AL-HASSA PHYCHAITRIC HOSPITAL

PREVENTIVE MAINTENANCE PLANNING FOR CCTV SYSTEM

LOCATION: DVR / NVR NAME: MODEL NO. :


MONTH: JULY 2022
WEEKLY PREVENTIVE MAINTENANCE CHECK LIST
ITEM
DATE
SHIFT WEEK 1 WEEK 2 WEEK 3 WEEK 4 REMARKS
A *
Check DVR Videos operation
display Working with clear vision
B

Check indicating two screen


A *
operational work with DVR are
readily accessible B

CHECK operating two DVR HDD A *


recording to confirm its ability
recording correctly B

Check Adaptor for two DVR by


A *
operating test power Trough
multimeter B

Check all BNC Jack of DVR to


A *
ensure that are operating correctly
for each Camera B

A *
Check that all CCTV cameras
are readily accessible on two
screen with clear vision B

MAINTENANCE CHIEF ELECTRONIC ENGINEER

SIGNATURE SIGNATURE

TECHNICIAN SHIFT.A SHIFT.B

SIGNATURE
WEEKLY PREVENTIVE MAINTENANCE CHECK LIST
ITEM DATE SHIFT NO. 1 7

test one camera adaptor and PNC A


jack to ensure that are operating
correctly B

Check Adaptor for two DVR by A


operating test power Trough
multimeter B

Check indicating two screen A


operational work with DVR are readily
accessible B
Check that all CCTV cameras are
readily A
accessible on two screen with clear
vision B

Check all PNC Jack of DVR to ensure A


that are operating correctly for each
Camera. B

check video quality A

MONTHLY PREVENTIVE MAINTENANCE CHECK LIST


ITEM DATE SHIFT NO.

test all camera adaptor to ensure that


A
are operating correctly

Check all camera PNC jack to


ensure that are operating correctly
A
each circuit should be tested in turn

Check two dvr PNC jack to ensure


A
that are operating correctly

Check indicating two screen


A
operational working good
DAILY PREVENTIVE MAINTENANCE CHECK LIST
ITEM DATE SHIFT NO. 16 17 18 19 21

A *
Check DVR Videos operation display
Working with clear vision
B

Check indicating two screen A *


operational work with DVR are readily
accessible B

CHECK operating two DVR HDD A *


recording to confirm its ability
recording correctly B

heck Adaptor for two DVR by A *


operating test power Trough
multimeter B

Check all PNC Jack of DVR to ensure A *


that are operating correctly for each
Camera B

Check that all CCTV cameras A *


are readily accessible on two screen
with clear vision B

TIME TO MAKE AWEEKLY MAINTENANCE *

DAILY A WEEKLY

PROJECT MANAGER ENG / SAMIR MAHMOUD

SIGNATURE
AL-HASSA PHYCHAITRIC HOSPITAL

TEM

*
MAINTENANCE CHECK LIST
14 21 REMARKS

MAINTENANCE CHECK LIST


15 REMARKS
AINTENANCE CHECK LIST
22 23 24 25 26 27 28 29 30 31 REMARKS

* ♦ *

* ♦ *

* ♦ *

* ♦ *

* ♦ *

* ♦ *

TIME TO MAKE AMONTHLY MAINTENANCE *

WEEKLY A B MONTHLY A

ELECTRONIC ENGINEER ENG / BALA

SIGNATURE

SHIFT A SHIFT B