AnnualPlan Coalmin 2010-11
AnnualPlan Coalmin 2010-11
AnnualPlan Coalmin 2010-11
Shastri Bhavan
New Delhi
Final Document
CONTENTS
Sl. No.
1
2
7
8
9
10
11
12
13
14
15
Description
Note on Annual Plan
Coal Demand / Supply / Movement Plan
All India Coal Demand (Sector-wise)
Indigenous Coal Supply Plan Sector-wise & Source-wise
Coal Supply Plan (Sector-wise Breakup) - CIL
Sector-wise Coal Off-take Plan of CIL & Subsidiaries and SCCL)
Company-wise / Mode-wise Coal Movement Plan of CIL Subsidiaries
Coal Movement Plan of SCCL
Field-wise Coal Movement Plan -CIL
Raw Coal Off-take & Wagon loading Programme
Coal Production Plan
Company-wise
UG - OC break up
Coalfield-wise
State-wise
Group-wise
Technology-wise
Grade-wise
Status of Mechanised Longwall faces (CIL & SCCL)
Coking coal Availability and Washed Coal Production
Washery-wise Coking Coal
Washery-wise Non-Coking Coal
Manpower & Productivity Plan
Company-wise Manpower reduction plan & VRS
Productivity (OMS)
Utilisation Plan
System Capacity Utilisation
Utilisation / Productivity of HEMM
Investment Plan
Company-wise
State-wise
Group-wise
Statement of IEBR & Financing Pattern
Detailed Drilling Programme
Promotional Exploration Programme
Status of Coal resource in India
Up gradation of Coal Resources Inventory
S & T Programme
R & D Programme
Environmental Measures & Subsidence Control. (EMSC)
Energy Conservation Programme
SEB wise Outstanding dues
Page No.
i - ix
1
2-3
4
5-9
10 - 13
14
15
16
17
18
19
20
21
22 - 23
24 - 27
28 - 30
31
32
33
34 - 35
36
37
38 - 39
40
41
42 -44
45 - 57
58 - 59
60 - 62
63 - 66
67 - 68
69 - 78
79 - 84
85 - 89
90 - 91
92
CONTENTS
Sl. No.
16
17
18
19
20
21
Description
State-wise Royalty Payment made by coal companies
Welfare Measures
Cost of Production & Sales Realisation
Scheme-wise Coal Production Plan
Eastern Coalfields Ltd.
Bharat Coking Coal Ltd.
Central Coalfields Ltd.
Northern Coalfields Ltd.
Western Coalfields Ltd.
South Eastern Coalfields Ltd.
Mahanadi Coalfields Ltd.
Singareni Collieries Company Ltd
Schemewise Expenditure & Investment Plan
Eastern Coalfields Ltd.
Bharat Coking Coal Ltd.
Central Coalfields Ltd.
Northern Coalfields Ltd.
Western Coalfields Ltd.
South Eastern Coalfields Ltd.
Mahanadi Coalfields Ltd.
Singareni Collieries Company Ltd
Neyveli Lignite Corporation Ltd. (NLC)
Page No.
93
94 - 95
96 - 98
99 - 102
103 - 109
110 - 111
112
113 - 115
116 - 118
119 - 120
121 - 123
124 - 125
126 - 127
128
129
130 - 132
133 - 134
135 - 136
137 - 146
147 - 180
S.N
Sector
200607
TY X
PL
200708
200809
200910
Prov #
201011
TY XI Plan
(2011-12)
50.51
Demand
Original Revised
%
%
MTA CAGR CAGR
Orig.
Rev.
68.50
68.50
9.41
14.26
Act. Consumption
Steel
35.17
39.02
37.66
40.69
483.00
473.00
8.45
8.97
Power
307.92 332.40 362.93 371.66 442.00
(Utilities)
Cement
19.67 21.27 18.85 18.98 30.00
31.90
33.35
4.66
11.06
Others
147.60
138.39
7.86
6.35
Total
731.00
713.24
9.70
8.96
Coal Production
As per original XI Plan document envisaged indigenous coal production in the terminal year
of XI Plan (2011-12) was 680.00 Mt. However, as per the Mid-Term Appraisal (MTA) coal
production of India is expected to reach 629.91 Mt. The Compounded Annualized Growth
Rate (CAGR) was originally projected to be 9.56% in the XI Plan period against annualized
growth of 5.62 % achieved in X Plan period. As per the MTA the projected the CAGR in the
XI Plan period is now expected to be 7.89%.
All India coal production grew @ 6.87 % in the first 2 year of XI plan. As per MTA likely
Annualized growth in first 3 year is 7.23 %.
Company wise coal production plan during the XI plan is given below:
(In Mt)
SN
Sector
07-08
Act
08-09
Act
09-10
Prov.*
10-11
Target
Original
Revised
520.50
486.50
TY XI Plan
2011 - 12
Latest
Assessment
%
CAGR
Original
%
CAGR
Revised
486.50
7.6
6.15
CIL
SCCL
40.60
44.54
50.42
46.00
40.80
47.00
47.00
1.59
4.50
Others
36.94
44.48
50.37
65.87
118.70
96.41
58.28
29.81
24.52
All
India
680.00
629.91
591.78
9.56
7.89
Sector
Demand /
Consump.
Supply /
Production
Import /
Gap
Coking
NonCoking
07 - 08
Act
08 - 09
Act
09 - 10
Prov.*
10 - 11
BE
656.31
Original
XI Plan
731.00
11 - 12
Revised
MTA
713.24
Latest
Assessment
713.24
504.29
546.10
582.32
454.49
490.02
514.58
573.42
680.00
629.91
591.78
49.80
56.08
67.74
82.89
51.00
83.33
121.46
22.03
27.77
21.08
35.00
23.47
44.27
32.59
50.30
40.85
10.15
42.48
40.85
It may be observed that the due to revised coal production projections in the terminal year of
XI plan (i.e. 2011-12) there is a production shortfall of around 50.09 Mt., indicating a growth
of 7.89 % in coal production against 9.60 % envisaged initially. Initial projected gap between
demand and availability of coal in the terminal year of XI plan was 51.00 Mt. (coking coal
40.85 Mt & non-coking coal 10.15 Mt.). Now as per revised estimate demand / supply gap
works out to be 83.33 Mt. The envisaged gap will be met up by import. (42.48 Mt - Coking
coal and balance 40.85 Mt - Non-coking coal.)
XI Plan: Plan outlay & Expenditure
Delay in taking up of new projects, delay in procurement of HEMM due to some court cases
and decision of some of the coal companies to outsource overburden removal / coal loading
& transport operations and slow progress in regard to central sector schemes have resulted in
shortfall in capital expenditure in first two years of the plan. In view of above, during Annual
Plan exercise, company-wise / scheme-wise expenditure has been revisited and originally
projected and as proposed have been depicted below:
ii
SN
Company/ Scheme
A.
1
2
3
3
B.
PSU
CIL
SCCL
NLC (Mines)
NLC (Power)
Central Sector
Schemes
Total MoC
Rs Cr.
Revised
XI Plan
Approved
XI Plan
Cumulative
expected
Expenditure
Till 09-10
Expenditure
as % of XI
Plan Outlay
17390.00
3440.00
2993.00
12051.00
1326.00
7640.68
1545.27
1502.68
3717.02
1501.23
43.94
46.26
50.21
30.84
113.21
16090.68
3802.07
2334.39
6140.61
4463.36
37,100.38
15,906.88
42.88
32,831.11
Production (Mt)
Off-take
(Mt)
CIL
435.00
437.40
Capital Outlay
(Revised)
(Rs Crs)
3100.00
SCCL
45.00
45.00
633.94
Others
52.83
52.83
--
All India
532.83
535.23
3733.94
Coal
Production
(Mt)
UG
Opencast
Total
Off take
2008 09
2009-10
Actual
Target
Actual (Prov)
%Achievement
Against Target
43.96
359.77
403.73
401.46
45.50
389.50
435.00
437.00
43.26
388.01
431.27
415.86
95.07
99.62
99.14
95.16
iii
Growth
Over
corrpdg.
Period of
last year
%
-1.59
7.85
6.82
3.59
Coal
Production
(Mt)
Underground
Opencast
Total
Off take
2008-09
Actual
12.087
32.455
44.542
44.520
2009-10
Target
Actual
(Prov)
12.800
11.969
31.700
38.456
44.500
50.425
44.500
49.378
%Achievement
Against Target
94
121
113
111
Growth
Over last
year (%)
-1
18
13
11
Lignite (Mt)
Power (MU)
%Achievement
Target
Act (Prov)
21.75
16600.00
22.34
17657.94
Against Target
102.70
106.37
COMPANY
ECL
BCCL
CCL
NCL
WCL
SECL
MCL
NEC
CIL
SCCL
Others
All India
2008-09
Actual
28.13
25.51
43.24
63.65
44.70
101.15
96.34
1.01
403.73
44.55
44.48
492.76
2009-10
2010-11
Target/ B.E
Target
Ach (Prov)
31.00
28.00
48.00
66.50
45.00
106.00
109.30
1.20
435.00
44.50
52.83
532.33
30.07
27.51
47.08
67.67
45.74
108.01
104.08
1.11
431.27
50.43
50.15
531.85
iv
33.00
29.00
50.00
72.00
46.50
112.00
116.75
1.25
460.50
46.00
65.87
572.37
BE 2009-10
21.75
16600
2009-10
Ach (Prov)
22.34
17657.94
BE 2010-11
24.14
18758
2008-09
Actual
Target/B.E
(Prov))
2010-11
Target/B.E.
ECL
28.26
31.00
29.19
33.00
BCCL
24.60
28.00
25.11
29.00
CCL
43.84
50.00
44.21
50.00
NCL
64.23
66.50
66.65
72.00
WCL
45.37
45.00
45.51
46.50
SECL
103.02
106.00
106.07
112.00
MCL
91.29
109.30
98.15
116.75
NEC
0.84
1.20
1.07
1.25
CIL
401.45
437.00
415.96
460.50
SCCL
44.54
44.50
49.37
47.05
Others
44.04
52.83
49.25
65.87
All India
490.02
534.33
514.58
573.42
COMPANY
2009-10
Capital Outlay:
Business as usual scenario for capital outlay for 2010-11 BE of CIL is Rs 3800 Crore and an
additional lump sum ad-hoc provision amounting Rs 6000.00 Crore has been kept for
proposed acquisition of assets in abroad. Subsidiary wise capital outlay, actual 2008-09, BE
& RE 2009-10 and BE 2010-11 are as under:
ECL
2008-09
Actual
191.88
2009-10
B.E
Act (Prov)
210.00
165.02
(Rs. Crore)
2010-11
(B.E.)
400.00
BCCL
221.16
230.00
293.35
350.00
CCL
334.84
420.00
321.31
350.00
NCL
266.52
730.00
545.45
800.00
WCL
277.92
230.00
252.34
350.00
SECL
855.98
730.00
770.67
600.00
MCL
321.26
200.00
404.19
650.00
Others #
37.61
150.00
57.66
300.00
CIL
2507.17
2900.00
2809.99
SCCL
650.44
580.57
3800.00 +
6000.00 ##
1334.93
NLC
1559.41
1893.84
1983.46
COMPANY
#
Others include NEC, CMPDIL, DCC, IICM & CIL (HQ) and R&D
## Additional Adhoc. Provision: Rs 6000 Crs (LS) for proposed acquisition of assets in abroad
Financing Pattern:
The estimates of IEBR as proposed in BE and RE 2009 - 10 and BE 2010 - 11 and actual of
2008- 09 are as under:
Coal India Limited
(Rs. Crore)
Head
2008 09
2009 - 10
2010 - 11
(Actual)
BE
Actual
BE
32034.24
27670.95
41424.58
37080.55
Total IEBR
32034.24
27670.95
41424.58
37080.55
Total Outlay
2507.17
2900.00
2809.99
IR
EBR
3800.00
(+6000.00 ##)
Resource Surplus
(+) / Gap (-)
Budgetary Support
from Govt.
29527.04
24770.95
38614.59
33280.55
(27280.55 ##)
## Additional Ad-hoc Provision: Rs 6000 Cr (LS) for proposed acquisition of assets in abroad.
vi
Head
2008 09
(Actual)
650.44
IR
2009 10
BE
RE
30.57
353.94
2010 11
BE
513.93
Others*
550.00
280.00
821.00
Suppliers credit
Total IEBR
650.44
580.57
633.94
1334.93
Total Outlay
650.44
580.57
633.94
1334.93
2009 10
IR
BE
673.46
RE
397.08
2010 11
BE
662.03
720.38
834.26
1321.43
500.00
Total Outlay
1893.84
1231.34
1983.46
Head
Reduction
31.3.09
Actual
31.3.10
(Target)
31.3.10
(Act)
31.3.2011
(Proj.)
412350
401891
397138
392545
08-09
(Actual)
09-10
(BE)
09-10
(Act.)
10-11
(BE)
13727
11611
15212
11179
vii
Reduction
31.3.09
Actual
31.3.10
(Target)
31.3.10
(Antic)
31.3.2011
(Proj.)
70586
69182
69370
67692
08-09
(Actual)
09-10
(BE)
09-10
(Antic.)
10-11
(BE)
-4987
-1404
-1216
-1678
Conclusion:
The proposed All India coal production target for the year 2010-11 is 572.37 Mt out of
which, share of CIL, SCCL & Others are 460.50 Mt (80.45 %), 46.00 Mt (8.05 %) & 65.87
Mt (11.50 %) respectively.
Similarly, All India coal off-take programme for the year 2010-11 has been pegged at 573.42
Mt out of which share of CIL, SCCL & Others are 460.50 Mt (80.45%), 47.05 Mt (8.10%)
and 65.87 Mt (11.50%) respectively.
The proposed Capital outlay of MoC for the year 2010-11 is Rs 7518.39 Crore. Additional Rs
6000 crore (Lumpsum) has been indicated for proposed acquisition of assets in abroad for
CIL. Out of Rs 7518.39 Crore, investment in PSUs & Central Sector Schemes would be Rs
7118.39 Crore & 400.00 Crore respectively. Out of Rs 7118.39 Crore investment in PSUs,
investments in CIL, SCCL & NLC are Rs 3800 Crore, Rs 1334.93 Cr & Rs 1983.46 Crore
respectively.
The plan outlay of MoC for 2009-10 (BE & RE) and 2010-11 (BE) comprising of the outlay
for the three public sector undertakings viz. CIL, SCCL and NLC and departmental schemes
is as under:
viii
Rs. Crore
Company / Scheme
2009-10
CIL
BE
2900.00
SCCL
580.57
633.94
2010-11
BE
3800.00 +
6000.00 ##
1334.93
NLC
-Mines
524.09
386.40
313.94
- Power
1369.75
844.94
1669.52
Total NLC
1893.84
1231.34
1983.46
5374.41
4965.28
7118.39 +
RE
3100.00
6000.00 ##
20.00
11.00
10.00
Regional exploration
30.39
30.39
68.00
60.00
60.00
110.00
15.00
10.53
30.00
(including RCFS/RFRP)
135.00
135.00
135.00
22.00
0.01
22.00
areas
Coal controller
0.31
0.33
0.25
Information technology
3.00
0.25
0.45
NE Component *
14.30
12.49
24.30
300.00
260.00
400.00
5674.41
5225.28
7518.39 +
6000.00 ##
## Additional Ad-hoc Provision Rs 6000 Crs (LS) for proposed acquisition of assets in abroad
ix
Raw Coal
Middling
2007-08
2008-09
2009-10
1
2010-11
2011-12
2011-12
Actual
Actual
Actual
BE
RE
PROV
BE
Original
MTA
Revised
17.30
16.99
16.58
20.29
17.26
17.23
17.92
23.78
26.02
17.88
35.17
22.03
39.02
21.08
37.66
20.29
27.26
44.52
23.47
40.69
32.59
50.51
44.72
68.50
42.48
68.50
307.92
(1.61)
28.13
(1.64)
19.67
17.47
55.51
332.40
(1.45)
29.31
(1.55)
21.27
20.92
61.37
362.93
(1.23)
32.74
(1.38)
18.85
19.78
77.07
397.54
(1.58)
57.66
(1.40)
25.59
44.33
58.93
401.00
(0.82)
40.00
(1.52)
25.59
28.80
58.07
371.66
(0.80)
39.08
(1.53)
18.98
23.09
88.82
442.00
(1.03)
44.00
(1.70)
30.00
28.80
61.00
483.00
473.00
57.06
47.00
31.90
28.96
61.58
33.35
28.96
62.43
428.70
(3.25)
465.27
(3.00)
511.37
(2.61)
584.05
(2.98)
553.46
(2.34)
541.63
(2.33)
605.80
(2.73)
662.50
644.74
463.87
(3.25)
504.29
(3.00)
549.02
(2.61)
604.34
(2.98)
597.98
(2.34)
582.32
(2.33)
656.31
(2.73)
731.00
713.24
Note: Figs from 2006 - 07 to 2008 - 09 have been taken from Coal Directory published by the Office of the Coal Controller (CCO)
1 582.32 fig. has arrived as CILs supply has been taken as 415.96 Mt as per CILs Quick Report.
I.
Coking Coal
Steel (
Indigenious)
Private Cokeries/
Coke Oven
Sub Total (R/C)
2008-09: Actuals
2009-10 : Target
19.39
8.26
16.68
8.38
16.69
8.69
0.40
0.58
0.58
0.54
0.54
0.51
19.78
8.84
17.26
8.92
17.23
9.20
CIL
CIL
8.30
8.03
16.33
10.81
8.58
0.25
0.40
16.58
11.20
0.25
8.55
0.00
II.
Power (Utilities)
(Middlings)
(1.23)
Power (Captive)
27.54
(Middlings)
(1.38)
10.44
1.32
Cement
6.83
6.05
Fertiliser
2.43
8.03
0.00
8.58
8.42
0.00
8.42
0.05
0.05
8.26
8.26
8.72
17.41
0.51
0.00
8.72
17.92
296.24 30.44 19.047 345.72 312.17 27.80 22.300 362.27 311.86 28.50 23.600 363.96 298.87 33.85 22.585 355.31 333.92 29.00 26.650 389.57
2.66
(1.23)
(1.58)
32.74
37.94
(1.38)
(1.40)
8.02
19.78
14.67
1.51
0.24
13.12
7.94
6.74
2.43
2.95
2.55
2.41
(1.58)
(0.82)
42.65
38.90
(1.40)
(1.52)
10.33
26.51
14.94
1.20
10.29 26.43
12.79
1.46
8.84
23.09
13.93
1.50
16.60
32.03
0.30
14.97
7.46
5.98
0.30
13.74
6.38
7.30
0.30
13.98
7.52
6.13
0.30
13.95
2.95
2.79
2.79
2.61
2.61
3.02
2.30
(0.82) (0.80)
2.10
2.20
43.20
33.90
(0.80) (1.03)
2.44
2.74
(1.52) (1.53)
0.02
0.02
3.95
6.16
58.79
49.40
5.93
10
Colliery
Consumption
Sub-total (R/C)
0.72
0.13
0.00
0.85
0.71
0.12
392.90 44.54
44.25
514.55 428.56 45.00 44.41 517.97 407.04 49.32 41.00 497.35 451.30 47.05
57.15 555.50
Raw Coal
401.44 44.54
52.83
534.33 437.40 45.00 52.83 535.23 415.96 49.37 49.25 514.58 460.50 47.05
65.87 573.42
(2.61)
0.00
(2.98)
0.00
(2.98)
0.69
0.12
(2.33)
0.02
0.02
51.79
4.17
0.81
0.67
0.10
3.02
0.02
8.02
67.03
46.19
(1.70)
48.68
(2.61)
0.83
(1.53) (1.70)
Export
0.00
7.10
2.60
(Middlings)
0.02
51.91
(1.03)
2.90
TOTAL
0.02
40.69
9.02
64.34
39.08
(2.33)
0.00
6.53
0.02
0.02
62.50
51.52
7.40
0.77
0.69
0.12
0.00
(2.73)
0.02
11.00
69.92
0.81
(2.73)
2006-07
2007-08
2008-09
TARGET
ANTIC'/R.E.
PROV'
PLAN/B.E.
PROJ'N
2009-10
2009-10
2009-10
2010-11
2011-12
MTA
CIL
SCCL
351.14
37.63
375.33
41.95
401.44
44.54
437.00
44.50
437.40
45.00
415.96
49.37
460.50
47.05
486.50
47.00
Other PSU
TISCO
Captive Mining
Meghalaya
1.78
7.04
17.41
5.79
2.10
7.22
21.35
6.54
1.77
7.28
29.49
5.49
1.92
7.30
37.11
6.50
1.92
7.30
37.11
6.50
2.38
7.22
33.89
5.77
2.30
7.30
49.77
6.50
2.52
6.50
80.89
6.50
420.79
454.49
490.02
534.33
535.23
514.58
573.42
629.91
474.18
492.50
550.00
604.34
597.98
597.98
656.31
713.24
53.39
38.01
59.98
70.01
62.75
83.40
82.89
83.33
43.08
49.79
59.00
62.75
67.74
82.89
83.33
17.88
22.03
21.08
27.26
23.47
32.59
42.48
25.20
27.77
37.92
35.49
44.28
50.30
40.85
463.87
504.29
549.02
597.98
582.32
656.31
713.24
10.31
-11.79
0.98
0.00
15.66
0.00
0.00
Sector
I. Coking Coal
1 Steel
2 Private Cokeries/ Coke
Oven/Others
Sub Total Coking
II. Non Coking Coal
3 Power (Utilities)
4 Power (Captive)
5 Sponge Iron
Mini Blast Furnace
Corex Process / CDI
6 BRK & Others /
LTC/SSF Plant/BRQ/
Pvt./NLW Cokeries
Soft Coke/Fuel Coke
Sub Total (4+5+6)
7
8
9
10
Cement
Fertiliser
Export
Colliery Consumption
Sub Total Non-Coking
Total
Supply
(Antc)
2009-10
R.E.
Supply
(Prov')
2009-10
Supply
(Plan)
2010-11
B.E.
8.90
0.97
8.83
1.24
8.30
0.25
10.81
0.40
8.26
0.58
8.38
0.54
8.69
0.51
9.87
10.07
8.55
11.20
8.84
8.92
9.20
Raw Coal
Middling
262.12
(1.61)
280.13
(1.45)
296.24
(1.23)
312.17
(1.58)
311.86
(0.82)
298.87
(0.80)
333.92
(1.03)
Raw Coal
Middling
}
}
}
Raw Coal
Middling
}
}
Raw Coal
Middling
25.00
(1.64)
9.47
27.48
(1.55)
12.06
27.54
(1.38)
10.44
37.94
(1.40)
14.67
38.90
(1.52)
14.94
33.90
(1.53)
12.79
40.69
(1.70)
13.93
31.99
(0.00)
34.94
48.68
49.40
51.91
51.79
51.52
66.45
(1.64)
9.41
2.45
0.00
0.84
341.27
351.14
(3.25)
74.48
(1.55)
7.41
2.47
0.01
0.76
365.26
375.33
(3.00)
86.66
(1.38)
6.83
2.43
0.02
0.72
392.90
401.44
(2.61)
102.01
(1.40)
7.94
2.95
0.02
0.71
425.80
437.00
(2.98)
105.75
(1.52)
7.46
2.79
0.02
0.69
428.56
437.40
(2.34)
98.49
(1.53)
6.38
2.61
0.02
0.67
407.04
415.96
(2.33)
106.14
(1.70)
7.52
3.02
0.02
0.69
451.30
460.50
(2.73)
Raw Coal
Raw Coal
Middling
ECL
BCCL
CCL
0.023
0.065
0.088
3.477
0.076
3.553
3.951
0.108
4.059
23.694
16.128
0.678
0.211
0.230
3.580
30.003
0.235
1.699
1.145
0.873
6.241
0.881
0.054
0.900
0.249
21.049
25.510
24.602
0.908
0.014
39.784
45.223
43.843
1.380
(MID)
POWER (CAPTIVE) (R/C)
0.951
(MID)
SPONGE IRON/COREX/CDI
SSF/BRQ/LTC/ BRK & OTHERS
0.614
2.330
NCL
WCL
SECL
0.698
0.148
0.000
0.698
0.148
0.000
0.000
58.476
73.241
59.813
0.236
3.239
34.644
0.320
1.213
9.574
10.653
0.020
2.496
0.231
6.921
4.436
10.197
4.267
16.365
1.642
4.758
0.640
0.175
0.011
0.050
0.016
44.667
45.685
45.365
0.320
0.024
102.870
103.018
103.018
0.000
0.005
91.289
91.289
91.289
0.000
0.002
0.837
0.837
0.837
0.000
0.549
(MID)
CEMENT
FERTILISER
0.152
(MID)
EXPORTS
0.020
COLLY.CONSUMPTION
0.410
TOTAL NON-COKING COAL
28.171
TOTAL (R/COAL+MIDDLINGS)
28.259
TOTAL RAW COAL OFFTAKE 28.259
MIDDLINGS 0.000
Note: Middlings include Washed Coal (Power) of CCL.
0.000
64.231
64.231
64.231
0.000
8.30
0.25
8.55
296.24
1.23
27.54
1.38
10.44
48.68
0.00
6.83
2.43
0.00
0.02
0.72
392.90
404.05
401.44
2.61
SECTORWISE RAW COAL OFFTAKE (TARGET / B.E.: 2009-10) - COAL INDIA LIMITED
SECTOR
COKING COAL
STEEL
COKERIES/C.OVENS/OTHERS
TOTAL COKING COAL
NON-COKING COAL
POWER (UTILITIES) (R/C)
ECL
BCCL
CCL
0.030
0.140
0.170
5.150
0.101
5.251
4.700
0.120
4.820
26.000
0.550
16.500
1.060
0.050
0.900
2.791
4.849
1.100
33.000
0.250
2.200
1.400
1.250
7.560
0.000
0.150
1.000
0.250
22.749
29.060
28.000
1.060
0.020
45.180
51.650
50.000
1.650
(MID)
POWER (CAPTIVE) (R/C)
(MID)
SPONGE IRON/COREX/CDI
SSF/BRQ/LTC/ BRK & OTHERS
(MID)
CEMENT
FERTILISER
0.170
(MID)
EXPORTS
0.020
COLLY.CONSUMPTION
0.399
TOTAL NON-COKING COAL
30.830
TOTAL (R/COAL+MIDDLINGS)
31.000
TOTAL RAW COAL OFFTAKE 31.000
MIDDLINGS 0.000
Note: Middlings include Washed Coal (Power) of CCL.
NCL
WCL
SECL
0.173
0.000
0.752
0.038
0.790
0.173
0.000
0.000
73.400
69.120
0.200
4.568
34.556
0.270
1.321
11.247
18.000
0.216
2.325
0.229
6.292
4.837
10.170
7.240
14.440
0.970
1.789
5.300
0.853
0.500
0.030
0.023
44.210
45.270
45.000
0.270
0.020
105.827
106.000
106.000
0.000
109.300
109.300
109.300
0.000
0.000
1.200
1.200
1.200
0.000
59.391
66.500
66.500
66.500
0.000
10.81
0.40
11.20
312.17
1.58
37.94
1.40
14.67
49.40
0.00
7.94
2.95
0.00
0.02
0.71
425.80
439.98
437.00
2.98
SECTORWISE RAW COAL OFFTAKE (ANTICIPATED / R.E.: 2009-10) - COAL INDIA LIMITED
SECTOR
COKING COAL
STEEL
COKERIES/C.OVENS/OTHERS
TOTAL COKING COAL
NON-COKING COAL
POWER (UTILITIES) (R/C)
ECL
BCCL
CCL
0.030
0.140
0.170
4.000
0.250
4.250
3.600
0.150
3.750
26.000
16.795
0.500
1.225
0.475
1.045
31.000
0.150
2.000
1.050
1.500
8.640
0.000
0.100
1.000
0.245
23.750
28.975
28.000
0.975
0.010
44.250
49.200
48.000
1.200
(MID)
POWER (CAPTIVE) (R/C)
0.940
(MID)
SPONGE IRON/COREX/CDI
SSF/BRQ/LTC/ BRK & OTHERS
0.900
2.401
4.440
(MID)
CEMENT
FERTILISER
0.170
(MID)
EXPORTS
0.020
COLLY.CONSUMPTION
0.399
TOTAL NON-COKING COAL
30.830
TOTAL (R/COAL+MIDDLINGS)
31.000
TOTAL RAW COAL OFFTAKE 31.000
MIDDLINGS 0.000
Note: Middlings include Washed Coal (Power) of CCL.
NCL
WCL
SECL
0.160
0.000
0.471
0.039
0.510
0.160
0.000
0.000
74.030
69.110
0.250
4.568
34.887
0.169
1.497
10.670
18.000
0.108
2.033
0.418
6.757
4.650
12.700
7.360
14.220
1.915
4.750
0.620
0.490
0.120
0.030
0.016
45.490
46.169
46.000
0.169
0.020
107.440
107.600
107.600
0.000
0.000
109.300
109.300
109.300
0.000
0.002
1.000
1.000
1.000
0.000
59.791
66.500
66.500
66.500
0.000
0.718
8.26
0.58
8.84
311.86
0.82
38.90
1.53
14.94
51.91
0.00
7.46
2.79
0.00
0.02
0.69
428.56
439.74
437.40
2.34
ECL
BCCL
CCL
0.008
0.098
0.106
4.053
0.250
4.303
3.668
0.150
3.818
25.213
16.541
0.517
0.816
0.365
0.000
2.088
0.000
1.137
29.176
0.006
2.826
1.170
1.193
6.229
0.000
0.123
0.831
0.221
20.803
25.988
25.106
0.882
0.013
40.391
45.385
44.209
1.176
(MID)
POWER (CAPTIVE) (R/C)
0.955
(MID)
SPONGE IRON/COREX/CDI
SSF/BRQ/LTC/ BRK & OTHERS
0.417
1.936
(MID)
CEMENT
FERTILISER
0.149
(MID)
EXPORTS
0.020
COLLY.CONSUMPTION
0.398
TOTAL NON-COKING COAL
29.088
TOTAL (R/COAL+MIDDLINGS)
29.194
TOTAL RAW COAL OFFTAKE 29.194
MIDDLINGS 0.000
Note: Middlings include Washed Coal (Power) of CCL.
NCL
WCL
SECL
0.150
0.000
0.502
0.039
0.541
0.150
0.000
0.000
74.204
57.967
0.096
3.176
34.203
0.273
2.009
11.177
12.868
0.077
0.103
1.906
0.290
7.284
4.289
10.961
6.497
20.569
0.819
1.172
0.000
4.622
0.644
0.240
0.000
0.078
0.000
0.011
44.969
45.783
45.510
0.273
0.023
105.920
106.070
106.070
0.000
0.005
98.146
98.146
98.146
0.000
0.000
1.070
1.070
1.070
0.000
61.467
66.652
66.652
66.652
0.000
8.38
0.54
8.92
298.87
0.80
33.90
1.54
12.79
51.79
0.00
6.38
2.61
0.00
0.02
0.67
407.04
418.29
415.96
2.33
SECTORWISE RAW COAL OFFTAKE (TARGET / B.E: 2010-11) - COAL INDIA LIMITED
SECTOR
COKING COAL
STEEL
COKERIES/C.OVENS/OTHERS
TOTAL COKING COAL
NON-COKING COAL
POWER (UTILITIES) (R/C)
ECL
BCCL
CCL
0.030
0.140
0.170
4.100
0.150
4.250
3.960
0.180
4.140
26.400
18.445
0.629
1.225
0.500
1.045
34.200
0.250
1.730
1.200
1.000
7.820
0.000
0.100
1.000
0.240
24.750
30.129
29.000
1.129
0.010
45.860
51.450
50.000
1.450
(MID)
POWER (CAPTIVE) (R/C)
0.940
(MID)
SPONGE IRON/COREX/CDI
SSF/BRQ/LTC/ BRK & OTHERS
0.900
4.001
3.795
(MID)
CEMENT
FERTILISER
0.170
(MID)
EXPORTS
0.020
COLLY.CONSUMPTION
0.399
TOTAL NON-COKING COAL
32.830
TOTAL (R/COAL+MIDDLINGS)
33.000
TOTAL RAW COAL OFFTAKE 33.000
MIDDLINGS 0.000
Note: Middlings include Washed Coal (Power) of CCL.
NCL
WCL
SECL
0.170
0.000
0.431
0.039
0.470
0.170
0.000
0.000
76.945
79.630
0.250
3.405
34.401
0.155
2.587
11.880
18.160
0.108
4.792
0.418
6.685
4.480
12.851
7.020
11.430
1.916
4.804
0.850
0.390
0.120
0.023
46.030
46.655
46.500
0.155
0.020
111.830
112.000
112.000
0.000
63.695
72.000
72.000
72.000
0.000
116.750
116.750
116.750
0.000
0.948
0.050
0.002
1.250
1.250
1.250
0.000
8.69
0.51
9.20
333.97
1.03
39.93
1.70
13.93
52.32
0.00
7.43
3.02
0.00
0.02
0.69
451.30
463.23
460.50
2.73
Coking Coal
Steel
Coke Ovens
Sub-Total Coking:
Non-Coking
Power Utilities
Cement
Steel DR
Railways
Fertilisers
LTC/Soft Coke
Cokeries / Coke oven (NLW)
Export
Captive Power
BRK & Others
E BOOKING
Sub-Total NonCoking:
Colly. Consump.
Grand Total
Million tonnes
2010-11
Target
7
2006-07
Actual
2
2007-08
Actual
3
2008-09
Actual
4
2009-10
Target
Ant. / RE
5
6
26.885
5.147
0.742
29.850
5.410
0.690
29.978
5.359
1.213
27.800
6.735
1.510
28.500
5.980
1.200
28.300
6.130
1.500
0.007
0.000
0.000
0.000
0.000
0.000
1.509
3.197
2.070
2.163
1.610
41.793
0.157
41.950
2.371
2.799
2.690
44.410
0.122
44.532
2.410
1.475
4.450
44.380
0.120
44.500
2.100
2.600
4.500
44.880
0.120
45.000
2.900
2.500
4.550
45.880
0.120
46.000
37.487
0.142
37.629
RAIL
COASTAL TOTAL
ROAD
MGR
SHPMT.
RAIL
(R/C)
(R/C)
(R/C)
(R/C)
(R/C)
ECL
13.712
1.822
15.534
2.226
10.089
BCCL
17.472
17.472
CCL
24.019
NCL
OTHERS TOTAL
COLLY.
TOTAL
TOTAL
(R/C)
WAGON
LOADING
(R/C)
(R/C+PDTS)
(R/C+PDTS)
27.849
0.410
28.259
15.534
695
6.881
24.353
0.249
24.602
20.845
935
24.019
19.810
43.829
0.014
43.843
33.880
1472
16.227
16.227
7.046
38.717
2.241
64.231
0.000
64.231
19.806
857
WCL
20.627
20.627
19.088
1.048
4.586
45.349
0.016
45.365
21.247
962
SECL
43.138
43.138
39.243
15.745
4.868
102.994
0.024
103.018
43.138
1878
MCL
42.476
54.179
18.664
17.082
1.359
91.284
0.005
91.289
54.179
2322
NEC
0.647
0.647
0.188
0.835
0.002
0.837
0.647
36
CIL
178.318
400.724
0.720
401.444
209.276
9158
11.703
13.525
191.843 113.146
82.681
13.054
10
RAIL
COASTAL
TOTAL
SHPMT.
RAIL
(R/C)
(R/C)
(R/C)
(R/C)
(R/C)
(R/C)
(R/C)
ECL
13.319
3.182
16.501
2.600
11.500
0.000
30.601
BCCL
21.500
21.500
6.250
CCL
28.640
28.640
21.340
NCL
17.644
17.644
6.523
39.633
2.700
66.500
WCL
20.902
20.902
19.280
1.000
3.795
44.977
SECL
42.210
42.210
35.430 23.700
4.640
105.980
MCL
54.940
65.940
23.310 18.910
1.140
109.300
NEC
1.000
1.000
0.200
CIL
200.155
11.000
14.182
ROAD
MGR
OTHERS
12.275
11
TOTAL
(IN BOX/DAY)
COLLY.
