This document outlines the requirements for applying for different types of environmental compliance certificates (ECCs) and amendments from the Philippines Environmental Management Bureau (EMB). It lists 18 requirements for a standard ECC application including a project description, environmental impact assessment, proof of authority over the project site, and application fee. Requirements are also provided for major ECC amendments involving project expansions. Minor amendments only require proof of ownership transfer. A separate section outlines 6 requirements for applying for a CNC project certificate.
This document outlines the requirements for applying for different types of environmental compliance certificates (ECCs) and amendments from the Philippines Environmental Management Bureau (EMB). It lists 18 requirements for a standard ECC application including a project description, environmental impact assessment, proof of authority over the project site, and application fee. Requirements are also provided for major ECC amendments involving project expansions. Minor amendments only require proof of ownership transfer. A separate section outlines 6 requirements for applying for a CNC project certificate.
This document outlines the requirements for applying for different types of environmental compliance certificates (ECCs) and amendments from the Philippines Environmental Management Bureau (EMB). It lists 18 requirements for a standard ECC application including a project description, environmental impact assessment, proof of authority over the project site, and application fee. Requirements are also provided for major ECC amendments involving project expansions. Minor amendments only require proof of ownership transfer. A separate section outlines 6 requirements for applying for a CNC project certificate.
This document outlines the requirements for applying for different types of environmental compliance certificates (ECCs) and amendments from the Philippines Environmental Management Bureau (EMB). It lists 18 requirements for a standard ECC application including a project description, environmental impact assessment, proof of authority over the project site, and application fee. Requirements are also provided for major ECC amendments involving project expansions. Minor amendments only require proof of ownership transfer. A separate section outlines 6 requirements for applying for a CNC project certificate.
Download as DOCX, PDF, TXT or read online from Scribd
Download as docx, pdf, or txt
You are on page 1of 1
Annex
A 1. Letter of Request addressed to EMB Regional
Director A. Requirements for ECC Online Application 2. SEC Registration/DTI Registration 3. Deed of Absolute Sale/Affidavit of Transfer/Lease Contract/Tax Declaration/Land 1. Project Description Titles 2. Environmental Impact and Management Plan 4. Copy of Environmental Compliance Certificate 3. Abandonment / Decommissioning / (ECC) or Amendment Rehabilitation Information 5. Processing Fee: 1,015.00 4. Geotagged photographs of project site (taken for last 30 days) 5. Topographic Map of impact/affected areas (at C.2. For Major Amendment: (e.g. Expansion of Project least 1km from the project boundaries) Area, Increase of Capacity) 6. Certification from LGU on the compatibility of proposed project with existing land use plan 1. Letter Request addressed to EMB Director 7. Site Development and/or Vicinity map signed by 2. Environmental Performance Report and registered professionals Management Plan (EPRMP) with Notarized 8. Project/Plant layout signed by registered Accountability Statement/s (with Electronic professionals Copy) 9. Schematic diagram of wastewater treatment 1. EPRMP Amendment – 4 Hard Copies facility and 1 CD 10. Schematic diagram of Air Pollution Control 3. Proof of Authority over the Project Site (Title- Facility OCT, TCT, TD, Lease Agreement) 11. Organizational Chart in charge on environmental (Expansion of Area only) concerns 4. Pictures of the Site of Proposed expansion 12. Proof of authority over the project site (land title, 5. Site Development Plan, Sketch Map (For lease contract, deed of absolute sale, etc.) additional Components only) 13. Duly notarized accountability statement of 6. LGU Resolution of No Objection (Poultry and proponent Piggery only) 14. Duly accomplished project environmental 7. Copy of previous ECC or Amendments monitoring and audit prioritization scheme 8. Processing Fee: 2,015.00 (PEMAPS) questionnaire 15. IEE Checlist Sworn Statement D. Requirements for CNC Project C Application 16. Bank Receipt (Application Fee) 17. Affidavit of No Complaint 1. Description of how the project enhances the 18. Project Components & Operation Information environment or address environmental issues 2. Project Components List B. Requirements for ECC Application – EPRMP Based 3. Description of Project Phases and EIS Based 4. Project Emissions/Effluent/Hazardous Waste/Solid Waste/Other Wastes 1. Letter Request address to EMB Director 5. Project Cost and Duration 2. Duly Notarized EIA Report (EPRMP or EIS) with 6. 1 page: Collage of photos or plates or proposed Electronic Copy project site 1. EPRMP New – 5 Hard Copies and 1 CD 2. EIS New and Amendment – 7 Hard Copies and 1 CD 3. Proof of Compatibility with the Existing Land Use Plan (Locational Clearance, Zoning Clearance, Zoning Viability) 4. Proof of Authority over the Project Site (Title- OCT, TCT, TD, Lease Agreement) 5. Photographs or plates/vicinity map of the project site showing impact areas and communities (Site Development Plan, Sketch Map) 6. Duly Accomplished PEMAPS Questionnaire 7. LGU Resolution with No Objection 8. Processing Fee: 1. PEIS – 15,000.00 2. EIS – 10,000.00 3. PEPRMP – 10,000.00 4. EPRMP – 10,000.00 5. IEE Checklist – 5,000.00 6. Documentary Stamp – 15.00
Continuation of Annex A
C. Requirements for ECC Amendment Application
C.1. For Minor Amendment: (e.g. Change of Ownership)