Bus Operations Management B Rts Book
Bus Operations Management B Rts Book
Kratika Narain
Soham Munshi
Shivangi
Trisha Swarup
Shambhavi Kumari
Shravan Engineer
Priyanka Agarwal
Mithika Mathew
Monika Gupta
Studio Instructor
Dr. Mercy Samuel
Teaching Assistant
Himadri Panchal
Editor and Compiler
Mithika Mathew, Monika Gupta
Graphic Designer
Soham Munshi, Kratika Narain
Acknowledgement
We are grateful to CEPT University, and the Faculty of Management for making it possible for
us to do this study.
We were privileged to work on this project under the guidance of Dr. Mercy Samuel and are
grateful for their mentorship and support. We are indebted to Ms. Himadri Panchal for her con-
stant guidance.
We are grateful to all the jurors and guest faculty throughout the semester, who with their
thoughtful comments gave the project more dimension at each stage. During the quest of data
collection, we met managers and staff on the site who helped us get through the investigation
process productively.
We would like to thank the City Government authorities and BRT SPV authorities who made it
possible for us to work with the organisations, and all the officers and staff at various offices who
were generous with their time and expertise.
Batch 2018-20
Master of Urban Management
Foreword
Public Transport is a much talked about subject. With the ever increasing traffic and vehicle
ownership it is pertinent to look at public transport comprehensively and holistically for making it ac-
cessible, comfortable and convenient for citizens to travel within a city. The density of private vehicles
in the country is increasing, the effects of which can be felt on the road with increasing traffic, pollution
and time delays. The easy access to two wheelers both in terms of convenience and affordability makes
matter worse for public transport in India. Higher motorization leads to decline in public transport usage.
Along with the comfort that a private mode offers it is the lack of appropriate public transport too which
adds to the woes of traffic.
Many cities in India have started a dedicated high priority bus lane called Bus Rapid Transit System to
make bus transport fast and comfortable on select routes within a city.
The semester III studio of services operations attempts to look at different aspects of public transporta-
tion with specific reference to Bus Rapid Transit System with a view to identify ways and means by which
the systems can be made smoother for citizens to adopt and sustain travel modes of public transit. The
studio looked at aspects of Contract Management, Fare determination, Fare collection and ticketing,
Depot Management, Bus maintenance and Incident Management, Integration of feeder systems, Rev-
enue Management, Intelligent Transit Management Systems and Adoption strategies with proposals to
streamline and better manage each function with efficiency for better traveler comfort and experience.
A case city was chosen to conduct the study and apply the operations tools from a service perspective.
Transport being a service its operations need to be looked at from a service perspective to be able to
professionally manage and cater to different customer segments. Segmentation, pricing, user behavior
and strategic management tools and techniques were used for arriving at innovative improvement strat-
egies. All this couldn’t have been possible without the help and support from the case city government
in terms of data, interviews and documents for better system understanding.
ITMS
Adoption Strategy
Contract Management
Feeder System
Fare Determination
BRTS
Depot Management
How people move from one point to another is a crit- Bus Rapid Transit (BRT) is a Mass Rapid Transit sys-
ical factor which determines the shape of cities, the tem with capacity and speed like a Metro rail system,
form of spaces in the public domain, the nature of em- but with flexibility, a lower cost, and simplicity of a
ployment and income, and overall, the quality of an standard city bus service. BRT has dedicated right-of-
urban inhabitant’s life. Public transport has evolved way- a segment on the road where only these buses
over centuries from rudimentary animal-drawn con- travel, allowing them to bypass traffic snarls and oth-
veyances to hyper-technological modes such as vac- er causes of delay. This infrastructure is aligned either
trains, responding to increasingly sophisticated de- along the side, or along the median of a road. BRT
mand. also has dedicated stations along these routes which
In India, the rapidly expanding population and the have platform-level boarding and off-board ticketing,
race of urbanization create a great demand for con- both of which reduce the overall time a passenger
venient, affordable, and efficient public transport. spends in the system.
The Indian government framed a National Urban BRT is a highly feasible option for Indian cities as it is
Transportation Policy (NUTP) in 2006, amended as re- relatively less expensive to set up and therefore eq-
cently as 2014 to reflect new challenges and possibili- uitable in terms of user fare, while meeting the need
ties. The Policy envisions livable, people-centric cities for a faster public transport to cater to the demands
which allow its citizens “safe, affordable, quick, com- of bigger and busier urban areas.
fortable, reliable, and sustainable access”. It priori-
tises public transport, sets out guidelines, prescribes Case city and BRT
funding support from the Government, and instructs
“cities with a population of more than 10 lakh to start A service operations management study was con-
planning for high capacity public transport systems”. ducted of the BRT service in a Tier-1 Indian city with
The various types of public transport systems in In- a population of nearly 85 lakh, and area about 465 sq
dian cities include waterway modes such as ferries, km. This city is governed by a Municipal Corporation,
rail-based modes including local trains, monorail and and is also a designated Smart City. Apart from the
metro rail, on-road modes including bus services and decade-old Bus Rapid Transit system, the city has a
Bus Rapid Transit systems public bus service established in the mid-20th centu-
ry, and is soon beginning its metro rail service.
Initiated to improve the standard of public transport
and draw in a new segment of users, the BRT system
was also meant to improve air quality by reducing the
number of vehicles on the road. The system has ded-
icated bus lanes and stations along the median of the
road, and was designed to form a network around the
city, rather than just transit corridors. The trunk-and-
feeder system was designed as closed- only BRT bus-
es would travel along it, but the system is currently
opened partially to extend BRT routes, and allow city
buses and state transport buses to use some sections.
The entire system is IT-enabled and constantly moni-
tored to optimize operational efficiency.
bring performance efficiency in the public sector. and revision Fare Collection
Highest Premium
OR
Lowest VGF per
route / per bus
System
Public transport services
Bus
Procurement Bus Procurement
Contracts in BRT
(Optional )
Scheduling
Procurement
In the case city, the Special Purpose Vehicle (SPV) set
up as transit authority is responsible for contracts. It
Procurement URBAN
and TRANSPORT PRIVATE (optional)/
Route planning Operation
Revenue Risk and AUTHORITY PLAYER Operation and
rationalization
Maintenance
Risk
practices a service model, where operations to run the
Fares collection – Maintenance service, including the bus fleet, are contracted to op-
Fixation and revision
erators. Competitive tendering is practiced, and con-
tracts used are of the Gross Cost (GCC) model. These
Lowest Cost of
Operations (Per km /
Per Vehicle / Per pax
contracts are usually for a period of seven years, with
Figure 2: Gross cost contract
no extension clause, and are monitored through the
Intelligent Transit Management System (ITS).
There are 4 categories of service contracts the stud-
ied SPV has entered to ensure efficient operations of
D1 O1 Diesel 88 83 5 94%
93% By mapping the process of payment, it was found that
D2
O1 Diesel 45 41 4 91%
the SPV takes 7 days to make each payment- 4 days
O2 Electric 18 9 9 47%
in excess of the agreed 3. These extra days are uti-
New contract
D3 O3 CNG 60 57 3 95%
lised to analyse the invoices generated by the oper-
D4 O4 Diesel 50 46 4 92%
ator, compare it with the on-ground report prepared
Table 5: Case city - Fleet availability as per contract by DC surveyors who record departure and arrival of
buses from stations, and the report generated by the
Intelligent Transit Management System (ITMS) which
records real-time data of each bus. The 3 reports are
forwarded to the audit team which accepts the report
which quotes the lowest amount, deducts penalties
for breach of SLA, and makes payment of the final
amount via RTGS.
A Accountable I Informed
A critical part of contract management is the assign- Monitoring can be through penalty or reward.
ment of risk between the parties. The assignment The operator contract defines penalties, but also a
of risk is a key factor of the success or failure of bus cap to the penalty to spare the operator from unrea-
systems, and is tied closely to the strength and ca- sonable fines and to give them a chance to improve
pacity of the SPV, and its willingness to manage risks service.
that may fall under its extent of control. Risk must be The contract restricts penalty to a maximum of 10%
shared, and a certain risk must be allocated to that of the invoice amount. However, if the operator over-
party which is most able to manage it. (Delloite, 2015). shoots this 10% cap for five consecutive payment cy-
cles, the contract may be terminated.
A RACI analysis of the parties and functions (Table 6)
show that the division of responsibility between oper- Conversely, the capping criterion in the contract
ator and SPV is almost equal. tends to make the operator lax about compliance.