TOTAL
TOTAL
WAGON
CONSM.
OFFTAKE
RAIL QTY.
LOADING
(R/C)
(R/C+PDTS)
(R/C+PDTS)
0.399
31.000
16.501
696
27.750
0.250
28.000
25.680
1082
49.980
0.020
50.000
39.190
1652
66.500
21.000
885
0.023
45.000
21.540
908
0.020
106.000
42.210
1779
109.300
65.940
2779
1.200
0.000
1.200
1.000
42
436.288
0.712
437.000
233.061
9823
ECL
RAIL
COASTAL
TOTAL
SHPMT.
RAIL
(R/C)
(R/C)
(R/C)
(R/C)
(R/C)
(R/C)
(R/C)
14.722
1.800
16.522
2.479
11.600
0.000
30.601
20.180
7.570
0.000
0.000
BCCL 20.180
ROAD
MGR
OTHERS
TOTAL
(IN BOX/DAY)
COLLY.
TOTAL
TOTAL
WAGON
CONSM.
OFFTAKE
RAIL QTY.
LOADING
(R/C)
(R/C+PDTS)
(R/C+PDTS)
0.399
31.000
16.522
696
27.750
0.250
28.000
23.680
998
0.010
48.000
37.240
1570
66.500
21.000
885
CCL
27.230
27.230
20.760
0.000
0.000
47.990
NCL
17.644
17.644
6.523
39.633
2.700
66.500
WCL
20.978
20.978
20.116
1.100
3.790
45.984
0.016
46.000
21.378
901
SECL
43.000
43.000
40.200 19.740
4.640
107.580
0.020
107.600
43.000
1812
MCL
54.940
65.940
23.310 18.910
1.140
109.300
109.300
65.940
2779
NEC
0.800
0.800
0.198
CIL
199.494
11.000
12.800
12.270
12
0.998
0.002
1.000
0.800
34
436.703
0.697
437.400
229.560
9676
RAIL
COASTAL TOTAL
ROAD
MGR
OTHERS
TOTAL
COLLY.
TOTAL
TOTAL
WAGON
RAIL QTY.
LOADING
(R/C)
(R/C+PDTS)
(R/C+PDTS)
SHPMT.
RAIL
(R/C)
(R/C)
(R/C)
(R/C)
(R/C)
(R/C)
(R/C)
ECL
14.968
1.800
16.768
2.008
10.020
0.000
28.796
0.398
29.194
16.768
755
BCCL
17.927
17.927
6.958
0.000
0.000
24.885
0.221
25.106
21.077
931
CCL
21.854
21.854
22.342
0.000
0.000
44.196
0.013
44.209
32.359
1373
NCL
19.473
19.473
7.112
38.535
1.532
66.652
66.652
22.995
981
WCL
20.679
20.679
19.577
1.171
4.072
45.499
0.011
45.510
21.185
966
SECL
40.680
40.680
40.517
19.483
5.367
106.047
0.023
106.070
40.680
1787
MCL
44.833
55.833
23.351
17.371
1.586
98.141
0.005
98.146
55.833
2403
NEC
0.802
0.802
0.268
1.070
0.000
1.070
0.802
47
CIL
181.216
194.016
122.133
415.286
0.671
415.957
211.699
9243
11.000
12.800
CONSM. OFFTAKE
86.580
12.557
12
RAIL
COASTAL
TOTAL
SHPMT.
RAIL
(R/C)
(R/C)
(R/C)
(R/C)
(R/C)
(R/C)
(R/C)
ECL
15.809
1.800
17.609
2.692
12.300
0.000
32.601
BCCL
21.970
21.970
6.790
CCL
31.249
31.249
18.741
NCL
20.843
20.843
10.407
40.250
0.500
72.000
WCL
21.173
21.173
20.404
1.100
3.800
46.477
SECL
47.477
47.477
37.823
21.980
4.700
111.980
MCL
63.220
77.220
16.920
20.910
1.700
116.750
NEC
0.877
0.877
0.373
CIL
222.618
238.418
114.150
14.000
15.800
ROAD
MGR
96.540
OTHERS
10.700
13
TOTAL
(IN BOX/DAY)
COLLY.
TOTAL
TOTAL
WAGON
CONSM.
OFFTAKE
RAIL QTY.
LOADING
(R/C)
(R/C+PDTS)
(R/C+PDTS)
0.399
33.000
17.609
749
28.760
0.240
29.000
25.890
1101
49.990
0.010
50.000
41.902
1782
72.000
24.199
1029
0.023
46.500
21.539
916
0.020
112.000
47.477
2019
116.750
77.220
3284
1.250
0.000
1.250
0.877
37
459.808
0.692
460.500
256.713
10917
(Million Tonnes)
Company
Rail
Coastal
TOTAL
ROAD
Year
(R/C)
Shipment (R/C)
Rail (R/C)
(R/C)
21.596*
0.000
21.674
6.284
9.107
0.500
37.565
0.142
37.707
21.596
25.629*
0.000
25.629
7.043
8.635
0.486
41.793
0.157
41.950
25.379*
0.000
25.379
8.382
10.109
0.540
44.410
0.122
26.600*
0.000
26.600
7.780
9.500
0.500
44.380
26.940*
0.000
26.940
7.790
9.650
0.500
0.000
27.930
7.950
9.500
0.500
MGR
OTHERS
TOTAL
COLLY
TOTAL
PDTS
TOTAL
21.596 2355
2355
25.629
25.629 2720
2720
44.532
25.379
25.379 2679
2679
0.120
44.500
26.600
26.600 2803
2803
44.880
0.120
45.000
26.940
26.940 2839
2839
45.880
0.120
46.000
27.930
27.930 2943
2943
2006-07 ACTUAL
CIL
SCCL
2007-08 ACTUAL
CIL
SCCL
2008-09 ACTUAL
CIL
SCCL
2009-10 BE
CIL
SCCL
2009-10 RE
CIL
SCCL
2010-11 PROPOSED
CIL
SCCL
27.930*
14
FIELD
STOCK
ON
1/4/10
PRODN.
ROAD
(1)
(2)
(3)
(3)
(4)
ECL
NEC
RNG
MUG/SLN/SPM
RAJMAHAL
TOTAL
TOTAL
S.KPA
N.KPA
E.BKRO
W.BKRO
GIRIDIH
RAMGARH
TOTAL
TOTAL
WARDHA
UMRER
PAT'KRA
PEN/KAN
KMT/SYL
TOTAL
K-REWA
KORBA
RAIGARH
TOTAL
IB
TAL
TOTAL
TOTAL
23.334
0.291
17.080
3.620
12.300
33.000
29.000
5.230
25.300
11.750
5.990
0.630
1.100
50.000
72.000
29.570
4.100
3.120
4.600
5.110
46.500
25.150
80.850
6.000
112.000
41.550
75.200
116.750
1.250
1.076
1.500
0.120
2.696
6.790
1.700
6.001
5.640
4.250
0.050
1.100
18.741
10.407
15.355
0.734
2.018
1.170
1.127
20.404
2.010
31.880
3.930
37.820
8.540
8.380
16.920
0.373
CIL
TOTAL
63.036
BCCL
CCL
NCL
WCL
SECL
MCL
3.342
8.331
16.102
2.028
2.855
6.753
15.800
10.700
(9)
13.024
2.106
0.675
15.805
21.970
3.750
19.369
5.900
1.600
0.630
0.000
31.249
20.843
10.697
3.465
0.000
3.483
3.528
21.173
22.040
23.370
2.070
47.480
30.100
33.120
63.220
0.877
(10)
0.000
3.920
0.510
5.950
2.155
0.910
0.000
1.125
10.650
3.356
0.366
0.366
0.000
0.000
(11)
(6+9+10)
14.824
2.106
0.675
17.605
25.890
4.260
25.319
8.055
2.510
0.630
1.125
41.899
24.199
10.697
3.465
0.000
3.849
3.528
21.539
22.040
23.370
2.070
47.480
30.100
47.120
77.220
0.877
WAGON GRAND
LOADING TOTAL
(Box/day)
631
90
29
749
1101
181
1077
343
107
27
48
1782
1029
455
147
0
164
150
916
938
994
87
2019
1280
2004
3284
37
(13)
(8+11)
15.900
3.606
13.095
32.601
32.680
5.960
31.320
13.695
6.760
0.680
2.225
60.640
75.356
29.352
4.199
3.118
5.019
5.155
46.843
25.130
80.850
6.000
111.980
41.550
75.200
116.750
1.250
0.380
0.014
0.005
0.399
0.240
0.002
0.000
0.008
0.000
0.000
0.000
0.010
0.000
0.005
0.001
0.002
0.010
0.005
0.023
0.020
0.000
0.000
0.020
0.000
0.000
0.000
0.000
TOTAL
OFFTAKE
(RAW
COAL)
(15)
(6+8+9+14)
16.280
3.620
13.100
33.000
29.000
5.452
25.370
11.548
5.850
0.680
1.100
50.000
72.000
29.357
4.200
3.120
4.663
5.160
46.500
25.150
80.850
6.000
112.000
41.550
75.200
116.750
1.250
10917
478.100
0.692
460.500
(12)
Quantity for 1 Box has been considered on the basis of 3800 Tonnes per rake of 59 Boxes i.e., 1 Box = 3800/59 = 64.41 Tonnes
15
COLLY.
CONS.
(14)
COMPANY
ECL
BCCL
CCL
NCL
WCL
SECL
MCL
NEC
CIL-TOTAL
SCCL
2002-03
Actual
27.29
22.22
36.75
44.43
38.16
68.37
51.37
0.64
289.23
33.48
2002-03
Actual
820
862
1357
290
1129
1629
1602
23
7713
854
2003-04
Actual
27.43
23.79
36.37
46.48
39.20
70.93
59.36
0.87
304.44
33.94
2003-04
Actual
756
930
1329
435
1053
1671
1693
34
7901
827
2009-10
Ant (R.E.)
696
998
1570
885
901
1812
2779
34
9676
1136
16
2009-10
Act. Prov'
755
931
1373
981
966
1787
2403
47
9243
1286
2010-11
Plan/B.E.
749
1101
1782
1029
916
2019
3284
37
10917
1193
07 08
Actual
08 09
09 10
09 10
10 11
Act.
BE
RE
Act.
(Prov.)
BE
11 12
(MTA)
ECL
24.06
28.13
31.00
31.00
30.07
33.00
36.00
BCCL
25.22
25.51
28.00
27.50
27.51
29.00
30.00
CCL
44.15
43.24
48.00
46.10
47.08
50.00
54.00
NCL
59.62
63.65
66.50
66.50
67.67
72.00
76.00
WCL
43.51
44.70
45.00
46.00
45.74
46.50
47.00
SECL
93.79
101.15
106.00
107.60
108.01
112.00
117.00
MCL
88.01
96.34
109.30
109.30
104.08
116.75
125.10
NEC
1.10
1.01
1.20
1.00
1.11
1.25
1.40
379.46
403.73
435.00
435.00
431.27
460.50
486.50
SCCL
40.60
44.55
44.50
45.00
50.43
46.00
47.00
2.02
1.84
1.92
1.92
2.60
2.30
2.52
Private - TISCO
7.21
7.28
7.30
7.30
7.21
7.30
6.50
Captive Mining
21.17
29.87
37.11
37.11
34.79
49.77
80.89
Meghalaya
6.54
5.49
6.50
6.50
5.77
6.50
6.50
457.00
492.76
532.33
532.83
532.06
572.37
629.91
CIL-TOTAL
All India
17
BCCL
CCL
NCL
WCL
SECL
MCL
NEC
CIL
SCCL
OC
UG
TOTAL
OC
UG
TOTAL
OC
UG
TOTAL
OC
UG
TOTAL
OC
UG
TOTAL
OC
UG
TOTAL
OC
UG
TOTAL
OC
UG
TOTAL
OC
UG
TOTAL
15.74
8.32
24.06
20.75
4.47
25.22
42.32
1.83
44.15
59.62
0.00
59.62
33.53
9.98
43.51
77.05
16.74
93.79
85.89
2.12
88.01
1.01
0.09
1.10
335.92
43.54
379.46
08 - 09 (Act)
Prod
%
19.74
70.17
8.39
29.83
28.13
21.38
83.80
4.13
16.20
25.51
41.68
96.40
1.56
3.60
43.24
63.65
100.00
0.00
0.00
63.65
34.59
77.37
10.12
22.63
44.70
83.58
82.63
17.57
17.37
101.15
94.19
97.77
2.15
2.23
96.34
0.97
95.54
0.05
4.46
1.01
89.11
359.77
10.89
43.96
403.73
OC
UG
TOTAL
27.96
12.65
40.60
32.46
12.09
44.54
OC / UG
07 - 08
Act.
72.86
27.14
09 - 10
BE
21.75
9.25
31.00
23.45
4.55
28.00
46.05
1.95
48.00
66.50
0.00
66.50
34.85
10.15
45.00
88.50
17.50
106.00
107.20
2.10
109.30
1.20
0.00
1.20
389.50
45.50
435.00
31.70
12.80
44.50
%
70.16
29.84
83.75
16.25
95.94
4.06
100.00
0.00
77.44
22.56
83.49
16.51
98.08
1.92
100.00
89.54
10.46
71.24
28.76
RE
22.50
8.50
31.00
23.45
4.05
27.50
44.53
1.57
46.10
66.50
0.00
66.50
35.85
10.15
46.00
89.60
18.00
107.60
107.20
2.10
109.30
1.00
0.00
1.00
390.63
44.37
435.00
33.57
11.43
45.00
18
%
72.58
27.42
85.27
14.73
96.59
3.41
100.00
0.00
77.93
22.07
83.27
16.73
98.08
1.92
100.00
89.80
10.20
74.61
25.39
09 - 10
Act. (Prov.)
%
21.83
72.62
8.23
27.38
30.07
23.61
85.82
3.90
14.18
27.51
45.61
96.87
1.47
3.13
47.08
67.67
100.00
0.00
67.67
36.12
78.97
9.62
21.03
45.74
90.18
83.49
17.83
16.51
108.01
101.88
97.88
2.20
2.12
104.08
1.11
100.00
1.11
388.01
43.26
431.27
38.46
11.97
50.43
89.97
10.03
76.26
23.74
10 - 11
BE
23.50
9.50
33.00
24.75
4.25
29.00
48.34
1.66
50.00
72.00
0.00
72.00
36.35
10.15
46.50
93.50
18.50
112.00
114.46
2.29
116.75
1.25
0.00
1.25
414.15
46.35
460.50
33.75
12.25
46.00
%
71.21
28.79
85.34
14.66
96.68
3.32
100.00
0.00
78.17
21.83
83.48
16.52
98.04
1.96
100.00
0.00
89.93
10.07
73.37
26.63
(Miilion Tonnes)
11 - 12
Proj.
%
26.00
72.63
10.00
27.38
36.00
25.50
85.00
4.50
15.00
30.00
52.30
96.85
1.70
3.15
54.00
76.00
100.00
0.00
0.00
76.00
36.60
77.87
10.40
22.13
47.00
97.20
83.08
19.80
16.92
117.00
122.34
97.79
2.76
2.21
125.10
1.40
100.00
0.00
0.00
1.40
89.90
437.34
10.10
49.16
486.50
34.75
12.25
47.00
73.94
26.06
Coalfields
07 - 08
Actual
09 - 10
08 - 09
Actual
BE
ECL Ranigunj
Rajmahal / Deogarh / MugmaSalanpur
SUB - TOTAL
BCCLRaniganj
Jharia
SUB - TOTAL
CCL Giridih
West Bokaro
East Bokaro
Ramgarh
South Karanpura
North Karanpura
SUB - TOTAL
NCL Singrauli
SUB - TOTAL
WCL Wardha - Valley
Kamptee
Umrer
Pench - Kanhan
Pathakhera
SUB - TOTAL
SECL CIC*
KORBA
MAND RAIGARH
SUB - TOTAL
MCL IB VALLEY
TALCHER
SUB - TOTAL
NEC Assam / Makum
SUB - TOTAL
13.98
10.08
14.53
13.61
17.08
15.92
17.80
18.20
24.06
1.60
23.62
25.22
0.61
5.60
9.98
0.85
4.94
22.17
44.15
59.62
59.62
27.79
4.36
4.26
3.88
3.23
43.51
23.40
67.43
2.97
93.79
34.35
53.66
88.01
1.10
1.10
36.00
1.43
28.57
30.00
0.63
6.73
12.66
1.30
5.32
27.36
54.00
76.00
76.00
29.99
4.10
5.09
5.35
2.47
47.00
27.93
83.07
6.00
117.00
44.89
80.21
125.10
1.40
1.40
CIL
379.46
486.50
TOTAL
15.81
15.19
RE
(Million Tonnes)
10 - 11 11 - 12
Proj.
Proj.
Prov.
BE
15.94 15.23
15.06 14.83
19
Company
BE
RE
Prov.
(Million Tonnes)
10 - 11 11 - 12
Proj.
BE
07 - 08 08 - 09
Actual Actual
09 - 10
ECL
15.10
15.38
16.76
16.52
16.07
18.33
19.21
BCCL
0.13
0.10
0.10
0.10
0.03
0.00
0.00
15.48
16.86
16.62
16.11
18.33
19.21
ECL
8.96
12.75
14.24
14.48
13.99
14.67
16.79
BCCL
25.09
25.42
27.90
27.40
27.48
29.00
30.00
CCL
44.15
43.24
48.00
46.10
47.08
50.00
54.00
81.41
90.14
87.98
88.55
93.67
100.79
MCL
88.01
96.34
109.30 109.30
104.08
116.75
125.10
BCCL
0.00
0.00
0.00
0.00
0.00
96.34
109.30 109.30
104.08
116.75
125.10
UP
NCL
11.43
12.03
14.20
14.00
13.97
15.50
15.50
MP
NCL
48.20
51.62
52.30
52.50
53.70
56.50
60.50
WCL
7.11
7.04
7.32
7.54
7.12
7.72
7.82
SECL
12.21
12.43
12.27
12.65
13.03
12.04
13.44
71.09
71.89
72.69
73.86
76.26
81.76
WB
JHARKHAND
ORISSA
0.00
0.00
CHATTISGARH SECL
81.59
88.72
93.73
94.95
94.97
99.96
103.56
MAHARASTRA WCL
36.40
37.66
37.68
38.47
38.61
38.78
39.18
NEC
1.10
1.01
1.20
1.00
1.11
1.25
1.40
431.27
460.50
486.50
SCCL
50.43
46.00
47.00
ASSAM
AP
40.60
44.54
20
44.50
45.00
Group
Existing
Completed
Ongoing Projects
Future Projects
Total
Existing
BCCL
Completed
Ongoing Projects
Future Projects
Total
Existing
CCL
Completed
Ongoing Projects
Future Projects
Total
Existing
NCL
Completed
Ongoing Projects
Future Projects
Total
Existing
WCL
Completed
Ongoing Projects
Future Projects
Total
Existing
SECL
Completed
Ongoing Projects
Future Projects
Total
Existing
MCL
Completed
Ongoing Projects
Future Projects
Total
Existing
NEC
Completed
Ongoing Projects
Future Projects
Total
TOTAL CIL Existing
Completed
Ongoing Projects
Future Projects
TOTAL
Existing
SCCL
Completed
Ongoing Projects
Future Projects
TOTAL
ECL
07 - 08
Actual
8.14
15.12
0.80
0.00
24.06
10.95
12.67
1.60
08 - 09
Actual
8.01
18.83
1.29
0.00
28.13
11.12
12.82
1.58
25.22
2.93
22.20
19.02
25.51
2.27
15.81
25.15
44.15
4.52
19.21
35.89
43.24
3.86
19.62
40.16
59.62
0.96
41.74
0.82
43.51
2.98
26.85
54.20
9.76
93.79
1.33
69.48
17.20
63.65
0.93
35.59
8.19
0.00
44.70
3.00
23.71
74.44
0.00
101.15
1.32
65.13
29.88
88.01
1.10
96.34
1.01
BE
6.84
19.63
1.43
3.10
31.00
11.48
14.84
1.69
RE
9.12
20.43
1.45
0.00
31.00
11.78
13.49
2.24
(Million Tonnes)
10-11
11 - 12
Proj.
BE
9.86
11.12
20.79
21.18
2.35
3.00
0.00
0.70
33.00
36.00
12.54
12.95
14.12
14.19
2.34
2.86
28.00
2.83
21.67
23.20
0.30
48.00
4.00
19.75
42.75
27.50
2.43
16.17
26.60
0.90
46.10
4.00
19.75
42.75
29.00
2.45
16.91
29.74
0.90
50.00
3.00
21.00
48.00
66.50
0.93
34.47
9.25
0.35
45.00
2.46
20.78
70.26
12.50
106.00
1.31
65.70
32.00
10.30
109.30
1.05
66.50
0.95
33.03
12.02
0.00
46.00
2.95
23.78
80.87
0.00
107.60
1.31
76.70
31.30
109.30
1.00
72.00
0.87
30.05
15.43
0.15
46.50
2.60
22.34
87.06
0.00
112.00
1.46
72.73
42.56
0.00
116.75
1.10
30.00
2.46
16.83
32.96
1.75
54.00
4.00
17.00
51.00
4.00
76.00
0.94
27.61
16.20
2.25
47.00
2.69
21.29
93.02
0.00
117.00
1.65
70.83
52.62
0.00
125.10
1.10
1.00
31.26
202.54
197.21
4.00
435.00
1.90
32.43
10.67
0.00
45.00
0.15
1.25
33.88
197.94
227.48
1.20
460.50
1.61
31.94
12.45
0.00
46.00
0.30
1.40
36.91
188.93
251.66
9.00
486.50
1.41
30.83
14.77
0.00
47.00
09-10
0.00
1.10
32.90
207.27
129.52
9.76
379.46
1.86
37.14
1.60
0.00
40.60
1.01
31.52
191.51
180.69
403.73
2.17
35.38
6.99
0.00
44.54
21
0.15
1.20
30.90
196.84
180.58
26.70
435.00
1.79
25.00
17.68
0.03
44.50
09 -10
(Million Tonnes)
11 - 12
10 - 11
Proj.
BE
07 - 08
Actual
08 - 09
Actual
BE
RE
15.74
15.74
4.39
0.02
3.48
0.16
19.74
19.74
3.93
0.02
3.75
0.12
21.75
21.75
3.57
0.03
4.95
0.16
22.5
22.50
3.50
0.03
4.35
0.16
23.5
23.50
3.29
0.03
5.20
0.16
26
26.00
3.04
0.03
5.77
0.16
0.27
8.32
24.06
0.57
8.39
28.13
0.54
9.25
31.00
0.45
8.50
31.00
0.82
9.50
33.00
1.00
10.00
36.00
20.75
20.75
2.32
0.05
1.96
0.10
0.03
4.47
25.22
21.38
21.38
2.03
0.03
1.89
0.10
0.07
4.13
25.51
23.45
23.45
1.90
0.05
2.39
0.12
0.09
4.55
28.00
23.45
23.45
1.32
0.04
2.50
0.12
0.08
4.05
27.50
24.75
24.75
0.73
0.05
3.00
0.40
0.08
4.25
29.00
25.50
25.50
0.28
0.05
3.40
0.70
0.08
4.50
30.00
0.32
42.00
42.32
1.39
0.44
0.35
41.33
41.68
1.17
0.39
0.15
45.90
46.05
1.40
0.55
0.35
44.18
44.53
1.20
0.37
0.30
48.04
48.34
1.26
0.40
0.30
52.00
52.30
1.23
0.48
1.83
44.15
1.56
43.24
1.95
48.00
1.57
46.10
1.66
50.00
1.70
54.00
59.62
59.62
59.62
63.65
63.65
63.65
66.50
66.50
66.50
66.50
66.50
66.50
72.00
72.00
72.00
76.00
76.00
76.00
33.53
33.53
1.03
8.69
34.59
34.59
0.82
8.95
34.85
34.85
0.63
8.78
35.85
35.85
0.82
9.09
36.35
36.35
0.71
8.90
36.60
36.60
0.66
8.65
0.26
9.98
43.51
0.34
10.12
44.70
0.74
10.15
45.00
0.24
10.15
46.00
0.54
10.15
46.50
1.09
10.40
47.00
77.05
77.05
83.58
83.58
88.50
88.50
89.60
89.60
93.50
93.50
97.20
97.20
22
07 - 08
Actual
08 - 09
Actual
1.04
15.30
0.18
0.12
0.09
16.74
93.79
0.78
15.84
0.36
0.20
0.38
17.57
101.15
BE
0.60
15.66
0.24
0.30
0.70
17.50
106.00
RE
0.70
16.10
0.26
0.21
0.73
18.00
107.60
(Million Tonnes)
11 - 12
10 - 11
Proj.
BE
0.36
0.43
17.50
16.70
0.24
0.24
0.60
0.30
1.10
0.83
18.50
19.80
112.00
117.00
85.89
85.89
0.06
2.06
94.19
94.19
0.06
2.09
107.20
107.20
0.03
2.07
107.20
107.20
0.03
2.07
114.46
114.46
0.00
2.29
122.34
122.34
0.00
2.58
2.12
88.01
2.15
96.34
2.10
109.30
2.10
109.30
2.29
116.75
0.18
2.76
125.10
1.01
1.01
0.09
0.09
1.10
0.96
0.96
0.05
0.05
1.01
1.20
1.20
0.00
0.00
1.20
1.00
1.00
0.00
0.00
1.00
1.25
1.25
0.00
0.00
1.25
1.40
1.40
0.00
0.00
1.40
0.32
335.60
335.91
10.24
0.07
31.94
0.44
0.64
0.21
43.54
379.46
0.35
359.42
359.76
8.79
0.05
32.92
0.58
1.12
0.50
43.96
403.73
0.15
389.35
389.50
8.13
0.08
34.40
0.52
1.58
0.79
45.50
435.00
0.35
390.28
390.63
7.56
0.07
34.48
0.54
0.90
0.81
44.36
435.00
0.30
413.85
414.15
6.41
0.08
36.49
0.80
1.66
0.91
46.35
460.50
0.30
437.04
437.34
5.56
0.08
38.38
1.10
2.87
1.18
49.16
486.50
27.96
27.96
4.83
5.23
1.13
32.46
32.46
4.13
5.95
0.89
0.03
0.00
1.09
12.09
44.54
31.70
31.70
3.17
6.44
1.19
0.80
0.00
1.20
12.80
44.50
33.57
33.57
3.05
6.06
0.89
0.32
0.10
1.02
11.43
45.00
33.75
33.25
1.62
7.62
0.99
0.60
0.07
1.35
12.25
46.00
34.75
34.75
1.23
6.15
2.88
0.80
0.00
1.20
12.25
47.00
0.00
1.46
12.65
40.60
23
09 -10
07 - 08
Actual
08 - 09
Actual
0.02
0.03
0.02
0.04
0.02
0.05
1.00
9.65
2.86
1.69
(Million Tonnes)
11 - 12
BE
RE
10 - 11
BE
0.05
0.05
0.05
0.03
0.03
0.03
0.08
0.03
0.08
0.03
0.08
0.93
10.61
3.13
1.10
0.91
10.44
3.97
1.90
0.65
9.99
3.65
2.95
1.00
10.78
3.63
3.04
1.05
11.31
3.73
3.18
0.06
0.46
0.75
0.51
7.06
0.01
0.58
0.56
0.51
10.66
0.45
0.93
0.77
11.60
0.48
0.71
0.69
11.80
24.02
24.06
28.08
28.13
30.97
31.00
30.92
31.00
0.55
1.15
0.67
11.90
0.20
32.92
33.00
0.67
0.82
0.81
13.50
0.85
35.92
36.00
0.08
0.28
0.38
1.08
0.51
1.20
3.54
0.08
0.96
0.23
0.81
0.30
1.11
3.48
0.10
0.40
0.50
1.20
0.75
1.30
4.25
0.08
0.90
0.25
0.80
0.37
1.70
4.10
0.16
0.60
0.60
1.40
0.80
0.70
4.25
0.16
0.60
0.70
1.50
0.85
0.79
4.60
0.15
0.41
0.03
0.59
0.07
0.50
0.01
0.58
0.16
0.48
0.03
0.66
0.50
0.06
0.55
0.17
0.56
0.02
0.75
0.18
0.61
0.02
0.81
0.16
2.88
4.85
7.88
12.01
0.13
3.52
5.36
9.02
13.08
0.30
3.10
5.20
8.60
13.51
0.14
3.20
5.76
9.10
13.75
0.50
4.50
6.20
11.20
16.20
0.60
5.90
5.00
11.50
16.91
0.07
5.19
6.64
1.32
0.08
4.39
5.92
2.04
0.08
5.74
6.97
1.70
0.09
5.05
7.31
1.30
0.03
7.07
5.20
0.50
0.03
6.76
5.80
0.50
13.21
25.22
12.43
25.51
14.49
28.00
13.75
27.50
12.80
29.00
13.09
30.00
24
09 - 10
BE
07 - 08
Actual
08 - 09
Actual
09 - 10
BE
RE
CCL
Coking (Met./LW)
W-I
0.01
W-II
0.13
0.12
0.12
0.12
W-III
2.23
1.81
2.29
1.68
W-IV
2.15
1.62
2.29
1.80
Sub Total
4.50
3.55
4.70
3.60
Coking (NLW)
W-II
W-III
0.45
0.90
0.65
1.08
W-IV**
8.33
8.09
8.11
8.87
Sub Total
8.78
8.99
8.75
9.95
Total Coking
13.29
12.54
13.45
13.55
Non - Coking (Others)
Gr -A
Gr- B (Long Flame)
0.61
0.47
0.66
0.47
Gr- C (Long Flame)
2.39
2.19
2.25
2.17
Gr- D (Long Flame)
0.17
0.19
0.45
0.18
Gr- E
22.55
22.48
24.08
23.78
Gr- F
5.14
5.37
7.12
5.95
Gr- G
Sub Total
30.86
30.70
34.55
32.55
TOTAL - CCL
44.15
43.24
48.00
46.10
** - Not suitable for feeding to washery due to poor washing characteristics.
NCL
NON COKING
Gr -B (LF)
0.40
0.85
Gr -C (LF)
18.55
16.86
21.25
18.00
Gr -D (LF)
3.20
4.68
7.00
7.00
Gr- E
37.48
41.26
38.25
41.50
Gr- F
TOTAL - NCL
59.62
63.65
66.50
66.50
WCL
COKING (Met./LW)
W-III
W - III (NLW)
Sub Total
NON COKING
Gr -A (LF)
Gr -B (LF)
Gr -C (LF)
Gr -D (LF)
Gr- E
Gr- F
Gr- G
Sub Total
TOTAL - WCL
10 - 11
BE
(Million Tonnes)
11 - 12
BE
0.12
1.77
2.06
3.96
0.13
1.98
2.24
4.35
1.34
9.65
10.99
14.95
1.75
9.68
11.43
15.78
0.48
2.55
0.19
25.26
6.57
35.05
50.00
0.51
2.92
0.19
27.13
7.37
0.10
38.22
54.00
21.00
7.50
43.50
21.50
7.50
47.00
72.00
76.00
0.64
0.03
0.68
0.69
0.04
0.73
0.75
0.04
0.79
0.47
0.04
0.51
0.43
0.04
0.47
0.56
0.04
0.60
0.56
1.25
19.24
21.79
0.60
2.29
16.12
24.97
0.51
1.32
18.97
23.27
0.14
0.44
1.41
19.46
24.19
0.50
1.52
19.45
24.41
0.15
0.50
1.66
18.80
25.14
0.30
42.84
43.51
43.97
44.70
44.21
45.00
45.49
46.00
46.03
46.50
46.40
47.00
25
(Million Tonnes)
11 - 12
BE
07 - 08
Actual
08 - 09
Actual
BE
RE
10 - 11
BE
0.16
0.16
0.15
0.15
0.17
0.17
0.16
0.16
0.17
0.17
0.17
0.17
0.00
0.00
0.30
0.37
0.30
0.30
2.81
9.74
10.02
3.73
0.00
67.34
2.61
9.86
9.58
4.44
0.00
74.52
1.74
9.92
9.14
5.58
0.20
78.95
2.58
9.61
9.54
4.73
0.00
80.61
2.56
9.81
9.59
5.42
0.00
84.15
1.89
9.92
10.99
7.85
85.88
93.63
93.79
101.00
101.15
105.83
106.00
107.44
107.60
111.83
112.00
116.83
117.00
0.22
0.22
1.68
4.34
81.56
0.23
0.23
1.69
5.58
88.60
0.21
0.22
1.68
5.30
101.90
0.21
0.22
1.68
5.30
101.90
0.24
0.25
1.80
7.55
106.91
0.42
0.33
2.01
8.00
114.34
88.01
88.01
96.34
96.34
109.30
109.30
109.30
109.30
116.75
116.75
125.10
125.10
09 - 10
NEC
NON COKING
Gr -A (LF)
Gr -B (LF)
Non Graded
TOTAL - NEC
1.10
1.01
1.20
1.00
1.25
1.40
1.10
1.01
1.20
1.00
1.25
1.40
0.08
0.28
0.38
1.21
3.38
3.35
8.68
0.08
0.96
0.24
0.93
2.80
2.73
7.73
0.10
0.40
0.50
1.32
3.79
3.59
9.70
0.08
0.90
0.25
0.92
2.52
3.50
8.17
0.16
0.60
0.60
1.52
3.01
2.76
8.64
0.16
0.60
0.70
1.63
3.39
3.03
9.51
26
07 - 08
Actual
08 - 09
Actual
BE
RE
10 - 11
BE
09 - 10
(Million Tonnes)
11 - 12
BE
0.00
0.62
8.75
0.18
0.16
2.91
4.85
0.03
17.49
26.17
0.00
1.00
8.59
0.17
0.13
3.56
5.36
0.01
18.82
26.56
0.00
0.81
8.58
0.20
0.30
3.14
5.20
0.03
18.25
27.95
0.00
1.13
9.37
0.19
0.14
3.24
5.76
0.06
19.88
28.05
0.00
1.56
10.21
0.20
0.50
4.54
6.20
0.02
23.23
31.87
0.00
1.98
10.29
0.20
0.60
5.94
5.00
0.02
24.03
33.54
2.10
10.83
22.87
25.80
2.81
10.48
18.06
11.28
87.97
161.10
0.00
353.30
1.94
12.76
24.70
23.77
2.61
9.95
14.55
10.92
96.85
179.15
0.00
377.17
2.11
11.46
26.76
29.54
1.74
10.66
17.58
13.93
93.57
199.71
0.00
407.05
1.65
11.01
23.27
31.08
2.58
10.17
17.24
12.93
96.76
200.26
0.00
406.95
2.25
11.82
26.40
31.79
2.56
10.32
19.76
11.96
101.89
209.68
0.20
428.63
2.45
12.53
27.22
31.49
1.89
10.46
21.34
14.66
108.58
221.39
0.95
452.96
CIL - TOTAL
379.46
403.73
435.00
435.00
460.50
486.50
1.180
6.100
10.150
14.955
11.145
0.970
0.000
44.500
0.04
0.890
6.270
9.496
16.028
10.942
1.072
0.263
45.000
0.860
6.170
10.105
15.555
11.880
1.430
0.000
46.000
0.805
5.695
10.945
17.560
11.575
0.420
0.000
47.000
27
Shearer
(KW)
A. Longwall
ECL - Chinakuri
Jhanjra
Churcha Set
R6 / Panel AW10
Dhemomain Set
Satgram Set
Chinese / Russian
Panel - AE2
Total Longwall
Roadheader /
Cont.Miner / Others
Sub-Total *
BCCL - Moonidih
Dowty
Dowty
Jessop & W-Falia
Proposed New equip.
Roadheader Dev
Sub-Total
SECL
A. Longwall
Balrampur PSLW
New Kumda PSLW
Rajendra PSLW
Badauli Extn.
