0% found this document useful (0 votes)
672 views3 pages

Electrical Level 1 Cl. 2 Instructor

Candidates will work in groups of two over two weeks to complete electrical installation tasks. They must make various wire joints including a married joint, tee joint, and straight twist joint. They must solder the joints and insulate two with electrical tape. Candidates must also create a 15 minute video demonstrating the joint construction and soldering to submit to their instructor. Materials provided include wire, solder, tools, and tape. Candidates will be evaluated on correctly and safely performing the tasks.

Uploaded by

Guyan Gordon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
672 views3 pages

Electrical Level 1 Cl. 2 Instructor

Candidates will work in groups of two over two weeks to complete electrical installation tasks. They must make various wire joints including a married joint, tee joint, and straight twist joint. They must solder the joints and insulate two with electrical tape. Candidates must also create a 15 minute video demonstrating the joint construction and soldering to submit to their instructor. Materials provided include wire, solder, tools, and tape. Candidates will be evaluated on correctly and safely performing the tasks.

Uploaded by

Guyan Gordon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Caribbean Vocational Qualification (CVQ)

Electrical Installation (MEM11002V03)


Level 1 – Cluster 2

PROJECT

Project duration: Two (2) weeks

INSTRUCTION TO CANDIDATES

Read the following instructions carefully before you begin. If you have any
questions, direct them to your instructor.

i. Candidates are required to work in groups of two (2).

ii. Examine the material listing for the task you are to perform.

iii. Material selection MUST be done by individual groups.

Tasks

From the list given, you are required to do the following:


• Make a Married

• Make a Tee joint

• Make a straight twist joint

• Solder the joints

• Insulate two (2) of the soldered joints using (PVC) electrical tape.

Note

You are also required to create a video lasting no longer than 15 minutes,
demonstrating the construction, and soldering of the joints, which must be given to
your instructor for uploading.

MEM11002V03 - 1.0 Project - Electrical Installation - Level 1


June 2022 Cluster 2
Caribbean Vocational Qualification (CVQ)

Electrical Installation (MEM11002V03)


Level 1 – Cluster 2

MATERIAL LISTING

The material listing below is in quantities per group.

TOOLS/MATERIAL/EQUIPMENT

• 2’ Assorted 2.5 mm single wire


• 60/40 tinman solder
• PVC electrical tape
• 1- Combination pliers
• 1- Side cutting pliers
• 1- Measuring tape
• 1- Utility knife
• 1- Digital multimetre

MEM11002V03 - 1.0 Project - Electrical Installation - Level 1


June 2022 Cluster 2
Caribbean Vocational Qualification (CVQ)

Electrical Installation (MEM11002V03)


Level 1 – Cluster 2

Criteria Sheet

CANDIDATE’S NAME: _____________________________________

CANDIDATE’S NO.: _____________________________________

INSTITUTION NAME: _____________________________________

N/D 1 2 3 4 5
Criteria
1. Joints made with conductors securely anchored
2. Joints are mechanically and electrically sound
3. Joint soldered to standard
4. Correct material used to insulate joint
5. Insulation done to standard
6. Correct materials selected
7. Correct scale selected on first attempt for continuity
8. Correct size wire selected
9. Followed correct safety procedures when making joints
10. Followed correct safety procedures when soldering joints
11. Candidate displayed positive work attitude
12. Correct PPE worn by candidate
13. Insulated joint suitable for display
14. Soldered joint suitable for display
15. Completed tasks within time specified
Sub-Total
Total
Final Average Percentage Score (%)

5. Can perform the task with initiative and adaptability to problem situations.
4. Can perform the task satisfactorily without assistance and/or supervision.
3. Can perform the task but requires periodic assistance and/or supervision.
2. Can perform some parts of the tasks satisfactorily requires considerable assistance.
1. Has some knowledge about the task, but cannot perform the task satisfactorily.
N/D Not demonstrated

MEM11002V03 - 1.0 Project - Electrical Installation - Level 1


June 2022 Cluster 2

You might also like