Therefore, the contract clause must be re-defined to
Risk analysis of the scenario (Tables 7 and 8) indicates ensure value of the penalty is high enough to act as a
significant risk in revenue, contributed to by leakage deterrent to non-compliance.
in revenue collection. The SPV owns this risk. The
other major risk is operational, caused by driver be- Some solutions could be to impose extra penalty, fire
haviour and bus accidents. This risk is owned by the the repeat offender (driver, operations manager), or
operator. These were identified through one-on-one to terminate the contract.
interviews with the operators, and by analysis of data
recorded through the ITMS.
RARE 1 L L L M M
LIKELIHOOD
UNLIKELY 2 L M M H H
LIKELY 3 L M H H E
DEFINITELY 4 M H H E E
Reward-based monitoring mechanism defined in the the same year. An additional performance-based bo-
contract prescribes a bonus to the contractor if total nus possibility also exists, but neither are ever used in
penalties levied in a given year are less than or equal the studied case.
to 3% of the total payments made to the operator in
Sharp cornering
56%
(54899)
Over speeding
In the case city, bus operators are only informed of Case Study: Driver incentives
driver misdemeanours after deduction of penalty in public transport
from payment. The operator could instead be pro-
vided access to view driver performance in real-time Go-Ahead Singapore (service provider) signed an
through the ITMS, allowing them to take prompt ac- MoU with the National Transport Workers’ Union
tion. (NTWU), to focus on safe driving and customer
service skills. The salient features of this agree-
The operator contract does not contain a clause ment include:
mandating recognition or reward of drivers through 1. Competitive salary
incentives based on performance monitoring. A solu- 2. Performance-related incentives: Bonus
tion could be to include a clause instructing the au- payments will be awarded based on accomplish-
thority to evaluate driver performance on the basis of ments in providing safe, reliable and comfortable
driver performance indicators, and provide monetary bus journeys.
or non-monetary benefits on monthly basis. 3. Flexible benefits: To encourage person
al well-being and development
4. Increased maternity and family care leave
5. Free transport: Travel concessions for rides
on public bus and MRT services.
6. Career progression opportunities: The op-
portunity to upgrade their skills through training
programmes, and for career advancement.
Recognition through certificate and awards: Recog- On-the-spot acknowledgement: Encourage cus-
nizing drivers by awarding them certificates and tro- tomers to acknowledge and praise a driver who is
phies to motivate them to perform better. seen to ‘do the right thing’
Responsibility
Positive towards Effective
Motivation
competiveness passenger service delivery
safety
Figure 8: Benefits
=
viability rather than financial viability- an objective Revenue (Number
Expenditure ( Payments
which prevents the system from being a profit-mak- made to bus operators,
of trips sold
fare collection costs,
ing enterprise for the transport authority. multiplied by
station customer service,
technical fare).
staff salaries, and fund
Pricing is a fare-box revenue system, and is one of the cost.
major sources of revenue for the enterprise. There-
fore, the determination of fare/price is crucial and Figure 1: Technical fare calculation
must take into consideration passenger willingness to
pay, and the socio-economic profile of the region. In
India, a large section of the population belong to low
income groups, and so public transport fares must Major factors for fare
be affordable. The transportation costs in an Urban determination
Transport System (UTS) are generally met by the There are various conditions and factors that need
provider of the System. The cost or price depends on to be considered according to the varying scenarios
various factors including infrastructure, geographical of different locations where the transit system has to
conditions, and administrative barriers. These costs operate. These factors make it more convenient for
may be either fixed or variable. the transit authority to determine the fare. The major
factors to be considered are:
What is fare/pricing in Price of Fuel: Oil is the major economic controller of
transportation? any country. Fuel price plays a significant role in de-
Fare is typically dedicated to a transit system’s op- termining the bus fare as it is the primary facilitator
erating cost, though the generated amount rarely of bus movements.
covers this cost. The increase in fare-box revenue
generally depends on transit pricing and fare change, Competition: Many urban transport system have
which may also respond to forecast or actual operat- networks which ply on the same route, thus creating
ing costs. It is the pricing policy which should balance a competitive market to determine the fare.
out the value of service, with a user’s willingness or
ability to pay. Season: According to geographical condition, the
climatic condition also varies. This climatic variation
affects fare price. For example, fare can be increased
the price can be accordingly higher or lower. Cost-Plus Pricing Loss Leader
Distance: Prices are calculated according to the dis- Figure 2: Various pricing strategies
tance travelled.
Pricing Strategies
Pricing of most public transport in urban areas is the
System
responsibility of the Urban Local Bodies (ULB). Till
now the ULB’s decisions on UTs fares determination Stakeholders
are primarily implemented by the by short-term po- The various stakeholders in the running of a public
litical, fiscal, and administrative expediency. Looking bus service are ULB, SPV, users, consultant, and fi-
after the rapid growth in UTs and its deficits, strin- nally state government. Generally in ULB, the munic-
gency in public subsidy budgets have demanded a ipal commissioner is the Chairman of all city bus ser-
more comprehensive view of UTS pricing. Although vices. The State government is the approval body for
it might seem that the whole city bus industry uses changes and implementation of the project. Public
similar pricing principles, in reality, different opera- transport is driven by the user and hence their needs
tors and business models need different approaches. are of highest priority in planning and designing a bus
One of the most important aspects in pricing is mak- system.
ing strategy, and the majorly used pricing strategies Special Purpose Vehicle
A company is established
Special Purpose whichVehicle
Vehicle is joint
for UTS are: A company is
Special
venture of state government
Special
established
Purpose
Special
which
andPurpose
Purpose
is
ULB
joint
called
Vehicle Vehicle
A company is established
as SPV which looks after the operationswhich is jointof
1. Cost-plus pricing: total cost + mark-up venture A company
of state
venture
venture
government
ofA
of
company
state
state
is established
isand
government ULB
established
government
and which
called
ULB iscalled
which joint
system. is joint Consultant
as SPVaswhich
venture
SPV looks
whichof after
state
looks the theand
operations
government
after ULB
andof ULB
operations called
ofcalled Planning and designing of the
2. Competitive pricing: deciding fare based on as SPV which
as SPV lookslooks
which afterafter
thesystem.
operations
the operations
system.
Urban Localsystem. Body
of of
Consultant
Consultant
Planning
infrastructure and system.
Consultant
and designing
Consultant of the of the
system. Planning and designing
that of competition A local government which
Urban Local Body governs all
Planning
infrastructure andand
Planning
infrastructure
infrastructure
designing
system.
and system. of the
designing
and system.
of the
the cityUrban Local
transport Body
system. infrastructure and system.
3. Value-based pricing: deciding fare by what A localAgovernment
local government
Urban
which which Urban
governs Local
governs
Body
allLocal Body
all User’s
The main user for whom the service is
A local
Athegovernment
citythe
local transport
government which governs
system.
city transportwhich governs
system. all all
customer believes it is worth the city transport
State
the city Governmentsystem.
transport system.
User’sUser’s
The main
made for.
User’s
The user for
User’s
main whom
user the service
for whom is
the service is
Price skimming: reducing initial high price as market for running State
The main authority
State the
State
the
is
Government responsible
Government
Government
service
State system .
Government
made The main
for.
made
made
The user user
for.main
for. for.
made
for whom the service
for whom is is
the service
Fare calculation
Changes liked to fuel price change in same Changes liked to change in wholesale price
Fuel Charges proportion ( effected monthly). Other Charges
index(effected annually).