Sub-Total
Total LW
07 - 08
Actual
Specification of Face
Collaborator Support
(Tonnes)
Height (Mtrs)
08 - 09
Actual
Length Depth of
(Mtrs.) Cut
(Mts)
0.016
British
4x680
380
1.65-3.2
150
0.600
Gullic
Gullic
4x550
4x550
2x314
380
380
2x200
2-3
1.82-3.4
2-2.5
150
150
150
0.600
0.600
0.600
0.023
BE
RE
(Million Tonnes)
BE
11 - 12
BE
BE
BE
0.03
0.03
0.03
0.03
0.11
0.11
09 - 10
0.12
* Including road-header
4x325
4x400
2x360
Chinese
Chinese
Chinese
4x440
4x440
4x440
200
375
100/200
375
375
375
2.50
2.50
1.20
2.0
2.0
2.5
60
150
150
150.00
150.00
150.00
28
0.60
0.75
0.60
0.60
0.60
0.60
10 - 11
0.07
0.070
0.093
0.15
0.130
0.160
0.14
0.14
0.52
0.62
0.96
0.58
0.87
1.05
0.59
0.712
0.19
1.11
0.74
1.01
0.28
1.19
0.11
0.07
0.15
0.10
0.00
0.32
0.65
0.11
0.07
0.15
0.10
0.32
0.65
0.06
0.00
0.13
0.36
0.00
0.00
0.24
0.00
0.00
0.26
0.24
0.24
0.19
0.88
0.36
1.14
0.24
1.50
0.26
1.10
0.24
1.57
0.24
2.08
Collaborator
07 - 08
Actual
Specification of Face
Support
(Tonnes)
Shearer
(KW)
Height (Mtrs)
08 - 09
Actual
Length Depth of
(Mtrs.)
Cut
(Mts)
09 - 10
BE
RE
0.30
0.21
10 - 11 11 - 12
BE
BE
BE
BE
B. Continuous Miner
SECL
Chirmiri"0" Seam JOY KIER
NCPH JOY KIER
Vindhya DBT
Pinoura SANCHETI
Sheetaldhara Yet to be finalised
0.12
0.20
0.30
0.30
0.30
Sub-Total
0.12
0.20
0.30
0.21
0.30
0.60
0.20
0.06
0.26
0.23
0.11
0.00
0.00
0.34
0.31
0.18
0.14
0.11
0.74
0.15
0.09
0.00
0.00
0.24
0.21
0.18
0.15
0.00
0.54
0.33
0.18
0.30
0.05
0.86
0.37
0.54
1.04
0.45
0.84
1.46
0.09
0.26
0.24
0.30
0.30
WCL
Tandsi Expn JOY ENGG.
Kumberkhani (Incl. C.M.Sch.)
Maori Block with CM Package
Saoner Mine - I Expn
Sub-Total
Total Cont. Miner (CIL)
SECL
C. Short wall
Balrampur
Chinese
Sub - Total
Total Short-wall (CIL)
29
0.09
0.26
0.24
0.30
0.30
0.00
0.09
0.26
0.24
0.30
0.30
0.00
Name of Face
Manufacturer
Support
Tonnes
Shearer
Face
Height Length Depth of 2008-09
KW
2009-10
(Mt) (Mt) Cut (Mt)
Actual Target RE
2010-11
2011-12
Proposed
Proj.
1 EXISTING FACE
i
V.K.-7
U.K.
360
375
120
0.60
0.00
0.00
0.00
0.00
0.00
ii
J.K.-5
U.K.
450
2x380
150
0.85
0.00
0.00
0.00
0.00
0.00
iii
G.D.K.-10A.
U.K.(MAMC/MECO)
4 = 750
2X375
3.3
150
0.85
0.43
0.70
0.70
0.70
0.60
iv
VAKILPALLI BLOCK.
CHINA.
4 = 750
2X375
3.3
120
0.85
0.34
0.33
0.00
0.00
0.00
PADMAVATIKHANI-1
CHINA.
4 = 775
2X300
150
0.60
0.00
0.00
0.00
0.00
0.00
ON-GOING FACES.
vi
vii
NEW PROJECTS.
30
PARTICULARS
I. RAW COKING COAL
(a) Washery Feed
CIL Washeries
08 - 09
08-09
09 - 10
09 - 10
Million Tonnes
10 - 11
BE
RE
Act
BE
RE
BE
BCCL
CCL
WCL
Sub Total
BCCL
3.18
4.14
0.65
7.97
4.22
5.35
0.79
10.36
0.02
3.30
4.35
0.66
8.31
0.60
3.31
3.51
0.70
7.52
3.50
4.70
0.75
8.95
0.60
2.84
3.60
0.47
6.91
0.70
4.00
3.96
0.43
8.39
0.76
BCCL
ECL
SECL
Sub Total
BCCL
(c) Own Hard Coke Ovens/
CCL
Cokeries etc.
ECL
WCL
BCCL
(d) DCOP, Pvt./ Others
Total Raw Coal - BCCL
Total Raw Coal - CIL
II. WASHED COAL TO STEEL PLANTS
BCCL
CCL
WCL
WASHED COAL TO DCOP/
BCCL
OTHERS
TOTAL CIL
0.04
0.02
0.16
0.22
0.16
0.04
0.03
0.16
0.23
0.03
0.00
0.05
0.03
0.17
0.25
0.03
0.08
0.03
0.15
0.26
0.05
0.05
0.03
0.17
0.25
0.05
0.41
0.03
0.16
0.60
0.10
0.26
0.03
0.17
0.46
0.10
0.03
0.04
3.41
8.42
0.05
0.03
4.34
10.72
0.04
0.02
4.00
9.25
0.04
0.03
7.89
0.04
0.05
4.25
9.94
0.04
0.05
4.10
8.40
0.04
0.05
5.17
9.80
1.66
1.84
0.33
2.41
2.40
0.39
1.83
2.00
0.32
1.60
1.71
0.37
2.10
2.20
0.37
1.52
1.80
0.23
1.70
2.00
0.21
3.83
5.20
4.16
3.68
4.67
3.55
3.91
31
Operating
Washery
Capacity
MTY
Million Tonnes
<------ACT 08 - 09 ---------->
RAW
CC
% Yield Middling
INPUT OUTPUT
<------BE 09 - 10 ---------->
RAW
CC
INPUT
OUTPUT
% Yield
<------RE 09 - 10 ---------->
Middling
RAW
CC
INPUT
OUTPUT
<------BE 10 - 11 ---------->
% Yield Middling
RAW
CC
% Yield Middling
INPUT OUTPUT
BCCL
A.
PRIME COKING
1
DUGDA
BHOJUDIH
PATHERDIH
SUDAMDIH
MOONIDIH
MADHUBAN**
SUB-TOTAL (A)
2.00
1.70
1.60
1.60
1.60
0.65
0.80
0.24
0.57
0.58
0.37
0.35
0.49
0.09
0.19
0.33
0.07
53.30
60.63
37.71
32.46
57.02
0.07
0.00
0.25
0.12
0.39
0.22
0.00
0.75
0.90
0.25
0.70
0.75
1.00
0.37
0.54
0.10
0.23
0.45
0.28
49.33
60.00
40.00
32.86
60.00
28.00
0.00
0.27
0.12
0.42
0.23
0.50
0.61
0.74
0.19
0.52
0.68
0.00
0.27
0.36
0.07
0.19
0.37
0.00
44.21
48.98
38.92
36.92
54.73
0.00
0.00
0.32
0.08
0.29
0.27
0.00
0.80
0.90
0.30
0.70
0.80
0.00
0.40
0.52
0.12
0.25
0.48
0.00
50.00
57.78
40.00
35.00
60.00
0.00
0.00
0.29
0.15
0.42
0.24
0.00
8.50
3.20
1.51
47.02
0.98
4.35
1.97
45.29
1.54
2.73
1.27
46.35
0.95
3.50
1.77
50.43
1.10
0.63
0.11
0.10
86.73
0.01
0.15
0.13
86.67
0.02
0.11
0.10
88.07
0.02
0.20
0.18
87.50
0.03
9.13
3.31
1.60
48.37
0.99
4.50
2.10
46.67
1.56
2.84
1.36
47.96
0.96
3.70
1.94
52.43
1.13
MEDIUM COKING
1MOHUDA
TOTAL BCCL
** - MADHUBAN Washery is now temporarily washing Non Coking Coal since 08 09.
CCL
MEDIUM COKING
1
Kathara
Sawang
Rajrappa
Kedla
3.00
0.75
3.00
2.60
0.84
0.54
1.04
1.08
0.32
0.26
0.61
0.52
38.00
47.00
59.00
48.00
0.34
0.24
0.26
0.40
1.20
0.70
1.50
1.30
0.48
0.34
0.84
0.54
40.00
48.57
56.00
41.54
0.42
0.30
0.39
0.55
0.80
0.60
1.20
1.00
0.30
0.30
0.70
0.50
37.50
50.00
58.30
50.00
0.30
0.25
0.30
0.35
0.90
0.66
1.30
1.10
0.34
0.33
0.78
0.55
37.80
49.20
60.00
50.00
0.40
0.30
0.35
0.40
TOTAL CCL
9.35
3.50
1.71
48.80
1.24
4.70
2.20
46.81
1.65
3.60
1.80
50.00
1.20
3.96
2.00
50.51
1.45
Nandan
1.20
0.70
0.37
52.29
0.25
0.75
0.37
48.94
0.27
0.47
0.23
49.00
0.17
0.43
0.21
49.00
0.16
TOTAL - CIL
19.68
7.51
3.68
48.94
2.49
9.95
4.67
46.91
3.48
6.91
3.39
49.10
2.33
8.09
4.15
51.30
2.73
WCL
1
32
Operating
No
Washery
Capacity
MTY
Million Tonnes
<------ACT 08 - 09
RAW
CC
---------->
% Yield
%
Utilisation
INPUT OUTPUT
<------Target 09 - 10 ---------->
RAW
CC
% Yield
%
Utilisation
INPUT OUTPUT
<------RE 09 - 10
RAW
CC
---------->
% Yield
INPUT OUTPUT
<------BE 10 - 11
---------->
%
RAW
CC
% Yield
%
Utilisation
Utilisation
INPUT OUTPUT
BCCL
1 Dugda - 1
1.00
0.33
0.26
80.06
32.60
0.30
0.25
Madhuban
2.50
0.47
0.61
129.70
18.72
0.30
0.27
90.00
12.00
3.50
0.79
0.87
109.32
22.69
0.60
0.52
86.67
17.14
1 Giddi
2.50
0.57
0.37
64.00
23.00
0.90
0.55
61.11
2 Kargali
2.72
0.58
0.54
94.00
21.00
0.75
0.70
3 Piparwar
6.50
6.82
5.93
87.00
105.00
6.60
5.55
11.72
7.97
6.84
85.75
68.04
8.25
4.50
4.01
3.58
89.23
89.11
19.72
12.78
11.28
88.31
64.80
Sub Total
30.00
0.41
0.29
70.73
41.00
0.36
0.29
80.58
36.00
0.40
50.00
0.00
0.00
0.40
50.00
0.00
0.41
0.69
57.02
11.71
0.36
0.69
59.48
10.29
36.00
0.60
0.38
63.00
24.00
0.80
0.51
64.00
32.00
93.33
27.57
1.00
0.78
78.00
37.00
1.13
0.86
77.00
42.00
84.09
101.54
6.85
5.95
87.00
105.00
6.85
5.95
87.00
105.00
6.80
82.42
70.39
8.45
7.11
84.14
72.10
8.78
7.32
83.37
74.91
3.95
3.36
85.01
87.73
3.95
3.36
85.01
87.73
3.95
3.36
85.01
87.73
12.80
10.68
83.42
64.90
12.81
11.16
87.10
64.95
13.09
11.37
86.84
66.37
CCL
Sub Total
NCL
1 Bina
Total CIL
No. of Non Coking coal Washery 5. Madhuban Washery is temporarily washing Non Coking Coal.
33
Actual
Actual
BE
RE
Proj.
06-07
07-08
08-09
09 - 10
09 - 10
10 - 11
Manpower as on
Net - Addn (+)/Redn(-)
98780
-2694
94943
-3837
90470
-4473
84756
-5156
85473
-4997
80954
-4519
Manpower as on
Net - Addn (+)/Redn(-)
83578
-3568
80051
-3527
76369
-3682
72469
-4096
73304
-3065
69454
-3850
Manpower as on
Net - Addn (+)/Redn(-)
61610
-2590
58808
-2802
56553
-2255
52992
-2737
53815
-2738
50875
-2940
Manpower as on
Net - Addn (+)/Redn(-)
16726
-188
16697
-29
16450
-247
17553
314
17553
1103
17505
-48
Manpower as on
Net - Addn (+)/Redn(-)
SECL (incl. DCC)
Manpower as on
Net - Addn (+)/Redn(-)
MCL
Manpower as on
Net - Addn (+)/Redn(-)
CMPDIL
Manpower as on
Net - Addn (+)/Redn(-)
NEC
Manpower as on
Net - Addn (+)/Redn(-)
CIL(HQ)
Manpower as on
Net - Addn (+)/Redn(-)
CIL
65599
-1779
64160
-1439
62492
-1668
63385
-606
63008
516
64270
1262
85015
-1503
83423
-1592
82054
-1369
79643
-1917
81377
-677
79811
-1566
20591
-285
20786
195
20869
83
23800
2700
22155
1286
23068
913
3127
-107
3048
-79
3065
17
3408
24
3160
95
3000
-160
3210
-181
3072
-138
2962
-110
2824
-123
2818
-144
2602
-216
1107
-49
1089
-18
1066
-23
1061
-14
1061
-5
1006
-55
439343
Net - Addn (+)/Redn(-) -12944
426077
-13266
412350
-13727
401891
-11611
403724
-8626
392545
-11179
82224
-3801
75573
-6651
70586
-4987
68989
-1853
69370
-1216
67692
-1678
ECL
BCCL
CCL
NCL
WCL
SCCL
Net - Addn (+)/Redn(-)
34
Company
Actual
Tar/BE
RE
Tar/BE
ECL
491
330
1000
1000
NIL
BCCL
NIL
NIL
NIL
NIL
NIL
CCL
347
220
500
500
350
NCL
NIL
NIL
NIL
NIL
NIL
WCL
164
NIL
NIL
NIL
NIL
SECL+DCC
45
47
50
50
NIL
MCL
52
33
55
10
50
Others #
49
19
25
32
30
1148
649
1630
1592
430
CIL (Total)
35
ECL
BCCL
CCL
NCL
WCL
SECL
MCL
NEC
Overall CIL
SCCL
07 - 08
Actual
08 - 09
Actual
2009 - 10
BE
RE
(Tonnes / Manshift)
2010-11
BE
UG
OC
Total
UG
OC
Total
UG
OC
Total
UG
OC
Total
UG
OC
Total
UG
OC
Total
UG
OC
Total
UG
OC
Total
UG
OC
Total
0.43
5.04
1.07
0.42
3.08
1.18
0.39
4.66
3.22
0.46
6.42
1.33
0.41
2.91
1.22
0.36
4.65
3.27
0.52
8.72
1.53
0.44
6.34
1.98
0.44
5.51
3.76
0.49
7.44
1.52
0.38
5.41
1.84
0.38
5.33
3.70
0.58
8.13
1.71
0.42
5.83
2.02
0.42
5.35
3.87
13.81
13.81
1.11
4.06
2.52
1.19
14.30
4.83
1.18
23.57
16.19
0.20
8.09
1.88
0.73
8.60
3.79
14.58
14.58
1.14
3.99
2.55
1.26
15.76
5.26
1.25
23.06
16.60
0.10
7.83
1.77
0.76
8.95
4.09
16.30
16.30
1.12
4.29
2.60
1.21
17.55
5.45
1.14
28.75
19.57
0.00
9.68
2.05
0.78
10.91
4.61
14.66
14.66
1.12
4.15
2.60
1.29
15.45
5.46
1.15
21.21
15.88
0.00
9.71
2.05
0.77
9.81
4.48
17.98
17.98
1.12
4.22
2.62
1.33
17.38
5.84
1.23
24.10
17.67
0.00
12.14
2.56
0.83
10.62
4.87
UG
OC
Total
1.02
10.76
2.63
1.05
10.60
3.01
1.18
10.75
3.30
1.04
11.61
3.25
1.18
15.33
3.63
36
Company
2008-09
Actual
Target
I. DRAGLINE
1
ECL
2
BCCL
3
CCL
4
NCL
5
WCL
6
SECL
7
MCL
8
CIL
108
69
103
108
103
81
99
123
83
99
100
100
95
98
110
83
98
100
100
81
96
110
85
99
100
100
92
98
II. SHOVEL
1
ECL
2
BCCL
3
CCL
4
NCL
5
WCL
6
SECL
7
MCL
8
CIL
84
82
78
66
93
104
82
84
80
88
83
56
90
100
77
81
85
88
79
57
90
105
83
83
85
88
80
57
90
105
85
83
III. DUMPER
1
ECL
2
BCCL
3
CCL
4
NCL
5
WCL
6
SECL
7
MCL
8
CIL
70
63
68
71
83
87
58
72
67
63
74
59
73
100
62
69
70
63
70
58
73
84
59
68
70
64
71
59
73
88
62
69
IV. DRILL
1
2
3
4
5
6
7
8
ECL
BCCL
CCL
NCL
WCL
SECL
MCL
CIL
55
60
61
60
72
103
93
72
55
57
70
36
70
100
89
63
55
57
63
36
70
102
94
63
55
58
64
37
70
102
94
64
V. DOZER
1
2
3
4
5
6
7
8
ECL
BCCL
CCL
NCL
WCL
SECL
MCL
CIL
66
53
58
44
70
63
68
60
63
51
64
39
69
100
73
64
67
51
59
39
69
64
67
58
67
52
60
39
69
67
74
59
38
2009-10
Anticipd.
2010-11
Proposed
SL.
NO.
1
2009-10
Target Anticipated
73
47
2010-11
Proposed
70
2011-12
Proj.
70
SHOVEL
52
61
52
50
50
DUMPER
36
50
35
45
45
DRILLS
DOZER
31
45
31
40
40
*Since drills are supposed to be worked for 2 shifts per day only (leaving the 3rd shift for
maintenance), CMPDIL had not assessed any net machine available hours for these
equipment. As such, these were not being included in the equipment.
39
07 - 08
Actual
08 - 09
Act.
09 - 10
BE
09 - 10
RE
10 - 11
BE
XI Plan
Now
Revised
161.79
133.82
297.84
404.71
176.05
560.42
276.16
1.86
20.86
191.88
221.16
334.84
266.52
277.92
855.98
321.26
3.92
33.69
210.00
230.00
420.00
730.00
230.00
730.00
200.00
10.00
140.00
250.00
300.00
350.00
600.00
350.00
700.00
400.00
10.00
140.00
400.00
350.00
350.00
800.00
350.00
600.00
650.00
15.00
285.00
1503.67
1424.98
1832.68
3071.23
1623.97
3316.40
2547.42
45.78
724.55
CIL
2033.51
2507.17
2900.00
3100.00
3800 +
6000 ##
16090.68
12.86
34.99
40.00
17.99
150.38
23.58
10.00
30.00
15.00
10.00
132.00
0.00
20.00
30.39
60.00
15.00
135.00
22.00
633.94
1334.93
386.40
313.94
844.94
1669.52
1231.34 1983.46
4965.28 7118.39 +
6000 ##
3802.07
2334.39
6140.61
8475.00
28367.75
11.00
30.39
60.00
10.53
135.00
0.01
10.00
68.00
110.00
30.00
135.00
22.00
75.35
305.82
523.08
1757.44
690.75
930.92
0.33
0.25
0.25
0.45
180.00
0.49
0.31
3.00
NE Component #1
14.30
12.49
24.30
279.80
197.49
300.00
260.00
400.00
TOTAL MOC
4653.99
4914.25
5674.41
4463.36
40
COMPANY
ECL
WB
BCCL
TOTAL WB
07 - 08
Act.
08 - 09
Act.
09 - 10
BE
09 - 10
RE
10 11
BE
139.80
117.62
154.05
154.53
254.99
0.80
0.03
1.00
1.00
0.50
140.60
117.65
155.05
155.53
255.49
ECL
21.99
74.26
55.95
95.47
145.01
BCCL
133.02
221.13
229.00
299.00
349.50
CCL
297.84
334.84
420.00
350.00
350.00
452.85
630.23
704.95
744.47
844.51
ORISSA
MCL
276.16
321.26
200.00
400.00
650.00
U.P
NCL
74.82
85.94
189.46
141.14
92.15
M.P
NCL
329.89
180.58
540.53
458.86
707.85
JHARKHAND
TOTAL JHARKHAND
WCL
29.38
23.38
38.20
64.10
69.87
SECL
66.53
94.57
69.10
70.10
54.03
425.80
298.53
647.83
593.06
831.75
TOTAL MP
CHATRISHGARH
SECL
493.88
761.41
660.90
629.90
545.97
MAHARASTRA
WCL
146.67
254.55
191.80
285.90
280.13
ASSAM
NEC
1.86
3.92
10.00
10.00
15.00
Others**
20.86
33.69
140.00
140.00
285.00
2033.51
2507.17
2900.00
3100.00
3800.00
+6000.00 ##
CIL (Total)
SCCL
573.97
650.44
580.57
633.94
1334.93
TN
NLC
1261.52
1074.40
1605.65
965.25
1765.23
RAJASTHAN
NLC
505.00
484.59
275.34
260.89
194.17
ORISSA
NLC
0.03
0.12
2.00
3.73
6.50
GUJRAT
NLC
0.16
0.04
1.85
0.17
1.33
JHARKHAND
NLC
1.00
0.10
1.00
MP
NLC
2.00
0.10
1.70
Chattisgarh
NLC
1.00
0.10
1.00
5.00
1.00
12.53
U.P
Note: Expenditure & outlay of the departmental schemes of MoC not included
41
X Plan
07 - 08
08 - 09
Actual
Actual
Actual
BE
09 - 10
RE
10 - 11
548.17
124.11
160.08
148.25
156.19
247.76
On Going Projects
22.09
28.39
25.40
13.50
60.28
109.09
Future Projects
14.77
0.00
27.48
12.10
19.15
TOTAL MINING
585.03
152.50
185.48
189.23
228.57
376.00
13.73
8.57
2.25
5.77
6.43
9.00
Exploration + P&D
10.76
0.72
4.15
15.00
15.00
15.00
Others
24.49
9.29
6.40
20.77
21.43
24.00
TOTAL ECL
609.53
161.79
191.88
210.00
250.00
400.00
628.16
112.89
192.56
183.80
227.60
232.95
On Going Projects
20.45
2.03
10.47
9.00
16.60
11.30
Future Projects
4.05
2.50
0.70
7.70
BE
ECL
BCCL
TOTAL MINING
Washery
652.66
114.92
203.03
195.30
244.90
251.95
2.20
0.46
0.31
15.50
19.25
51.35
2.29
0.04
5.50
5.10
11.70
Exploration + P&D
20.39
18.39
17.81
13.70
30.75
35.00
Others
24.88
18.89
18.13
34.70
55.10
98.05
TOTAL BCCL
677.54
133.82
221.16
230.00
300.00
350.00
CCL
Existing Mines & Completed Projects
900.94
136.64
144.96
249.68
132.50
59.00
On Going Projects
176.28
128.21
136.18
123.82
165.00
233.00
0.00
3.00
3.00
3.00
281.14
376.50
300.50
295.00
Future Projects
Adv. Action Projects
TOTAL MINING
9.09
1086.31
264.85
Washery
12.72
0.99
2.23
6.50
5.00
20.00
105.87
18.48
19.18
10.50
18.00
10.00
Exploration + P&D
85.76
13.53
32.29
26.50
26.50
25.00
Others
204.35
32.99
53.70
43.50
49.50
55.00
TOTAL CCL
1290.66
297.84
334.84
420.00
350.00
350.00
NCL
Existing Mines & Completed Projects
612.67
98.45
73.18
241.44
250.67
150.02
On Going Projects
674.80
290.05
177.11
431.78
295.74
588.23
Future Projects
56.15
1346.63
388.50
250.29
673.22
546.41
738.25
51.06
16.21
Exploration + P&D
1.84
3.01
Washery / D.plant
Others
TOTAL NCL
56.78
28.59
35.75
25.00
26.00
52.90
16.21
16.23
56.78
53.59
61.75
1399.53
404.71
266.52
730.00
600.00
800.00
42
X Plan
07 - 08
08 - 09
09 - 10
10 - 11
Actual
Actual
Actual
BE
615.13
126.90
185.20
114.00
152.16
172.50
On Going Projects
154.94
21.91
51.07
70.42
127.44
108.62
5.65
4.16
10.40
770.07
148.81
236.27
190.07
283.75
291.52
Washery
0.59
1.15
0.36
0.18
1.40
3.15
78.97
2.55
6.54
14.76
27.85
18.34
Exploration + P&D
105.49
23.54
34.75
25.00
37.00
37.00
Others
185.05
27.24
41.65
39.94
66.25
58.49
TOTAL WCL
955.13
176.05
277.92
230.00
350.00
350.00
908.02
193.72
167.32
39.92
39.92
40.20
On Going Projects
277.70
315.32
624.14
522.76
580.53
478.39
Future Projects
12.76
RE
BE
WCL
Future Projects
TOTAL MINING
SECL
109.32
2.50
1198.48
509.04
791.46
672.00
620.45
521.09
84.99
19.13
64.52
17.62
24.55
23.91
Exploration + P&D
105.82
32.25
40.38
55.00
55.00
Others
190.81
51.38
64.52
58.00
79.55
78.91
TOTAL SECL
1389.29
560.42
855.98
730.00
700.00
600.00
MCL
Existing Mines & Completed Projects
403.01
90.00
121.41
85.95
187.01
226.60
On Going Projects
250.71
114.77
121.96
75.55
132.40
152.33
Future Projects
13.74
1.60
672.00
204.77
243.37
163.10
319.41
378.93
154.54
67.59
57.89
16.90
50.59
216.00
Exploration + P&D
1.93
3.80
20.00
20.00
30.00
35.07
Washery
20.00
Others
156.47
71.39
77.89
36.90
80.59
271.07
TOTAL MCL
828.46
276.16
321.26
200.00
400.00
650.00
7.53
1.63
3.05
5.00
3.00
6.00
4.44
6.00
7.44
12.00
0.50
0.50
2.06
2.5
NEC
Existing Mines & Completed Projects
On Going Projects
0.00
0.75
TOTAL MINING
8.27
0.34
1.63
3.38
5.00
0.53
Exploration
Others
0.96
0.23
0.53
5.00
2.56
3.00
TOTAL NEC
9.23
1.86
3.92
10.00
10.00
15.00
43
X Plan
07 - 08
08 - 09
09 - 10
10 - 11
Actual
Actual
Actual
BE
RE
BE
4623.62
884.34
1047.76
1068.04
1149.05
1135.03
On Going Projects
1581.51
900.68
1146.33
1246.83
1377.99
1680.96
Future Projects
102.22
0.00
0.34
149.55
24.40
48.75
CIL
12.10
0.00
0.00
0.00
0.00
0.00
TOTAL MINING
6319.44
1785.02
2194.42
2464.42
2551.43
2864.74
Washery
15.51
2.60
2.90
22.18
25.65
74.50
492.41
132.80
150.91
132.83
163.67
327.70
Exploration + P&D
331.99
92.23
109.00
140.58
219.25
228.07
Others
839.91
227.62
279.05
295.59
408.57
650.27
(CMPDIL/CIL
(HQ)/DCC/IICM/R&D)
TOTAL CIL
48.87
20.86
33.69
140.00
140.00
285.00
7208.22
2033.51
2507.17
2900.00
3100.00
3800.00
+6000.00
##
## Note: - Rs. 6000.00 Crore Ad-hoc provision for acquisition of assets in abroad.
SCCL
MINING
Existing Mines & Completed Projects
770.17
329.45
249.54
51.60
137.20
108.75
On Going Projects
392.28
141.82
250.43
399.60
329.93
392.18
3.86
0.00
2.60
24.00
90.00
135.00
1166.31
471.27
502.57
475.20
557.13
635.93
279.28
102.16
146.37
102.37
74.31
696.00
Future Projects
TOTAL MINING
NON-MINING
Other Projects
Exploration + P&D
5.00
0.54
1.50
3.00
2.50
3.00
TOTAL NON-MINING
284.28
102.70
147.87
105.37
76.81
699.00
TOTAL SCCL
1450.59
573.97
650.44
580.57
633.94
1334.93
44
ESTIMATES OF INTERNAL & EXTERNAL BUDGETARY RESOURCES (IEBR) FOR XI th FIVE YEAR PLAN
(2007-08 to 2010-11) AND PERFORMANCE IN XTH FIVE YEAR PLAN
Appendix-3 / Annexure -III
NAME OF THE COMPANY: - COAL INDIA LIMITED
PART I: Retained Profit / Surplus
Tenth
SL
DESCRIPTION
NO
ELEVENTH PLAN
Plan
2007-08
2008-09
2009-10
2010-11
(Actual)
Actual
Actual
RE
BE
126227.06
32536.60
38788.83
42162.65
46641.43
8583.65
2898.71
4641.67
3533.49
3440.46
134810.71
35435.31
43430.50
45696.14
50081.89
1 RECEIPTS
(i) Gross Sales/
Operating income
(NET OF LEVIES)
(ii) Other income
(iii) Total
2 OPERATING COST
(i) Salaries & Wages
47889.23
12384.56
19742.09
16273.60
17151.17
43266.72
11420.96
14235.52
15963.82
17577.25
91155.95
23805.52
33977.61
32237.42
34728.42
7443.95
1626.29
1736.90
1585.41
1745.32
6419.88
1964.09
2131.19
2441.65
1544.48
13863.83
3590.38
3868.09
4027.06
3289.80
1029.55
155.34
133.61
72.26
1.75
30820.48
8194.75
5718.41
9503.92
12065.42
-543.69
-25.69
-79.74
-143.38
4 Accretion (+) or
Discretion (-) of stocks of Finished products
5 Gross Profit/Loss
6 INTEREST PAYMENTS to :
(i) Central Government
152.79
812.44
965.23
-543.69
-25.69
-79.74
-143.38
12905.45
4380.55
4214.76
3900.97
4640.55
8 Dividend Payment to
3309.56
1705.42
1705.42
1705.42
1705.42
13640.24
2652.47
-176.08
3977.27
5862.83
Central Government
9 Investment in Securities if obligatory
due to statutory or other requirements
10 Retained Profit / Surplus carried over to part II
(Item no.5 minus Item no 6 to 8)
45
ESTIMATES OF INTERNAL & EXTERNAL BUDGETARY RESOURCES (IEBR) FOR XI th FIVE YEAR
PLAN (2007-08 to 2010-11) AND PERFORMANCE IN XTH FIVE YEAR PLAN
NAME OF THE COMPANY: - COAL INDIA LIMITED
Part II (GENERATED I&EBR for Plan)
Appendix-3 / Annexure -III
Tenth
ELEVENTH PLAN
SL
DESCRIPTION
Plan
2007-08
2008-09
2009-10
2010-11
NO
(Actuals)
Actual
Actual
RE
BE
1 Retained profit
13640.24
2652.47
-176.08
3977.27
5862.83
2 Add: Deprn & Write-offs
13863.83
3590.38
3868.09
4027.06
3289.80
3 Deduct:
(i)Total loan repayment
5222.82
139.37
279.77
93.41
182.70
of which to GOI
980.88
Redemption of preference Share
904.18
(ii) Net increase in the margin for working
-1211.20
-773.30
-7670.12
288.66
124.38
capital requirement
(iii) Discharging of pension fund liability
602.26
1090.00
200.00
(iv) Arrears of Pay Revision
2213.39
508.68
4413.31
(v) Non Plan capital
(vi) Cash Credit (Banks)
(vii) Decrease in overdue interest to Govt.
(viii) Others (Past Dues)
38.89
-288.36
-198.83
-198.83
-198.83
Total 3
6866.16
-922.29
-7589.18
1781.92
4721.56
4 Adjusted internal resources
available for plan schemes
20637.91
7165.14
11281.19
6222.41
4431.07
(1+2-3)
5 Carry forward surplus from previous year
35.37
15621.42
20753.05
29527.07
32649.48
6 Total int. resources (4+5)
20673.28
22786.56
32034.24
35749.48
37080.55
7 Extra Budgetary Resource
(Other than from Govt. of India)
i) Gross assistance from financial
413.92
Institutions for Plan Project
ii) Gross assistance from financial institutions
for Plan Project foreign (Specify source)
iii) Foreign Commercial Borrowings
Suppliers Credit
iv) Bonds/Debentures issued during the year
v) Inter-corporate transfers
vi) Receipt from other funds i.e
a) OIDB
b) SDF
c) Others (B.O.B)
vii) Loan from CIL
viii) Issue of Equity to Public (IPO)
ix) Others, if any (Specify) IBRD
116.04
x) Securitisation of coal sales dues
Total EBR
529.96
8 Total Internal and External resource available
for financing plan expenditure on projects
21203.24
22786.56
32034.24
35749.48
37080.55
renewals and replacement etc. (6 +7)
9 Plan Outlay (according to printed budget
7208.24
2033.51
2507.17
3100.00
3800.00
documents)
(+6000.00 ##)
RESOURCE GAP (8-9)
13995.00
20753.05
29527.07
32649.48
33280.55
(27280.55 ##)
10 i) Budgetary support from Government
103.50
ii) External Assistance through Budget
12.62
iii) External Assistance direct
iv) Net Budgetary Support
116.12
11 Carry forward of surplus for next year
14111.12
20753.05
29527.07
32649.48
33280.55
1510.30
(27280.55 ##)
(Adjustment in closing balance of Surplus)
Adjusted opening balance
15621.42
# Rs. 6000.00 crore ad-hoc provision for acquisition of assets in abroad; accordingly surplus will be reduced.
46
2007-08 (Actual)
Sl no Name of Internal
Bonds/
PSE
Resources Debenture
1
2
3
4
CIL
22786.56
ECB/Supplier's
Credit
5
Others
6
0.00
Total
IEBR
7
22786.56
2008-09 (Actual)
Sl no Name of Internal
Bonds/
PSE
Resources Debenture
1
2
3
4
CIL
32034.24
ECB/Supplier's
Credit
5
Others
6
0.00
Total
IEBR
7
32034.24
2009-10 (RE)
Sl no Name of Internal
Bonds/
PSE
Resources Debenture
1
2
3
4
CIL
35749.48
ECB/Supplier's
Credit
5
Others
6
0.00
Total
IEBR
7
35749.48
2010-11 (BE)
Sl no Name of Internal
Bonds/
PSE
Resources Debenture
1
2
3
4
CIL
37080.55
ECB/Supplier's
Credit
5
47
Others
6
0.00
Total
IEBR
7
37080.55
SL
DESCRIPTION
NO
1 Capital Structure
(i)Authorized Share Capital
(ii) Paid-up Capital
(iii) Preference Equity
2 Reserve/Surplus
3 Net Worth
4 Net Profit (+)/Loss (-) after
Interest and Depreciation before
CPRA
5 Debts
6 Loans and Interest
Outstanding and Due:
(a) Outstanding
(i) Principal
(ii) Interest
(b) Overdue
(i) Principal
(ii) Interest
7 Investment
a) Cash at Bank
b) Securities
c) Inter Corporate Transfer
d) Others
8 (i) Wages Bill (incl.Bonus)
(ii)% Wages to Total Cost
(iii) No. of Employees
(a) Officers
(b) Others
(iv) Persons availing vrs-no.
(v) Impact of vrs. Rs. crore
(iv) Employees after vrs-no.
