire Alarm Control Panel


16 16

Heating Ventilation and Air


HVACP
RTN 2 Condition Control Panel
15 15

14 14

13 13

Drawing Title:
RTN 1
12 12

11 11
SITE KBR009
SLD & Rack Layout
10 10

9 9

8 8
Project:
7 7
5G PROJECT
6 6

Prepared By:
BATTERIES
5 5

4 4 RSC
3 3

Date:
August 16, 2022
2 2

1 1

NOTE: Power readings, breaker verification, and MDB power utilization will be filled/ Scale:
verified during Handover
NTS