For Review No
COE
AMC For
Review
Approval
STATE For
GOVT Approval
Yes
Avg km travelled by
5 km 6 km 7 km
Passenger
1 0-2. 3.00 4.00 5.00 6.00 5.00 5.00 5.00 2.00 -2.00 -3.00 -4.00
2 2-4. 7.00 7.00 8.00 9.00 8.00 8.00 8.00 1.00 -6.00 -7.00 -8.00
3 4-6. 8.00 9.00 10.00 11.00 9.00 9.00 9.00 1.00 -8.00 -9.00 -10.00
4 6-8. 11.00 10.00 11.00 12.00 10.00 11.00 11.00 0.00 -10.00 -11.00 -12.00
5 8-10. 12.00 11.00 12.00 13.00 11.00 12.00 12.00 0.00 -11.00 -12.00 -13.00
6 10-14. 13.00 13.00 14.00 15.00 15.00 14.00 14.00 1.00 -12.00 -13.00 -14.00
7 14-18. 15.00 14.00 15.00 16.00 16.00 15.00 15.00 0.00 -14.00 -15.00 -16.00
8 18-22. 17.00 20.00 21.00 22.00 18.00 20.00 20.00 3.00 -17.00 -18.00 -19.00
9 22-26. 18.00 22.00 23.00 24.00 19.00 21.00 21.00 3.00 -19.00 -20.00 -21.00
10 26-32 20.00 25.00 26.00 27.00 21.00 24.00 24.00 4.00 -21.00 -22.00 -23.00
11 32-38. 22.00 27.00 28.00 29.00 23.00 26.00 26.00 4.00 -23.00 -24.00 -25.00
12 38-44. 23.00 29.00 30.00 31.00 25.00 28.00 28.00 5.00 -24.00 -25.00 -26.00
1 0-2. 3.00 4.00 5.00 6.00 5.00 5.00 7.00 4.00 0.00 -1.00 -2.00
2 2-4. 7.00 7.00 8.00 9.00 8.00 8.00 14.00 7.00 0.00 -1.00 -2.00
3 4-6. 8.00 9.00 10.00 11.00 9.00 9.00 17.00 9.00 0.00 -1.00 -2.00
4 6-8. 11.00 10.00 11.00 12.00 10.00 11.00 21.00 10.00 0.00 -1.00 -2.00
5 8-10. 12.00 11.00 12.00 13.00 11.00 12.00 23.00 11.00 0.00 -1.00 -2.00
6 10-14. 13.00 13.00 14.00 15.00 15.00 14.00 26.00 13.00 0.00 -1.00 -2.00
7 14-18. 15.00 14.00 15.00 16.00 16.00 15.00 29.00 14.00 0.00 -1.00 -2.00
8 18-22. 17.00 20.00 21.00 22.00 18.00 20.00 37.00 20.00 0.00 -1.00 -2.00
9 22-26. 18.00 22.00 23.00 24.00 19.00 21.00 40.00 22.00 0.00 -1.00 -2.00
10 26-32 20.00 25.00 26.00 27.00 21.00 24.00 45.00 25.00 0.00 -1.00 -2.00
11 32-38. 22.00 27.00 28.00 29.00 23.00 26.00 49.00 27.00 0.00 -1.00 -2.00
12 38-44. 23.00 29.00 30.00 31.00 25.00 28.00 52.00 29.00 0.00 -1.00 -2.00
KM 0-2. 2-4. 4-6. 6-8. 8-10. 10-14. 14-18. 18-22. 22-26. 26-32 32-38. 38-44.
Old Fare 2.00 5.00 6.00 7.00 8.00 11.00 12.00 14.00 15.00 17.00 19.00 21.00
New Fare 4.00 7.00 9.00 10.00 11.00 13.00 14.00 20.00 22.00 25.00 29.00 29.00
Fare
50% 29% 33% 30% 27% 15% 14% 30% 32% 32% 34% 28%
Change %
%
26% 46% 39% 43% 48% 85% 91% 43% 41% 41% 38% 47%
Ridership
KM 0-2. 2-4. 4-6. 6-8. 8-10. 10-14. 14-18. 18-22. 22-26. 26-32 32-38. 38-44.
Old Fare 2.00 5.00 6.00 7.00 8.00 11.00 12.00 14.00 15.00 17.00 19.00 21.00
New Fare 3.00 6.00 8.00 11.00 13.00 16.00 19.00 20.00 22.00 25.00 29.00 29.00
Fare
33% 17% 25% 36% 38% 31% 37% 30% 32% 32% 34% 28%
Change %
% Ridership 39% 78% 52% 36% 34% 42% 35% 43% 41% 41% 38% 47%
30.00 80%
70%
25.00
60%
20.00 50%
15.00 40%
30%
10.00
20%
5.00 10%
0.00 0%
0-2. 2-4. 4-6. 6-8. 8-10. 10-14. 14-18. 18-22. 22-26. 26-32 32-38. 38-44.
10% Discount
Pass Max Fare In INR Operations hours Fare In INR for using only Fare to Be Paid In INR
BRTS
Max Fare of
Fare to Paid In Fare transfer to Each Organisation(
Pass BRTS/AMTS which Operations hours Split Fund
INR AMTS/BRTS) In INR
ever is highest.
10% Discount
Pass Max Fare In INR Operations hours Fare In INR for using only Fare to Be Paid in INR
BRTS
Max Fare of
BRTS/AMTS which Fare to Paid Fare transfer to Each Organisation(
Pass Operations hours Split Fund
ever is highest in In INR AMTS/BRTS) In INR
INR
5 7 2
Pricing is one of the most important business-relat- price model must be thorough. Such an analysis must
ed decisions a public transit operator can make. Thus, be based on the type of activity, competition, regula-
the analysis which supports choice and adoption of a tions, and expectations of target customers.
System
machines. It takes 30 sec to generate one tickets, and
on an average, it takes every 10th passenger around
300 seconds (5 minutes) to get a ticket.
Rapid transit systems are designed to cater to large
passenger volumes. Managing peak-hour volumes Card based ticket
has been a challenge for public transport agencies The BRT system issues a pre-paid, chip-based smart
around the world. In the case city, off-board ticket- card with a 5 year validity and with maximum re-
ing system is used in the BRT system. Fare collection charge amount up to Rs 10,000. In addition to tran-
has been outsourced to two agencies which provide sit fare, the card can be used for parking payment,
manpower for ticket sales and collection of fares, and utilities bill payment, amusement parks and enter-
to deposit collected fare with the respective agency. tainment payments. There are five different named
These agencies, which are on a 2 year contract, han- cards- instant, personalised, handicapped (10% dis-
dle 60% and 40% of the stations each. count on transit fare), blind (free travel), and student
(40% discount). in the case city, the transit cards are
issued at BRT stations, city civic centres, the SPV of-
fice, and few retailer outlets.
1 Scan 3
EXIT
Avg-5 mint-10th customer
Figure 2: Movement pattern in the BRTS station with a printed ticket in the case city
1 Scan 3
EXIT
Avg-1 mint-Per customer
Figure 3: Movement pattern in the BRTS station with a travel card in the case city
Analysis 22
28
3
3
Despite the apparent advantages of the smart card, 4
only a small fraction of BRT travellers use them. To 37
understand the reason for this under-utilisation, a 23
in and around a high, medium, and low footfall BRT NOT ANY UNAWRE TO APPLY LOCATION SERVER DOWN OFFICE CLOSED
MORE NO OF DOCUMENTS TIME TAKING PROCESS NON AVAIBILITY OF THE FORM
station each.
On an average 15 lakh fare transactions occur per Figure 6: Analysis of card issue applying process in the case city
week, of which 10 lakh are paper tickets, 2 lakh are
transit cards, and the rest are mobile or other ticket From the survey in the case city it was identified that
modes. It is identified that of the 1.5 lakh daily fare nearly half the respondents found the card difficult
transactions, only 30,000 are smart card transactions. to use as they had experienced instances of being
It therefore emerges that out of the total 2.5 lakh unable to recharge their cards due to equipment or
cards issued thus far, only 30,000 are used daily. This server failure. Another substantial section of respon-
is only 12% of the total cards issued. dents were unhappy with the time it took to get a
card issued.
ISSUES WHILE USING
6
1200000
TICKET ANALYSIS
9
998193
1000000 5
1 33
TYPES OF TICKETS
800000
27
600000 14
6
143507
151318
156895
400000
140964
143549
142316
119644
181462
200000 0 5 10 15 20 25 30 35
29525
30065
29721
29220
29844
25628
NO.OF RESPONDENT
7459
DID NOT FACE ANY ISSUE UNABLE TO CHECK BALANCE PENALTY CHARGES NON FUNCTION OF THE MACHINE
0
RECHARGING OF THE CARD LOW BALANCE IN THE CARD NON AVAILIBILITY OF THE FORM
16th SEPT 17th SEPT 18th SEPT 19th SEPT 20th SEPT 21st SEPT 22nd SEPT 16TH-22ND
DATES SEPT
JANMITRA CARD USER QR TICKET USER Figure 7: Analysis of card issue using process in the case city
Figure 4: Ticket analysis for ticketing type used in the case city
CARD ISSUANCE
Therefore the reasons for non-usage can broadly be
300000 categorized into two: problems during card issue, and
242792
200000
150000
The process analysis in Figure 8 shows that the main
64084
60312
100000
reasons for delaying in issuing the card is at the ap-
45168
18916
12823
50000
2172
1919
402
253
0
INSTANT STUDENT HANDICAPPED BLIND TOTAL
form forwarding stage.