9 Capital Restructuring, if any
(Give Details of nature of
Capital Restructuring)
2006-07
Actual
2007-08
Actual
2008-09
Actual
2009-10
RE
2010-11
BE
8904.18
6316.36
8904.18
6316.36
8904.18
6316.36
8904.18
6316.36
8904.18
6316.36
1836.05
1675.48
1980.54
1887.13
1704.43
1836.05
1675.48
1980.54
1887.13
1704.43
48
Statement - I
PSE: Coal India Limited
Rs. Crores
Sl no
Parameter
Actual
Actual
BE
RE
Estimates
2007-08
2008-09
2009-10
2009-10
2010-11
15621.42
20753.05
25376.78
29527.07
32649.48
2652.47
-176.08
2366.38
3977.27
5862.83
Add: Depreciation/provisions
3590.38
3868.09
3882.66
4027.06
3289.80
Deduct Adjustments
-922.29
-7589.18
3954.87
1781.92
4721.56
22786.56
32034.24
27670.95
35749.48
37080.55
Bonds / Debentures
Others
10
Total I&EBR
22786.56
32034.24
27670.95
35749.48
37080.55
11
Plan Outlay
2033.51
2507.17
2900.00
3100.00
3800.00
(+6000.00 ##)
12
13
20753.05
29527.07
24770.95
32649.48
33280.55
(27280.55 ##)
# Rs. 6000.00 crore ad-hoc provision for acquisition of assets in abroad; accordingly surplus will be reduced.
49
Statement - II
PSE: Coal India Limited
Rs. Crores
Sl no
Parameter
RE
2009-10
BE
2010-11
29527.07
32649.48
3977.27
5862.83
Add: Depreciation/provisions
4027.06
3289.80
Deduct Adjustments
1781.92
4721.56
35749.48
37080.55
Bonds / Debentures
Others
10
Total I&EBR
35749.48
37080.55
11
Plan Outlay
3100.00
3800.00
(+6000.00 ##)
12
13
32649.48
33280.55
(27280.55 ##)
# Rs. 6000.00 crore ad-hoc provision for acquisition of assets in abroad; accordingly surplus
will be reduced.
50
Statement III
PSE: Coal India Limited
Rs. Crore
Name of
PSE
(1)
COAL INDIA
LIMITED
Internal
Resources
Bonds
Debentures
(2)
(3)
37080.55
Total
Budgetary
Support
(7)
Total
Plan
Outlay
(8)
3800.00
(+6000.00 ##)
37080.55
# Rs. 6000.00 Crore ad-hoc provision for acquisition of assets in abroad; accordingly surplus will be reduced.
Name of
PSE
(1)
COAL INDIA
LIMITED
Internal
Resources
Bonds
Debentures
(2)
(3)
35749.48
35749.48
51
Total
Budgetory
Support
(7)
Total
Plan
Outlay
(8)
3100.00
APPENDIX- 3 - Annexure - VI
10th Plan
10th Plan
11th Plan
Annual
Annual
Annual
Annual
Annual
(2002-2007)
(2002-2007)
(2007-2012)
Plan
Plan
Plan
Plan
Plan
(2008-2009)
Actual
(2009-2010)
Approved
(2009-2010)
Anticipated
(2010-2011)
Proposed
Approved
Actual
Approved
(2007-2008)
Actual
Outlay
Expenditure
Outlay
Expenditure
Expenditure
Outlay
Expenditure
Outlay
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D. IEBR
14310.00
7208.24
17390.07
2033.51
2507.17
2900.00
3100.00
3800.00
14310.00
7208.24
17390.07
2033.51
2507.17
2900.00
3100.00
1
A. Domestic Budgetary
Support
B. Externally Aided
Projects (EAP)
C. Gross Budgetary
Support (A+B)
(+6000.00 ##)
# Rs. 6000.00 crore ad-hoc provision for acquisition of assets in abroad; accordingly surplus will be reduced.
52
3800.00
(+6000.00 ##)
ANNUAL PLAN 2010-11 - MoC YEARWISE FINANCING PATTERN FOR X PLAN (Approved Outlay), X PLAN (CUMULATIVE ACHIEVEMENT), AP 2006-07(ACTUAL), AP
2007-08 (ACTUAL), AP 2008-09 (ACTUAL), AP 2009-10 (BE&RE), 2010-11 PROPOSED AND 2011-12 TARGET
Format-27
Company: SCCL
Rs. Crore
SL.
COMPANY / HEAD
IR
BONDS
NO.
SUPPLIER'S ARM
OTHERS
TOTAL
CREDIT
EAP
DBS
GBS
TOTAL
(2 to 6)7
(8+9) 10
(7+10) 11
424.80
0.00
0.00
0.00
424.80
IEBR
5
SCCL
424.80
SCCL
1471.50
SCCL
-67.17
1317.73* 1450.56
0.00
0.00
0.00
1450.56
SCCL
22.14
426.49 *
448.63
0.00
0.00
0.00
448.63
SCCL
286.47
287.50 *
573.97
0.00
0.00
0.00
573.97
SCCL
650.44
0.00
650.44
0.00
0.00
0.00
650.44
SCCL
30.57
550.00 *
580.57
0.00
0.00
0.00
580.57
SCCL
353.94
280.00 *
633.94
0.00
0.00
0.00
633.94
SCCL
513.93
821.00*
1334.93
0.00
0.00
0.00
1334.93
SCCL
848.27
170.00 *
1018.27
2113.23
2113.23
53
1018.27
ANNUAL PLAN 2010-11 - MoC - SCCL INTERNAL & EXTRA BUDGETARY RESOURCES
STATEMENT.I
FORMAT -28
Rs.Crores
DESCRIPTION
NO.
X Plan
2002-07
ACTUAL
1.
2.
3.
4.
5.
6.
7.
8
RECEIPTS
(i)
GROSS SALES/OPERATING INCOME
(ii)
OTHER INCOME
(iii)
TOTAL (1)
OPERATING COST
(i)
SALARIES & WAGES
(ii)
BONUS
(iii)
MAINTENANCE COST
(iv)
OTHER COST
(v)
TOTAL (2)
DEPRECIATION & WRITEOFFS
(i)
DEPRECIATION
(ii)
DRE. WRITEOFFS
(iii)
TOTAL (3)
(+)ACCRETION OR (-) DECRETION OF STOCK
OF FINISHED PRODUCTS
GROSS PROFIT/LOSS (Item 1 minus items 2 to 4)
INTEREST PAYMENTS TO
(i)
CENTRAL GOVERNMENT
(ii)
OTHERS (Interest Paid - Interest Received)
(iii)
TOTAL (6)
PROVISION FOR INCOME TAX
DEVELOPMENT EXPENDITURE
WRITTEN OFF
9
DEFERRED TAX
10 PROVISION FOR DIVIDEND PAYMENTS TO
CENTRAL GOVT.
XI PLAN
2006-07
ACTUAL (ALLOCATED)
17557.03
3891.63
17557.03
3891.63
7673.28
186.97
473.56
6842.43
15176.24
1688.55
61.13
112.94
1750.98
3613.60
1018.56
168.17
1186.73
40.44
19675.15
0.00
19675.15
XI Plan
2007-08
2008-09
2009-10
Actual
Actual
BE
2010-11
2011-12
2007-12
Total
Ant.
Proposed
Target
10
11
4642.63
5958.81
6200.20
28425.14
4642.63
5958.81
6200.20
28425.14
9408.32
17333.82
1878.88
47.95
100.06
2079.73
4106.62
1989.79
70.00
170.67
2884.56
5115.02
1797.27
70.00
170.67
2969.77
5007.71
9946.09
331.54
777.77
13721.26
24776.67
216.39
29.76
246.15
-28.31
1393.83
150.00
1543.83
0.00
243.12
48.42
291.54
-69.14
248.91
0.00
248.91
246.00
26.02
272.02
264.82
10.00
274.82
287.99
10.00
297.99
335.54
10.00
345.54
1380.38
78.42
1458.80
-69.14
1234.49
3.57
797.49
175.33
103.20
707.56
449.25
545.80
846.95
2120.53
0.00
-767.05
-767.05
542.45
0.00
-113.62
-113.62
71.62
0.00
397.28
397.28
410.70
0.00
-114.78
-114.78
122.36
-145.12
-145.12
323.75
-141.00
-141.00
288.43
-94.44
-94.44
160.80
-64.92
-64.92
90.29
-11.63
-11.63
282.05
-430.88
-430.88
979.25
-37.46
0.00
-6.61
-206.65
-78.20
46.03
66.87
-178.56
7182.10
60.10
145.23
54
ANNUAL PLAN 2010-11 - MoC - SCCL INTERNAL & EXTRA BUDGETARY RESOURCES
SINGARENI COLLIERIES COMPANY LIMITED
Sl.
NO.
1
11
DESCRIPTION
2
INVST. IN SECURITIES IF OBLIGATORY DUE TO
STATUTORY OR OTHER REQUIREMENTS
12 RETAINED PROFIT / SURPLUS CARRIED OVER TO PART
II (ITEM NO 5 - ITEM NO.6 TO 11)
1. RETAINED SURPLUS FROM PART-I
2. ADD DEPRECIATION & WRITE OFFS
2A. INTEREST (ACCRUED-DUE)\VIII PLAN MORITORIUM
2B. PROV.FOR GRATUITY & LEAVE ENCASHMENT &
NCWA VIII
2C. VRS DEFERRED REV.A/C
2D DEFERRED TAX
2G SUB TOTAL (1+2+2A+2B+2C+2D+2E+2F)
3. DEDUCT
i. LOAN INSTALLMENT DUE UPTO 3/97
ii. TOTAL LOAN REPAYMENT TO GOI
iii. DIVIDEND PAYMENT & TAX THEREON
iv. NET INCREASE IN THE MARGIN FOR WORKING
CAPITAL REQ.
v. Provn..for ob backlog/advance action removal
vi non-plan capital req. (break-up of major items like
Replacements repairs & maint. Need to be indicated)
vii OTHERS: SPECIFY.(V . R. S )
viii INSTALMENTS ON MARKET BORROWINGS
ix NCWA VI ARREARS
x NCWA VII ARREARS/VIII /IR
xi LUMPSUMP PAYMENT IN LIEU OF
DEP.EMPLOYMENT/MMC
Moratorium payment (GOI)
xii GRATUITY FUND PAYMENT
TOTAL (3)
4. Adjusted internal resources available for plan
SCHEMES.(3-2G)
5. Carry forward surplus available from previous years
STATEMENT.I
X Plan
2002-07
2006-07
XI PLAN
ACTUAL
3
ACTUAL
4
(ALLOCATED)
1253.76
83.03
1253.76
1186.73
0.00
1379.66
83.03
246.15
2008-09
Actual
5
Actual
6
BE
7
-10.49
174.36
131.21
-10.49
1543.83
174.36
291.54
131.21
248.91
287.18
332.59
269.30
-206.65
775.36
308.93
45.65
196.04
4061.84
-37.46
600.65
1661.35
-6.61
746.47
392.53
1357.51
98.81
13.70
168.92
24.33
-6.26
189.63
-49.85
47.44
374.00
0.00
1170.00
0.00
850.00
80.00
578.51
22.14
330.00
300.00
3008.55
-1347.20
0.00
0.00
0.00
145.27
743.59
195.35
544.00
195.22
555.54
4129.01
-67.17
128.00
12.00
55
XI Plan
2009-10
2007-08
2010-11
2011-12
Ant.
8
Proposed
9
Target
10
11
560.14
461.09
474.40
509.66
1750.73
560.14
272.02
461.09
274.82
474.40
297.99
509.66
345.54
1750.73
1458.80
2007-12
Total
619.77
832.16
-78.20
657.71
46.03
818.43
66.87
922.07
269.30
-178.56
3920.04
40.56
40.55
-52.86
40.56
1.67
40.56
-0.17
40.56
-0.91
186.57
-5.67
-177.40
433.57
-56.69
197.77
-32.18
0.00
0.00
-118.35
0.00
0.00
65.44
0.00
0.00
583.00
0.00
18.00
0.00
520.00
132.66
224.34
240.00
506.47
FORMAT -28
Rs.Crores
583.00
66.33
66.33
66.33
-4.18
779.54
100.00
1041.26
-209.10
652.87
4.84
304.49
513.93
73.80
848.27
331.65
224.34
1266.98
2653.05
220.00
139.68
349.10
0.00
0.00
0.00
ANNUAL PLAN 2010-11 - MoC - SCCL INTERNAL & EXTRA BUDGETARY RESOURCES - STATEMENT.I
SINGARENI COLLIERIES COMPANY LIMITED
Rs.Crores
Sl.
NO.
DESCRIPTION
1
2
6. TOTAL INTERNAL RESOUCES (4 + 5)
7. EXTRA BUDGETORY RESOURCES OTHER THAN FROM GOI
i. Gross assistance from financial institutions for the plan projects
ii. Gross assistance from financial institutions for the plan projects foreign specify source *
iii. FOREIGN COMMERCIAL BORROWING/SUPPLIERS' CREDIT **
iv. BONDS AND DEBENTURES ISSUED DURING THE YEAR
v. INTER CORPORATE TRANSFERS $
vi. RECEIPT FROM OTHER FUNDS i.e.
a) OIDB
b) SDF
c) OTHERS
vii. ISSUE OF EQUITY TO PUBLIC $$
a)
b)
c)
viii. OTHERS, IF ANY SPECIFY
a) GOVT.OF A.P EQUITY
b) SALE OF INVESTMENTS-VIDYUT BONDS/MATURITY OF FDRS
8. TOTAL INTERNAL AND EXTERNAL RESOURCES
AVAILABLE FOR FINANCING PLAN EXPENDITURE
ON PROJECTS, RENEWALS AND REPLACEMENTS
ETC. (6 + 7)
9. PLAN OUTLAY (ACCORDING TO PRINTED
BUDGET DOCUMENT)
Plan Outlay
Ongoing Projects
New Projects
Additions / Modifications & Replacements (AMR)
AMR - Completed Projects
AMR - Existing Projects
POWER PROJECTS
NON-MINING PROJECTS.
TOTAL PLAN OUTLAY
RESOURCE GAP (9-8)
X Plan
2002-07
XI PLAN
2006-07
XI Plan
2009-10
2010-11 2011-12
2007-08 2008-09
0.00
4300.00
1317.73
426.49
387.50
1450.56
1450.59
448.63
448.63
392.11
4.03
Actual
5
506.47
Actual
BE Anticipated Proposed target
6
7
8
9
10
999.54 -69.43
353.94
513.93
848.27
11
2653.05
0.00
0.00
0.00
0.00
0.00
287.50
650.00
280.00
821.00
170.00
1558.50
3340.30
3340.30
793.97
573.97
999.54 580.57
650.44 580.57
633.94
633.94
1334.93
1334.93
1018.27
1018.27
4211.55
4211.55
145.09
2.61
303.40
2193.67
141.81
0.00
250.43 383.60
2.60
0.00
329.93
90.00
392.18
135.00
750.20
15.00
1864.55
242.60
643.37
126.80
150.68
25.62
484.72
68.51
307.80
21.66
245.17
4.37
284.28
1450.59
*
124.63
448.63
*
290.00
3340.30
102.70
573.97
*
147.87 105.37
650.44 580.57
133.80
3.40
24.05
52.76
633.94
105.37
3.38
625.00
74.00
1334.93
60.44
2.63
130.00
60.00
1018.27
852.58
35.44
779.05
437.33
4211.55
56
0.00
2007-12
Total
80.60
11.00
ANNUAL PLAN 2010-11 - MoC - SCCL INTERNAL & EXTRA BUDGETARY RESOURCES
SINGARENI COLLIERIES COMPANY LIMITED
Sl.
NO.
1
10.
(i)
(ii)
(iii)
(iv)
11.
12.
(i)
(ii)
(iii)
(i)
(ii)
DESCRIPTION
X Plan
2002-07
2006-07
XI PLAN
ACTUAL
ACTUAL
XI Plan
2009-10
2007-08 2008-09
(ALLOCA
TED)
2010-11
2011-12 2007-12
Total
Actual
Actual
BE
Ant.
Proposed
Target
10
57
STATEMENT.I
FORMAT -28
Rs. Crores
11
58
0.45
12.26
50.00
29.41
32.32
50.79
d) Total demand:
81.38
138.32 121.91
148.61
141.48
176.20
2) Non-CIL Drilling: MoC
Release/Outlay
a) Ex-NE Area:
40.00
15.00
60.00
60.00
110.00
107.24
b) For NE region
6.80
6.80
11.44
11.92
c) Total release/demand from MoC:
40.00
15.00
66.80
66.80
121.44
119.16
d) Due for Payment related to 2007-08 & 08-09
18.11
e) Balance fund demand from CIL
5.41
3) Promotional Drilling: MoC Release/Outlay for coal & lignite is given in separate table
Note: 1. Contractual drilling in Non-CIL/CIL blocks includes non-coring drilling also at places.
2) Achievement of enhanced targets from 2010-11 onwards depends on availability of high-tech machines for
departmental capacity expansion, suitable agencies for contractual drilling, clearance from Forest Authorities &
revision of Forestry Norms to 15-20 borehole/sq.km. for exploration in forest area.
59
2007-08
2008-09
2009-10
2009-10
2010-11
2011-12
Actual
Actual
BE
RE
BE
Proj.
15572
15400
16500
14850
17600
11473
SCCL
NLC
7487
7963
12100
8050
8650
8800
Total GSI:
18960
23535
27500
24550
23500
26400
37999
27944
37700
37950
45000
50655
B. MECL
CIL -Ex. NEC
CIL -NEC
564
504
700
800
800
SCCL
17154
14730
15000
17000
14000
13400
NLC
37863
54454
65000
69050
61700
76000
93580
97632
118400
124800
121500
140055
Total MECL:
C. CMPDI
CIL -Ex. NEC
2992
5646
12200
8750
10000
12100
CIL -NEC
Total CMPDI:
2992
5646
12200
8750
10000
12100
52464
49162
65300
63200
69850
80355
D. OVERALL
CIL -Ex. NEC
CIL -NEC
564
504
700
800
800
SCCL
17154
14730
15000
17000
14000
13400
NLC
45350
62417
77100
77100
70350
84800
115532
126813
158100
158100
155000
178555
30.25
28.46
23.29
57.17
58.22
72.54
2.50
1.53
3.48
4.73
5.86
4.76
1.64
0.00
1.74
2.09
2.09
2.09
0.60
0.01
1.88
2.40
1.83
1.93
34.99
30.00
30.39
30.39
68.00
81.32
3.45
3.45
7.56
9.04
33.84
33.84
75.56
90.36
34.99
30.00
34.87
Note: 1) Drilling indicated above is subject to provision of adequate exploration resources by executing agencies and
availability of potential area in lignite sector.
2) Above drilling is also subject to availability of permission from Forest Authorities to explore in forest areas
60
100000 100000
100000 100000
100000 100000
75.69
16.81
20.65
22.00
22.00
24.20
24.20
75.69
16.81
20.65
22.00
22.00
24.20
24.20
75.69
16.81
20.65
22.00
22.00
24.20
24.20
61
Company: SCCL
Agency
2006-07
Actual
X PLAN
Cumulative
(in metres)
2008-09
2009-10
2010-11 2011-12
Actual Target Anticip. Proposed Proj.
2007-08
Actual
A. REGIONAL
EXPLORATION
I. DRILLING (mts)
(I) GSI
(ii) State Govt. Agencies
B. PROMOTIONAL
EXPLORATION
I. DRILLING (mts)
GSI
CIL
SCCL
NOT APPLICABLE
NLC
Sub-Total GSI:
MECL
CIL
SCCL
18212
18212
17154
14000 13000
18212
18212
17154
14000 13000
18212
18212
17154
14000 13000
NLC
Sub-Total MECL:
CMPDIL
CIL
Sub-Total CMPDIL:
GRAND TOTAL:
62
63
STATE
WEST BENGAL
5070.70
0.00
28326.79
BIHAR
0-300
160.00
0.00
160.00
JHARKHAND
6338.32
0.00
76711.96
MADHYA PRADESH
2645.25
0.00
20981.01
CHHATTISGARH
4380.67
0.00
44483.10
UTTAR PRADESH
0-300
866.05
195.75
0.00
0.00
1061.80
MAHARASHTRA
0-1200 5255.36
2907.21
1992.17
0.00
10154.74
ORISSA
13799.18
0.00
65226.86
ANDHRA PRADESH
0-1200 9193.61
6748.04
2985.27
0.00
18926.92
SIKKIM
0-300
0.00
58.25
42.98
0.00
101.23
ASSAM
0-600
348.65
35.85
0.50
2.52
387.52
31.23
40.11
12.89
6.00
90.23
MEGHALYA
0-300
89.04
16.51
27.58
443.35
576.48
NAGALAND
0-300
8.76
0.00
8.60
4.58
21.94
GRAND TOTAL
0.00
0.00
456.45 267210.58
64
DEPTH (m)
PROVED
TOTAL
COKING
0-300
300-600
0-600*
600-1200
Total 0-1200
7294
988
8104
1160
17545
11818
6628
8110
6856
33413
NON COKING
0-300
300-600
0-600*
600-1200
Total 0-1200
75143
6530
5607
518
87798
149578
64436
6102
12608
232724
0-300
300-600
Total 0-600
334
144
478
919
155
1073
0-300
300-600
0-600*
600-1200
Total 0-1200
82771
7661
13710
1678
105820
162315
71219
14212
19464
267211
65
Coal
Proved
Indicated
Inferred
Total
Recoverable
No.
Resources
(Mt.)
(Mt.)
(Mt.)
(Mt.)
from proved
as on
FRs
Established
No. of
Miniable
reserves
Reserves
FRs
Reserves
(Mt.)
(Bt.)
(mt.)
1.4.2007
(Actual)
99060
120177
38144
257381
N.A.
17.00
(2006-07)
1.78
(2006-07)
N.A.
N.A.
1.4.2008
101829
124216
38490
264535
N.A.
17.00
3.19
N.A.
N.A.
(2007-08)
(2007-08)
20.00
(2008-09)
2.73
(2008-09)
N.A.
N.A.
(Actual)
3
1.4.2009
(Actual)
105820
123470
37921
267211
N.A.
Note: 4
1.4.2010
1. The inventory of Geological Resources of Indian Coal is updated by GSI every year, on 1st April now instead of 1st January.
(Target)
2. The programme of Regional Exploration is formulated and executed by GSI. It is, therefore, not possible to indicate yearly
projections of likely increase in the total inventory of coal.
3. Sub-Group-III on Coal & Lignite Exploration for Formulation of XI Plan has envisaged that the Regional/promotional
exploration programme is expected to add 30 Bt of coal resources in Indicated/Inferred category and Detailed Exploration
is expected to upgrade 35 Bt. of coal resources into Proved category during the XI Plan period.
4. CMPDI and its contractual agencies carry out detailed exploration in the command area of CIL. On an average,
2-3 Bt/year of coal resources are upgraded to Proved category, which is likely to enhance in XI plan. However, the increase
in inventory is largely from regional/promotional exploration work, in Indicated & Inferred categories.
66
Depth (m)
Proved
Indicated
Inferred
Total
% share
0-300
82,770.63
65,784.33
13,760.24
162,315.20
60.75
300-600
7,661.28
45,452.79
18,104.64
71,218.71
26.65
13,710.33
502.09
0.00
14,212.42
5.32
600-1200
1,678.08
11,730.49
6,055.68
19,464.25
7.28
105,820.32 123,469.70
37,920.56
267,210.58
100.00
Total
Type of Coal
Proved
Indicated
Inferred
Total
% share
Prime Coking
4,614.35
698.71
5,313.06
1.99
Medium Coking
12,448.44
12,063.93
1,880.23
26,392.60
9.88
482.16
1,003.29
221.68
1,707.13
0.64
17,544.95
13,765.93
2,101.91
33,412.79
12.51
Non Coking
87,797.69
109,614.09
35,312.63
232,724.41
87.09
Tertiary coal
477.68
89.68
506.02
1,073.38
0.40
105,820.32
123,469.70
37,920.56
267,210.58
100.00
39.60
46.21
14.19
100.00
Semi Coking
Total coal
% share
67
Reserves
No.
as on
Proved
Indicated
Inferred
Total
Recov.
Reserves
Explored
in Sq.Kms.
GRs
No
FRs
Recov.
No of
Mineable
Reserves
FRs
Reserves
SCCL:
1 1.1.2006 (Actual)
8403.18
6158.17
2584.25
17145.60
2823.00
7.52
2823.00
298.840
2 1.1.2007 (Actual)
8791.13
6265.58
2657.75
17714.46
2823.00
11.47
2823.00
325.370
3 1.1.2008 (Actual)
9007.13
6710.65
2978.81
18696.59
2995.50
14.80
2995.50
348.000
4 1.1.2009 (Actual)
9193.61
6748.04
2985.27
18926.92
3064.23
8.36
3064.23
17.067
5 1.1.2010 (BE/RE)
9343.00
NA
NA
NA
3114.02
8.00
3114.02
NA
NA
6 1.1.2011 (Target)
9493.00
NA
NA
NA
3164.02
12.00
3164.02
NA
NA
Note: The Reserves are added to the National inventory in the Financial year with effect from 01.04.2007
68
1
A
1
2
On-Going Projects
Stability of parting between coal
pillars workings in level contiguous
seams during depillaring - MT/137
Implementing Agency: CMRI
Indigenous development of prototype
longwall supports (chock - shield) MT/143
Implementing Agency: SCCL
Date of
Compl.
Approved
Outlay
Disbursement
Progressive
upto
31.03.2010
Actual
Disbursement
during
2009 - 10
2008 - 09
(31.03.2010)
Rs in lakh
BE
BE
RE
2009 - 10
2009 - 10
2010 - 11
10
Jun. 2010
50.54
42.00
Aug. 2009
228.47
197.00
80.00
91.98
68.02
125.00
100.00
CMPDI 81.98
CMRI 10.00
CMPDI - 63.02
171.98
171.98
68.02
68.02
125.00
125.00
100.00
100.00
Development of a micro-seismic
monitoring system for stability
analysis of
UG mine workings under Difficult to
cave roof conditions - MT/145
Implementing Agency: CMRI & ECL
Characterisation of rock and explosive Mar. 2010
270.37
215.91
parameters for optimal explosive
energy utilisation in opencast blastingFor CMPDI CMPDI MT/146
206.15
154.91
For CMRI - CMRI - 61.00
Implementing Agency: CMPDI & CMRI
64.22
For CMRI- 2.00
Sub-total
Progressive
69
CMRI - 5.00
Date of
Compl.
Approved
Outlay
Disbursement
Progressive
upto
31.03.2010
1
5
2
3
4
5
41.19
33.00
Establishment of standard method for Sep.2009
assessment of incendivity of 32mm dia
permitted explosive- MT/149
Implementing Agency: CMRI
Underground coal gasification and its Aug. 2009
1125.00
220.00
utilisation for power generation
studies in lignite deposit of Rajasthan
S&T Grant (Phase - I) - MT/150
562.50
Cont DST - 375.00
Implementing Agency: NLC
Cont NLC - 187.50
Investigation of cavability of overlying Mar. 2010 461.3674
255.00
strata and development of guidelines
of support capacity for longwall faces
For CMRI - CIMFR - 70.00
- MT/151
200.142
For NIRM - NIRM - 130.00
Implementing Agency: CMRI, NIRM, ISM,
187.91
CMPDI, SECL, SCCL,
For ISM - 63.3154
ISM - 55.00
ECL & BCCL
For CMPDI - 10.00
Oct.2010
342.2692
170.00
Delineation of barrier thickness
against waterlogged workings in
underground coal mines - MT/153
Implementing Agency: CMRI
Sub-total
Progressive
70
Rs in lakh
BE
Actual
Disbursement
during
2009 - 10
2008 - 09
31.03.2010
6
-
7
-
8
5.00
9
-
10
-
50.00
20.00
25.00
BE
RE
2009 - 10
2009 - 10
2010 - 11
ISM -10.00
70.00
100.00
100.00
70.00
95.00
266.98
10.00
78.02
155.00
280.00
120.00
220.00
70.00
70.00
Sl. No.
Date of
Compl.
10
11
12
13
BE
2009 - 10
RE
2009 - 10
BE
2010 - 11
10
402
320.00
20.00
70.00
80.00
90.00
45.00
124.30
95.00
5.00
7.00
5.00
4.00
100.82
150.00
150.00
10.00
10.00
Dec. 2010
9242.70
1789.74
Mar.2010
UNDP/GEF - 4143.70
UNDP/India - CCF-545.10
ONGC Co-Sharing - 1215.70
S&T Grant -1805.80
GoI Kind - 699.40
Part of the Revenue - 833.0
182.12
100.00
Mar.2009
120.82
387.80
225.00
303.02
237.00
517.00
115.00
335.00
49.00
119.00
71
Date of
Compl.
Approved
Outlay
14
Sep. 2009
338.58
321.48
CFRI - 279.50
15
16
17
18
19
20
Disbursement
Progressive upto
Actual
31.03.2010
2008 - 09
Disbursement
during 2009 - 10
31.03.2010
Rs in lakh
BE
2010 - 11
BE
2009 - 10
RE
2009 - 10
10
45.00
8.88
10.00
5.00
35.00
25.00
10.00
20.00
CET - 35.00
CMPDI - 11.72
150.00
CFRI - 125.00
BHU - 25.00
22.00
BHU - 10.00
5.00
5.00
5.00
14.00
9.00
5.00
4.00
4.00
5.00
45.36
30.00
30.00
5.00
10.00
40.06
25.00
25.00
10.00
287.684
55.92
11.82
13.45
100.00
121.82
509.62
66.33
369.35
30.00
547.00
144.00
479.00
35.00
154.00
72
CFRI - 25.00
1
21
22
23
24
25
26
27
28
Date of
Compl.
Approved
Outlay
2
3
4
Devlopment of suitable biological waste water
Dec.2010
78.62
treatement technology through constructed
wetlands for treatments of acid mine drainage from coal projects - EE/31
Implementing Agency: CMPDI
Investigation into low cost liner for disposal of
Dec. 2009
44.14
coal ash in abandoned opencast mine - EE/34
Implementing Agency: CMRI
Study on blasting dust management system in an Sep. 2010
48.33
opencast coal mine - EE/35
Implementing Agency: NIRM, MCL & NCL
Development and use of fly ash based pesticides Apr. 2011
304.92
- EE/36
For NLC Implementing Agency: NLC, Annamalai Univ. VCRC,
131.737
Pondichery
For AMU - 89.82
For VCRC - 53.82
Survey and ecological conservation of NLC
environment through bioremediation
Bioremediation with tree species - EE/37
Implementing Agency : NLC & TNAU
Disbursement
Progressive upto
Actual
31.03.2010
2008 - 09
5
6
23.76
-
Rs in lakh
BE
2010 - 11
Disbursement during
2009 - 10
31.03.2010
7
-
BE
2009 - 10
RE
2009 - 10
8
-
9
25.00
10
25.00
42.00
3.00
5.00
5.00
45.00
10.00
10.00
10.00
5.00
5.00
200.00
20.00
25.00
25.00
30.00
10.00
5.00
25.00
NLC - 100.0
AMU - 65.00
VCRC - 35.00
56.50
AMU - 25.00
NLC - 19.50
TNAU - 47.00
19.50
NLC - 4.50
TNAU - 15.00
24.00
9.00
5.00
8.00
2.00
296.00
290.00
6.00
6.00
10.00
30.00
10.00
4.00
362.00
871.62
70.50
439.85
53.00
600.00
81.00
560.00
101.00
255.00
CIMFR - 290.00
BHU - 6.00
30.00
73
1
B
29
30
31
32
33
34
35
C
D
I
II
III
E
F
Date of
Compl.
Approved
Outlay
Disbursement
Progressive upto
Actual
31.03.2010
2008 - 09
5
6
2
3
4
Newly sanctioned S&T Projects commenced w.e.f Jan. 2010
Application of high strength steel roof-bolts in
Dec. 2011
103.22
underground coal mines - MT/156
For RDCIS - 89.02
Implementing Agency: RDCIS, DGMS & CMPDI
For CMPDI - 14.20
Prototype development for methane alarm
Dec. 2011
30.85
system using carbon nanofibres - MT/157
Implementing Agency: Jadavpur University
Development and optimisation of coal bed
Dec. 2011
22.30
recovery process for CO2 sequestration - CE/29
Implementing Agency: ISM
Development of Indigenous catalyst through
Dec.2012
805.40
Pilot Scale Studies of Coal-toLiquid (CTL) conversion technology - CU/57
For CIMFR - 688.50
For CMPDI - 116.90
Implementing Agency: CIMFR & CMPDI
An approach to explore the applicability of
Dec.2012
147.61
spectro-radiometry as a tool
for assessment of coal quality - CU/58
Implementing Agency: CIMFR
Treatment of acid mine water generated in
Dec.2012
44.17
Indian coal mines using low cost material EE/41
Implementing Agency: CIMFR
Emissions from coal-based industries Dec.2012
82.46
development of predictive models - EE/42
Implementing Agency: NEIST, Jorhat
Projects in pipelne/new projects
S&T Co - ordination
Manpower
Publication/ Equipment
Seminars/Workshops/Meetings
Completed / Terminated Projects
Re application of Successful S&T Projects
Sub-total (B+C+D+E+F)
Grand Total (A+B+C+D+E+F)
Rs in lakh
BE
2010 - 11
Disbursement during
2009 - 10
31.03.2010
7
BE
2009 - 10
RE
2009 - 10
10
70.00
70.00
8.00
15.00
15.00
5.00
15.00
15.00
2.00
250.00
250.00
150.00
125.00
125.00
5.00
20.00
20.00
10.00
20.00
20.00
20.00
1240.00
300.00
310.00
107.33
1.08
0.34
71.65
180.40
1052.02
181.06
0.29
27.32
723.67
1163.52
125.00
10.00
10.00
10.00
5.00
1400.00
2000.00
200.00
5.00
5.00
25.00
5.00
540.00
1100.00
200.00
10.00
10.00
10.00
5.00
745.00
1000.00
74
A. COMPLETED SCHEMES
Sl.No.
2009-10
2008-09
ACTUAL
EXPDR
BE
1
2
3
4
5
6
7
8
75
2010-11
PROPOSED
RE
A. COMPLETED SCHEMES
Name of the R&D Project
( Rs. Crores )
2009-10
2010-11
PROPOSED
Cum.
2007-08 2008-09
Expdr.
ACTUAL ACTUAL
X Plan
EXPDR
EXPDR
2002-2007
BE
10
11
12
13
14
15
16
17
18
19
20
21
22
Frequency analysis and modeling of noise pollution for an opencast coal project
Optimisation of production from underground coal mines by achieving longer pull
(Phase-I)
Development of a model vis--vis study of parameters influencing abutment loading
of pillars at a depillaring face of shallow depth cover and under massive roof strata
Role of blast design parameters on ground vibration and correlation of vibration level
to blasting damage to surface structures
Study into extent of abutment loading trend and design of advance support during
pillar extraction by stowing in a coal mine
Development of mining method for final extraction of critically thick coal seam
standing on pillars and the development made along the roof horizon
Development of integrated mine operation management system for a large opencast
mine
Development of support guidelines for depillaring panels in Indian Coal mines
Studies on the advance detection of fires in coal mines with special reference to
SCCL
Environmental impact of subsidence movements caused due to caving on ground
water and forest cover in Godavari Valley coal fields
Optimisation of pillar parameters for development and final extraction of highly
inclined seams at SCCL mines
Efficacy of rock bolt in underground fire zones and water bearing exacavations
0.0300
0.0240
0.0360
0.1120
0.1400
0.3420
76
RE
Sl.No.
B. ON-GOING SCHEMES
Name of the R&D Project
2007-08 2008-09
Cum.
Expdr. ACTUAL ACTUAL
X Plan EXPDR EXPDR
2002-2007
( Rs. Crores )
2009-10
2010-11
PROPOSED
BE
RE
0.20818
0.02018
0.02018
0.2024
0.20818
0.02018
0.02018
0.2024
0.6450
0.6450
77
C. New Schemes
Sl.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Cum. Expdr.
X Plan
2002-2007
78
0.0000
0.9870
2007-08
ACTUAL
EXPDR
0.0000
0.0000
2008-09
ACTUAL
EXPDR
0.0000
0.2082
2009-10
2010-11
PROPOSED
BE
RE
0.0000
0.0202
0.0000
0.0202
0.0000
0.2024
10
11
CMPDI/BCCL
817.94
May.2010
38.92
1.17
0.00
BCCL/
721.41
Dec.2009
81.71
0.00
0.00
CIMFR
A. On-Going Projects
1
Dec.2006
Jun.2004
CMPDI
1991.91
Jan.2011
1353.83
189.41
0.02
IIT Kgp./
359.65
Mar.2009
358.00
150.00
0.00
50.00
WCL
340.58
0.02
Oct.2008
79
Implementing Approved
Agency
Outlay
Date of
Compl.
