White Flint Sector Plan: Montgomery County Planning Board
White Flint Sector Plan: Montgomery County Planning Board
M-NCPPC
Vision: North Bethesda’s Urban C
Walkable
Urban
Green
Livable
Marketplace
White Flint T
Not Walkable
Especially MD 355
Not Urban
Transforming
Not Green
Surface parking lots
Few public amenities
Limited open space
Livable?
Marketplace
Regional and local sho
Plan Con
Livable-Residential Marketplace-Retail
Plan Con
Walkable: Multimodal
Public facilities
Major highways
1992 Master
Transit Station, Residential (TSR)
Maximum Density: 2.5 FAR
Mid-Pike Plaza
Maple Avenue
Metro West
Metro East
NRC
White Flint Crossi
White Flint Mall
Nebel Corridor
Nicholson Court
Level of Develop
Amount of Development
Residential
Square Feet 2.7M 2.6 M 11.7 M* 17 M
Allocation of density
Edges
Density and H
Major Highways
Arterials
Private Streets
Flexibility for:
- Public / private coordinatio
- Implementation and stagin
Sustainab
Plan for Sustainability
Open Space
M-NCPPC
Connec
Located between
Rock Creek
and Cabin John
Stream Valleys
Montrose Parkway
Trails
Open Space Frame
Civic Green
Recreation loop
Promenades
Urban Boulevard
Public R
Green roofs,
green walls, and
water
Recycle m
conservation
from exis
building
deconstru
G
Transportation: At
Recreation: Active or
and safe walking a
Passive lanes
Environmental:
Stormwater infiltration Cultural: Public ar
Historic reference
Public Fac
Urban Parks and Open Spaces
Civic Green
Express/Urban Library
Police Sub-station
Farmer’s Market
Elementary School
Design Guidelines
Staging
Financing
Design Guide
Design Excellence
• PROM
Great
• PRESE
Flexib
O
Design Guidelines
Overall - Streets, Spaces and Connec
Concept
Civic green
Urban park
Building Height, Step Backs Neighborhood
and Setbacks greens
Recreation Loop
East West Green
M
M
Trail
M
M Promenades
Boulevard
Streets
Pedestrian priority
streets
Eddies
Design Guidelines
Overall - Streets, Spaces and Connec
Public Use
30 stories
• Urban
• Public Enjoyment
• Paved or Planted
• Private Development
Design Guidelines
Overall - Streets, Spaces and Connec
Public Use
• Every private development must provide “Public Use Spa
• Calculation for public use space is on the net lot area
Net
Gross
10% 20%
Standard Optiona
The Lot Dedication
Public Use Space
Design Guidelines
Overall: Streets, Spaces and Connec
Rockville Pike Bou
Existing
Proposed
Design Guidelines
Overall – R
Retail Activity Priority
Design Guidelines
Overall - Architecture: Character, Massing,
Height
Building Height, Step Backs
and Setbacks
Design Guidelines
Overall - Architecture: Character, Massing, S
Height Parts of a Buil
Typical per Story:
Office: 12 feet
Design Guidelines
Overall - Architecture: Character, Massing,
Comparison of Heights
Design Guidelines
Overall - Architecture: Character, Massing,
Nuclear
Regulatory
Commission
240 Feet
Design Guidelines
Overall - Architecture: Character, Massing,
FAR and Massing
If the area of the whole property = 80,000 Sq.Ft.
Then ….