TYPES OF PASSES
BRTS AMTS TOTAL CARD
Data Entry at
office/Forwards
BANK
the Forms along
with Data mail
to DGM
Form Approved Delay in print
Reviews
SPV on the /sending to the
and
Availability of Ahmedabad
approval
the time Yes through courier
Uploaded Informed
BANK Send to
Scanned of
ICICI Bank
Virtual cards Customer
1 Day 1-2 Day 1 Day 3-5 Day 1 Day 7 Day 1 Day 1-2 Day
Figure 8: Swim lane showing process for availing passes in the case city
Suggestions
System-based proposal
Fare collection and fare validation are an essential uses off-board ticketing, but the city bus service prac-
part of the BRT service. In a BRT system with limited tices on-board ticketing), or fare media.
physical space for stations in a centre median, provid- A simple solution for this tangle could be to issue tick-
ing infrastructure space for fare collection is a major ets to city bus users off-board at the BRT station, but
challenge. Depending on how the fare system is con- use a QR code scanner device on-board the city bus to
figured, there may be some time lost while paying for validate these tickets. This will prevent entry into the
off-board tickets. In the case city, it was observed that system without some kind of ticket.
several BRT stations are also used by the city bus ser- Establishing kiosk machines will reduce manual de-
vice. This causes a degree of chaos at boarding and pendency for ticketing, and reduce long queues at the
de-boarding, and revenue leakage as both systems ticket counters in the peak hours.
do not use the same fare rates, fare systems (BRT
Reviews
SPV and
approval
Yes Uploaded
Improved Courier
BANK Send to Scanned
service
Bank Virtual cards
Cashbacks Hoardings
Hoardings
From the survey it was identified that many citizens include newspaper advertisements, radio jingles,
are unaware of the smart card, its various discount hoardings, information at retail stores, outreach to
schemes, how to go about getting the card, etc. To educational institutions, among others.
counter this, awareness and adoption strategies can
be deployed. Some measures taken for this could
Bus depot categorisation can be done on the basis When new stock is to be purchased, quotes are tak-
of size, and number of buses it can accommodate. en from three suppliers. Selection is made based on
Small depots hold up to 80 buses, medium depots price and quality, and once approval is received from
80 to 200, and large depots, more than 200. For the the operator head office, a purchase order is sent to
smooth functioning of the depot and making its per- the supplier. The bought goods are delivered to the
formance level up to the set benchmarks, daily op- depot, copies of the bill are maintained at the depot
erations should be planned efficiently. These perfor- and at the head office, then payment is made to the
mance types differ from depot to depot. (Rao, 2017) supplier.
System the driver has listed bus or trip issues. This log sheet
is given to the Depot Manager who assigns work to
all the particular department relevant to rectifying
Depot the issues. Bus maintenance is done every night from
There are five depots in the case city, D1, D2, D3, 11:00 pm to 6:00 am. If any breakdown occurs during
D4, D5, where bus maintenance and management is the trip, the driver informs the Point Supervisor, who
done. Data about these depots is listed in Table 1 informs the concerned depot operator. This informa-
tion is transferred to the breakdown team, who goes
Inventory Management on the incident spot for repair. If an immediate solu-
All depots have inventory stores where all equip- tion is not possible, a spare bus is sent from depot to
ment, tools, and spares are kept in stock. When work replace the damaged one.
starts in the maintenance pit, tools and other re-
quired material are dispatched from this store. There Depot Management Software
are two store in-charges at each depot- one for day Depot operations include processing and storing a
shift, and another for night shift- who keep all records
48 | SERVICE OPERATIONS MANAGEMENT: BRTS
DESCRIPTION Depot A Depot B Depot C Depot D Depot E
Area of Depot 7,345 m.sq 13,981 m.sq 13,588 m.sq. 12,523 m.sq 9,138 m.sq
Total drivers, late fine if 78, 200rs to 500rs 100, 200rs and 500rs 120 drivers (25 drivers trained) 87 65 , 500rs fined per day if trip loss
drivers comes late.
Contract time 7 years 7 years 7+2 years 7 years 7+3 years extendable if
performance is good
Qualification and Training (6-7 days), ITI, Diploma 10th ,12th , graduate Mechanical , Electrical, Diploma ; Training -7days, earlier B.com, B.A, Diploma ; 4 days
Training or experienced Training- Chennai experience, expertise in mechanic training(if they join salary are paid
work for 4 days)
Employee per depot 60 45-50 50-60 100 45
Bus kilometers per day 250km -300km(covers both shift) 250km 40km- Swap, 200km fast charging 200km-250km(115 liters to 144 190km-225km
– 150 litres liters)
Refuelling van/ station Yes 4(Reliance), earlier- Indian oil 1hour (less than 3 minutes to swap a yes No, 175km to 250km(Sabarmati
corporation battery), 2 hour (6hour complete CNG Adalaj, Adani)
charging)
Bus oil changing 60,000km 60,000 12 battery at a time(battery life – 7- 27000km 10,000per km
8 years)
Washing area 1 2 2 washing bay 1 Pressure nozzel
No of buses washed per 5 bus per day 10-12 2 buses deep cleaning per day 5-6 5-10 deep cleaning
day
Recovery van 1- turn around time(half an hour) 2(Narol- Naroda, Ghuma- 1 2 1
Maninagar)
Prepare schedule
Supervisor allocate bus to drivers
Break No
Driver He takes bus He takes bus down
Starts it’s
Driver checks to route operation
to gate During
the bus trip
Depot
manager
(mechanics)
Point Informs to
supervisor point
supervisor
Informs to
Operator
operator
Break down
team
6am-11pm
Figure 1A:Figure
Process
4.1 A-mapping for depot
Process Mapping operation:
for Depot swimlane
Operation:Swimlane
Supervisor
Starts it’s
Driver
operation
Security
Point
supervisor No
Informs to operator
Operator
6am-11pm
Figure 4.1 B- Process Mapping for Depot Operation:Swimlane
Figure 1B: Process mapping for depot operation: swimlane
Sort
The results of the previously described ABC analysis
can be used to sort inventory. A refers to highest
consumption, B to medium consumption, and C re-
Figure 4 2 Percentage of consumption of inventories
fers to low consumption. This can be segregated
Figure 2: Percentage of consumption of inventories accordingly to ease access and usability. The front
of the store can be designated for fast pick-up, and
items can be placed stack-wise. This suggested ar-
rangement of store and stacking mechanism are il-
A Highest consumption lustrated in below in figure 5.
A B C A A A B B A
B Medium consumption While sorting of items in the store, red-tag areas can
be defined. Red tags can be attached to inventory
C Low consumption
that are defective, dead, or obsolete stock.
Set-in-place recommends that every item should
Figure 3: Existing layout of inventory store-mixed form
have a designated places to make it quicker to iden-
Various issues identified in depot management in- tify and an item for a particular work. Currently, it
clude lack of recovery vans, improper arrangement of is been observed that items are lying on the floor,
inventory, and lack of designated lanes for bus park- or even outside the store in a dis-arranged manner.
ing. Inventory standardization can be done using label
boards on the racks, and mark contents of each rack
on the encompassing cabinet.
Highest consumption
A To sustain the 5S techniques, phase-wise process can
Medium consumption
be implemented:
B
Shine
The current inventory arrangements are untidy, and
make the objects look dirty. For efficient and effective
workflow, the workplace needs to be clean. A proper
cleaning schedule must be prepared so that it meets
standards, and can be monitored by the concerned
Supervisor. Daily and weekly cleaning schedules
should be prepared.
Standardize
Once the first three steps of 5S are done, things
should look well-defined and be in designated places.
All the extra items like old obsolete stock is placed in
the red zone area, everything is organized, cleaned,
and equipment is in good working condition. The ob- Figure 4. 7 Racks addressing sign board, 5S Manual, www.lean.o
jective of standardization is to establish best practic-
es and to encourage team member to actively partic-
ipate and share their creative ideas.
PARKING LANES
Code wise
Staff facilities like canteen
Parking area
,restroom, toilet
Placement of buses
It was observed that there was haphazard placement
of Figure
buses in4.7the
Proposed modelhinders
depot, which for designated bus lane
the movement
of the vehicles. It is advisable to park buses at a 60
degree angle instead of 90 to allow an ideal mix of
easy parking, smooth manoeuvring, and better space
utilization.
A suggested layout for D1 is illustrated in the figure 6
Total Area for parking in the depot is 3,600.25 sqm.