Disbursement
Disb. During
2009-10
BE
RE
BE
IIT Kgp /
ECL/NCL
Presidency
College
Kolkata/
BCCL
CMPDIL/
NRSA
8
9
10
11
148.69 May.2009
Oct.2008
143.36
30.00
0.00
138.40 Jan.2010
July.2009
124.80
25.00
5.00
10.00
10.00
388.00 Apr.2009
July.2008
343.07
248.01
21.50
10.00
15.00
ISM/CCL
129.69
115.00
0.00
0.00
CMPDIL /
SAIL
182.00 Jan.2010
148.30
80.00
0.00
30.00
30.00
Sub-Total 383.01
Progressive Sub- Total 723.59
26.50
26.52
50.00 55.00
650.00 355.00 1150.00
July.2009
July.2009
80
Implementing
Approved
Agency
Outlay
Date of
Compl.
Disbursement
Disb. During
2009-10
BE
RE
BE
10
11
IIT, Kharagpur
216.98
Oct.2010
115.00
115.00
0.00
50.00
50.00
50.00
522.00
Nov.2010
0.00
0.00
0.00
2714.24
May.2010
0.00
0.00
0.00
200.00 25.00
500.00
530.90
May.2010
0.00
0.00
0.00
150.00 50.00
480.00
0.00
26.52
/ECL
CMPDI
CMPDI /
CIMFR & BHEL
81
Implementing
Agency
Approved
Outlay
CIMFR,
Dhanbad/
Molopo Austrlia Ltd,
Melbourne./
Molopo Energy
India Pvt. Ltd,
Kolkata/
20.90518
Date of
Disbursmenent Disb. During BE
Compl. Prog. upto Actual
2009-10 2009-10
(Aug.09) 2008-09 ( till Aug.09)
5
6
7
8
9
Jul.2009
RE
2009-10
BE
2010-11
10
11
20.42
20.42
0.00
444.23
Apr.2009 444.00
444.00
0.00
168.597
Feb.2012
24.00
24.00
0.00
100.00
20.00
CMPDI-126.0
ISMU-42.597
3339.98 May.2011
0.00
0.00
2100.00
2100.00
800.00
CIMFR-217.90
Molopo Aus-3073.72
Molopo Ener(I)-48.36
82
2100.00
2126.52
1250.00
2200.00
2930.00
820.00
3250.00
Implementing
Approved
Agency
Outlay
Date of
Compl.
Disbursement
Disb. During
2009-10
(Aug.09)
1
System Depptt.,
54.00
Aug.2010
BE
RE
BE
10
11
0.00
0.00
0.00
30.00
24.00
CIL, Kolkata/
System Depptt.
ECL
CMPDI, Ranchi /
206.8
Feb.2011
0.00
0.00
0.00
150.00
56.00
265.00
Aug.2011
0.00
0.00
0.00
50.00
150.00
Sub-total 0.00
0.00
230.00 230.00
D FPCL, Pune
CMPDI, Ranchi/
RDCIS (SAIL),
Ranchi
83
2126.52
Implementing
Approved
Agency
Outlay
Date of
Compl.
Disbursement
Disb. During
2009-10
BE
RE
BE
B.
3513.05
Dec'06
246.31
CIL- 2000
Dec'03
10
11
0.00
1700.00
SECL-1513.05
CMPDI
181.85
July.08
155.20
12.75
0.00
179.39
64.406
2.70
Oct.07
July.06
CMPDI
295.00
Sep.08
Jan'07
industry
C. New CIL R&D projects to be sanctioned
Sub- Total 77.156
Grand Total (A+B+C) 1404.17
84
0.00
2.70
2129.22
EMSC
CODE
B.E
09-10
R.E
09-10
B.E
10- 11
Proj.
B.E
11- 12
Remarks
376.68
341.01
35.67
25.00
0.00
0.00
0.00
BCCL 31.08.08(O)
31.03.09
(R)
66.25
54.00
40.58
13.42
0.00
0.00
0.00
0.00
538.12
430.68
381.59
49.09
25.00
0.00
0.00
0.00
ECL
397.00
387.11
9.89
10.00
10.00
0.00
0.00
ECL
30.9.01 (O)
31.12.09 (R
)
30.9.01 (O)
31.12.09
(R)
30.9.01 (O)
30.4.09(R)
187.77
85.00
91.42
-6.42
5.00
5.00
0.00
0.00
187.77
185.00
187.77
-2.77
0.00
0.00
0.00
0.00
187.77
160.00
163.05
-3.05
15.00
15.00
0.00
0.00
ECL
165.00
187.77
-22.77
0.00
0.00
0.00
0.00
ECL
31.12.05
478.38
(O)
31.12.09(R)
225.00
151.54
73.46
0.00
0.00
0.00
0.00
140.00
20.00
0.00
20.00
20.00
20.00
0.00
0.00
TOTAL ( A )
(B) SUBSIDENCE CONTROL SCHEMES: 9 SCHEMES
1
2
ECL
ECL
Gwala Basti.
5
6
Pottary Area.
EMSC- Stabilisation of inaccessible
waterlogged voids beneath
26
Haripur village.
EMSC- Stabilisation of inaccessible
waterlogged voids beneath
29
Sanctoria village and other
areas.
EMSC- Stabilisation of govt. colony,
Jeebnepara village,
31
Vivekananda School, Satgram
Area
ECL
31.08.07(O)
31.08.09(
R)
85
EMSC
CODE
EMSC- Stabilisation of
32
inaccessible waterlogged
voids beneath Narsamuda
village, (Phase I)
9 EMSC- Stabilisation of
ECL
31.08.09
212.00
40.00
33
inaccessible waterlogged
(O)
voids beneath Alluthia /
Bharatchak (Phase-I)
2283.46
1317.00
TOTAL ( B )
(C ) REHABILITATION ( SOCIAL MITIGATION ) SCHEMES : 2 SCHEMES
1 EMSC- Shifting of people from
BCCL 31.05.00(O) 6109.00
5092.00
24
most endangered areas of
31.03.09
BCCL.
(R)
2 EMSC- Rehabilitation of four
ECL
31.5.01(O) 3252.49
2350.00
25
unstable localities in ECL.
31.03.11(R)
9361.49
7442.00
TOTAL ( C )
(D ) FIRE CONTROL SCHEMES : 3 SCHEMES
BCCL
31.12.05
635.23
144.00
1 RCFS-01 Scheme for control of fire
(O)
Revised to
and subsidence for
30.06.09 ( 292.00
protection of Dhanbad R)
Patherdih Railway line at
Lodna and Bagdidi
colliery.
BCCL
31.12.05
578.41
320.00
2 RCFS-02 Scheme for dealing with
(O)
fire for protection of Adra31.08.10 (R
Gomoh Railway line at
)
Block-II OCP and
Phularitand colliery
3 RCFS-03 Scheme for dealing with
BCCL
31.12.05
769.82
430.00
fire for protection of
(O)
Chatkari jore at Jeenagora /
31.08.08 (R
Bararee colliery.
)
1348.23
894.00
TOTAL (D )
(E ) Co-ordination of EMSC schemes
TOTAL ( A+B+C+D+E)
B.E
09-10
R.E
09-10
0.00
0.00
B.E
10- 11
0.00
Proj.
B.E
11- 12
3.01
36.99
0.00
0.00
0.00
1172.30
144.70
50.00
50.00
0.00
3240.13
1851.87
0.00
100.00
0.00
50.82
2299.18
0.00
0.00
0.00
3290.95
4151.05
0.00
100.00
0.00
2.28
141.72
0.00
0.00
0.00
226.83
93.17
0.00
0.00
0.00
0.00
244.59
185.41
0.00
0.00
0.00
0.00
473.70
420.30
5318.54
4765.14
0.00
40.00
115.00
0.00
20.00
170.00
0.00
0.00
0.00
0.00
0.00
0.00
86
Remarks
ANNUAL PLAN 2010-11 - MoC DETAILS OF SCHEMES OF EMSC CONTROL, REHABILITATION AND CONTROL OF FIRES
Company: SCCL
Rs. Crores
Sl.
No.
A
(i)
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
n)
o)
p)
2006-07
Cumulative during
X Plan (2002-07)
ACTUAL
Singareni Collieries Co. Ltd.
Environmental measures
Ongoing projects
Baseline data generation, preparation of EMP etc.
for proposed projects viz. Kasipet, Abbapur and
Dorli Blocks.
Baseline data generation, preparation of EMP for JVR OC-I
Baseline data generation and preparation of EMPs for
Projects JK-5 OC, MNG.OC-II Ext., RG OC-III Exp and
MNG OCP.
Baseline data generation and preparation of EMPs for
New Projects.SRP OC-II, Sravanapalli OC and Indaram
OC
Baseline data generation, preparation of EMP etc. for
proposed projects viz. Koyagudem OC-I(Phase-II),
Koyagudem OC-II, RG.OC-I (Expansion), Adriyala Shaft
Block
Jallaram Shaft, Shanthikhani Longwall.
Construction of Check dams/rock fill dams/settling
ponds/toe walls/
garland drains, ETPs, RWHS etc. at OCPs as per the
requirements.
Payment of Statutory fees under Air & Water acts for
obtaining consent for Establishment (CFE) for New
Projects.
Asphalting of internal roads and approach roads
Pollution monitoring facilities
Greenbelt development and bio-engineering
Plant and Machinery , Equipment for Environment
Protection
Noise & Blast vibration control measures
Reclamation / Subsidence Management
Others i.e disposal of shale and waste material
Pollution abatement including dust extraction systems
/Water spray equipment at CHPs & OCPs.
Vehicles for Environment Department (Corporate & RGM
Region)
0.113
0.200
2007-08
BE
RE
0.190
Nil
0.065
0.047
0.060
0.315
0.315
2008-09
ACTUAL
2009-10
2010-11
ACTUAL
BE
RE
Proposed
0.049
0.000
0.000
0.000
0.347
0.026
0.026
0.000
0.026
0.000
0.000
0.012
0.000
0.000
0.000
0.300
0.113
0.138
0.298
0.102
0.102
0.200
3.569
3.569
3.391
1.620
1.078
1.078
1.000
0.298
0.150
0.400
0.085
0.230
0.000
0.000
0.500
2.522
0.524
0.892
4.760
2.522
0.446
0.892
4.760
0.780
20.000
0.545
1.180
10.977
20.000
0.545
1.180
10.977
10.000
0.500
1.000
20.000
0.300
0.150
0.386
0.025
0.000
0.150
0.386
0.025
0.000
0.020
0.500
0.400
0.945
0.020
0.500
0.400
0.945
0.050
0.500
0.400
3.000
0.100
0.200
0.200
0.000
0.000
0.000
87
0.036
4.000
ANNUAL PLAN 2010-11 - MoC DETAILS OF SCHEMES OF EMSC CONTROL, REHABILITATION AND CONTROL OF FIRES
Company: SCCL
Rs. Crores
Sl.
No.
q)
r)
(ii)
a)
b)
d)
f)
g)
h)
i)
j)
(iii)
a)
b)
c)
d)
e)
f)
g)
h)
i)
Cumulative during
X Plan (2002-07)
ACTUAL
Furniture for Environment Department
Expenditure for Environmental Clearances and scientific
studies
as advised by MoEF
New projects
Baseline data generation and EIA/EMP preparation for new
projects
(KTK Long wall, RKP shaft block)
Baseline data generation and preparation of EMPs for
power plants
c)
e)
2006-07
2007-08
BE
0.100
0.100
RE
0.100
0.100
0.000
0.000
0.062
0.000
0.062
0.060
0.315
0.037
0.075
0.100
0.050
2008-09
ACTUAL
ACTUAL
2009-10
2010-11
0.008
BE
0.005
0.005
RE
0.005
0.005
Proposed
0.000
0.200
0.038
0.140
0.140
0.020
0.012
0.000
0.000
0.012
0.315
0.075
0.074
0.074
0.018
0.075
0.057
0.000
0.000
0.000
0.062
0.386
0.386
1.000
0.045
0.500
0.730
0.045
0.500
0.730
0.050
0.500
0.550
0.840
0.840
0.000
0.685
0.000
0.000
0.100
0.013
0.200
1.000
1.000
0.750
0.500
0.200
1.000
1.000
0.750
0.500
0.150
1.000
1.000
1.000
0.500
0.900
0.900
0.500
0.128
0.062
0.020
0.017
1.316
0.252
88
0.036
1.316
0.086
6.372
0.920
0.656
6.308
0.086
6.572
0.920
0.656
6.308
0.715
0.715
6.400
0.007
5.970
15.290
0.780
ANNUAL PLAN 2010-11 - MoC DETAILS OF SCHEMES OF EMSC CONTROL, REHABILITATION AND CONTROL OF FIRES
Company: SCCL
Rs. Crores
Sl.
No.
j)
k)
l)
B.
i)
a)
b)
ii)
a)
ii)
a)
b)
c)
C)
a)
b)
c)
d)
f)
2006-07
Cumulative during
X Plan (2002-07)
ACTUAL
Reclamation / Subsidence Management
Others i.e disposal of shale and waste material
Construction of Check dams/rock fill dams/settling
ponds/toe walls/
garland drains etc. at OCPs as per the requirements.
Sub-Total (A):
Subsidence study & control measures
Completed projects
21 Incline
Goleti 1&1A
Ongoing projects
Jallaram Shaft
New projects
Subsidence prediction study for renewal of mining leases
and control
Subsidence prediction study for new mines
Peddampet Shaft
Sub-Total (B)
Monitoring
Post-Project environmental monitoring data on Air and
water quality at all the SCCL Areas.
Consultancy payments & Scientific studies in the field of
Environment.
Preparation of Vegetation and land cover details using
satellite imageries for existing projects
Environmental quality monitoring equipment
Ground water studies
Sub-Total (C)
Total A+B+C
0.375
3.835
2007-08
2008-09
2009-10
2010-11
BE
1.820
0.060
3.140
RE
1.820
0.060
3.140
ACTUAL
ACTUAL
BE
1.000
1.000
0.500
RE
1.000
1.000
0.500
Proposed
1.000
0.500
1.000
34.374
36.214
19.925
20.072
45.246
45.246
46.062
0.100
0.100
0.031
0.053
0.500
0.500
0.100
0.018
0.066
0.018
0.100
0.100
0.024
0.302
0.100
0.100
0.031
0.053
0.500
0.500
0.300
0.121
0.535
0.500
0.500
0.250
0.250
0.500
0.500
0.600
0.037
0.075
1.768
1.768
0.139
0.300
0.300
0.400
0.023
Nil
0.500
0.100
0.100
0.100
0.633
4.770
0.402
NIL
2.670
37.144
0.448
0.500
3.216
39.530
0.500
0.050
1.450
47.196
0.500
0.050
1.450
47.196
1.050
0.050
2.200
48.562
0.158
0.533
89
0.200
0.014
0.403
20.359
0.250
20.375
90
Company
WCL
MCL
SECL
Activity
1.Addition of capacitors
2. Reorg. of power supply
3. Segregation of domestic feeder
4. Re-organisation of pumping
5. Conducting energy audit
6. Installation of underground
bunker
1. Power factor improvement
2.Demand management
3. Re-organisation of power Supp.
4. Awareness programme
5. Energy efficient lighting
6. Power system design Improv.
7. Construction of strata bunker
8. Re-organisation of pumping
circuit
9. Energy Audit Report
formulation
1. Power factor Correction
2. Re-organization of dewatering
pipe
3. Bore hole pumping
4. Construction of strata Bunker
5. Ventilation System
Improvement
6. Re-organisation of Transport
System
7. Re-organisation of Power
supply
8. Energy Efficient Lighting
9. Others
TOTAL
0.5535
0.212
0.440
1.700
0.15
0.500
1.120
0.150
14.00
2010
11
BE /
Target
1.800
0.15
0.50
0.08
0.800
0.180
1.712
0.420
0.100
2.000
0.160
0.800
0.030
0.230
0.50
0.05
0.50
1.000
2.700
0.500
0.080
10.200
0.070
2.000
0.080
0.850
0.800
0.300
0.500
0.500
16.250
0.100
0.120
2.000
0.400
0.500
0.020
0.160
0.050
0.05
0.50
1.000
2.25
0.250
0.300
3.000
0.200
5.800
0.340
0.320
0.400
2.300
0.600
1.350
0.000
4.140
1.000
17.080
0.200
4.100
1.250
12.810
0.582
0.750
0.750
0.800
0.680
0.332
0.509
0.770
0.565
0.680
0.770
0.565
0.680
0.700
0.400
0.500
0.350
0.430
0.430
0.400
0.100
1.334
0.120
1.229
0.120
1.229
0.100
1.000
2.723
0.335
6.945
20.6165
0.350
1.854
0.125
6.523
23.782
2.500
1.854
0.125
6.523
36.857
1.750
1.800
0.800
6.500
34.842
3.000
Actual
Expenditure
(08-09)
CIL
SCCL
91
2009 - 2010
BE
RE
COAL SALE OUTSTANDING DUES AS ON 31.03.08 & 31.03.09 OF POWER & OTHERS
COAL INDIA LIMITED
Rs.crores
SL.NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
SECTORS
31.3.2008
31.03.2009
185.80
100.92
48.91
107.51
67.85
13.74
70.92
50.84
320.44
49.31
-25.40
1.29
173.42
1.46
-0.01
20.04
-7.35
71.22
5.82
18.69
375.73
-0.68
0.58
1.29
2.48
3.27
1.89
167.33
177.10
140.26
15.18
64.26
28.60
5.60
84.93
62.47
304.57
30.15
-61.08
1.29
130.56
2.60
-0.01
11.68
12.29
169.35
7.98
60.61
241.16
-4.51
-9.27
15.59
5.33
-3.82
3.15
188.16
6.52
-2.18
11.07
-13.41
-0.02
-0.02
TOTAL POWER
1831.63
1681.82
OTHERS
221.44
260.53
G. TOTAL
2053.07
1942.35
POWER
BSEB
JSEB
UPRVUNL
PSEB
TNEB
HPGCL
RRVUNL
MSPGCL
MPPGCL
CSEB
GEB (GSECL)
WBSEB
WBPDCL
APGENCO
ASEB
KPCL
DPL
DVC
DVB
BTPS
NTPC
VPGC
BALCO
CESC
AEC
BSES
DPS
TVNL
HPCL
OPGC
BOKARO PS
RP Co.
TATA Hydro.
92
March-09
March-10
(Anticipated)
134.00
10.00
55.00
25.00
27.00
26.00
197.00
12.00
35.00
127.00
WEST BENGAL
9.27
9.51
9.66
JHARKHAND
93.41
128.57
159.79
WEST BENGAL
0.17
0.12
0.05
JHARKHAND
310.23
377.46
420.83
CCL
JHARKHAND
485.53
556.46
561.48
MCL
ORISSA
624.51
762.14
872.38
WCL
MAHARASHTRA
410.37
503.06
496.87
MADHYA PRADESH
89.86
106.35
99.04
MADHYA PRADESH
173.15
212.41
207.77
CHHATTISGARH
765.23
887.51
898.44
MADHYA PRADESH
504.40
645.17
624.47
UTTAR PRADESH
115.17
93.40
169.17
ASSAM
20.92
19.00
24.98
3602.22
4301.16
4544.93
ROYALTY
479.02
556.82
546.17
APMBL Cess
35.78
TOTAL SCCL
514.80
556.82
546.17
BCCL
SECL
NCL
NEC
TOTAL CIL
SCCL
AP
93
Target
Antic.
Projection
As on
As on
As on
As on
01.04.2009
01.04.2010
01.04.2010
01.04.2011
10 - 11
1 (a) No of Houses
4113308
414348
414337
414113
(b) Manpower
412350
401891
403724
392545
2 (a) No of Hospitals
85
85
86
87
(b) No of Beds
5835
5970
5970
5970
(c) No of Dispensaries
424
424
424
424
2294043
2297349
2295088
2297173
- Water Supply
(Total Population covered)
94
ANNUAL PLAN 2010-11 - MoC COMPANY WISE SAFETY & WELFARE MEASURES
Company: SCCL
Sl.
No.
0
Company
1
0.50
0.27
0.30
47,604
49,705
82,224
2009-10
2010-11 2011-12
Target Anticipated Proposed Projected
5
50,056
50,610
50,610
50,802
50,802
75,573
70,586
69,182
69,370
67,692
63,176
58%
66%
71%
73%
73%
75%
80%
1058
1058
1008
845
845
845
845
40
40
36
28
28
28
28
31.55
31.50
31.50
31.50
31.50
31.50
31.50
650,000
650,000
650,000
SCCL
1 Fatality Rate (Per
MT of Coal
produced)
2 No. of Houses
Manpower
Housing satisfaction
(%)
3 No. of Hospitals
No. of Beds
No. of Dispensaries
4 Water Supply
(Total Population
covered)
95
Cost of Production
(Rs. Per Tonne)
Company
ECL
BCCL
CCL
NCL
WCL
SECL
MCL
CIL
2006-07
Actual
2007-08
Actual
2008-09
Actual
2009-10
BE
2009-10
RE
2010-11
BE
OC
UG
Overall
505.08
3059.96
1172.48
742.99
3608.88
1702.81
792.32
4930.41
1984.67
1545.47
1646.66
1592.76
OC
UG
Overall
621.84
3284.55
1140.92
659.65
4059.40
1238.82
927.51
6480.00
1794.40
1459.61
1507.98
1475.35
OC
UG
Overall
514.58
2881.52
625.69
549.86
3464.67
670.28
663.59
5652.13
842.72
750.60
833.95
810.60
OC
UG
Overall
544.78
527.93
601.06
544.78
527.93
601.06
595.47
625.72
634.92
OC
UG
Overall
619.62
1455.44
811.10
706.75
1618.05
915.47
821.20
2123.20
1115.76
1095.37
1127.90
1194.15
OC
UG
Overall
346.17
1424.22
543.19
353.15
1612.58
576.95
378.67
1963.78
652.38
660.58
651.20
672.24
OC
UG
Overall
214.46
1292.05
240.97
229.56
1395.00
257.59
324.00
1664.06
353.84
316.07
391.28
343.19
OC
UG
Overall
426.76
2017.61
614.88
452.29
2318.71
663.42
536.13
3114.36
812.71
736.64
781.70
772.10
96
ANNUAL PLAN 2010-11 - MoC COST OF PRODUCTION UG, OC, OVERALL & AVERAGE SALES REALISATION
Company: SCCL
Sl.
(Rs. Crs.)
Company
2006-07
2007-08
2008-09
Actual
Actual
Actual
Target
OC
1650.90
2156.53
UG
2148.62
Overall
3799.52
No.
0
2009-10
AP 2010-11
AP 2011-12
Anticip.
Proposed
Projected
2900.91
2454.38
2980.34
2850.55
2812.33
2240.80
2531.62
2291.10
2418.60
2497.54
2529.29
4397.33
5432.53
4745.48
5398.94
5348.09
5341.62
4573.49
5680.86
5305.61
5942.63
5958.81
6200.20
Cost of Production
SCCL
SCCL
3863.32
97
ECL
BCCL
CCL
NCL
WCL
SECL
MCL
CIL
2006-07
Actual
2007-08
Actual
2008-09
Actual
2009-10
BE
2009-10
RE
2010-11
BE
OC
UG
Overall
991.37
1699.16
1176.26
1173.82
1710.29
1353.49
1169.77
1936.04
1390.57
1291.31
1712.87
1771.60
OC
UG
Overall
930.71
1299.25
1002.55
979.66
1356.51
1043.86
1224.30
1626.82
1287.15
1290.98
1499.25
1594.39
OC
UG
Overall
763.14
1290.08
787.88
811.60
1380.09
835.08
958.21
1494.07
977.45
889.33
960.00
1010.00
OC
UG
Overall
872.59
909.31
1010.07
872.59
909.31
1010.07
970.17
1020.00
1070.00
OC
UG
Overall
965.51
1136.60
1004.70
1070.25
1269.59
1115.91
1188.27
1435.90
1244.31
1149.51
1183.74
1255.64
OC
UG
Overall
591.20
1244.03
710.51
652.27
1249.54
758.41
708.30
1411.32
829.69
810.15
817.60
846.47
OC
UG
Overall
462.37
919.32
473.61
483.64
949.92
494.86
550.47
926.62
558.84
510.26
582.24
604.28
OC
UG
Overall
719.97
1297.20
788.23
765.78
1342.49
831.01
856.99
1514.11
927.48
873.09
954.72
997.96
98
99
PROD - 2
Figures in Mt
10-11
11-12
(BE)
(Proj)
Actual 09-10
(08 - (BE)
09)
09-10
(RE)
0.04
Comp
0.02
0.05
0.12
0.04
0.01
0.03
0.06
0.03
0.16
0.04
0.07
0.09
0.01
0.03
0.03
0.12
0.23
0.04
0.03
0.12
0.08
0.03
0.05
0.08
0.15
0.08
0.03
0.03
0.13
0.02
0.05
0.1
0.05
0.02
0.03
0.06
0.03
0.15
0.04
0.06
0.12
0.01
0.04
0.03
0.11
0.24
0.05
0.02
0.1
0.1
0.04
0.05
0.07
0.15
0.08
0
0.04
0.05
0.06
Shown in Complted project
0.02
0
0.00
0.06
0.06
0.06
0.13
0.14
0.14
0.04
0.06
0.06
0.01
0.00
0.00
0.02
0.03
0.05
0.07
0.11
0.11
0.03
0.04
0.00
0.16
0.16
0.16
0.03
0.05
0.05
0.07
0.08
0.08
0.09
0.09
0.09
0.01
0
0.00
0.03
0.04
0.05
0.03
0.00
0.00
0.12
0.13
0.14
0.24
0.24
0.27
0.04
0.04
0.04
0.03
0.03
0.04
0.11
0.13
0.14
0.07
0.10
0.09
0.03
0.04
0.05
0.05
0.04
0.04
0.09
0.09
0.09
0.15
0.16
0.17
0.07
0.06
0.06
0.00
0.00
0.00
0.10
0.02
0.03
0.02
0.06
0.03
0.06
0.04
0.20
0.04
0.11
0.20
0.23
0.10
0.02
0.06
0.10
0.09
0.04
0.18
0.03
0.11
0.03
0.04
0.03
0.05
0.03
0.08
0.05
0.3
0.04
0.1
0.24
0.21
0.12
0.02
0.07
0.07
0.1
0.05
0.19
0.03
0.1
0.03
0.04
0.02
0.08
0.03
0.06
0.05
0.23
0.04
0.12
0.19
0.24
0.1
0.02
0.06
0.07
0.09
0.04
0.2
0.02
0.12
0.03
0.04
0.00
0.08
0.00
0.07
0.06
0.27
0.05
0.14
0.2
0.24
0.10
0.02
0.08
0.07
0.12
0.05
0.2
0
0.13
0.03
0.05
0.00
0.09
0.00
0.05
0.06
0.28
0.06
0.14
0.2
0.24
0.10
0.03
0.08
0.07
0.12
0.05
0.20
0.00
100
PROD - 2
Actual 09-10
(08 - (BE)
09)
09-10
(RE)
Figures in Mt
10-11
11-12
(BE)
(Proj)
3.58
0.04
0.00
0.03
0.00
0.26
0.09
3.94
0.00
0.00
0.00
0.00
0.00
0.00
3.67
0.00
0.00
0.00
0.00
0.22
0.10
3.91
0.00
0.00
0.00
0.00
0.2
0.10
4.02
0.00
0.00
0.00
0.00
0.00
0.10
0.00
0.14
0.00
0.00
0.00
0.00
0.01
0.89
0.02
0.21
0.00
0.00
0.30
0.02
0.00
0.17
0.00
0.10
0.00
0.00
0.00
0.00
0.10
1.00
0.00
0.00
0.00
0.00
1.00
0.10
0.00
0.00
0.00
0.25
0.00
0.00
0.00
0.00
0.14
1.20
0.00
0.00
0.00
0.00
1.00
0.12
0.00
0.00
0
0.02
0.00
0.00
0.00
0.00
0.20
1.20
0.00
0.00
0.07
0.31
1.00
0.00
0.00
0.20
0.00
0.00
0.16
0.20
0.00
0.00
0.09
1.05
0.00
0.00
0.15
0.40
1.20
0.00
0.00
0.30
0.19
0.00
0.00
0.00
0.00
0.00
0.00
0.02
0.14
0.20
0.00
0.00
0.00
0.00
0.00
0.10
0.10
0.10
0.11
0.10
0.00
0.00
0.00
0.10
0.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.98
0.00
0.10
0.00
0.80
1.00
0.00
1.70
0.00
2.00
0.00
0.00
0.00
0.00
4.02
4.44
0.40
0.00
0.00
0.00
2.90
2.90
0.50
0.00
0.00
0.00
5.13
5.45
0.40
0.20
0.00
0.00
5.65
5.95
0.20
0.85
0.00
0.00
7.00
7.10
8.01
6.84
9.12
9.86
11.12
101
PROD - 2
Actual 09-10
(08 - (BE)
09)
09-10
(RE)
Figures in Mt
10-11
11-12
(BE)
(Proj)
0.07
0.10
0.24
0.26
0.23
0.04
0.08
0.07
0.02
0.09
0.06
0.03
0.07
0.08
0.05
0.66
0.12
0.03
0.44
0.17
0.11
0.07
0.13
0.25
0.27
0.13
0.05
0.08
0.06
0.03
0.09
0.06
0.05
0.11
0.1
0.04
0.7
0.12
0.03
0.46
0.23
0.13
0.08
0.11
0.24
0.25
0.24
0.03
0.09
0.07
0.03
0.09
0.06
0.04
0.07
0.08
0.05
0.6
0.13
0.03
0.46
0.17
0.1
0.08
0.12
0.26
0.27
0.25
0.06
0.11
0.07
0.03
0.11
0.06
0.06
0.10
0.12
0.06
0.56
0.14
0.04
0.46
0.2
0.13
0.08
0.12
0.27
0.28
0.25
0.06
0.11
0.07
0.03
0.12
0.06
0.07
0.10
0.12
0.07
0.42
0.14
0.04
0.40
0.2
0.13
0.06
0.09
0.13
0.05
0.07
0.1
0.11
0.19
0
0.08
0.06
0.09
0.13
0.05
0.08
0.08
0.11
0.15
0.06
0.1
0.08
0.11
0.16
0.06
0.10
0.08
0.09
0.08
0.09
0.09
0.03
0.12
0.05
3.69
0.06
0.2
0.06
4.080
0.03
0.13
0.06
3.730
0.04
0.13
0.06
4.110
0.04
0.14
0.06
3.980
0.16
0.03
1.28
0.13
0.23
0.45
0.39
0.00
0.20
8.69
0.10
0.26
0
0
1.25
0
0.3
0.6
0.5
0.00
0
9.50
0.00
0.00
0.18
0
1.3
0.13
0.3
0.45
0.5
0.00
0.17
10.00
0.10
0.24
0.19
0.19
1.2
0.00
0.30
0.45
0.41
0.00
0.2
10.00
0.05
0.24
0.20
0.20
1.20
0.00
0.30
0.45
0.41
0.10
0.20
10.50
0.00
0.24
3.20
0.03
3.40
0.00
3.30
0.03
3.40
0.05
3.40
0.00
102
PROD - 2
Actual 09-10
(08 - (BE)
09)
09-10
(RE)
Figures in Mt
10-11
11-12
(BE)
(Proj)
15.14
15.55
16.70
16.68
17.20
18.83
19.63
20.43
20.79
21.18
0.21
0.23
0.00
0.00
0.57
0.00
0.00
0.00
0.00
0.12
0.00
0.00
0.00
0.00
1.12
0.17
0.00
0.00
0.00
0.17
1.12
0.17
1.29
0.300
0.320
0.00
0.00
0.440
0.00
0.00
0.05
0.00
0.120
0.000
0.00
0.00
0.00
1.23
0.200
0.00
0.00
0.000
0.20
1.23
0.20
1.43
0.24
0.29
0.00
0.00
0.45
0.00
0.00
0.00
0.00
0.12
0.00
0.00
0.00
0.00
1.10
0.35
0.00
0.00
0.00
0.35
1.10
0.35
1.45
0.27
0.60
0.00
0.00
0.48
0.00
0.00
0.00
0.00
0.13
0.00
0.00
0.00
0.00
1.48
0.40
0.00
0.20
0.27
0.87
1.48
0.87
2.35
0.27
0.66
0.00
0.00
0.50
0.03
0.02
0.05
0.03
0.14
0.20
0.00
0.00
0.10
2.00
0.40
0.00
0.30
0.30
1.00
2.00
1.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.75
1.00
0.35
0.00
0.00
3.10
0.00
0.00
0.00
8.39
19.74
28.13
3.10
3.10
9.25
21.75
31.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.70
0.00
0.00
0.00
Rajmahal Expansion OC in
ongoing Project
0.00
0.00
0.70
0.00
0.00
0.00
0.00
0.00
8.50
22.50
31.00
0.00
0.00
9.50
23.50
33.00
0.70
0.70
10.00
26.00
36.00
Prod-2
Million Tonnes
A1
Name of Mine/Project
Existing Mines
1 Akashkinaree
2 Alkusa
3 Angarpathra(AARC)
4 Balihari 5&6 pit
5 Basdeopur
6 Basdeopur
7 Bassuriya
8 Bassuriya
9 Bastacolla/Bera
10 Bastacolla
11 Bastacolla(Kuya/Dobari/
Ghanoo.)
12 Bera
13 Bhagaband
14 Bhatdih
15 Bhowrah North
16 Bhowrah South
Bhowrah South
17 Dahibari
18 Damoda
19 Dhansar
20 Dobari
21 East Bassuriya
22 East Bassuriya
23 Ena
24 Ghanoodih
25 Ghanoodih
26 Godhur
27 Gondudih
28 Gopalichak
29 Govindpur UG
30 Jealgora
31 Jeenagora
32 Jogidih/Govindpur
33 Jogidih
Type
of
Mine
Name of the
Area
Type Latest Sanction PR Cap 08-09 09-10 09-10 Target 08-09 10-11
of
CMPDI
Date
(Actual) (Target) (Ant) 10-11 Revised (Tar)
Coal Cap(mty)
1.04.09
Target
11-12
Mechanisation proposed
To continue prodcution
UG
UG
UG
UG
UG
UG
OC
UG
OC
UG
UG
GOVIND
KUSTORE
KATRAS
PB
SIJUA
SIJUA
KUSUNDA
KUSUNDA
BASTA
BASTA
BASTA
NC
NC
NC
C
C
NC
NC
NC
NC
NC
C
0.115
0.184
0.265
0.064
0.000
0.098
0.000
0.060
0.600
0.393
0.106
0.092
0.100
0.000
0.000
0.071
0.150
0.090
0.115
0.000
0.010
0.040
0.140
0.090
0.100
0.000
0.000
0.050
0.090
0.000
0.100
0.000
0.020
0.060
0.125
0.105
0.120
0.020
0.000
0.070
0.130
0.090
0.100
0.000
0.000
0.050
0.150
0.090
0.100
0.000
0.000
0.050
0.050
0.170
0.200
0.000
0.030
0.100
0.235
0.000
0.030
0.100
0.180
0.000
0.000
0.000
0.200
0.000
0.030
0.100
0.245
0.000
0.000
0.000
0.230
0.000
0.000
0.000
0.230
0.000
UG
UG
UG
UG
UG
UG
UG
UG
UG
UG
OC
UG
OC
OC
UG
UG
UG
UG
UG
UG
UG
UG
UG
BASTA
PB
W/JHARIA
E/JHARIA
E/JHARIA
E/JHARIA
C.VIC
BARORA
KUSUNDA
BASTA
KUSUNDA
KUSUNDA
KUSTORE
BASTA
BASTA
KUSUNDA
KUSUNDA
PB
GOVIND
LODNA
LODNA
GOVIND
GOVIND
NC
C
C
C
C
NC
NC
NC
NC
NC
NC
NC
C
C
NC
NC
NC
C
NC
C
NC
C
NC
0.133
0.057
0.000
0.090
0.161
0.000
0.000
0.132
0.138
0.332
0.000
0.050
0.190
0.000
0.000
0.193
0.000
0.000
0.115
0.000
0.000
0.000
0.101
0.090
0.042
0.000
0.047
0.024
0.043
0.000
0.055
0.100
0.221
0.000
0.031
0.113
0.036
0.000
0.121
0.000
0.012
0.110
0.000
0.000
0.000
0.087
0.145
0.040
0.000
0.065
0.090
0.000
0.000
0.065
0.125
0.210
0.000
0.000
0.030
0.300
0.000
0.135
0.000
0.000
0.120
0.000
0.000
0.000
0.100
0.120
0.040
0.000
0.065
0.090
0.000
0.000
0.065
0.100
0.180
0.000
0.000
0.030
0.400
0.000
0.110
0.000
0.000
0.120
0.000
0.000
0.000
0.100
0.150
0.000
0.080
0.000
0.100
0.140
0.040
0.000
0.060
0.085
0.000
0.000
0.300
0.240
0.000
0.000
0.000
0.500
0.000
0.000
0.000
0.000
0.090
0.000
0.000
0.000
0.210
0.000
0.075
0.110
0.245
0.000
0.020
0.090
0.600
0.000
0.120
0.000
0.050
0.120
0.000
0.000
0.000
0.105
0.120
0.030
0.000
0.050
0.080
0.000
0.000
0.060
0.100
0.230
0.000
0.000
0.100
0.250
0.000
0.110
0.000
0.030
0.100
0.000
0.000
0.000
0.100
0.120
0.030
0.000
0.050
0.080
0.000
0.000
0.060
0.100
0.230
0.000
0.000
0.100
0.250
0.000
0.110
0.000
0.030
0.120
0.000
0.000
0.000
0.110
103
Group Sl.