Design Guidelines
Overall - Architecture: Character, Massing, S
FAR and Massing
You can arrange the FAR many ways Tower
Steps
Cube
FAR 4 =
M
M
Today Concept
Design Guidelines
District- Metro West:Conference Center
240’
Building Height, Step
Backs and Setbacks
M
M
M
M
300’
250’
150’
Design Guidelines
Prepared by M-NCPPC Urban Design Division 9/5/08 Margar
District-Metro West:Conference Center
M M
M M
Design Guidelines
District: Metro West- Conference Center
3 4 Intensity
Perviousn
Open Space
Undergro
Parking E
Design Guidelines
District: Metro West- Conference Center
Assembly None Some All
Design Guidelines
District: Metro West- Conference Center
Summary
Civic Green & Eddies
Street Oriented Retail
No Assembly Scenario
Promenade
Draft
Pedestrian Priority Stree
Landmark @ Boulevard
Great Grid
Connected
Design Guidelines
Staging of Develop
Pre-Requisites for Stage 1
Stage 1
West of the Metro Station
Stage 2
East of the Metro Station
Stage 3
Further away from the Metro Station
Staging of Develop
Stage 1
Metro West and Mid-Pike Districts
Level of Development
3,200 residential dwelling units
1.77 million sq.ft of non-residential
Requirements
Fund the realignment of Executive Blvd
and Old Georgetown Road
Fund the east-west Main Street
Establish a bus circulator system
Fund the acquisition/dedication/
building of Civic Green
TMD goal of 30% non-automotive drive share
Public-private partnership to redevelop Wall Park
Locate an express/urban library
Pre-planning for Rockville Boulevard with SHA
Staging of Develop
Stage 2
Metro East, Maple Avenue
and NRC Districts
Level of Development
2,600 residential dwelling units
1.6 million sq.ft of non-residential
Requirements
Increase non-automotive drive share to 35%
MCPS to evaluate the status of an
elementary school
Fund the second entrance
to the Metro Station
Staging of Develop
Stage 3
Nebel, Nicholson, White Flint Mall and
White Flint Crossing Districts
Level of Development
4,000 residential dwelling units
2.30 million sq.ft of non-residential
Requirements
Increase non-automotive drive share to 39%
Implement MARC station
Complete all streetscape improvements
Construct an elementary school, if needed
Reconstruction of Rockville Pike
Implement
Public-Private Partnerships
An Urban District
Silver Spring
Bethesda
Wheaton
Development District
Middle Schools-
North Bethesda Mid
Tilden Middle
Elementary Schools
Ashburton
Farmland
Garrett Park
Kensington-Parkwo
Luxmanor
Wyngate
Issue 1B: Sc
Potential locations:
The Gables
Roadway realignment
Acquisition of property
Potential dedication
Issue 2: Land Use /Transportation Ba
Walkable blocks
Hierarchy of forms
Management of expectatio
Staff recommendations ar
- Aggressive
- Achievable
- Affordable
Issue 2: Land Use /Transportation Ba
Considerations
Regional connections
Strategies
Acceptance of more
Regional connection
Regional connections
Regional connections
Regional connections
Strategies
Regional connections
Can more density be allocated through staging without need for mas
Plan amendment?
Issue 3: Land
Stage 1
West of the Metro Station
Stage 2
East of the Metro Station
Stage 3
Further away from the Metro Station
Issue 5: St
Transportation Costs
February estimate: $280M, including
• Public transit = $60M
•Montrose Parkway = $70M
• Rockville Pike = $70M
• Local streets = $80M (in addition to those already in
CIP, but including some that might be conditions of
development approval)
Many public dollars are:
• Already committed (e.g. state funding for Montrose),
• Proposed (e.g., Chapman Avenue), or
• From negotiable sources (e.g., MARC/WMATA)
Issue 6: Fina
Cost/Benefit Analysis
• Impact taxes
The Problems
Lumpiness
Cost
Certainty
Issue 6: Fina
Cost/Benefit Analysis
Impact taxes
The Problems
Lumpiness
Cost
Certainty
Issue 6: Fina
Goal in selecting innovative alternative
Predictability for developers
Minimal additional public sector costs/risks
Where incidence of benefit is broad, incidence of cost
should also be broad
Solution
Create a district that can:
Deliver infrastructure projects on time (in phase) and in
their entirety
Spread the costs of Rockville Pike broadly over the Sector
Plan
Target public sector dollars for up-front mobility
Create monitoring system with broad
representation/accountability
Issue 6: Fina
Impact Taxes
Should be reduced or phased out
Should be captured
May be more appropriate for residential uses than a special
assessment
Special Assessment
Must be at level acceptable to existing uses
Must cover most of the cost of infrastructure
Other Possibilities
Some public money up-front
TIF-like financing, if necessary, for Pike
Issue 6: Fina
Next Steps