In this layout, buses can be parked in 3,094 sqm. This
leaves 506 sqm for another 9 buses, or any other re-
quired activity in the case city.
2. W2 O1 87 700 INR. 62
cost. But these urban modes of transport do require • New diesel
3. W3 O3 • CNG 60 87 INR. 64
proper maintenance in order to run smoothly” (Shak- 4. W O4 • Diesel 50 85 INR. 62
ti - Sustainable energy foundation, 2016). This study Table 1: Maintenance operator details for workshops
is an in-depth analysis of the bus maintenance and Table 1 shows the scale of maintenance work being
Source – Primary survey dated 24/09/19
incident management practices being carried out in carried out by the operators for different types of
the case city with a comparative approach to the best buses. The buses run an average of 250 km per day,
practices and available guidelines for the same. The and the daily maintenance work and general check-
aim of the study is to find out loopholes in existing ing is done at night after the buses complete their
practices to give recommendations that can be incor- scheduled trips. The contract cost for electrical buses
porated in the existing systems. is slightly higher than the diesel buses as they require
battery swapping after every 40 km. The general and
Figure 3: Observations
The site observations show that the work allocation ends once the checklists are submitted to the work-
process starts once the log sheets are submitted by shop manager after completion of work. The driver’s
the drivers to the entry counter. These log sheets are log sheet, summary of complaints and the filled-up
then handed over to the workshop manager who checklists are recorded as maintenance documents
then creates a summary of issues. Based on the type to show the authorities at the time of inspection.
of incidents, concerned maintenance departments The detailed weekly and monthly preventive main-
are verbally notified by the workshop manager com- tenance plan include oiling of engine, gear etc. after
pleting the work allocation process. Issues are re- completion of certain kms.
solved under the inspection of department heads and
checklists are updated. The daily rectification process
Major Minor
Calls Mails
Source – Incident Management Manual, CCC
Figure 6: Incident categories in case city bus rapid transit
RACI Matrix
Dimension Maintenance
Drivers Entry counter Workshop Manager department heads Mechanics
Process
recorded.
at | Productivity Tracking Figure 10:Proposed work order format- productive tracking
Documents Included
• Work orders issued for bus
Creating passenger awareness
• Daily & monthly checking
records
and involvement
• Mechanic Feedback for the
bus
It is important to create trust amongst passengers us-
• Gradings of the bus
Uses
• PUC details
ing the service. Since most of the city transit models
• Insurance details
• Easy inspection
• Performance evaluation of
are on service contract basis, it is necessary to make
the bus the passengers aware that the authority is actively in-
• Facilitate bus allocation
process volved in the management and operators are bound
• Easy data updating on DMS
by contract to provide safe and high quality service.
Figure 11:Proposed work order format- productive tracking Complaint helpline numbers should be communicat-
Source – Google Images
ed to passengers and there can be a feedback system
Driver training based on through the same number so that drivers can direct-
performance-based analysis ly be graded by the users. This would also make the
commuter feel that the system is safe and reliable.
“In most public transport corporations, a training re- Signage can be put up inside the bus so that passen-
gime for the newly recruited drivers exist which are gers can immediately contact the authority when
conducted by their contractors”. (India, 2018) These necessary.
Passenger Awareness | Feedback System
training regimes along with the safety rules should
emphasize on the passenger’s response. All buses Complaint Helpline
should have the contact numbers of the transport of- Helpline no.:
XXXXXXXXXXXX Bus Ticket
Uses
port authorities. Drivers found guilty of these inci- How was your ride? Selection of
drivers of the
Ø
Month Figure 13: Creating awareness amongst passengers Source – Google Images
Parameters
60% Circuitous route The PBS project has been divided into phases, with
Phase 1 focussed on the western region of the city,
Not suitable for carrying heavy load
with almost 500 bicycle stations and 2,000 bicycles to
be deployed on a permit basis. The bicycle operators
Figure 3 will have to buy a permit from the authorities in order
Figure 2: Reasons for not using Public Transport Figure
Predominant factors for shifting to PT to distribute their cycles in the city.
Along with the permit criterion, a Non-Motorised
2%
Transport (NMT) policy has also been drafted, which
the operators will have to follow. The payment for
22% If bus quality is improved
these cycles will also be integrated with the Common
42% If journey time is reduced Mobility Card of the city.
If there are bus stops at walking distance
34% For the e-auto service, authorities have identified four
If fares are reduced
clusters in the city where the autos will run perpen-
dicular to the BRTS main line. These autos will charge
the riders INR 5 to INR 25, depending on the distance
Figure 3: Factors for shifting to Public Transport travelled by them. This is less than fare of the exist-
ing auto-rickshaw service. This project is being imple-
A leading newspaper in the case city had conducted
mented on a Public-Private Partnership basis.
surveys in order pin down the reason for people not
using the Bus Rapid Transport System. It was found
that 60% people found the bus stops too far for them
to walk and reach. Another survey which was carried
out to assess the willingness to shift to the Bus Rap-
id Transport System found that 34% people said that
they would if the service had bus stops were within
walkable distance.
Description Particulars For integrating IPT mode into the system, it is im-
Fuel cost (in INR) 70.00 portant to have the IPT integrated physically, techno-
Mileage (km/L) 10 logically, and administratively.
Per km cost (in INR) 7.00
Distance to be covered (round trip in km) 12
Fuel Cost per month (in INR) 2,520.00
Physical Integration
Fuel Cost per annum (in INR) 30,240.00
Fuel Cost for 5 years (in INR) 1,51,200.00 For physical integration, the authorities need to pro-
Table 5: Scenario 3 - Car
vide IPT stands at walkable distances from the origin
points of the riders. These must preferably between
Description Particulars 100 and 300 meters from residential or commercial
Total cost over 5 years (cost of car, areas. The autos can also be given the permission
maintenance, PUC etc.) 6,83,250.00 to run as shared autos in the city, hence increasing
Salvage value 1,00,000.00 the number of riders catered to, while reducing the
Net cost 5,83,250.00 amount of pollution generated per rider.
Net cost + fuel cost 7,34,450.00
Cost per km 34.00
Per trip cost 408.03
Table 6: Scenario 3 - Cost analysis for Car
The IPT modes need to be integrated with the city The studied BRT acquired 300 electric midi buses,
BRT system’s mobile application, with autos/IPT be- each able to carry 50 passengers and with a range
ing shown on the application just like one could see of 200 km per charge. These could be used as feed-
vehicles on an Uber or an Ola application. From this er buses, which penetrate within the city, and collect
application, riders could book their entire journey, riders from locations which are not being served by
from origin to destination. Once a trip is booked, the BRT trunk.
the passenger would board an IPT vehicle from the
origin to the nearest BRT station, board a bus to the A 2015 study of the catchment area of this BRT sys-
BRT stop closest to final destination, and board an tem identified that almost 65% of the potential BRT
IPT vehicle from this point to final destination. This users walk 10 minutes to or from a bus station. In or-
would save time and money for the rider, while also der to cater to the demands of people who live further
augmenting incomes for both the bus service provid- away from the catchment area of the BRTS stations,
er and the private IPT operators. The auto drivers can midi buses or the electric buses can run perpendicu-
also be provided with a Point of Service machine or a lar to the trunk lines and bring riders into the system.
tap-in tap-out machine in order to integrate with the Therefore, these midi buses will not only cater to the
case city’s Smart Card initiative. population living within walkable distance, but also
those that live further away.
Administrative Integration A hub and spoke model would work effectively to de-
fine routes. The BRT stations can act as hubs, while
For administrative integration, authorities need to midi buses going around and picking customers from
recognise the importance of IPT as a mode of trans- the feeder routes will act as spokes.
port, and work with these private operators to give
riders in the city a seamless, quick, and efficient trans-
port system. The private IPT operators become mid-
dlemen in the said system. In order to keep them in
the system, authorities can augment the farebox rev-
enue of IPT operators by providing them INR 1.50/-
per trip made via the Application or for a trip paid by
the Smart City Card. INR 1.50/- is 37% of the base fare
of the BRT system of the city.