No. No.
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
Name of Mine/Project
Joyrampur
Joyrampur
Kankanee
Keshalpur
Kharkharee
Khas Kusunda
Khas Kusunda
Kooridih/Block-IV
Kustore
Kustore
Kusunda
Kuya
Lohapatti
Lohapatti
Mudidih
Mudidih
Muraidih
Nichitpur
Nichitpur
North Tisra
North Tisra
Patherdih
Phularitand
Phularitand
Phularitand
Pootkee
Ramkanali
Salanpur
Ramkanali (AARC)
Salanpur
Sendra Bansjora
Sendra Bansjora
South Govindpur
Tetulmari
Victoria West
West Mudhidih
Type
of
Mine
OC
UG
UG
UG
UG
OC
UG
UG
UG
UG
UG
UG
UG
UG
UG
UG
OC
OC
UG
UG
UG
UG
OC
OC
UG
UG
OC
OC
UG
UG
UG
UG
UG
UG
UG
UG
Name of the
Area
LODNA
LODNA
SIJUA
KATRAS
GOVIND
KUSUNDA
KUSUNDA
GOVIND
KUSTORE
KUSTORE
KUSUNDA
BASTA
W/JHARIA
W/JHARIA
SIJUA
SIJUA
BARORA
SIJUA
SIJUA
LODNA
LODNA
E/JHARIA
BARORA
BARORA
BARORA
PB
KATRAS
KATRAS
KATRAS
SIJUA
SIJUA
GOVIND
SIJUA
C.VIC
KATRAS
Type Latest Sanction PR Cap 08-09 09-10 09-10 Target 08-09 10-11
of
CMPDI
Date
(Actual) (Target) (Ant) 10-11 Revised (Tar)
Coal Cap(mty)
1.04.09
C
0.000
0.000 0.000 0.000 0.000 0.000 0.000
NC
0.151
0.088 0.105 0.090 0.000 0.105 0.090
C
0.000
0.000 0.000 0.000 0.000 0.040 0.000
NC
0.000
0.000 0.000 0.000 0.000 0.000 0.000
C
0.073
0.058 0.065 0.065 0.090 0.090 0.080
NC
0.460
0.000 0.000 0.000 0.000 0.000 0.000
NC
0.000
0.000 0.000 0.000 0.000 0.000 0.000
NC
0.035
0.043 0.060 0.060 0.000 0.060 0.060
C
0.000
0.000 0.000 0.000 0.000 0.000 0.000
NC
0.000
0.000 0.000 0.000 0.000 0.000 0.000
NC
0.000
0.000 0.000 0.000 0.000 0.000 0.000
NC
0.135
0.072 0.075 0.070 0.070 0.080 0.070
C
0.000
0.000 0.000 0.000 0.000 0.000 0.000
NC
0.032
0.023 0.027 0.027 0.000 0.025 0.025
C
0.000
0.000 0.000 0.000 0.000 0.000 0.000
NC
0.092
0.099 0.105 0.100 0.000 0.100 0.100
NC
1.428
1.708 1.512 1.663 1.800 1.568 1.736
NC
1.020
0.684 0.500 0.455 0.000 0.600 0.450
NC
0.000
0.000 0.000 0.000 0.000 0.000 0.000
C
0.110
0.000 0.000 0.000 0.000 0.000 0.000
NC
0.000
0.098 0.100 0.090 0.000 0.095 0.090
C
0.046
0.028 0.036 0.036 0.000 0.045 0.025
C
0.000 0.000 0.000 0.000 0.000 0.000
NC
0.000 0.000 0.000 0.000 0.000 0.000
C
0.112
0.029 0.030 0.030 0.000 0.030 0.030
C
0.000
0.000 0.000 0.000 0.000 0.000 0.000
NC
0.000
0.000 0.000 0.000 0.000 0.000 0.000
0 NC
0.000 0.000 0.000 0.000 0.000 0.000
NC
0.000
0.101 0.115 0.100 0.100 0.120 0.100
NC
0.141
0.091 0.080 0.080 0.000 0.090 0.075
C
0.000
0.000 0.045 0.040 0.050 0.070 0.000
NC
0.161
0.179 0.165 0.160 0.300 0.130 0.160
C
0.000
0.000 0.000 0.000 0.000 0.000 0.000
NC
0.093
0.128 0.135 0.100 0.000 0.145 0.100
C
0.000 0.000 0.000 0.000 0.000 0.000
NC
0.234
0.147 0.175 0.150 0.150 0.185 0.140
Target
11-12
0.000
0.090
0.000
0.000
0.080
0.000
0.000
0.000
0.000
0.000
0.000
0.070
0.000
0.025
0.000
0.100
1.960
0.450
0.000
0.000
0.090
0.025
0.000
0.000
0.030
0.000
0.000
0.000
0.120
0.000
0.000
0.160
0.000
0.100
0.000
0.140
UG
4.096
2.786
2.690
OC
3.698
2.711
2.760
104
More
prodcution
for
mechanisation
&
continuance of prodcution in UG mines, some of
the UG were earlier proposed for closure.
Muraidih to be operated as Block-III by 11-12.
Group Sl.
No. No.
A2.
Name of Mine/Project
Type
of
Mine
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
Name of the
Area
Type Latest Sanction PR Cap 08-09 09-10 09-10 Target 08-09 10-11
of
CMPDI
Date
(Actual) (Target) (Ant) 10-11 Revised (Tar)
Coal Cap(mty)
1.04.09
7.794
5.497 5.525 5.426 4.700 6.253 5.291
LODNA
C
LODNA
C
SIJUA
C
SIJUA
NC
W/JHARIA
C
BL-II
NC
KATRAS
NC
BL-II
NC
BARORA
NC
KUSUNDA
NC
BARORA
NC
KUSUNDA
NC
Kustore
C
Kustore
NC
PB
C
PB
C
PB
C
LODNA
NC
GOVIND
C
BL-II
NC
BL-II
NC
CV
NC
KUSUNDA
NC
KUSUNDA
C
KATRAS
NC
BASTACOLLA NC
BASTACOLLA NC
BASTACOLLA C
BASTACOLLA NC
LODNA
NC
GOVIND
C
SIJUA
C
BARORA
NC
W/JHARIA
NC
W/JHARIA
C
BARORA
NC
0C
BARORA
NC
SIJUA
C
0.175
0.109
0.190
0.000
0.000
0.000
0.036
0.887
0.027
0.000
0.000
0.207
0.000
0.006
0.000
0.019
0.000
0.000
0.000
0.000
0.873
0.000
1.010
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.057
0.000
0.000
0.000
0.631
0.000
0.000
0.394
105
0.200
0.200
0.040
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.800
0.000
0.000
0.000
0.025
0.100
0.000
0.000
0.000
0.000
0.000
0.500
0.000
0.000
0.000
0.600
0.000
0.000
0.000
0.412
0.000
0.000
0.000
0.000
0.700
0.100
0.000
0.250
0.200
0.200
0.040
0.000
0.000
0.000
0.300
0.400
0.000
0.000
0.000
0.778
0.000
0.250
0.000
0.000
0.070
0.000
0.000
0.000
0.350
0.000
0.500
0.000
0.000
0.000
0.250
0.000
0.000
0.000
0.412
0.000
0.000
0.000
0.000
0.700
0.000
0.000
0.200
0.180
0.400
0.000
0.000
0.000
0.000
0.300
0.200
0.000
0.000
0.000
0.300
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.300
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.190
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.250
0.250
0.110
0.000
0.000
0.000
0.600
0.650
0.000
0.000
0.000
0.100
0.000
0.400
0.000
0.070
0.000
0.000
0.000
0.000
0.650
0.000
0.600
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.700
0.000
0.000
0.360
0.000
0.175
0.000
0.000
0.000
0.000
0.200
0.750
0.000
0.000
0.000
0.560
0.185
0.200
0.000
0.000
0.000
0.000
0.000
0.000
0.450
0.200
1.000
0.000
0.000
0.000
0.000
0.300
0.000
0.000
0.000
0.000
0.200
0.000
0.000
0.430
0.050
0.000
0.070
Target
11-12
5.450
0.000
0.060
0.000
0.000
0.000
0.000
0.200
0.500
0.050
0.000
0.000
0.630
0.115
0.285
0.000
0.000
0.000
0.000
0.000
0.000
0.450
0.200
1.000
0.000
0.000
0.000
0.000
0.300
0.000
0.220
0.000
0.000
0.200
0.000
0.000
0.380
0.050
0.000
0.100
Group Sl.
No. No.
Name of Mine/Project
40
41
42
43
44
45
46
47
48
49
50
51
52
53
Jogta
Kankanee
Jogta
Sendra Bansjora Patch
Tetulmari Patch
Salanpur Patch
West Mudidih/Kanta pahari
Gaslitand
Block-IV
Akashkinaree
Mohulbani Patch
Bhowra (N) Patch
Bhowra (S) Patch
New Akash kinaree Patch
B/Block-IV
Type
of
Mine
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
Name of the
Area
SIJUA
SIJUA
SIJUA
KATRAS
KATRAS
GOVIND
GOVIND
EJ
EJ
EJ
GOVIND
Type Latest Sanction PR Cap 08-09 09-10 09-10 Target 08-09 10-11
of
CMPDI
Date
(Actual) (Target) (Ant) 10-11 Revised (Tar)
Coal Cap(mty)
1.04.09
C
0.000 0.500 0.000 0.000 0.000 0.200
NC
0.300 0.350
0.330
NC
0.000 0.500
0.000
C
0.000 0.000 0.000 0.000 0.000 0.100
NC
0.000 0.000 0.000 0.000 0.000 0.180
NC
0.000 0.000 0.000 0.000 0.000 0.100
NC
0.000 0.000 0.000 0.000 0.000 0.200
0C
0.000 0.000
0.210
C
0.000 0.000 0.000 0.000 0.260 0.000
NC
0.946 1.223 0.700 0.000 0.900 0.810
C
0.000 0.000 0.000 0.000 0.000 0.000
C
0.025 0.000 0.100 0.000 0.100 0.150
C
0.000 0.000 0.050 0.000 0.000 0.000
NC
0.031 0.000 0.000 0.000 0.000 0.200
0.100
0.400
0.200
0.100
0.200
0.100
0.200
0.300
0.000
0.810
0.000
0.150
0.000
0.200
0.000
0.000
0.000
5.623
UG
OC
0.000
4.096
3.698
7.794
5.623
2.786
8.334
11.120
5.950
3.083
8.392
11.475
0.000
0.033
0.183
0.000
0.000
0.200
0.010
0.030
0.120
0.000
1.157
0.000
0.000
1.900
0.000
0.077
0.334
June-92
1.870
2.400
4.170
6.570
6.000
3.295
8.958
12.253
GOVIND
C.VIC
KUSTORE
NC
C
C
UG
KUSTORE
NC
OC
OC
OC
E/JHARIA
E/JHARIA
BL-II
NC
C
NC
0.280
0.040
0.710
0.360
OC
BL-II
0.000
2.500
0.100
0.200
9 Block IV OCP(C)(0.50)
10 Block IV OCP(NC) (0.75)
Jogidih OCP
11 BlockIIOCP(NC)Benedih (0.90)
12 BlockIIOCP(NC)Nudkrkee
(0.80)
OC
OC
OC
OC
OC
GOVIND
GOVIND
GOVIND
BL-II
BL-II
C
NC
NC
NC
NC
1.450
0.000
0.500
0.750
0.688
0.200
0.000
0.000
0.000
0.000
1.100
0.000
0.000
0.000
0.600
0.400
0.000
0.000
0.000
0.900
0.800
106
0.600
0.300
0.000
0.000
0.000
0.000
1.300
0.000
0.000
0.000
0.000
1.100
0.000
0.000
0.000
7.250 7.500
2.755 2.690
9.786 10.260
12.541 12.950
OC
UG
UG
Oct-80
0.470
0.180
0.700
6.350
2.778
8.998
11.776
0.000
7.500
UG
OC
Total (A2)
B.
Target
11-12
0.600
0.400
0.000
0.000
0.000
Group Sl.
No. No.
Name of Mine/Project
Type
of
Mine
Name of the
Area
OC
OC
C.VIC
BARORA
OC
OC
UG
UG
OC
OC
OC
OC
OC
OC
E/JHARIA
E/JHARIA
KUSTORE
KUSTORE
KUSUNDA
BASTA
KUSUNDA
KUSUNDA
BASTA
BASTA
C
NC
NC
C
NC
NC
NC
C
C
NC
25
26
27
28
29
30
31
OC
OC
OC
UG
UG
UG
OC
KUSUNDA
BL-II
LODNA
KATRAS
KATRAS
KATRAS
KATRAS
OC
OC
UG
UG
UG
UG
UG
0.000
0.260
0.000
0.300
0.000
1.010
0.210
0.360
0.560
0.000
0.210
0.640
0.720
NC
NC
NC
C
NC
C
NC
0.000
0.520
0.290
0.270
0.310
KUSUNDA
KUSUNDA
LODNA
SIJUA
BARORA
C.VIC
GOVIND
C
NC
C
C
C
NC
NC
0.150
0.510
0.101
0.061
0.063
0.226
0.066
UG
OC
OC
UG
OC
OC
W/JHARIA
BARORA
W/JHARIA
W/JHARIA
C.VIC
LODNA
C
NC
C
C
NC/C
NC
0.252
1.122
0.145
0.000
1.860
0.240
0.360
0.700
E/JHARIA
KUSTORE
KUSTORE
C
NC
C
0.049
1.270
0.000
0.570
0.420
32
33
34
35
36
37
38
39
40
41
42
43
44
Gondudih
Jamunia OCP (0.27)
Jeenagora Patch (0.31)
Katras (0.9) Proj./E.K.C.
Katras (East Katras)
Katras Choitudih
Keshalpur 2nd Expn OCP
(1.00)/West Mudidih
Kusunda OCP
Kusunda OCP/Dhansar
Lodna Aug. (0.240)
Loyabad Augmentation (0.150)
Madhuband Sector A (0.21)
Mech Ldg. Basantimata(0.130)
Mech. Extrn.& Dev/Dep. IX
Seam Maheshpur(0.14)
Moonidih (1.50)
Muraidih Expn.OCP
Murulidih 20/21 Patch
Murulidih 20/21 RPR (0.24)
N.L.O.C.P. / K.C.OCP (0.36)
N.TISRA (NC) OCP (0.70)
0.000
0.148
1.680
0.900
1.000
1.000
0.240
0.150
0.210
0.140
Dec-94
1.500
0.960
Target
11-12
0.000
0.100
0.000
0.218
0.000
0.000
0.000
0.668
0.000
0.014
0.000
0.594
0.000
0.300
0.000
0.000
0.000
0.800
0.000
0.000
0.000
0.600
0.000
0.200
0.000
0.000
0.000
0.300
0.000
0.000
0.000
0.600
0.000
0.000
0.000
0.000
0.000
0.950
0.200
0.030
0.000
0.000
0.000
0.250
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.600
0.000
0.300
0.000
0.000
0.000
1.200
0.000
0.000
0.000
0.600
0.000
0.300
0.000
0.000
0.000
1.200
0.000
0.000
0.000
0.300
0.168
0.308
0.352
0.000
0.000
0.060
1.614
0.000
0.700
0.400
0.000
0.000
0.040
1.500
0.000
0.700
0.400
0.000
0.000
0.040
1.740
0.000
0.700
0.400
0.000
0.120
0.000
1.500
0.000
0.700
0.380
0.000
0.000
0.085
1.450
0.000
0.000
0.350
0.000
0.000
0.030
1.800
0.000
0.000
0.350
0.000
0.000
0.030
1.800
0.179
0.237
0.072
0.056
0.026
0.135
0.059
0.300
0.200
0.100
0.040
0.025
0.175
0.000
0.230
0.170
0.070
0.040
0.025
0.150
0.000
0.500
0.000
0.000
0.000
0.040
0.180
0.000
0.350
0.280
0.110
0.060
0.035
0.180
0.060
0.000
0.000
0.070
0.000
0.030
0.130
0.000
0.000
0.000
0.080
0.000
0.030
0.130
0.000
0.174
1.347
0.000
0.110
0.000
1.101
0.252
1.188
0.000
0.176
0.000
1.700
0.152
1.307
0.000
0.176
0.000
1.500
0.860
1.330
0.000
0.240
0.000
0.600
0.205
1.232
0.000
0.115
0.000
1.200
0.400
1.364
0.000
0.110
0.000
1.600
0.750
1.540
0.000
0.110
0.000
1.600
0.000
0.972
0.000
0.000
0.850
0.000
107
Group Sl.
No. No.
48
49
50
51
52
53
Name of Mine/Project
Type
of
Mine
Name of the
Area
OC
OC
OC
UG
OC
OC
UG
OC
SIJUA
BARORA
LODNA
E/JHARIA
LODNA
SIJUA
UG
UG
UG
UG
OC
OC
OC
OC
OC
UG
UG
LODNA
C
LODNA
C
PB
C
E/JHARIA
C
BARORA
C
CV
C
C.V.
NC
BARORA
C
BASTACOLLA NC
BASTACOLLA C
PB
C
OC
KUSUNDA
Total(B)
C.
D.
Type Latest Sanction PR Cap 08-09 09-10 09-10 Target 08-09 10-11 Target
Remarks - Conditions/Reasons for Variation/
of
CMPDI
Date
(Actual) (Target) (Ant) 10-11 Revised (Tar) 11-12
Constraints
envisaged
in
incremental
Coal Cap(mty)
production.
1.04.09
NC
0.790
0.270
0.298 0.300 0.250 0.620 0.285 0.300 0.300 The mine has land problem - prodcution reduced.
NC
1.040
Dec-02
0.800
0.635 0.900 0.900 0.800 1.000 0.800 0.800
NC
0.000
1.230
0.000 0.000 0.000 0.600 0.000 0.000 0.000 Have been taken in Amalgamted OC North Tisra.
C
0.220
0.600
0.097 0.084 0.084 0.000 0.135 0.090 0.090
NC
0.000 Sept-97 0.700
0.000 0.000 0.000 0.000 0.000 0.000 0.000
NC
0.620
0.480
0.469 0.500 0.500 0.600 0.600 0.500 0.500 The mine has land problems and limits the area.
1.742
1.015 1.132 0.937 1.520 1.290 1.155 1.450
14.932
11.803 13.708 12.552 14.430 12.242 12.964 12.740 The various mine have been considered in XIth
Plan projects under expansion PR.
16.674
12.818 14.840 13.489 15.950 13.532 14.119 14.190
0.073
0.098
Aug-03
Oct-03
Aug-03
Aug-03
Sept-02
Apr-03
0.270
0.240
0.270
0.120
0.450
0.550
1.300
0.600
1.200
0.290
0.680
0.048
0.053
0.000
0.000
0.000
0.000
1.244
0.000
Sep-97
0.700
Feb-98
1.410
0.370
NC
0.000
0.232
0.050
0.045
0.000
0.000
0.000
0.000
1.300
0.000
0.000
0.000
0.240
0.050
0.045
0.000
0.000
0.000
0.000
1.400
0.000
0.000
0.000
0.240
0.000
0.000
0.000
0.000
0.000
0.350
1.300
0.400
0.500
0.000
0.480
0.070
0.050
0.000
0.000
0.000
0.000
1.300
1.400
0.000
0.000
0.295
0.050
0.050
0.000
0.000
0.000
0.000
1.300
0.000
0.000
0.000
0.240
0.060
0.060
0.000
0.000
0.000
0.000
1.300
0.200
0.300
0.000
0.240
0.000
0.700
UG
OC
0.541
1.410
0.333
1.244
0.360
2.500
Total (C)
Future Projects (To be formulated)
Xth Plan Projects
2 Exploitation of seam I/II by
UG
Continuous Miner Technology at
Block-II
3 Exploitation of seam IV by
UG
Continuous Miner Technology at
Dhansar UG
UG
OC
Total (D)
1.951
1.577
2.860
BL-II
NC
Sept'09
0.45
0.000
0.000
KUSUNDA
NC
NA
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
108
Group Sl.
No. No.
E.
Name of Mine/Project
Type
of
Mine
Name of the
Area
Type Latest Sanction PR Cap 08-09 09-10 09-10 Target 08-09 10-11
of
CMPDI
Date
(Actual) (Target) (Ant) 10-11 Revised (Tar)
Coal Cap(mty)
1.04.09
Target
11-12
OC
GOVIND
NC
NA
4.000
0.000
0.000
2 Amalgamated Kharkharee
UG
Dharmaband Exten. Block
3 Moonidih XV Seam
UG
4 Kapuria UG
UG
5 Block-III OCP including SOCP OC
& MOCP
6 Muraidih& Shatabdi Turnkey UG UG
7 Madhuband Turn key UG
UG
GOVIND
NA
0.270
0.000
0.000
WJ
WJ
BARORA
C
C
NC
NA
NA
NA
1.500
2.000
6.000
0.000
0.000
0.000
0.000
0.000
0.000
BARORA
NC
C
NA
NA
2.000
1.000
0.000
0.000
LODNA
NC
NA
6.000
0.000
0.000
BL-II
BL-II
NC
NC
C
C
C
NC
C
C
C
C
NC
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
1
0.5
0.5
2
0.5
0.6
0.5
0.5
0.5
1.000
4.000
0.000
0.000
4.134
21.381
25.514
0.000
0.000
4.550
23.450
28.000
OC
UG
UG
UG
OC
UG
UG
UG
UG
UG
OC
OC
UG
OC
Total (BCCL)
0.000
6.379
20.040
26.419
109
0.000 0.000
0.000 1.750
4.050 4.750
23.450 23.250
27.500 28.000
0.000
0.000
5.000
23.900
28.900
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
1
2
3
4
5
6
7
8
9
10
11
12
Existing Mines
Dhori Khas OC (Pichri)
Karo-I OC
Selected Dhori (Man.)
Tarmi (Outsourcing)
Topa OC
Argada UG
Bhurkunda UG
Dhori Khas UG
Jarangdih UG
Karo UG
Khasmahal UG
N.S.Dhori UG
Sarubera UG
Saunda UG
Sawang UG
Sayal D UG
Sirka UG
Topa UG
Total UG
Total OC
Total Existing Mines
Completed Projects
Dakra OC
Dhori East OC RO
Giddi-A OC
Jarangdih OC RO
Jharkhand OC
Kabribad OC
Karkatta OC
Kathara Int OC RO
KD Hesalong OC
Kedla OC
Khasmahal OC
New Giddi C OC
New Sawang OC
Parej East OC
Phusro / Kargali OC
Pundi OC RO
Rajhara NW OC
Rajrappa OC
Religera OC
Sangam OC
Sel Dhori OC / Kalyani RO
Sirka OC
Govindpur UG
Karo Sp.(KSP-II)UG
Kedla UG
Ray Bachra UG
Saunda-D UG
Total UG
Total OC
Total Completed Projects
Ongoing Projects
Amlo OC
Ara RO OC
Ashok Expn. OC
Bokaro (Bermo Seam) OC
Chainpur OC
Karma OC
Karo OC
Konar OC
Magadh OC
N Urimari OC
Piparwar OC
Purnadih OC
COK/NC
COK/NC
E/WIII/WIV
F/WII/IV
NC
NC
COK
COK
COK
COK
COK
COK
NC
COK
NC
NC
COK
C
B/C
WII/IV
WII/IV
WIV
WIII/IV
WIII
WIV
B/C
WII/IV
C/D
B
WIII/IV
NC
COK/NC
NC
COK
COK
NC
NC
COK
NC
COK
COK/NC
NC
COK
COK/NC
COK
COK
NC
COK
NC
NC
COK
NC
COK
COK
COK
NC
NC
BE
RE
2009-10
BE
In Mt
Proj.
2010-11 2011-12
0.4000
0.00
1.4865
1.60
1.60
1.60
1.60
0.098
0.199
0.113
0.081
0.098
0.199
0.113
0.081
0.056
0.121
0.064
0.084
0.09
0.17
0.06
0.10
0.06
0.16
0.07
0.10
0.06
0.16
0.07
0.10
0.06
0.16
0.07
0.10
0.055
0.148
0.055
0.148
0.09
0.06
0.07
0.07
0.07
0.087
0.159
0.044
0.072
1.056
0.400
1.456
0.087
0.159
0.044
0.072
1.056
0.000
1.056
0.052
0.063
0.000
0.108
0.152
0.031
0.050
0.78
1.49
2.268
0.12
0.17
0.035
0.105
0.93
1.60
2.530
0.10
0.15
0.03
0.06
0.83
1.60
2.434
0.11
0.16
0.07
0.07
0.85
1.60
2.446
0.11
0.16
0.07
0.07
0.86
1.60
2.460
E
F/WIII/IV
C
WIV
WIV
E
E
WIV
E
WIV
E/WIV
C
WIV
E/WIV
WIII
WIII/IV
D
WIII
C
B/C
WIII/IV
C
WIII/IV
WIV
WIII/IV
B
B/C/D
0.630
0.560
0.260
0.580
1.250
0.630
0.740
0.790
4.230
0.590
0.660
0.430
0.400
1.050
0.200
0.690
0.120
1.480
0.510
0.180
1.680
0.200
0.093
0.047
0.226
0.107
0.153
0.626
17.860
18.486
0.630
0.560
0.260
0.580
1.250
0.630
0.290
0.790
3.230
0.590
0.660
0.430
0.400
1.050
0.200
0.690
0.120
1.480
0.510
0.180
1.680
0.200
0.093
0.047
0.226
0.107
0.153
0.626
16.410
17.036
0.452
0.330
0.413
0.489
0.921
0.626
1.135
0.469
3.137
0.458
0.700
0.446
0.545
1.358
0.231
0.427
0.119
1.001
0.265
0.158
1.465
0.212
0.083
0.026
0.160
0.101
0.088
0.458
15.356
15.813
0.500
0.500
0.400
0.800
0.850
0.600
0.800
0.900
3.700
0.430
0.600
0.400
0.460
0.300
0.420
0.500
0.950
0.630
1.150
0.705
3.200
0.460
0.700
0.450
0.460
0.450
0.420
0.500
0.950
0.630
1.200
0.750
3.500
0.460
0.700
0.450
0.500
0.450
0.450
0.500
1.000
0.630
1.200
0.750
3.500
1.600
0.150
0.725
0.050
1.250
0.250
0.300
1.600
0.175
0.110
0.030
0.190
0.080
0.130
0.540
16.580
17.120
1.500
0.250
0.500
0.140
1.100
0.250
0.160
1.700
0.230
0.095
0.026
0.150
0.060
0.080
0.411
15.755
16.166
1.550
0.250
0.600
0.140
1.100
0.270
0.210
1.700
0.230
0.100
0.026
0.170
1.600
0.250
0.600
0.140
1.300
0.270
0.210
1.700
0.230
0.100
0.030
0.170
0.095
0.391
16.520
16.911
0.100
0.400
16.430
16.830
COK/NC
COK
NC
COK
COK
NC
COK/NC
NC
E/WIII/IV
WIV
E
WII/WIV
WIV
C
E/WIII/IV
E
1.810
0.050
4.500
0.400
0.120
0.250
1.950
0.910
0.050
0.400
0.120
0.250
1.550
2.813
0.019
7.103
0.172
0.037
0.195
0.766
2.000
0.250
9.000
0.170
3.000
0.025
8.000
0.175
0.025
0.200
0.600
3.000
0.100
8.750
0.175
0.050
0.300
1.000
3.000
0.200
9.400
0.175
0.100
0.400
1.195
0.300
NC
E/F
0.270
12.360
0.270
8.860
0.352
9.005
0.500 0.300
10.000 9.500
0.200
110
0.300
1.100
0.700
0.450
0.500 0.750
9.750 10.000
0.600 0.850
13
14
15
16
17
18
19
20
21
22
23
24
25
Rohini OC
Tapin OC
Tetariakhar OC
Tarmi OC
Topa OC RO
Urimari OC
Central Saunda UG
Churi-Benti UG
Kargali (Bermo Seam) UG
Kuju SDL
Pindra SDL
Parej East UG
Urimari UG
NC
B/C
0.084
Total UG
0.648
Total OC
26.560
Total Ongoing Projects
27.208
Future Projects
(A) Xth Plan Projects - Under Approval
1 Amrapali (12 MTY)
(B)
XI th Plan Projects- To be formulated / Under formulation
1 Ashok Expn / West OCP
2 Chano-Rikba OC
3 Godo OC
4 Kedla EPR OC
5 Koed / Manatu OC
6 Pachra Integrated OC
7 Parej West OC
8 Pichri / Pichri Extn OC
9 Ramgarh - II West OC
10 Govindpur Ph - II OC
11 Piparwar Mangardaha UG
Total UG
Total OC
Sub Total B
(C) XII th Plan Projects - To be formulated
1 Tapin Integrated OC
NC
2 Religara Expn. OC
3 Pundi Expn. OC
4 Rajbar ABC OCP
5 Hindegir OCP
6 Ramgarh Block III UG
Total UG
Total OC
Sub Total (C)
(D) XIII th Plan Projects and Beyond To be formulated
1 Gonda OC
NC
2 Mahuamilan OC
3 Naiparam OC
4 Raham OC
5 Padrangi OC
6 Mandu UG
7 Asnapani (East) UG
8 Asnapani (West) UG
9 North Kathara Ph I UG
10 North Kathara Ph II UG
11 Patratu A UG
Total UG
Total OC
Sub Total (D)
Total UG
Total OC
Total Future Projects
Total UG Coal
2.330
Total OC Coal
44.820
Total CCL
47.15
111
0.084
0.648
17.260
17.908
0.057
0.319
24.836
25.154
BE
RE
2009-10
0.300
0.750
0.150
0.700
0.300
0.150
0.800
2.250
0.065
0.140
0.035
0.080
0.060
0.100
0.480
27.570
28.050
BE
In Mt
Proj.
2010-11 2011-12
0.600
2.500
0.045
0.070
0.030
0.060
0.050
0.300
0.700
0.500
0.298
0.800
2.500
0.050
0.100
0.030
0.120
0.050
0.750
0.900
0.700
0.600
0.900
2.300
0.050
0.120
0.030
0.120
0.050
0.070
0.325
26.275
26.600
0.070
0.420
29.323
29.743
0.070
0.440
32.520
32.960
0.200
0.550
0.300
0.900
0.900
1.000
0.000
0.000
0.300
0.300
0.000
0.900
0.900
0.000
0.900
0.900
0.000
1.750
1.750
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.300
0.300
1.950
46.050
48.00
0.000
0.000
0.000
0.000
0.900
0.900
1.570
44.530
46.10
0.000
0.000
0.000
0.000
0.900
0.900
1.657
48.343
50.00
0.000
0.000
0.000
0.000
1.750
1.750
1.700
52.300
54.00
0.000
2.330
33.670
36.00
1.558
41.678
43.24
A. EXISTING MINES
1 Jhingurda
TOTAL (A)
B. COMPLETED PROJECTS
1 Jayant
2 Kakri
3 Khadia
C.
1
2
3
4
5
6
D.
D1.
D2.
D3.
E.
a)
b)
1
2
3
Million Tonnes
Specific
Consumer
Code/
Linkage
New
OC
NC
E/F
3.00
3.86
3.86
4.00
4.00
4.00
4.00
3.00
3.00
2.00
2.00
New
New
New
OC
OC
OC
NC
NC
NC
C/D/E
E
C/D
10.00
3.00
4.00
13.02
2.93
3.68
12.75
3.00
4.00
12.75
3.00
4.00
14.00
3.00
4.00
10.00 SGR
MP
3.00 SGR
UP
4.00 SGR MP&UP
19.62
19.75
19.75
21.00
17.00
5.28
5.44
3.43
1.08
13.27
11.66
40.16
5.50
5.50
3.00
3.00
12.75
13.00
42.75
5.50
5.50
3.00
3.00
12.75
13.00
42.75
6.00
6.00
4.00
4.00
14.00
14.00
48.00
8.50
6.00
3.50
4.00
14.00
15.00
51.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
4.00
0.00
72.00
6.00
76.00
TOTAL (B)
ON GOING PROJECTS
Amlohri Expn.(10.0)
New
Bina Extn.(6.0)
New
Block-B(3.5)
New
Krishnasila(4.0)
New
Dudhichua Expn.(15.0)
New
Nigahi Expn.(15.0)
New
TOTAL (C)
FUTURE PROJECTS-Xth PLAN
NIL
Awaiting approval
To be formulated
NIL
Sc. for maintenance of coal production
NIL
TOTAL (D)
ADVANCE ACTION PROJECTS
NIL
ONGOING
FORMULATED BUT NOT YET APPROVED
FUTURE PROJECT-XI th PLAN
Khadia Expn.(6.0)
New
Jayant Expn.(5.0)
New
Kakri Extn
New
TOTAL (E)
GRAND TOTAL
OC
OC
OC
OC
OC
OC
OC
OC
OC
X
X
X
X
XI
XI
X
XI
XI
NC
NC
NC
NC
NC
NC
NC
NC
NC
C/D/E
E
C/D/F
D
C-E
C/D/E
D
C/D/E
E
10.00
6.00
3.50
4.00
15.00
15.00
6.00
5.00
3.00
0.00
63.65
112
0.00
66.50
0.00
66.50
SGR
State
Code
MP
SGR
SGR
SGR
SGR
SGR
SGR
MP
UP/MP
MP
UP
MP
MP
SGR
SGR
SGR
UP/MP
MP
UP/MP
POW(C)
POW (U)
POW (U)
POW (U)
POW (U/C)
POW (U)
POW(U)
POW(U)
POW(U/C)
VII PLAN
0.150
0.110
0.080
0.230
0.110
0.090
0.080
0.200
0.080
0.200
0.320
0.150
0.330
0.110
0.340
0.140
0.930
0.920
0.870
0.210
0.230
0.225
0.200
0.040
0.400
0.210
0.230
0.250
0.210
0.060
0.380
0.260
0.260
0.350
0.200
0.060
0.400
0.420
0.395
0.400
UG
10 Jharna
UG
VI &
EARLIER
NC
0.201
09/83
0.231
0.150
0.210
0.240
11 Kumberkhani (Including
C.M. Scheme)
12 Mahadeopuri
UG
IX PLAN
NC
0.327
07/02
0.329
0.400
0.360
0.420
UG
VI &
EARLIER
NC
0.057
02/86
0.042
0.080
0.060
0.060
13 Mathani
14 Mauri Block
15 Morpar
16 Naharia
17 Nandan
UG
UG
UG
UG
UG
VII PLAN
AP 90-92
VII PLAN
VIII PLAN
NC
NC
NC
NC
COK
C
D
D
C
WG-II
0.124
0.393
0.082
0.198
0.147
09/89
07/96
06/89
06/96
09/85
0.080
0.450
0.083
0.220
0.159
0.140
0.400
0.100
0.280
0.250
0.130
0.450
0.090
0.220
0.150
0.130
0.300
0.100
0.290
0.090
UG
VII PLAN
NC
0.140
11/89
0.152
0.150
0.150
0.160
UG
VI &
EARLIER
NC
0.291
06/83
0.456
0.200
0.320
0.170
20 Pipla
UG
NC
0.129
08/80
0.130
0.130
0.140
0.150
UG
UG
VI &
EARLIER
AP 90-92
NC
NC
D
D
0.154
0.786
05/97
07/95
0.174
0.874
0.190
0.850
0.170
0.900
0.180
0.900
NC
0.494
09/79
0.531
0.420
0.550
0.600
NC
NC
C
E
0.224
0.325
04/93
10/80
0.275
0.496
0.240
0.240
0.240
0.360
0.250
0.290
NC
0.581
05/86
0.512
0.525
0.650
0.570
NC
0.476
09/92
0.511
0.520
0.510
0.500
VI &
EARLIER
VI &
EARLIER
NC
0.098
0.416
10-11
B.E./Tar.
