Annex

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Annex 

A 1. Letter of Request addressed to EMB Regional


Director
A. Requirements for ECC Online Application 2. SEC Registration/DTI Registration
3. Deed of Absolute Sale/Affidavit of
Transfer/Lease Contract/Tax Declaration/Land
1. Project Description
Titles
2. Environmental Impact and Management Plan
4. Copy of Environmental Compliance Certificate
3. Abandonment / Decommissioning /
(ECC) or Amendment
Rehabilitation Information
5. Processing Fee: 1,015.00
4. Geotagged photographs of project site (taken for
last 30 days)
5. Topographic Map of impact/affected areas (at C.2. For Major Amendment: (e.g. Expansion of Project
least 1km from the project boundaries) Area, Increase of Capacity)
6. Certification from LGU on the compatibility of
proposed project with existing land use plan 1. Letter Request addressed to EMB Director
7. Site Development and/or Vicinity map signed by 2. Environmental Performance Report and
registered professionals Management Plan (EPRMP) with Notarized
8. Project/Plant layout signed by registered Accountability Statement/s (with Electronic
professionals Copy)
9. Schematic diagram of wastewater treatment 1. EPRMP Amendment – 4 Hard Copies
facility and 1 CD
10. Schematic diagram of Air Pollution Control 3. Proof of Authority over the Project Site (Title-
Facility OCT, TCT, TD, Lease Agreement)
11. Organizational Chart in charge on environmental (Expansion of Area only)
concerns 4. Pictures of the Site of Proposed expansion
12. Proof of authority over the project site (land title, 5. Site Development Plan, Sketch Map (For
lease contract, deed of absolute sale, etc.) additional Components only)
13. Duly notarized accountability statement of 6. LGU Resolution of No Objection (Poultry and
proponent Piggery only)
14. Duly accomplished project environmental 7. Copy of previous ECC or Amendments
monitoring and audit prioritization scheme 8. Processing Fee: 2,015.00
(PEMAPS) questionnaire
15. IEE Checlist Sworn Statement D. Requirements for CNC Project C Application
16. Bank Receipt (Application Fee)
17. Affidavit of No Complaint 1. Description of how the project enhances the
18. Project Components & Operation Information environment or address environmental issues
2. Project Components List
B. Requirements for ECC Application – EPRMP Based 3. Description of Project Phases
and EIS Based 4. Project Emissions/Effluent/Hazardous
Waste/Solid Waste/Other Wastes
1. Letter Request address to EMB Director 5. Project Cost and Duration
2. Duly Notarized EIA Report (EPRMP or EIS) with 6. 1 page: Collage of photos or plates or proposed
Electronic Copy project site
1. EPRMP New – 5 Hard Copies and 1 CD
2. EIS New and Amendment – 7 Hard
Copies and 1 CD
3. Proof of Compatibility with the Existing Land Use
Plan (Locational Clearance, Zoning Clearance,
Zoning Viability)
4. Proof of Authority over the Project Site (Title-
OCT, TCT, TD, Lease Agreement)
5. Photographs or plates/vicinity map of the project
site showing impact areas and communities
(Site Development Plan, Sketch Map)
6. Duly Accomplished PEMAPS Questionnaire
7. LGU Resolution with No Objection
8. Processing Fee:
1. PEIS – 15,000.00
2. EIS – 10,000.00
3. PEPRMP – 10,000.00
4. EPRMP – 10,000.00
5. IEE Checklist – 5,000.00
6. Documentary Stamp – 15.00

Continuation of Annex A

C. Requirements for ECC Amendment Application

C.1. For Minor Amendment: (e.g. Change of Ownership)

You might also like