Table 8
Number of trips before charging required 41
Total trips 244
Figure 4: Point to point VS hub & spoke model
Table 7: Analysis of feeder route 1
As Figure 4 shows, point-to-point (linear) grid or
mesh approach between 8 points needs 16 routes. In Description Particulars
contrast, hub and spoke does the same work with 8 Running kms of one bus (in kms) 200
Distance to charging station (in kms) 6
routes. Connectivity, time, and savings- all three are
Hence number of trips including the trip
taken care in the hub and spoke model.
to the charging station 39
Hence, feeders can be planned for short feeder routes
Number of trips completed in one hour 2
around the BRTS corridor while also keeping in mind
Hours of operation by one bus on a
the charging requirements of the buses. single charge for feeder service 20
Running kms of one bus (in kms) 200
Feeder route 1 Distance to charging station (in kms) 6
Table 8: Number of trips and hours of operations per bus on feeder
A ‘willingness to shift’ survey was conducted on 40 route 1
people in a predominantly residential area of the For feeder route 1, which will have headway 5 min-
case city, of which the farthest point was 1 km away utes, the number of buses required will be 6, and the
from a BRT station. 72% of the surveyed respondents number of passengers catered to will be 300 per hour
agreed that unavailability of feeder is one of the ma- at maximum capacity. These buses can make a cumu-
jor issues hindering their usage of BRT. At the same lative of 244 trips in total, and can run for 20 hours
time, 80% respondents said that they would use BRT each.
if there was a feeder available to them. According to
Feeder route 2
Figure 8
the survey and interactions with residents of the area,
a feeder bus every 5-10 minutes that drops directly to
the BRT station would be ideal. The second feeder route selected is in an area which
is a mix of residential and commercial. It is one of the
busiest commercial areas of the case city, but has no
BRT connectivity. Hence, connecting the same to the
BRT network will pool in riders who regularly visit the
area for work, education etc. The route also touches
one of the major attractions of the city, a lake, which
is surrounded by retail as well as commercial outlets.
Feeder route 2 will have headway 5 minutes, and will
require only 4 buses as it is a shorter route than route
Figure 5: Feeder route 1
Table 12 Intersection 7
Time taken (in seconds)
70
465
30
255
Time taken (in minutes) 7.75 4.25
Figure 7: Traffic Signal Prioritisation Table 10: Time saved at each intersection due to TSP
It is through Traffic Signal Priority (TSP) that time, Description Particulars
money, and fuel can be saved for BRT in the case city. Per hour consumption (in Litres/hr) 5
TSP basically prioritises buses over other vehicles, Per minute fuel consumption (in litres/min) 0.08
giving buses more time to go through an intersection Per bus idling fuel consumed for the trip (in litres) 0.65
If tsp is implemented, savings in fuel (in litres/hour) 0.35
and reach the destination faster.
Therefore, savings in fuel consumed 0.29
Per day fuel saving (in litres) for all buses 413
A trip from Station A to Station B was undertaken at
Table 11: Fuel saved due to TSP
Table 11
a peak traffic hour in order to assess how much time a
bus stands still at junctions, waiting for the green sig-
Description Particulars
Consumption of Diesel when only engine running (litres/hr) 4
nal. The route chosen had 7 intersections on the way, Adding 20% for ad hoc AC load (refrigeration, maintenance
with each signal having varying time stops according cost etc) (in litres/hr) 5
Price of diesel (in INR) 68
to the traffic volume at that particular intersection. Minutes in an hour 60
Cost of idling per minute (in INR) 5.7
Cost of idling at junctions (survey junctions) (in INR) 43.9
If the number of rounds of green signal during one Cost if TSP followed (in INR) 24.1
traffic cycle during the peak hours is increased from Savings (in INR) 19.8
Number of busses 236
two to four, the buses can reach faster, improving the
Peak hours (8-11 and 5-8) 6
headway and saving fuel while doing this. This in turn Total savings in a day 28,084.00
saves revenue for the authorities. The time saved on Consumption of Diesel when only engine running (litres/hr) 4
adding 20 % for ad hoc ac load (refrigeration, maintenance
just one trip could be improved by almost 3 minutes cost etc) (in litres/hr) 5
by implementing the said initiative. Price of diesel (in INR) 68
Minutes in an hour 60
Cost of idling per minute (in INR) 5.70
The monetary savings per bus from such an interven- Cost per hour per bus (in INR) 340.00
tion would be INR 19.80/-. If all buses of the fleet save
Table 12:Cost Savings due to TSP and cost incurred for the idling
3 minutes in an hour during the peak hours, the total
time at each intersection
savings in a year would be INR 1,01,10,240/- .
Governement
The NationalUrbanTransportation Policy (NUTP) man- of Gujarat
dates the formation of an Urban Transportation Fund 15%
which has three distinct prospects of potential revenue:
(a) Taxes and charges on vehicle owners Figure 1: Distribution of Fund for Initialisation of BRTS
(b) Direct and indirect beneficiaries and
Sources of Income in the Organization
(c) Central and State Government allocations
Direct Incomes Indirect Income
Advertisement License Fees Grant
100.0
86.9 95.3
74.6
80.0 67.4
62.0
57.7 57.7 59.6
60.0 61.2 55.4
59.0
54.8
40.0 35.7
29.3
19.2
20.0
8.5
3.0 0.8
0.0
2015 2016 2017 2018 2019 2025
160
141.1
140 129 125.7
117.8
120
98.5 95.32
100 86.9
74.6
80 67.4
62
57.7
60
40
20
40% 66% 76% 70% 73.3% 139%
0
2014-15 2015-16 2016-17 2017-18 2018-19 2024-25
Income Expense
Though projected deficit by 2025 is 139%, a study cate that selling advertisement rights are a common
of income and expense numbers since 2017 in- and substantial source of revenue. Gujarat Develop-
dicates that the actual quantum of deficit is al- ment Control Regulations (GDCR) define the kinds
most constant. The gap has not grown narrow- of permission, and licenses that are to be acquired
er though there has been increase in fleet size. for setting up of advertisement which every agency
providing advertisement service have to abide by.
Reviews of other similar transportation systems indi-
1.40 1.30
1.20
1.00
0.84
0.80
0.60
0.40
.17
0.20
0.00
2015 2016 2017 2018 2019 2025
Analysis
Advertisement scenario
Looking at the current scenario of advertisement rights in BRT of the case city, there is visible stagnation in
revenue, and the strategies that could have been adopted to increase the revenue.
The rates for other parts of the city, and the net pos- space available for advertisement on a BRT shelter in
sible revenue can be calculated through variations of the same location, it is seen that the possible revenue
this formula. is much higher than that currently extracted by the
SPV. Thus, it is very much important to carry out the
Thus, rate for advertisement in a city is majorly de- revaluation of available advertising space.
pendant on its location. On imposing the market
advertisement rates of a particular location on the
{Area of the Station (20% ) + Daily Footfall (10%) + Surrounding Market (commercial
land value / sqm) (50%) + Traffic (Road Width) (20%) } of required bus shelter X
{Area of the Station (20% ) + Daily Footfall (10%) + Surrounding Market Y
(commercial land value / sqm) (50%) + Traffic (Road Width) (20%) } of metro station
The basic process flow from Issuing Tender to kind of Payment Mechanism to be adopted:
Electricity, Maintenance
Area demarcation
Terms and Conditions and repair responsibility of
to be given by AJL.
licensee
10% increase in
License Fee every
year
Figure 8: Summarised procedure for semi-naming rights
1 Characteristics of existing
License for Advertisement Rights
3 Derivation of
Probable Rate
“Semi-Naming Rights”
Strategy
Chairman, MC
Vehicle Planning, Scheduling, and Dispatch (VPSD) Automated Fare Collection System (AFCS)
Depot Management System (DMS) Incident Management System
Systems Automatic Vehicle Location System (AVLS) Enterprise Management System (EMS)
Passenger Information System (PIS) Business Intelligence System (BI)
Facilities Command Control Centre (CCC) Data Security Centre (DC) Data Recovery Centre (DRC)
PIS
Route, Stops,
Schedule, Depot Fleet, Crew, Dispatch
DMS VPSD
Route, Stops
(latlong), Schedule Route, Stops,
Schedule, Depot
AFCS
Route, Stops, Depot,
VPSD Ticketing/ridership data DMS Schedule, Dispatch
Depot Management System the Passenger Information System (PIS). The devic-
(DMS) es which support this system on each bus are Driver
Display Units (DDU) and On-Board Unit (OBU). Data
This software module is operated from each bus on the health of these devices can also be extracted
Depot by each Depot Manager. It has 4 modules in through this system.
this particular case. The Roster Management module
functions complementary to the VPSD software, and The AVLS system in the case city’s CCC is monitored
is used for scheduling buses and staff as per the re- by 3 technicians, who check route selection and ad-
quirements conveyed through VPSD. The beginning herence, device health, co-ordinate first response,
of each trip from the depot is also marked in this. Cur- cross-check trip adherence with on-ground person-
rently, only this module of DMS is utilized by the bus nel, and generate daily reports on trips, vehicle us-
operators in the case city. age, breakdowns or other events.