9 Inder
0.353
07/87
10/80
09-10
RE/ Antic
UG
UG
VI &
EARLIER
C
D
09-10
B.E./Tar.
7 Gajendoh
8 Hindusthan Lalpeth
VI &
EARLIER
VI &
EARLIER
NC
NC
Prod 2
In Mt
10/80
UG
24 Sasti RO
25 Satpura
UG
UG
26 Shobhapur
UG
27 Silewara Ph-II
UG
UG
VII PLAN
COK
WG-II
0.276
07/01
0.502
0.500
0.300
0.320
UG
UG
UG
UG
UG
VII PLAN
VIII PLAN
VII PLAN
AP 90-92
AP 90-92
COK
NC
NC
NC
NC
WG-II
D
C
C
C
0.543
0.133
0.075
0.107
05/00
07/94
09/89
05/90
01/91
0.635
0.102
0.047
0.073
0.600
0.135
0.080
0.125
0.620
0.135
0.080
0.110
0.680
0.140
0.110
0.110
UG
OC
VII PLAN
NC
7.829
0.445
12/88
8.904
0.321
8.430
0.400
8.640
0.460
8.690
0.560
OC
OC
OC
OC
OC
OC
VII PLAN
VII PLAN
VII PLAN
VIII PLAN
X PLAN
NC
NC
NC
NC
NC
NC
E
D
E
E/D
E/D
0.398
0.596
10/87
04/97
11/89
07/96
11/01
10/78
OC
OC
OC
OC
OC
VII PLAN
VII PLAN
VII PLAN
VIII PLAN
NC
NC
NC
NC
NC
E
E/D
E/D
E
E
46 Gondegaon RCE
OC
VIII PLAN
NC
E/D
VIII PLAN
VI &
EARLIER
VI &
EARLIER
VI &
EARLIER
VI &
EARLIER
VI &
EARLIER
113
0.768
0.624
0.300
1.378
0.870
0.150
1.200
0.450
0.640
09/86 0.457
0.600
0.800
05/95 Bal. Res. considered with Gauri - I & II
05/97 Bal. Res. considered with Gauri - I & II
09/92 0.618
0.600
0.650
02/91
08/98
0.700
0.800
Expn. OC
Expn. OC
0.660
48 Junad - I RCE
49 Kamptee UG to OC
50 Kolarpimpri Ph-I
51 Makardhokra - II UG to OC
52 Mungoli (Including Nirguda
OC)
53 Naigaon/Bellora
54 Navinkunada Ph-I Incl.
N'kunada Expn.
55 New Dhuptala SECTOR
C/E/F/G
56 New Majri / Kawadi
Prod 2
In Mt
09-10
B.E./Tar.
0.500
09-10
RE/ Antic
0.700
10-11
B.E./Tar.
0.650
1.000
1.040
1.300
1.900
1.050
0.300
1.100
2.000
1.600
OC
OC
OC
OC
OC
AP 90-92
IX PLAN
VIII PLAN
X PLAN
VIII PLAN
NC
NC
NC
NC
NC
E/D
E
E/D
D
E
0.984
0.278
0.952
1.781
03/99
05/00
09/92
01/03
01/95
0.585
1.036
1.134
1.102
2.039
OC
OC
AP 90-92
X PLAN
NC
NC
E
E/D
1.185
01/91
07/97
0.922
1.075
0.090
1.400
1.360
OC
VIII PLAN
NC
0.141
10/93
0.107
0.050
0.140
OC
VI &
EARLIER
VII PLAN
IX PLAN
NC
E/D
1.070
07/84
1.120
1.100
1.150
NC
NC
E/D
E
2.624
04/87
05/99
3.025
NC
NC
NC
NC
E/D
E/D
E
E/D
2.191
0.553
0.883
1.538
05/92
09/96
03/91
09/89
2.435
0.402
0.952
1.679
2.350
0.600
0.900
1.600
2.350
0.600
0.950
1.700
2.350
0.600
1.000
NC
NC
NC
E/D
E/D
D
1.745
2.611
02/95
01/92
03/85
0.254
1.801
3.079
0.300
1.570
2.900
1.950
3.000
1.600
3.000
22.023
29.852
26.681
35.585
23.650
32.080
24.350
32.990
21.460
30.150
30.728
36.515
33.010
33.910
31.020
0.047
0.230
0.230
0.280
57 Niljai
58 Nirguda (Amalgamted to
Mungoli OC)
59 Padampur RCE
60 Pauni
61 Pimpalgaon
62 Sasti RCE
OC
OC
OC
OC
OC
OC
VIII PLAN
VIII PLAN
AP 90-92
63 Telwasa
64 Ukni
65 Umrer (Incl. Expn.)
OC
OC
OC
VIII PLAN
AP 90-92
VI &
EARLIER
VI &
EARLIER
Umrer Extent.
OC
VIII PLAN
NC
(Kanhwa)(Incl. MKD-II UG
to OC)
Completed Mines Closed
SUB TOTAL
OC
TOTAL COMPLETED
TOTAL
PROJECTS
TOTAL EXISTING AND COMPLETED PROJECTS
C ONGOING PROJECTS as on 1/08/2009 :
1 Durgarpur Ryt. 6,7,& 8
UG
IX PLAN
NC
Inclines
2 Kumberkhani C.M. Scheme
UG
NC
3 Sarni Sch. (For working
UG
NC
propoerty beyond D2 Dyke)
4 Tawa - II
UG
X PLAN
NC
5 Waghoda
UG
XI PLAN
NC
Ongoing Mines Dropped/Closed
SUB TOTAL
6 Bhanegaon
OC
X PLAN
NC
7 Bhatadih Expn.
OC
X PLAN
NC
8 Durgapur Expn. Deep
OC
X PLAN
NC
9 Gauri Deep
OC
X PLAN
NC
10 Gauri I & II Expn. Scheme
OC
XI PLAN
NC
11 Ghonsa RPR
OC
X PLAN
NC
12 Ghugus Deep Scheme
OC
XI PLAN
NC
13 Gokul
OC
XI PLAN
NC
14 Gondegaon Expn.
OC
X PLAN
NC
15 Inder UG to OC
OC
X PLAN
NC
16 Junad Extn.
OC
XI PLAN
NC
17 Junakunada
OC
X PLAN
NC
18 Kolar pimpri Extn.
OC
X PLAN
NC
19 Kolgaon
OC
X PLAN
NC
20 Makardhokra I
OC
X PLAN
NC
21 Pauni-II
OC
X PLAN
NC
22 Penganga (Mugoli Extn.)
OC
XI PLAN
NC
23 Scheme for Ballarpur OC
OC
NC
24 Scheme for Bellora / Naigaon
OC
NC
Deep
25 Scheme for Telwasa Expn.
OC
NC
OC
26 Scheme for Dhurwasa Expn.
OC
NC
OC
27 Scheme for Deepening Niljai
OC
NC
OC
28 Sasti Expn.
OC
X PLAN
NC
29 Singori
OC
X PLAN
NC
30 Urdhan
OC
X PLAN
NC
31 Yekona -I
OC
X PLAN
NC
0.201
04/01
0.321
0.525
1.360
1.145
0.246
1.378
1.264
0.535
0.478
0.978
0.359
0.260
0.816
E/D
E/D
03/04
04/08
11/03
05/07
05/07
11/01
04/07
10/01
01/07
06/06
09/04
12/04
11/07
03/03
06/06
11/01
04/05
11/03
10/08
06/08
12/08
0.234
0.310
0.360
0.360
0.281
0.540
0.050
0.400
2.000
0.050
1.600
0.300
1.700
0.590
0.640
0.150
0.600
1.800
0.050
1.400
0.300
1.700
0.361
1.720
2.107
0.088
1.729
1.500
0.038
0.363
1.350
0.400
0.500
0.150
1.100
0.400
0.050
0.050
0.850
0.600
1.600
1.400
0.300
1.700
1.400
0.600
0.550
1.100
0.400
1.500
0.500
0.500
0.050
1.260
0.400
0.300
0.950
0.640
0.600
10/08
0.402
04/09
E/D
E/D
E
E
11/04
03/04
07/02
12/04
0.140
0.600
06/08
E/D
114
3.000
0.522
E
D
E/D
E
E/D
E
E
D
E/D
E
E
E
E/D
E
D
E
E
E
E
1.000
09/96
D
E
D
D
2.840
3.000
Included in Mungoli OC.
1.000
1.900
0.450
0.750
1.600
0.050
0.150
0.150
0.250
Prod 2
In Mt
Specific Latest Sanction
ROM Capacity Date Actual
Grade
(Mty)
2008-09
E
08/03
9.887
7.904
10.409
8.185
D/W-II
D
WG-II
WG-II
D/C
F
E
C/D
E
E/D
F
D
F
F
E/D
E
E
PR CAP.
0.270
1.000
0.360
0.135
0.720
0.900
0.500
4.000
0.289
0.500
1.170
0.400
3.000
C
D
D/E
D/E
D
C
0.700
0.600
0.500
0.240
2.000
0.300
14.199
1.600
0.700
4.500
0.600
E
E
E/F
E
E
D
E
E
E/D
E/D
E/D
E/D
E/D
E
E
11.500
12.090
10-11
B.E./Tar.
0.040
14.690
15.330
0.150
0.110
0.250
0.150
0.250
0.150
0.250
0.150
0.250
0.150
0.600
1.500
0.400
1.500
1.500
2.500
0.500
2.000
0.600
2.000
1.000
21.500
35.699
18.649
33.300
51.949
27.876
65.210
93.086
115
09-10
RE/ Antic
0.140
0.750
0.315
4.450
1.000
0.300
1.700
3.000
1.250
0.800
1.250
2.000
0.500
11.800
16.250
E
D
E
WG-II
D
D/C
D
09-10
B.E./Tar.
0.050
11.200
11.740
10.115
34.585
44.700
10.150
34.850
45.000
10.150
35.850
46.000
10.350
36.150
46.500
Area
Type
No.
EXISTING MINES
1 CHIRIMIRI UG
2 KURASIA UG
3 NORTH CHIRIMIRI UG
4 WEST JKD A SEAM UG/S.JKD.
5 BANKI 9/10,MAIN, SURAKACHAR 5/6
UG
6 SURAKACHAR MAIN, 3/4 UG
7 BIRSINGPUR UG/ 3&4 INCL.
8 NOWROZABAD (W) UG converted to OC
from 11-12
9 NOWROZABAD (E) UG
10 AMLAI/NEW AMLAI UG
11 DHANPURI RO UG
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
UG
OC
TOTAL (A)
COMPLETED PROJECTS
BISRAMPUR UG RO (JAINAGAR NEW
& OLD)
KUMDA (OLD) UG
BALARAMPUR UG / PSLW
NEW KUMDA UG / PSLW
REHAR UG
BISRAMPUR OC
BHATGAON UG RCE
MAHAMAYA UG
SHIVANI
KALYANI UG
DUGGA OC
JHILIMILI UG
CHURCHA EXPN UG / CHURCHA
WEST RPR
CHURCHA WEST RPR
PANDAVPARA UG
KATKONA UG REAPPRISAL 1/2 & 3/4
NCPH UG RO
KURASIA OC RCE
CHIRIMIRI OC
WEST CHRM OC/KOREA OC
BALGI UG
DILWADI UG
PAWAN INC PR
RAJGAMAR UG RO
SINGHALI UG
MANIKPUR OC
BAGDEVA UG
LAXMAN OC
CHHAL UG converted to OC from 11-12
DHARAM UG converted to OC from 11-12
PALKIMARA UG M/SCH.
B SEAM UG
BAHERABAND UG
KAPILDHARA AUG UG
RAJNAGAR RO RCE UG 7/8 & 5/6
(in MT)
ACTUAL
BE
RE
BE
Proj.
08-09
09-10
09-10
10-11
11-12
CIC-CHR
CIC-CHR
CIC-CHR
CIC-HSD
K
UG
UG
UG
UG
UG
0.59
0.34
0.26
0.33
0.27
0.60
0.36
0.00
0.33
0.30
0.72
0.35
0.25
0.32
0.31
0.65
0.30
0.00
0.37
0.30
0.60
0.27
0.00
0.45
0.30
K
CIC-JHL
CIC-JHL
UG
UG
UG
0.49
0.10
0.23
0.42
0.12
0.15
0.50
0.10
0.24
0.42
0.12
0.24
0.42
0.15
0.30
CIC-JHL
CIC-SGP
CIC-SGP
UG
UG
UG
0.00
0.22
0.16
0.00
0.00
0.18
0.00
0.00
0.17
0.00
0.00
0.20
0.00
0.00
0.20
3.00
0.00
3.00
2.46
0.00
2.46
2.95
0.00
2.95
2.60
0.00
2.60
2.39
0.30
2.69
0.00
CIC-BIS
UG
0.12
0.15
0.00
0.00
CIC-BIS
CIC-BIS
CIC-BIS
CIC-BIS
CIC-BIS
CIC-BHAT
CIC-BHAT
CIC-BHAT
CIC-BHAT
CIC-BHAT
CIC-BKP
CIC-BKP
UG
UG
UG
UG
OC
UG
UG
UG
UG
OC
UG
UG
0.00
0.48
0.31
0.26
0.62
0.44
0.00
0.00
0.00
0.40
0.69
0.50
0.35
0.35
0.45
0.30
0.29
0.45
0.70
0.71
0.35
0.45
0.44
0.45
Shown in ongoing group
0.27
0.27
0.36
0.08
0.09
0.10
0.75
0.35
0.40
0.40
0.00
0.30
0.25
0.50
CIC-BKP
CIC-BKP
CIC-BKP
CIC-CHR
CIC-CHR
CIC-CHR
CIC-CHR
K
K
K
K
K
K
UG
UG
UG
UG
OC
OC
OC
UG
UG
UG
UG
UG
OC
K-K
K-RAI
K-RAI
CIC-HSD
CIC-HSD
CIC-HSD
CIC-HSD
CIC-HSD
OC
UG
UG
UG
UG
UG
UG
UG
116
0.24
0.08
0.38
0.30
0.25
0.40
0.65
1.15
0.05
0.40
0.28
0.13
0.24
0.30
3.27
0.60
2.00
0.15
0.15
0.12
0.09
0.52
0.57
0.52
0.25
0.30
0.51
0.60
1.25
0.15
0.28
0.30
0.10
0.30
0.25
2.45
0.60
1.50
0.15
0.15
0.08
0.00
0.52
0.57
0.55
0.45
0.36
0.12
1.00
0.42
0.25
0.42
0.51
0.60
1.25
0.00
0.25
0.35
0.30
0.25
2.90
0.60
1.50
0.08
0.00
0.52
0.57
0.40
No.
47 RAMNAGAR RO UG (Malga &
S.Jhimar/Jhiria)
48 SOMNA UG
49 BIJURI UG
50 RAJNAGAR OC
51 BHADRA UG/NARAYAN INCL.
52 GOVINDA UG RO/MEERA
53 JAMUNA RO UG, 1,5,9,11
54 KOTMA WEST UG (3/4 & 7/8)
55 JAMUNA OC
56 PALI UG
57 UMARIA REO UG
58 PIPARIYA RPR UG
59 BANGWAR UG
60 NAVEGAON UG RCE
61 RAJENDRA-PSLW
62 BAIGA OC
63 SHARDA OC/BAKHO
64 AMLAI OC RCE
65 DHANPURI OC RCE
NCPH SEAM V UG / R6 UG
Area
ACTUAL
BE
RE
BE
Proj.
CIC-HSD
UG
08-09
0.67
09-10
0.63
09-10
0.65
10-11
0.65
11-12
0.65
CIC-HSD
CIC-HSD
CIC-HSD
CIC-JK
CIC-JK
CIC-JK
CIC-JK
CIC-JK
CIC-JHL
CIC-JHL
CIC-JHL
CIC-SGP
CIC-SGP
CIC-SGP
CIC-SGP
CIC-SGP
CIC-SGP
CIC-SGP
UG
UG
OC
UG
UG
UG
UG
OC
UG
UG
UG
UG
UG
UG
OC
OC
OC
OC
0.24
0.42
1.07
0.12
0.23
0.44
0.00
1.31
0.24
0.13
0.15
0.36
0.19
0.16
0.12
0.40
1.15
1.00
0.22
0.41
1.25
0.14
0.22
0.42
0.00
0.75
0.26
0.20
0.21
0.40
0.00
0.28
0.00
0.00
0.59
1.20
0.25
0.43
1.10
0.15
0.24
0.43
0.00
0.92
0.24
0.17
0.19
0.36
0.19
0.35
0.20
0.30
0.80
1.25
0.12
0.41
0.80
0.16
0.24
0.40
0.00
0.70
0.25
0.15
0.17
0.42
0.20
0.30
0.10
0.30
0.80
1.20
0.30
0.12
0.45
1.25
0.20
0.15
0.40
0.00
0.00
0.42
0.24
0.24
0.42
0.00
0.40
0.00
0.10
0.60
1.20
0.30
10.91
12.80
23.71
10.59
10.19
20.78
11.15
12.63
23.78
11.39
10.95
22.34
10.99
10.30
21.29
UG
OC
Sub Total
13.91
12.80
26.71
13.05
10.19
23.24
14.10
12.63
26.73
13.99
10.95
24.94
13.38
10.60
23.98
CIC-BHAT
CIC-BHAT
CIC-BIS
CIC-BIS
CIC-CHR
UG
OC
UG
OC
UG
0.14
0.04
0.11
0.00
0.20
0.20
0.36
0.18
0.70
0.30
0.18
0.11
0.20
0.19
0.21
CIC-CHR
UG
0.19
0.33
0.32
CIC-JK
CIC-JHL
CIC-JHL
CIC-JHL
CIC-SGP
CIC-JK
CIC-BIS
CIC-BIS
CIC-BIS
CIC-CHR
CIC-HSD
K
K-RAI
K-RAI
CIC-SGP
K-G
K-G
UG
UG
UG
UG
OC
UG
OC
UG
UG
OC
UG
UG
OC
OC
OC
UG
OC
OC
0.47
0.32
0.18
0.21
0.36
0.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.60
1.56
0.00
25.00
18.31
0.50
0.35
0.30
0.30
0.65
0.20
0.50
0.05
0.00
0.00
0.00
0.12
0.50
2.50
2.50
0.05
25.00
20.00
0.50
0.35
0.21
0.23
0.50
0.20
0.13
0.00
0.00
0.00
0.00
0.00
0.00
2.64
1.70
0.00
25.00
19.50
UG
OC
TOTAL (B)
A Existing Mines & Completed Projects
B
1
2
3
4
5
ON GOING PROJECTS
NAWAPARA UG
MAHAN OC
GAYATRI UG
AMERA OC
NCPH SEAM V UG / R6 UG
RANI ATARI UG
BAGDEVA UG
KURJA / SHEETALDHARA UG
BARTARAI / AMADAND UG
PINOURA UG AUG PR
VINDHYA AUG PR UG
KANCHAN OC
DAMINI UG
AMADAND OC
KETKI UG
BINCARA UG
AMGAON OC
VIJAY WEST UG
HALDIBARI UG
SARAIPALLI OC
CHAAL OC
BAROUD EXPN OC
KHAIRAHA UG
GEVRA EXPN OC (25.00 MT)
DIPKA EXPN OC (20.00 MT)
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
(in MT)
Type
117
0.22
0.36
0.05
0.30
0.25
0.25
0.60
0.80
completed in BE 1011
0.42
0.48
0.52
0.40
0.20
0.20
0.60
0.42
0.60
0.10
0.05
0.20
0.05
0.05
1.00
3.10
1.80
0.05
25.00
20.00
0.70
0.43
0.30
0.30
0.65
0.48
1.05
0.30
0.27
0.60
0.30
0.30
1.20
3.00
3.00
0.25
25.00
20.00
Area
CIC-BHAT
KSM
CHURCHA RO UG
JAMPALI OC
KARTALI EAST OC
AMBICA OC
BATURA OC
PELMA OC
BIJARI OC
JAGANNATHPUR OC
ON GOING R&D PROJECT
BALRAMPUR SHORTWALL UG
GRAND TOTAL
SECL
ACTUAL
BE
RE
OC
OC
UG
OC
08-09
0.00
6.81
0.27
0.75
09-10
0.00
9.00
0.35
0.85
09-10
0.30
10.00
0.30
0.80
1.21
1.22
1.20
UG
OC
OC
OC
OC
OC
OC
OC
0.26
UG
OC
Sub Total
Type
CIC-BHAT
CIC-BIS
CIC-BIS
CIC-CHR
CIC J&K
RAI
RAI
RAI
RAI
SGP
J&K
CIC-BHAT
CIC-BIS
BE
(in MT)
Proj.
10-11
11-12
0.60
1.00
10.00
10.00
0.33
0.45
Completed in BE 1011
1.25
1.25
3.66
70.78
74.44
4.45
78.31
82.76
3.90
76.97
80.87
4.51
82.55
87.06
6.42
86.60
93.02
UG
OC
Sub Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
UG
OC
Total
17.57
83.58
101.15
17.50
88.50
106.00
18.00
89.60
107.60
18.50
93.50
112.00
19.80
97.20
117.00
UG
UG
UG
UG
UG
OC
OC
OC
OC
UG
UG
UG
UG
118
119
120
PROD-2
Coal
10-11 11-12 Field State
BE
Proj Code Code
0.00
0.00 TAL ORI
2.71
4.75 TAL ORI
5.00
6.50 IB (N) ORI
0.75
1.50 IB (S) ORI
5.00
5.00 IB (S) ORI
5.00
5.00 IB (S) ORI
0.00
0.00 TAL ORI
0.00
0.88 IB (S) ORI
0.00
0.18 TAL ORI
TAL ORI
TAL ORI
IB (S) ORI
0.00
42.56
42.56
0.18
52.44
52.62
IB (N) ORI
TAL ORI
TAL ORI
IB (N) ORI
IB (N) ORI
IB (N) ORI
IB (N) ORI
TAL ORI
IB (S) ORI
0.00
0.00
0.00
0.00
0.00
0.00
TAL ORI
TAL ORI
TAL ORI
0.00
0.00
0.00
2.29
114.46
116.75
12.00
29.55
75.20
116.75
0.00
0.00
0.00
2.76
122.34
125.10
13.50
31.39
80.21
125.10
2007-08
Actual
1.863
37.139
1.602
2008-09
Actual
2.173
35.382
6.987
(Million Tonnes)
2009-10
2009-10
BE
RE
1.793
1.902
30.382
32.426
12.325
10.672
2010-11
Prop.
1.610
31.940
12.450
2011-12
Proj.
1.410
30.825
14.765
0.000
0.000
0.000
40.604
0.000
0.000
0.000
44.542
0.000
0.000
0.000
44.500
0.000
0.000
0.000
46.000
0.000
0.000
0.000
47.000
0.164
0.155
0.214
0.217
0.368
0.066
0.298
0.050
0.280
0.100
0.250
0.300
0.000
0.000
0.000
45.000
0.019
0.225
0.240
0.360
0.177
0.310
0.389
0.367
0.480
0.102
0.063
0.074
0.401
0.044
0.215
0.088
0.012
0.001
0.232
0.027
0.245
0.276
0.507
0.160
0.240
0.480
0.212
0.227
0.557
0.160
0.240
0.400
0.160
0.200
0.400
1.863
2.173
1.793
1.902
1.610
1.410
0.291
0.120
0.209
0.120
0.120
1.392
0.888
0.550
0.709
0.700
3.000
3.000
2.223
2.917
0.079
3.900
3.000
0.000
0.280
0.300
0.000
0.292
0.426
0.100
0.290
0.360
0.325
0.360
0.300
0.237
0.300
0.300
0.230
1.752
0.847
0.251
3.016
2.345
0.227
0.015
2.797
3.291
0.125
4.000
3.000
0.278
0.329
0.198
0.221
0.250
0.301
0.352
0.132
0.201
0.242
0.362
0.300
0.323
0.300
0.300
0.867
0.516
0.675
0.571
0.740
0.080
0.700
0.300
0.243
0.373
0.166
0.300
0.300
0.360
0.284
0.314
0.207
0.300
0.406
121
0.300
0.270
(Million Tonnes)
2009-10
2009-10
BE
RE
2.000
3.004
3.500
3.432
0.150
0.121
0.350
0.341
0.290
0.266
0.250
0.183
0.490
0.466
0.240
0.126
0.250
0.250
2006-07
Actual
2.432
4.565
0.224
0.286
0.258
0.206
0.520
0.133
0.209
2007-08
Actual
2.628
4.006
0.240
0.290
0.277
0.198
0.552
0.125
0.242
2008-09
Actual
2.567
4.108
0.117
0.352
0.273
0.191
0.587
0.124
0.236
2010-11
Prop.
3.200
3.600
0.070
0.390
0.390
0.240
0.480
0.160
0.240
2011-12
Proj.
3.350
4.000
0.000
0.280
0.350
0.250
0.400
0.160
0.200
0.006
0.391
0.408
0.328
0.274
0.408
0.469
0.491
0.294
0.402
0.514
0.233
0.326
0.377
0.480
0.240
0.240
0.361
0.527
0.210
0.305
0.330
0.450
0.070
0.200
0.360
0.360
0.070
0.090
0.261
0.027
0.277
0.480
0.255
0.051
0.275
0.140
0.255
0.005
0.310
0.040
0.175
0.135
0.197
0.184
0.172
0.135
0.000
2.902
1.367
0.224
2.792
2.503
0.431
3.350
2.750
3.097
3.000
3.000
0.241
0.221
1.062
0.357
0.304
0.226
1.286
0.363
0.281
0.240
0.784
0.326
0.300
0.240
0.300
0.240
0.790
0.170
0.580
0.048
0.067
0.300
0.280
0.500
0.540
0.173
0.278
0.974
0.399
62
0.018
0.016
63
1.058
0.774
1.000
0.770
0.490
64
0.378
0.000
0.450
0.760
0.480
2.752
1.187
0.345
2.913
32.426
2.500
0.600
0.400
2.200
31.940
3.000
0.600
0.400
2.500
30.825
0.139
0.280
0.245
0.194
0.320
0.280
2.149
0.132
2.500
0.300
2.500
0.400
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
C
1
2
3
4
5
6
7
8
9
122
0.000
0.939
123
(Million Tonnes)
2009-10
2009-10
BE
RE
0.700
1.240
0.700
0.000
2.000
2.813
0.400
0.187
1.000
0.288
2010-11
Prop.
0.700
0.350
2.300
0.300
1.000
2011-12
Proj.
0.700
0.700
2.000
0.400
1.000
0.300
0.050
0.000
3.000
2.850
3.000
3.000
0.115
0.000
0.250
1.400
0.080
0.050
1.000
0.680
0.000
0.000
0.800
0.150
0.120
0.000
1.000
0.300
0.200
0.290
0.030
12.325
10.672
12.450
14.765
0.000
0.000
0.000
0.000
0.000
0.000
44.500
0.000
0.000
45.000
0.000
0.000
46.000
0.000
0.000
47.000
Group
No.
Name of the
Project/Mine
MINING
A & B EXISTING MINE AND COMPLETED PROJECTS
Sub Total (A+B)
C
ON GOING PROJECTS (PRIOR TO X PLAN)
1
J K NAGAR
UG
2
SARPI AUGMENTATION
UG
3
SIDHULI
UG
4
NABA KAJORA
UG
5
JHANJRA - CM
UG
6
PARASEA (DOBRANA)
UG
7
BANKOLA (R VI)
UG
8
KUMARDIHI B
UG
9
KHANDRA (NKJ )
UG
10
SHANKARPUR
UG
11
JHANJRA L/W R-VI
UG
12
BELBAID-DHASAL
UG
13
NARAINKURI
UG
14
JHANJRA CM (2ND SET)
UG
15
KHOTTADIH AUGMENTATION
OC
16
RAJMAHAL EXPASION OC
OC
17
NAKRAKONDA B
OC
18
CHITRA EAST OCP
19
SONEPUR BAZARI (HANSDIHA)
OC
20
MOHANPUR
OC
TOTAL ON GOING PROJECTS (C)
D
FUTURE PROJECTS
2
RANGAMATI A
UG
3
RANGAMATI B
UG
4
TILABONI
UG
5
SARPI/SHYAMSUNDARPUR
UG
6
KUNUSTORIA - DOBRANA
UG
0.435
0.46
0.3
0.3
0.4375
0.16
0.24
0.42
0.285
0.24
1.7
0.36
0.54
0.51
1
17.00
1.5
1.30 (INCM)
1.00
1.00
2009-10
(BE)
2009-10
(ANT./RE)
2010-11
(BE)
160.08
148.25
156.19
247.76
0.80
0.00
0.00
0.00
21.33
0.12
0.22
0.13
1.25
0.14
0.44
0.00
6.50
0.12
0.13
0.63
0.12
0.35
2.02
0.45
0.29
1.65
0.10
0.35
1.15
1.24
5.13
0.00
3.84
0.64
0.78
25.49
0.00
36.00
0.05
0.05
6.85
0.12
0.76
2.00
2.65
0.44
1.00
0.10
0.10
0.60
2.00
3.13
0.00
3.00
0.64
0.79
60.28
0.00
60.00
2.00
2.00
1.23
0.50
0.87
4.56
1.43
0.00
5.00
5.00
2.00
5.00
0.50
12.00
0.00
5.00
0.00
2.00
109.09
132.21
0.00
0.00
0.00
0.00
0.00
0.00
144.8
0.11
0.00
0.00
0.00
0.00
0.00
54.15
147.86
54.99
56.14
93.598
11.89
19.14
79.23
18.81
8.13
287.18
69.11
149.06
122.35
23.01
153.82
4.22
112.69
2.733
14.23
2/91
9/03
12/06
12/06
12/06
11/02
3/3
07/06
7/03
6/2002
11/06
8.13
Act.
08-09
12/06
09/09
0.13
0.84
25.40
0.36
0.36
2.00
1.2
0.54
124
0.15
Group
No.
7
8
9
10
11
12
13
D
Name of the
Project/Mine
BANSRA CM
HARIPUR CM
KHOTTADIH CM
HIGHWALL MINING
SONEPUR COMBINED OC
CHUPERBHITA OC
HURA - C OC
SUB-TOTAL (FUTURE PROJECTS)
TOTAL MINING
NON MINING
F
WASHERIES
G
OTHER NON - MINING
ACTIVITIES
WORKSHOP & STORES
WATER SUPPLY
RAILWAY SIDING
MINES RESCUE STATION
SAND GATHERING
HOSPITAL & CIVIL WORKS
TRAINING
POWER
ENVIRONMENTAL MEASURES
CMD'S OFFICE & OTHER CIVIL
WORKS
FIRE PROJECTS
OTHER
H
EXPLORATION & P&D ACTIVITIES
TOTAL NON MINING
GRAND TOTAL
125
2009-10
(BE)
2009-10
(ANT./RE)
2010-11
(BE)
0.00
185.48
0.00
0.00
0.00
0.00
0.75
7.40
7.23
15.49
189.23
0.00
0.00
0.00
0.00
0.10
4.00
8.00
12.10
228.57
0.00
0.00
1.00
0.00
2.00
6.00
10.00
19.15
376.00
2.25
4.15
6.40
191.88
5.77
15.00
20.77
210.00
6.43
15.00
21.43
250.00
9.00
15.00
24.00
400.00
Act.
08-09
Type of
Mine
UG/OC
Project
Status
PR/RPR/RCE
Likely/Sanct.
Capacity
(Mt)
Likely/Sanct.
Cost
(Rs.Crs)
Sanction
Date
Antic./Act
Comple
date
Actual
2008-09
192.56
UG
UG
OC
OC
OC
OC
OC
UG
UG
OC
RPR
RPR
PR
PR
PR
PR
PR
PR
RPR
PR
09-10
10-11
BE
183.80
RE
227.60
BE
232.95
0.05
0.05
0.10
0.10
0.00
0.00
0.50
6.40
0.20
0.30
0.00
1.00
0.50
9.00
0.00
9.20
0.20
2.50
0.00
1.50
3.00
16.60
0.00
5.00
0.30
2.80
0.00
0.60
2.60
11.30
0.27
0.24
0.45
0.55
1.30
0.60
1.20
0.29
0.68
0.70
6.28
11.54
7.88
45.97
7.12
81.25
7.78
12.27
16.02
182.60
44.74
417.17
6.00
5.00
0.45
120.00
120.00
113.00
1.50
0.00
0.00
0.00
1.50
UG
0.42
70.00
0.50
0.00
3.20
UG
OC
OC
5.00
6.00
NA
1004.00
0.50
2.50
0.00
0.00
0.70
0.70
0.00
2.00
6.70
UG
0.27
NA
0.00
1.50
2.00
1.00
210.00
900.00
NA
0.00
0.00
0.50
0.50
0.00
0.00
0.00
0.00
0.00
0.00
OC
OC
8/94
3/2005
7/94
3/2005
8/91
Kept in abeyance
8/03
10/03
6.52
8/03
8/03
Project sanctioned in Sept 2002
4/03
3/2007
3.95
8/97
Kept in abeyance
10.47
09-10
At CIL board
UG
UG
UG
UG
UG
OC
UG
UG
UG
NIT floated
NIT floated
NIT floated
NIT floated
NIT under prep
NA
NA
NA
NA
NA
0.50
0.50
1.00
126
F
1
2
3
G
1
2
3
4
5
6
7
8
9
10
11
H
I
Type of
Mine
UG/OC
UG
UG
UG
UG
Project
Status
PR/RPR/RCE
NA
NA
NIT under prep
NA
Likely/Sanct.
Capacity
(Mt)
0.50
0.50
2.00
Likely/Sanct.