The remaining modules are HR Management- to
GPS data
monitor crew employed, crew available, and pay-
VPSD
roll, Maintenance Management- to track cleaning Route, Stops, Schedule, Depot
PIS
System (AVLS) Tracking buses
CCC
2-way communication with driver
AVLS is used to track and monitor buses on the net- Reporting data
work. The system is enabled by a GPS unit on each All sub-systems, BI reports
bus, which transmits live data to the Command Con- Figure 4: Integration of AVLS with other ITMS sub-systems
trol Centre (CCC). Each bus is tracked on a live GIS
map at the CCC. The AVLS monitors bus location,
speed, stops, driver behaviour such as over-speed-
ing or sudden braking. It checks schedule adherence,
gaping or bunching of buses. This data feeds into
Depot
VPSD Expert DGM, ITMS GM, SPV Bus Driver Bus Operator
Manager
Demand and
operations R A C C
data analysis
Scheduling R C A C I I
Assigning
vehicle and I I I R I A C
crew
Trip begins I I I R R A
Figure 6: Responsible, Accountable, Consulted, and Informed personnel for bus scheduling.
Correction of bunching,
gaping etc R A R I R
Incident redressal I R I I A R
Report generation A R R C I C I
Report review R R A R
Device Maintenance and The Station Devices in the studied case are Hand-
Management held Ticketing terminal (HHT), Point of Sale terminal
(POS), Fare Validator and Turnstile, Passenger Infor-
mation System LCD screen, CCTV Camera, Station
The various hardware devices are core components
Server.
of the ITMS system. If each of these devices do not
continuously function with precision, the data gener-
Each station is meant to have 2 HHT devices. Howev-
ated and therefore the entire system is compromised.
er, 20% of the units require correction in a day. How-
Devices are monitored through various ITMS sub-sys-
ever, if a HHT is available for less than 99% of the shift
tems that they contribute to, or by the users of the
time, it is in critical breach of the SLA. As total oper-
physical devices. Maintenance is handled by the con-
ational time is 17 hours (1020 minutes), the machine
tractor consortium, with division of responsibility
cannot be down for more than 10.2 minutes. This is
according to level of fixing required. Initial ground
combated by having spare devices in each station,
support and basic fixing is handled by one member
and ensuring technicians reach the station to fix the
of the consortium is titled L1 support, while the other
device immediately. The current downtime is up to 2
consortium member which designed and implement-
hours.
ed the system handles escalated levels of fixing re-
quired, which is titled L2 support. L3 for maintenance
The POS machines are currently being phased out as
Incident closed
Electrical technicians
SPV informed
BRT SPV dispatched and issue
fixed
OFC Vendor
informed,
vendor
issue fixed
L2
technician
OEM
Report Generation
ularities in device health affect accuracy of data and
Daily reports are generated against fixed KPIs and therefore manual intervention is necessary to correct
benchmark criteria on heads such as bus availability it. Therefore, visual representation on the BI dash-
and utilization, scheduled trip adherence, revenue, boards are also incorrect.
ridership, and device status and emailed to SPV up- Though SPV officials have access to the various inter-
per management. Weekly review meetings are held faces and dashboards they rely on ITMS Contractor
to brief on the data generated and analysed. Irreg- staff for data extraction and analysis.
Suggestions
Clauses in Operator Contract drivers on a monthly basis.
Maintenance schedule shall be defined in the soft-
ware and updated daily, weekly, monthly, as per type
Despite the DMS system being designed to ease
of maintenance. Inventory shall be defined and regis-
depot management, only the roster management
tered, and daily updates of inventory movement shall
module is used diligently. Operators continue with
be made. Updates shall be monitored by CCC staff,
their own systems to manage HR, Maintenance, and
Assistant Manager-Operations-SPV, and are subject
Inventory. It is however necessary for AJL to be aware
to random ground checks by SPV authority and field
of these aspects as well, so an ideal way to mandate
staff. SPV shall arrange training of designated depot
this would be to include a pertinent clause in the op-
staff to operate software. Non-compliance with pre-
erator contract. The clause could be along the follow-
scribed update schedule shall result in penalty.
ing lines:
The data generated through ITMS is valuable and val-
The designated bus operator staff shall ensure data
id and bears more weight when utilised
is entered in Depot Management Software provided
by SPV. Roster shall be prepared for 14 days at a time,
and corrected on a daily basis prior to fleet dispatch.
HR shall be updated with accurate information about
Maintenance Management
module
EMS
Network and
device status Device status and location AVLS
Maintenance Device status and location
Management AFCS
EMS
Responsive maintenance
Network and IMS
history on
device status nd locati AVLS
status a
evice sub-systems
Figure 13:Ref
Device Integration
no Currentof Maintenance
Current Management
Location module withDother
Maintenance Scheduled Mean Mean Warranty Scheduled OEM
status location history Maintenance
history status and locationTime ToAFCS
Device maintenance Time history renewal
EMS
Management Responsive m Repair Before
aintenance
Network and history Failure
IMS
device status
s a nd location AVLS
Responsible Inventory e statu
DevicManager,Operator; AGM-IT, AJL Mean
Maintenance Scheduled Mean
Ref Current Current Maintenance
Location De vice sta tus and location Time Warranty Scheduled
Device AccountableManagement Project Manager,
history Operator; Time To AFCS
maintenance OEM
no status location history Responsive m Before history renewal
aintenanceRepair
Consulted DGM-IT,hiAJL
story Failure
IMS
Table 1: Data recorded in the Maintenance Management module
Informed GM,AJL
Responsible Inventory Manager, Operator; AGM-IT, SPV
Mean
Maintenance Scheduled Mean
Ref Current Location
Current Accountable Project Manager, Operator; Time Warranty Scheduled
Device history maintenance Time To OEM
no status location history Before history renewal
Repair
Consulted DGM-IT, SPV Failure
Informed GM,SPV
Responsible Inventory Manager, Operator; AGM-IT, SPV
Informed GM,SPV
Table 2: Responsible, Accountable, Consulted and Informed personnel for device management
It is difficult to choose between private vehicles and National Urban Transport Policy
public service as there are different influences. Excur-
sion quality, for example, time of outing and consis- National Urban Transport policy, 2014 clearly states
tency of outing, motivations behind outing, and sta- that there is a need to control the development in
tistic attributes such as age, gender and pay level, are transport demand in light of the fact that there is a
among the huge influences. Likewise, as the age and breaking point to the enlargement of urban transpor-
salary of an individual increases; there is a decrease tation foundation and administrations. Transport De-
in the utilization of public transport. Other secondary mand Management comprises a lot of strategies that
solid influences are out of the pocket cost of travel, impact why, when, where and how individuals travel.
nature of administration, the proximity of the bus
stop from the start point and nearness of destination
from the station.
Methodology
4. Literature study
3. Issue Identification • International cases
• National cases
• Research Papers
2. Capacity Check
5. Bus Aggregator Model
1. Survey
• Rider
• Non-Riders 6. Business Model Canvas
Figure 2: Methodology
Analysis
There are two sides to the public transportation sys- ed below. The study was conducted in six Bus Rapid
tem. One is the receiving side: the public who creates Transit stations of the case city based on footfall of
the demand for service, and the other is the deliver- the station from low, medium to high density.
ing side: the administrators who meet the demand
for service. The objective of the analysis is illustrat-
Figure 4: SERVQUAL
The study brought forward different findings among were academicians, government sector employee,
the 97 respondents from 6 selected stations. Since the private sector employee, house maker and entrepre-
sample stations are in close proximity to major uni- neur. The sample was a balance between male and
versities of the city 40.7 percent of the total respon- female ranging from the age of 17 to 50 years.
dent were students, while remaining 59.3 percent
Information of the Service availability and Passengers belongings Well aware about the Staff appear neat
routes changes are are secure availability of passes and smart
communicated in
BRTS buses are punctual advance Station staff are polite bus service information buses are spacious,
is readily available and safe and comfortable
BRTS bus drivers stop at Service are timely and Station staff have in- accessible
all bus stops efficient depth knowledge buses are clean
about the service Bus frequency are
BRTS buses never break Increase in service designed optimally (no BRTS station are
down during the frequency in festive Driver drives safely by additional bus required) clean
journey seasons following traffic rules
Bus route are designed
Bus drivers wait until all Disturbance causing optimally (no additional
passengers are passengers are not stop required)
comfortably onboard allowed onboard
SOURCE: Primary survey, September, 2 019
To meet passenger requirements, it is necessary for There is evidently a gap between the demand and
the stock-end to be adequate. There must be the re- supply of the transit stock of the case city. An alter-
quired number of buses to be able to provide trans- native arrangement could be double-decker, or artic-
portation for the volume of passengers and at the ulated buses to carry more passengers comfortable
frequency required. It was observed while conducting in the same number of trips. Unfortunately, the case
the survey that the BRT stations of the case city were city’s BRT infrastructure isn’t designed for such flexi-
packed at peak hours and 76 percent of the respon- bility.
dents complained of congested stations and buses.
PRIVATE
VEHICLE
OWNER
DAILY
USERS
Figure 9 suggests that if bus stations are placed in port Aggregators’ commonly possess no advantages
close proximity to a particular kind of high-usage other than the Information Technology framework.
development, ridership would increase. However, They form agreements with private transport propri-
this assumption would be incorrect in the case city. etors for their activities. Aggregator transport man-
A previous study conducted of the case city on rider- agements contrast to State Transport U by empower-
ship and the built-form indicators in 2018 disproves ing travellers to track transport timings, bus arrival,
this assumption. The case city isn’t a Transit Orient- and guaranteeing them seating for the span of their
ed Development (TOD), development is not oriented trip.
along the BRTS corridor though such a relationship
would increase ridership.
Alternatively, new businesses have emerged in the
country of exclusive bus-pool transport. These ‘Trans-
SERVICE OPERATIONS MANAGEMENT: BRTS | 109
Bus
Bus Bus
Bus
Bus
Bus
Bus
SERVICE PROVISION:
After the demand analysis, if the project seems via-
ble, a strong back-end team would be set up for the
2. Fare-change vs Ridership
2. Lack of reward mechanism
model
in contract.
2. Fare-change vs Ridership
4. Fuel efficiency vs Fare.
model
3. Fare Collection 1. Fare-box revenue leakage at 1. Closed station system.
BRT stations. 3. Fare model for daily bus
passes.
5. Bus Maintenance and Lack of set regime for general Token-based work allocation
Incident Management checking of buses and work regime
allocation
depots. by defining lane and assigning
codes to buses.
The learnings cover a wide range of aspects in the BRT system, but an overall theme that emerges is to
do with the outsourced services, and regulation of them. The SPV has well-defined SLAs and KPIs, and
the service would benefit greatly from additional proactive governance.
This study has offered an entry point to investigate these possibilities.
References
(2017). Bus depot design guidelines. Sgarchitects, delhi, association of state road transport . New
delhi: shakti sustainable energy foundation. Retrieved from https://shaktifoundation.in/wp-con-
tent/uploads/2017/11/bus-depot-design-guidelines.pdf
Chaudhary, m. L. (2017). – is ahmedabad bus rapid transit system on the pathway it desired for?
Retrieved october 2, 2019
Embarq india. (2013, may). Tamil nadu intermediate public transport policy. Retrieved september
15, 2019, from http://www.indiaenvironmentportal.org.in/files/file/tamil%20nadu_ipt%20policy__
may%202013.pdf
Embarq india. (n.d.). Bus karo: a guidebook on bus planning & operations. Retrieved august 25,
2019
Gadepalli, r. (2016, march). Role of intermediate public transport in indian cities. Retrieved septem-
ber 30, 2019 , from https://shaktifoundation.in/wp-content/uploads/2016/03/ravi_article.pdf
Hari, g. P. (2019, october 21). How were auto rickshaw drivers integrated with the kochi metro? (s.
Engineer, interviewer)
Islam, m. R., brussel, m., munshi, t., & grigolon, a. (2018, september 20). Ridership and the built-
form indicators: a study from ahmedabad janmarg bus rapid transit system. Retrieved september
10, 2019, from urbansci-02-00095%20.pdf
Itdp. (2017, november 16). The brt planning guide. Retrieved september 21, 2019, from https://
www.sutp.org/files/contents/documents/resources/i_brt-planning-guide/giz_sutp_brt-planning-
guide_complete_4th_en.pdf
Delloite. (2015). Consultancy services for preparing guidelines & model contract for city bus private
operations. Deloitte touche tohmatsu india pvt. Ltd. Ministry of urban development,government
of india.
Shivanand swamy , h., & patel, g. (n.d.). Ppp arrangements in urban transport. 2nd asia brt confer-
ence, (p. 40). Ahmedabad
Annexure 1
WILLINGNESS TO SHIFT SURVEY FORM
Question Options
1. Male
1 Gender
2. Female
1. 1 - 15
2. 16 - 25
2 Age group
3. 25 - 45
4. 45+
1. Daily
2 OCCUPATION
STUDENTS
JOB
BUSSINESS
WORKERS
HOME MAKER
OTHERS
3 FREQUENCY OF TRAVEL
DAILY
WEEKLY (ONCE A WEEK)
MONTHLY(ONCE A MONTH)
OCCASIONALLY
FIRST TIME
4 METHOD OF TICKETING
JANMITRA CARD
MANUAL TICKET
7 FUTURE USE
YES
NO
10 PLACE OF MAKING
BRTS STATION
RETAILER SHOP
CITY CIVIC CENTRE
AJL OFFICE
10 PLACE OF MAKING
BRTS STATION
RETAILER SHOP
CITY CIVIC CENTRE
AJL OFFICE
12 RECHARGE AREA
BRTS STATION
RETAIL OUTLET
JANYATRA APP
16 IMPROVEMENTS/SUGGESTION IF ANY
Annexure 3
Survey of BRTS Service
Strongly Agree: 4, Agree: 3, Disagree: 2, Strongly Disagree: 1
1 Gender
Female
Male
Prefer not to say
2 Age
Below 17
Young (17-30 yrs)
Middle (31-55 yrs)
Old (Above 55 yrs)
3 Occupation
Government sector
Private sector
Entrepreneur
Businessman
Homemaker
Academician
Ridership pattern of BRTS
the form aims at both riders and non riders of BRTS
4 Do you use BRTS, if no, state the reason
Yes
Unreliable (Delays, Breakdowns)
Inconvenient
Crowded
Expensive
5 How do you travel a short distance of 500 m?
Walking
Cycling
Autorickshaw
Bus Service
Riding 2 Wheeler (motorised)
Driving 4 wheeler
6 For what purpose do you use BRTS
Travelling to school/university
Commuting for work
Shopping
Outings
Experienced insecurity due to discrimination in the BRTS station
7
or bus under any of the following heads
Caste
Religion
Gender
Age
Physical disability
Other…
Reliability
the ability of BRTS to perform their services accurately
8 Information on the route of the BRTS bus is available to the passengers
Shopping
Outings
Experienced insecurity due to discrimination in the BRTS station
7
or bus under any of the following heads
Caste
Religion
Gender
Age
Physical disability
Other…
Reliability
the ability of BRTS to perform their services accurately
8 Information on the route of the BRTS bus is available to the passengers
9 BRTS buses are punctual
10 BRTS bus drivers stop at all bus stops
11 BRTS buses never break down during the journey
12 Bus drivers wait until all passengers board/alight the bus comfortably
13 Passengers belongings are secure (cases of theft or snatching)
Assurance
14 Station
the Staff are
knowledge always
and polite
courtesy of the transport operators’ employees, and their ability to convey trust
15 Station staff have in-depth knowledge to solve issues of the passenger
16 Driver drive safely and follow traffic rules
Personnel prevent the boarding of passengers that cause
17
disturbance (drunk passenger, or vendor with their products, etc)
Tangibility
the physical appearance of the vehicles, staff and other infrastructured
18 Staff appear neat and smart
19 Buses are spacious, safe and comfortable
20 Buses are clean
21 BRTS stations are clean
Empathy
Aware about different passes available (instant pass, personalized pass, student
22
pass, blind pass, handicapped pass, senior citizen pass, monthly ridership)
23 Bus service information is readily available and accessible
24 Staff are always on hand to serve passengers
25 Bus frequencies are designed optimally, no additional schedule required
26 Bus routes are designed optimally, no additional bus stops needed
mention the location below
Responsiveness
the promptness with which services are provided
27 Staff provide individualised attention to passengers
28 Service availability and changes are communicated in advance
29 Services are timely and efficient
30 increase in service frequency in festive seasons
Suggestion