Cost
(Rs.Crs)
Sanction
Date
Antic./Act
Comple
date
Actual
2008-09
09-10
09-10
10-11
BE
RE
0.00
0.00
0.00
BE
0.00
0.00
0.00
0.00
1.00
203.03
195.30
244.90
251.95
15.50
19.25
15.50
0.00
19.25
51.35
0.00
0.00
51.35
14.95
0.31
1750 house
1750 house
4/87
4/87
0.40
0.40
0.60
0.00
0.50
0.50
0.20
0.00
0.50
0.50
0.80
1808 house
734 house
5/89
5/89
2.20
0.15
2.00
0.50
3.50
0.20
0.00
17.59
1.75
5.50
13.70
0.00
1.40
5.10
30.75
4.70
1.50
11.70
35.00
0.22
18.13
221.16
34.70
230.00
55.10
300.00
98.05
350.00
127
128
Fin 2
Rs Crs
Actual BE
RE
BE
2008-09 2009-10 2009-10 2010-11
144.96 249.68 132.50
4.45
3.60
5.44
0.63
4.48
1.100
4.200
3.300
1.800
0.77
2.25
2.18 24.000
29.003
7.46
8.000
0.36
4.000
18.36 21.260
2.49
3.497
2.97
8.99
18.36
4.00
0.49
2.050
3.06
15.19
48.75
0.96
0.20
8.45
17.50
5.00
2.50
0.20
2.50
20.00
21.00
2.20
19.39
15.40
1.10
5.45
7.50
6.10
0.10
7.50
4.61
0.50
0.75
15.00
0.15
0.80
59.00
2.000
1.000
2.200
0.300
0.200
3.000
2.200
1.200
3.700
2.200
24.000
30.000
22.000
37.000
2.000
1.00
1.00
21.000
4.61
7.76
1.00
0.300
7.000
0.250
0.03
0.550
0.03
0.000
0.36
0.500
0.35
3.000
0.10
0.04
0.400
0.85
136.18 123.82 165.00
0.3500
1.0000
0.4500
233.00
1.000
1.000
1.750
0.2000
74.000
0.6000
0.4000
0.250
0.100
0.500
0.500
0.400
0.100
0.100
0.100
0.500
0.250
0.00
2.00
0.00
3.00
281.14 376.50
2.23
6.50
19.18 10.50
32.29 26.50
334.84 420.00
1.000
1.000
0.250
0.200
1.25
2.00
3.00
3.00
300.50 295.00
5.00
20.00
18.00
10.00
26.50
25.00
350.00 350.00
Rs.Crores
Sl.
Type of
Project
Likely
Likely
Sanction
No.
Mine
Mine
Status
Sanct.
Sanct.
Date
Actual
Target
RE
10-11
UG/OC
PR/RPR/
Capacity
Cost
PR/RPR
08-09
09-10
09-10
BE
RCE
(Mty)
(Rs.crs)
RCE
73.18
241.44
250.67
150.02
Coal-
Projection
field
ONGOING PROJECTS
1 Amlohri Expn.
OC
EPR
10.00
1896.96
19/5/06
13.39
155.89
21.73
309.04
SGR
2 Bina Extn.
OC
3 Block-B
OC
EPR
6.00
535.96
22/11/06
15.41
22.76
70.24
17.51
SGR
PR
3.50
746.04
7/7/06
35.50
36.25
9.25
33.70
SGR
4 Dudhichua Expn.
5 Krishnasila
OC
RCE
15.00
1281.39
26/3/01
25.86
71.91
80.29
51.11
SGR
OC
PR
4.00
789.88
19/5/06
28.40
47.26
8.79
40.60
SGR
6 Nigahi Expn.
OC
EPR
15.00
2105.89
8/10/07
58.56
98.00
105.45
136.27
SGR
177.11
431.78
295.74
588.23
0.00
0.00
0.00
0.00
SGR
0.00
SGR
OC
EPR
6.00
2 Jayant Expn.
OC
EPR
5.00
3 Kakri Extn.
OC
PR
3.00
SGR
0.00
0.00
0.00
SGR
0.00
0.00
0.00
SGR
0.00
0.00
0.00
0.00
Total Mining
250.29
673.22
546.41
738.25
Total Non-Mining
16.23
56.78
53.59
61.75
GRAND TOTAL
266.52
730.00
600.00
800.00
129
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Name of the
Project/Mine
2
TOTAL EXISTING + COMPLETED PROJECTS
ONGOING PROJECTS AS ON 31/08/2009:
Durgarpur Ryt. 6,7,& 8 Inclines
Kumberkhani C.M. Scheme
Sarni Sch. (For working propoerty beyond D2
Dyke)
Tawa - II
Waghoda
Ongoing Mines Dropped/Closed
SUB TOTAL
Bhanegaon
Bhatadih Expn.
Durgapur Expn. Deep
Gauri Deep
Gauri I & II Expn. Scheme
Ghonsa RPR
Ghugus Deep Scheme
Gokul
Gondegaon Expn.
Inder UG to OC
Junad Extn.
Junakunada
Kolar pimpri Extn.
Kolgaon
Makardhokra I
Pauni-II
Penganga (Mugoli Extn.)
Scheme for Ballarpur OC
Scheme for Bellora / Naigaon Deep
Scheme for Telwasa Expn. OC
Scheme for Dhurwasa Expn. OC
Scheme for Deepening Niljai OC
Sasti Expn.
Singori
Urdhan
Yekona -I
Type of
Mine
UG/OC
3
Project
Status
PR/RPR/RCE
4
Likely/Sanc.
Capacity
(Mt)
5
37.28
Sanct./Proj.
Cost
(Rs.Crs)
6
2538.18
Sanction
Date
PR & RPR
7
UG
UG
UG
PR
PR
RCE
0.32
0.18
0.14
13.64
10.87
8.35
UG
UG
PR
PR
0.39
0.39
UG
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
PR
PR
PR
PR
SCH
RPR
SCH
PR
PR
PR
PR
PR
PR
RPR
PR
PR
PR
SCH
SCH
SCH
SCH
SCH
SCH
PR
PR
PR
1.41
0.60
0.65
2.00
0.40
1.80
0.45
1.50
1.00
0.75
0.60
0.60
0.60
1.50
0.50
1.00
0.60
3.00
0.54
1.00
0.70
0.90
2.10
1.40
0.80
0.50
0.40
36.43
71.73
31.31
172.34
30.44
99.68
42.98
86.21
13.00
44.66
10.15
79.83
27.54
38.23
38.76
23.76
72.90
49.59
39.98
28.11
339.77
4.67
3.04
5.12
6.89
4.83
16.80
48.72
43.50
46.07
130
B.E. 2009-10
Fin-2
Rs Crores
R.E. 2009-10
B.E. 2010-11
ACTUAL
2008-09
8
185.20
9
114.00
10
152.16
11
172.50
04/01
04/06
10/05
1.08
1.04
2.49
2.73
03/04
04/08
1.36
0.69
1.50
4.38
1.39
3.47
3.69
2.44
1.10
4.03
11.49
3.22
1.26
17.12
1.46
0.50
2.96
1.95
9.68
0.85
1.90
0.48
10.88
0.43
1.95
0.47
2.40
0.55
8.26
1.33
22.71
22.29
1.60
6.82
2.02
11.56
0.10
9.67
0.37
15.59
7.17
1.06
0.91
0.05
0.30
0.45
0.02
5.00
0.17
9.89
2.84
16.64
4.28
3.14
5.65
3.99
3.10
2.40
16.58
0.70
5.82
1.31
5.57
2.21
4.74
0.12
0.90
0.96
6.70
0.48
0.55
0.66
1.12
7.23
0.50
3.96
1.39
2.93
0.45
11/03
05/07
05/07
11/01
04/07
10/01
01/07
06/06
09/04
12/04
11/07
03/03
06/06
11/01
04/05
11/03
10/08
06/08
12/08
10/08
06/08
04/09
11/04
03/04
07/02
12/04
3.85
0.09
25.41
0.12
2.27
0.10
2.33
0.17
4.00
2.05
1.37
1.02
Name of the
Project/Mine
1
2
32 Yekona -II
SUB TOTAL OC
TOTAL ONGOING (UG+OC): D FUTURE PROJECTS
D1. AWAITING APPROVAL:
1 Bhakra
2 Dhankasa
3 Dhau North
4 Harradol
5 Jamuniya
6 Maori Block with C.M. Package
7 Saonr Mine-I Expn.
8 Sharda
SUB TOTAL
9 Bellora / Naigaon Deep
10 Chincholi
11 Dhuptala ( Sasti UG to OC)
12 Dinesh (Makardhokra - III)
13 Motagaht
14 New Majri UG to OC
15 Pauni-III (Sakhari - Irawati)
16 Ukni Deep
17 Yekona - I Extn.
SUB TOTAL
TOTAL AWAITING APPROVAL
D2. TO BE FORMULATED:
1 Antargaon
2 Borda
3 Chatarpur - III / Umri
4 Dhanwa
5 Gandhigram
6 Mathra Incl. Extn.
7 Murpar Expn.(Including Bhansuli&Surmanjari
UG)
8 Nand
9 Nokoda South UG
10 Pauni Deep Expn.
11 Pisgaon
Type of
Mine
UG/OC
3
OC
Likely/Sanc.
Capacity
(Mt)
5
0.60
26.49
27.90
Sanct./Proj.
Cost
(Rs.Crs)
6
48.06
1293.28
1465.62
UG
UG
UG
UG
UG
UG
UG
UG
UG
OC
OC
OC
OC
OC
OC
OC
OC
OC
oc
0.27
1.00
0.36
0.14
0.72
0.90
0.75
0.32
4.45
1.00
0.30
1.70
3.00
1.25
0.80
1.25
2.00
0.50
11.80
16.25
55.28
152.86
41.70
16.36
127.52
67.50
68.17
50.95
580.35
114.41
24.64
194.11
496.40
144.29
72.57
173.57
311.61
225.70
1757.30
2337.64
UG
UG
UG
UG
UG
UG
UG
0.50
4.00
0.29
0.50
1.17
0.40
3.00
120.00
600.00
3.58
150.00
593.04
60.00
400.00
UG
UG
UG
UG
0.70
0.60
0.50
0.24
135.89
90.00
90.00
105.00
TOTAL
Project
Status
PR/RPR/RCE
4
PR
131
Sanction
Date
PR & RPR
7
08/03
B.E. 2009-10
ACTUAL
2008-09
8
48.63
51.07
Fin-2
Rs Crores
R.E. 2009-10
B.E. 2010-11
9
1.60
67.20
70.42
10
0.50
119.18
127.44
11
1.35
98.73
108.62
0.80
0.05
0.10
1.50
2.40
2.05
0.10
1.28
1.60
0.96
3.26
1.10
7.88
0.25
0.30
0.15
0.50
0.35
1.87
0.90
4.16
2.52
10.40
0.65
1.20
0.10
2.75
0.75
0.80
0.55
2.10
4.85
0.80
Name of the
Project/Mine
1
2
12 Shakithgarh
13 Thesgora - C
SUB TOTAL
14 Antargaon
15 Bhatadi North - West
16 Chikalgaon / Chinchala
17 Ghonsa Extn. (Including Parsoda UG)
18 Junakunda Deep
19 Kamptee Deep
20 Kolgaon Deep
21 Mugoli / Nirguda Deep
22 New Majri Sector A Extn.
23 Niljai Deep
24 Nokoda UG to OC
25 Padmapur Deep
26 Pauni-II Deep
27 Pauni Deep
28 Yekona - II Extn.
SUB TOTAL
TOTAL TO BE FORMULATED:
FUTURE PROJECTS
E
1
2
F.
Type of
Mine
UG/OC
3
UG
UG
UG
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
UG + OC
UG
OC
TOTAL
TOTAL
Project
Status
PR/RPR/RCE
4
Likely/Sanc.
Capacity
(Mt)
5
2.00
0.30
14.20
1.60
0.70
4.50
0.60
0.60
1.50
0.40
1.50
1.50
2.50
0.50
2.00
0.60
2.00
1.00
21.50
35.70
18.65
33.30
51.95
Sanct./Proj.
Cost
(Rs.Crs)
6
150.00
60.00
2557.51
100.00
400.00
1357.30
50.00
50.00
375.36
50.00
150.00
100.00
400.00
50.00
501.16
50.00
500.00
400.00
4533.82
7091.33
3137.86
6291.12
9428.97
117.13
13432.77
132
B.E. 2009-10
ACTUAL
2008-09
8
10
11
0.80
3.55
2.10
5.65
3.26
0.90
4.16
7.88
2.52
10.40
236.27
190.07
283.75
291.52
30.85
0.36
0.18
1.40
30.85
0.36
6.54
34.75
41.65
277.92
0.18
14.76
25.00
39.94
230.00
1.40
27.85
37.00
66.25
350.00
0.15
3.00
3.15
18.34
37.00
58.49
350.00
131.81
13595.43
117.13
Sanction
Date
PR & RPR
7
Fin-2
Rs Crores
R.E. 2009-10
B.E. 2010-11
0.80
Type DATE OF
Total
of
SANC.
approved
Mines
cost
(Rs Crs)
A EXISTING MINES
UG
OC
TOTAL (A) EXISTING
B COMPLETED PROJECTS
UG
OC
TOTAL (B) COMPLETED
C ONGOING MINING PROJECTS
1 NAWAPARA UG
UG 23-Oct-00
2 MAHAN OC
OC
4-Jun-98
3 GAYATRI UG
UG
8-Apr-99
5 NCPH SEAM V / R6 UG
UG 21-Dec-02
6 RANI ATARI
UG
21-Jul-99
7 KURJA
UG 23-May-00
UG/SHEETALDHARA UG
8 JHIRIA UG
UG 23-Oct-00
9 BARTARAI UG/
UG
21-Jul-99
AMADAND UG
10 PINOURA AUG PR
UG 27-Mar-98
11 VINDHYA UG AUG RPR
UG 27-Mar-98
12 KANCHAN OC
OC 29-May-03
13 DAMINI UG
UG
5-Apr-00
14 AMERA OC
OC
25-Jul-02
15 GEVRA EXPN. OC (25.00
OC
12-Jul-05
MTY)
16 DIPKA EXPN. OC (20.00
OC
12-Jul-05
MTY)
17 MAHAN II OC
18 AMADAND OC
OC 25-Sep-03
19 KIUSMUNDA EXPN. OC
10.00 MTY
20 SARAIPALLI OC
OC 22-Feb-03
21 CHAAL OC
OC 29-May-03
22 BAROUD EXPN. OC
OC 29-May-03
23 AMGOAN OC
OC
24-Jun-04
24 KHAIRAHA UG
UG 25-Sep-03
25 KETKI UG
UG 14-Nov-03
26 BINCARA UG
UG
24-Jan-04
27 VIJAY WEST UG
UG
8-Apr-04
28 HALDIBARI UG
UG 15-Oct-03
29 JAMPALI OC
30 AMBICA OC
31 BIJARI OC
32 KARTALI EAST OC
33 BATURA OC
34 JAGANNATHPUR OC
35 PELMA OC
UG
OC
TOTAL (C) ONGOING
UG
OC
TOTAL MP
UG
OC
TOTAL CG
D FUTURE PROJECTS
XI-th PLAN PROJECTS
36 PATHAKPUR UG
37 JAMDAI UG
38 GUMGARA UG
39 VIJAY EAST UG
40 BAKULMUNI UG
AREA
Figures in Rs Crs
BE
Proj.
10-11
11-12
6.02
0.00
6.02
3.05
0.00
3.05
3.05
0.00
3.05
1.66
0.00
1.66
1.45
0.00
1.45
40.07
121.23
161.30
12.11
24.76
36.87
12.11
24.76
36.87
11.09
27.45
38.54
11.55
23.50
35.05
4.15
6.79
0.15
4.00
1.00
3.00
0.00
2.00
19.00
5.000
3.000
3.000
0.000
5.000
4.000
1.50
3.00
3.00
1.29
7.16
4.00
1.00
3.00
0.00
2.00
19.00
0.00
1.11
0.000
1.000
0.50
42.55
41.95
21.91
49.29
48.54
98.98
CIC-BHAT
CIC-BHAT
CIC-BIS
CIC-CHR
CIC-HSD
CG
CG
CG
CG
CG
MP
32.06
45.26
CIC-HSD
CIC-J&K
MP
MP
22.37
1.72
0.00
1.11
CIC-JHL
CIC-JHL
CIC-JHL
CIC-SGP
K-G
MP
MP
MP
MP
CG
CG
0.04
0.24
0.45
2.94
1.85
317.20
2.00
3.00
1.00
3.00
4.00
91.16
2.00
3.000
3.00
2.000
1.00
0.500
3.00
6.000
4.00
3.000
103.61 70.000
2.00
2.00
0.50
7.00
4.00
76.50
1268.53
K-G
CG
107.33
70.00
83.39
CIC-J&K
MP
0.01
108.13
5.00
1.00
50.00
22.82
19.99
28.02
39.28
88.33
46.24
41.98
63.56
47.92
CG
CG
CG
CG
MP
CG
CG
CG
CG
0.01
12.70
1.16
4.00
6.00
5.00
10.00
10.00
10.00
5.00
7.30
4.00
3.00
2.00
1.00
1.00
2.000
2.000
2.000
6.000
4.000
8.000
12.000
10.000
10.000
3.000
3.000
2.000
3.000
0.500
0.500
5.000
77.00
401.39
478.39
30.00
1.50
31.50
47.00
399.89
446.89
5.00
1.00
4.00
10.00
6.00
9.00
10.00
6.00
4.00
10.00
10.00
5.00
5.00
3.00
3.00
10.00
73.00
392.50
465.50
26.50
1.50
28.00
46.50
391.00
437.50
0.000
0.000
0.000
0.000
0.000
0.500
5.00
2.00
2.00
2.00
3.00
49.92
49.90
23.91
39.32
41.69
1667.55
K-RAI
CIC-BIS
CIC-SGP
CIC-BIS
CIC-BIS
CIC-CHR
K
0.99
1.36
44.17
579.98
624.14
35.84
0.46
36.30
8.33
579.51
587.84
133
5.00
74.66
448.10
522.76
42.11
2.00
44.11
32.55
446.10
478.65
4.00
6.00
5.00
2.50
2.50
2.50
2.50
2.30
4.00
1.00
0.50
0.50
1.00
0.00
0.00
1.00
56.16
524.37
580.53
42.11
2.00
44.11
14.05
522.37
536.42
5.00
5.00
Type DATE OF
Total
of
SANC.
approved
Mines
cost
(Rs Crs)
41 RAI EAST OC
42 PORDA OC
43 CHIMTAPANI OC
44 DURGAPUR OC
45 BORI / BODRI NORTH UG
46 AMRITDHARA UG
47 AMBA UG
UG
OC
TOTAL (D)
UG
OC
TOTAL MP
UG
OC
TOTAL CG
E ADVANCE ACTION PROJECTS
48 BADAULI EXTN UG
TOTAL UG
TOTAL OC
TOTAL (A+B+C+D)
UG
OC
TOTAL CG
UG
OC
TOTAL MP
TOTAL SECL
NON-MINING
PROJECTS
1 AREA Hqs
2 HOSPITALS
3 REGIONAL STORES
4 REGIONAL WORKSHOPS
5 OTHERS
NON MINING EXIST/COMPLETED PROJECTS
NON-MINING ONGOING
1 AREA HQS BHATGOAN
2 COMM ALL AREAS SECL
HQS
3 GM COMPLEX RAIGARH
AREA
4 HOSPITAL MULTI SPS.
BSP
5 RESCUE SERVICES
6 SAFETY,HQ
7 SHAFT RAJ. WINDER &
VENT RO
8 SHAFT VENT CHURCHA
(W)
9 CENT. W/S & STORES
10 R & D & OTHERS
NON-MINING ONGOING
NON MINING
FORMULATED
AWAITING APPROVAL
NON MINING YET TO BE FORM
* NON MINING
EXPLORATION
GRAND TOTAL
TOTAL NON MINING
TOTAL MINING
TOTAL SECL
AREA
Figures in Rs Crs
BE
Proj.
10-11
11-12
0.000
0.000
0.500
1.000
0.000
0.500
0.00
109.32
109.32
0.00
0.00
0.00
0.00
109.32
109.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.50
2.50
1.00
0.00
1.00
0.00
1.50
1.50
5.00
5.00
2.00
2.00
1.00
19.00
13.00
32.00
7.00
3.00
10.00
12.00
13.00
25.00
90.25
701.21
791.46
39.88
664.00
703.89
50.37
37.21
87.57
791.46
89.82
582.18
672.00
42.72
568.18
610.90
47.10
14.00
61.10
672.00
71.32
549.13
620.45
24.22
535.13
559.35
47.10
14.00
61.10
620.45
90.75
430.34
521.09
55.62
418.44
474.06
35.13
11.90
47.03
521.09
1.00
106.00
429.00
535.00
68.15
418.00
486.15
37.85
11.00
48.85
535.00
5.23
0.78
0.44
0.27
7.62
2.50
0.50
0.50
0.50
11.62
7.62
2.50
0.50
0.50
0.50
11.62
7.500
0.500
0.200
0.200
0.200
8.600
8.00
0.50
0.20
0.20
0.20
9.10
0.00
0.00
0.00
0.00
0.500
0.000
0.50
6.72
CIC-BHAT
HQ
CG
HQ
1.96
CIC-RAI
CG
0.00
0.00
0.000
HQ
CG
0.00
0.00
0.000
HQ
CIC-HSD
HQ
HQ
MP
0.00
5.00
0.00
0.00
5.00
0.00
0.200
5.000
0.000
CIC-BKP
CG
0.00
0.00
0.000
HQ
HQ
0.50
0.50
6.00
0.00
0.50
0.50
6.00
0.00
2.000
0.500
8.200
0.000
53.58
0.00
0.00
40.38
0.00
0.00
61.93
0.000
0.000
62.110
48.00
64.52
791.46
855.98
65.00
535.00
600.00
0.01
2.25
4.22
HQ
134
0.20
5.00
1.50
0.70
7.90
OC
OC
10.00
10.00
OC
OC
OC
OC
10.00
2.00
15.00
15.00
45.83
5.69
2.13
5.50
37.85
10.72
3.90
5.50
10.05
0.20 0.10 2.50
9.80 12.87 14.43
7.75 10.36 14.58
5.36
1.60
16.24 20.50
0.20 2.18 3.09
1.20 1.10 6.06
0.20 3.66 3.51
0.00
4.70
13.50
18.20
11.60 11.44 14.60
63.95 120.96 137.73
75.55 132.40 152.33
0.20
0.40
0.60
62.00
62.00
OC
OC
OC
Rs.Crores
0.90
0.10
OC
OC
OC
291.95
732.13
Fin 2
6.00
4.00
5.00
UG
135
1024.08
1024.08
0.00
0.00
0.00
0.00
1.60
1.60
0.00
0.00
0.00
0.00
136
I.
A.
a)
i)
ii)
iii)
b)
i)
ii)
iii)
B
a)
i)
ii)
iii)
b)
i)
ii)
iii)
C
i)
a)
b)
1
2
ii)
a)
b)
1
2
iii)
NAME OF THE
PROJECT/MINE.
CAP
(mtpa) SANC.
ANT.
DATE OF COMPLETION.
X Plan (2002-07)
Org.
Latest
NOW Cumulative Cumulative
Approved Rev.
ANT.
Exp.
Exp.
during
upto
X Plan
X Plan
2002-2007 31.03.2007
MINING:
EXISTING PROJECTS (AMRs)
AMRs Sanctioned by Competent Authority.
Additions. - Nil
Modifications. - Nil
Replacements.
AMRs yet to be Sanctioned by Competent
Authority.
Additions. - Nil
Modifications. - Nil
Replacements. -Nil
SUB-TOTAL - A
COMPLETED PROJECTS (AMRs)
AMRs Sanctioned by Competent Authority.
Additions. - Nil
Modifications. - Nil
Replacements.
AMRs yet to be Sanctioned by Competent
Authority.
Additions. - Nil
Modifications. - Nil
Replacements.-Nil
SUB-TOTAL - B
ON GOING PROJECTS
Projects sanc. before & during VII Plan.
As per Sanctioned Capital (Initial Capital only)
AMRs
AMRs sanctioned by Competent authority. - Nil
AMRs yet to be sanctioned by Competent authority. - Nil
TOTAL - C(i):
Projects sanc. during VIII Plan
As per Sanctioned Capital (Initial Capital only)
AMRs
AMRs sanctioned by Competent authority. - Nil
AMRs yet to be sanctioned by Competent authority. - Nil
TOTAL - C(ii):
Projects sanctioned during IX Plan.
137
126.80
0.00
521.75
0.00
0.00
0.00
0.00
126.80
0.00
0.00
0.00
0.00
690.44
0.00
0.00
0.00
0.00
521.75
0.00
0.00
0.00
0.00
4293.71
0.00
0.00
0.00
0.00
690.44
0.00
0.00
12.35
0.00
0.00
-130.83
-118.48
0.00
38.24
0.00
0.00
0.00
38.24
0.00
0.00
0.00
0.00
4293.71
0.00
0.00
28.26
0.00
0.00
-130.83
-102.57
0.00
48.96
0.00
0.00
0.00
48.96
0.00
(RS. CRS.)
2009-10
2010-11
Apprvd.
Ant.
Proposed
Outlay
Expdr
Outlay
B.E.
R.E.
B.E.
2006-07
(ACT.)
EXP.
2007-08
(ACT.)
EXP.
2008-09
(ACT.)
EXP.
25.62
21.66
4.37
11.00
3.40
3.38
25.62
21.66
4.37
11.00
3.40
3.38
197.75
360.67
245.17
80.60
133.80
105.37
197.75
360.67
245.17
80.60
133.80
105.37
2.95
4.93
4.81
9.00
3.00
2.80
2.95
4.93
4.81
9.00
3.00
2.80
6.14
0.05
0.00
0.00
0.00
0.00
6.14
0.05
0.00
0.00
0.00
0.00
a)
b)
1
2
NAME OF THE
PROJECT/MINE.
CAP
(mtpa) SANC.
ANT.
DATE OF COMPLETION.
X Plan (2002-07)
Org.
Latest
NOW Cumulative Cumulative
Approved Rev.
ANT.
Exp.
Exp.
during
upto
X Plan
X Plan
2002-2007 31.03.2007
141.71
145.33
0.00
0.00
0.00
0.00
0.00
0.00
141.71
145.33
0.00
0.00
152.91
152.95
0.00
0.00
0.00
0.00
0.00
0.00
152.91
152.95
345.21
375.51
0.00
0.00
3.86
4.55
0.00
0.03
3.86
4.58
1166.31
5195.55
0.00
0.00
0.00
0.00
0.00
0.00
84.30
201.74
84.30
201.74
0.00
0.00
194.98
338.44
0.00
0.00
194.98
338.44
0.00
0.00
0.00
5.69
0.00
0.00
0.00
5.69
5.00
116.48
284.28
662.35
1450.59
5857.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
138
(RS. CRS.)
2009-10
2010-11
Apprvd.
Ant.
Proposed
Outlay
Expdr
Outlay
B.E.
R.E.
B.E.
2006-07
(ACT.)
EXP.
2007-08
(ACT.)
EXP.
2008-09
(ACT.)
EXP.
63.00
26.96
28.76
20.00
35.79
5.00
63.00
26.96
28.76
20.00
35.79
5.00
25.94
57.00
216.86
354.60
291.14
384.38
25.94
98.02
57.00
88.94
216.86
250.43
354.60
383.60
291.14
329.93
384.38
392.18
2.60
0.00
2.60
324.00
0.00
471.27
1.85
0.75
2.60
502.57
0.00
0.00
0.00
475.20
90.00
0.00
90.00
557.13
135.00
0.00
135.00
635.93
30.79
30.79
33.51
33.51
124.89
124.89
15.00
15.00
42.91
42.91
71.00
71.00
90.26
66.55
19.30
81.87
7.35
85.00
90.26
66.55
19.30
81.87
7.35
85.00
0.00
2.10
2.18
5.50
24.05
540.00
0.00
3.58
124.63
448.63
2.10
0.54
102.70
573.97
2.18
1.50
147.87
650.44
5.50
3.00
105.37
580.57
24.05
2.50
76.81
633.94
540.00
3.00
699.00
1334.93
NAME OF THE
PROJECT/MINE.
iii)
b)
i)
ii)
iii)
Replacements.
AMRs yet to be Sanctioned by Competent Authority.
Additions. - Nil
Modifications. - Nil
Replacements.-Nil
SUB-TOTAL - A:
Completed Projects.
AMRs Sanctioned by Competent Authority.
Additions. - Nil
Modifications. - Nil
Replacements.
K.T.K.-1&1A.
I.K.-1 & 1A.
KTK-5.
KTK-2&2A.
SDLs in RK-6 and KTK-1 &1A Incs.
KTK-3.
GOLETI -2 INCLINE.
BPA. OC.I
BPA.OC-II.
Goleti-1 Extn.
GOLETI-1A
GOLETI-1 INCLINE.
BPA OC-II EXTN.
V.K.-7 LONGWALL.
B
a)
i)
ii)
iii)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
10
22
23
24
25
26
CAP
(mtpa) SANC.
0.300
0.500
0.410
0.416
0.320
0.572
0.070
ANT.
DATE OF COMPLETION.
X Plan (2002-07)
Org.
Latest
NOW Cumulative Cumulative
Approved Rev.
ANT.
Exp.
Exp.
during
upto
X Plan
X Plan
2002-2007 31.03.2007
126.80
521.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
126.80
521.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3/94
3/97
3/97
16.80
53.21
3/89
3/97
3/98
5.73
46.13
3/95
3/2004 3/2004
14.89
40.63
3/95
3/2005 Sep.04
24.11
51.31
2007-08
2007-08
0.62
0.62
3/2003 3/2007 3/2007
26.33
36.74
3/87
3/87
0.00
7.79
3/87
3/87
0.00
16.03
3/91
3/93
2.20
33.47
0.400
44.19
46.11
40.19
35.35
5.05
47.33
5.60
11.27
19.00
44.19
46.11
40.19
33.27
5.05
47.33
4.31
10.25
25.83
0.240
0.161
0.400
0.385
0.140
0.250
1.200
0.250
2.000
0.400
1.100
18.05
2.04
35.51
15.90
12.80
13.20
196.17
40.21
415.93
48.30
91.24
18.05
3.16
35.51
13.94
12.80
13.20
181.88
40.21
159.74
48.30
91.24
3/2005
3/83
2007-08
3/87
3/94
3/96
3/2000
3/98
3/2002
2007-08
3/2008
0.138
0.075
0.075
0.075
0.057
2.01
2.03
2.05
1.98
0.83
2.59
1.16
1.02
0.99
0.84
3/80
3/80
3/82
3/82
3/83
3/2006
3/87
2007-08
3/87
3/94
3/94
3/96
3/97
3/98
3/2002
2007-08
3/2008 3/2008
3/82
3/85
3/85
3/82
3/85
139
21.93
4.04
2.56
0.00
3.84
0.00
8.89
1.33
24.10
0.00
49.18
0.17
0.01
0.00
0.00
0.00
0.00
21.93
14.09
2.56
15.17
16.17
12.69
193.84
35.62
142.41
0.00
49.18
0.17
5.74
2.18
2.95
4.92
3.31
(RS. CRS.)
2009-10
2010-11
Apprvd.
Ant.
Proposed
Outlay
Expdr
Outlay
B.E.
R.E.
B.E.
2006-07
(ACT.)
EXP.
2007-08
(ACT.)
EXP.
2008-09
(ACT.)
EXP.
25.62
21.66
4.37
11.00
3.40
3.38
25.62
21.66
4.37
11.00
3.40
3.38
3.01
0.17
2.30
5.43
4.59
7.79
1.34
2.09
3.19
1.00
1.00
1.00
1.00
1.10
1.00
2.49
4.30
1.00
0.30
0.87
0.50
0.46
1.00
2.00
10.00
2.20
0.60
7.10
1.00
5.00
14.00
7.74
13.00
7.00
10.00
5.06
6.25
3.76
6.95
1.79
1.72
1.00
2.25
9.99
1.63
10.20
3.96
3.84
0.33
4.17
27.82
10.67
0.17
26.90
9.58
6.60
8.23
23.98
0.00
1.00
27
28
29
30
31
32
33
24
25
26
26
27
28
29
30
31
32
33
34
35
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
NAME OF THE
PROJECT/MINE.
K.K.-2A
KASIPET.
SHANTI KHANI EXTN. PHASE-I.
MNG.OC-I.
P.K.-1 INCLINE.
P.K.-2 INCLINE.
P.K.-3
MNG.OC-II.1
CENT. OC MNG.2
MNG. OC-III.3
MNG. OC-IV.4
GDK-7/9 LW
GDK-7 LIFE EXTN.
MEDAPALLI OCP.
GDK-5 LHDS.
GDK-5
GDK-5,GDK-6B,GDK-9 SDLs.
GDK-6B BG-I
RG.OC-I.
RG.OC-I EXP.
G.D.K.-9&9A INCS.
G.D.K.-8 & 8 A INCS.
GDK-9 AUG.
GDK-8 MECH.
GDK-10 BG METHOD AND LHD
RG.OC-III.
G.D.K.-10A. SDL & LW
VAKILPALLI BLOCK-A.
GDK-8 BG METHOD FOR DEVELOPED PILLARS.
GDK-8 BG-II
DRIVAGE OF TUNNELS GDK.9 INC.
Continuous Miner at GDK-8 Inc.
Continuous Miner at GDK-10 Inc.
SINKING OF INTAKE AIR SHAFT AT GDK-11A INC.
G.D.K.-10 INCLINE.
THICK SEAM MINING BY BG AT GDK-10 INC.
GDK-11A INC.BG
RG.OC-II.
CAP
(mtpa) SANC.
0.180
0.190
0.800
0.188
0.116
14.80
10.41
18.32
18.84
4.69
4.91
2.750
0.600
0.500
1.250
199.95
19.84
25.10
21.95
0.180
1.250
0.180
0.180
0.243
0.330
2.4
1.500
0.625
0.613
10.14
219.82
7.53
7.53
5.72
36.91
81.78
49.18
8.71
6.47
0.250
2.750
0.770
0.510
0.200
0.300
39.20
535.03
116.53
88.80
36.47
44.33
5.58
20.78
20.78
7.25
4.84
18.56
156.00
807.85
0.240
0.240
290 M
0.175
0.275
1.400
2.000
DATE OF COMPLETION.
X Plan (2002-07)
Org.
Latest
NOW Cumulative Cumulative
ANT. Approved Rev.
ANT.
Exp.
Exp.
during
upto
X Plan
X Plan
2002-2007 31.03.2007
3.25
3/93
3/93
0.00
2.99
10.41
3/98
3/2000
5.98
17.72
20.50
3/97
Sep.04
7.95
22.39
18.50
3/85
3/85
3/83
0.00
60.35
5.97
3/81
3/85
6.02
20.59
4.25
3/81
3/87
1.80
10.53
3/85
3/87
0.00
6.89
196.93
3/90
3/92
3/92
56.19
294.18
20.13
3/93
3/92
2.05
39.29
25.10
2007-08
2007-08
12.67
12.72
21.95
3/2005
3/2003
5.24
7.00
3/86
3/85
0.00
10.48
10.14
3/97
3/96
4.04
16.14
99.58
3/2001
3/2001
27.54
72.61
7.53
3/2000
3/2002
0.10
3.74
7.53
3/2000
3/2002
0.10
3.74
3.66
3/2004
3/2004
4.83
4.83
36.91
3/2003
3/2003
15.14
28.87
82.94
3/85
3/86
3/88
18.95
268.71
88.10
3/2008
3/2008
42.50
42.50
8.16
3/80
3/82
3/82
14.82
42.28
9.62
3/82
3/86
19.43
51.96
0.00
3.42
3/92
3/93
0.00
1.04
39.20
3/95
3/94
5.26
43.89
534.17
3/95
3/95
3/95
100.44
559.72
118.24
3/92
3/95
3/95
19.01
149.02
88.80
3/95
3/96
3/96
1.50
70.42
36.47
3/96
3/96
0.40
39.12
44.33
3/2001
3/2001
5.73
29.33
5.58
3/97
3/2001
0.00
13.91
20.78
2007-08
2007-08
0.00
0.00
20.78
2007-08
2007-08
0.00
0.00
2008-09 2008-09
0.00
0.00
6.19
3/84
3/87
5.26
24.22
22.15
3/91
3/90
5.91
43.45
167.44
3/89
3/93
3/93
36.76
211.49
800.87
3/92
3/95
3/96
20.55
837.48
140
2006-07
(ACT.)
EXP.
2007-08
(ACT.)
EXP.
2008-09
(ACT.)
EXP.
1.99
0.70
3.63
1.38
1.42
0.69
0.10
35.14
0.00
11.15
0.00
3.85
1.29
65.30
0.89
31.96
1.28
3.34
1.74
12.72
(RS. CRS.)
2009-10
2010-11
Apprvd.
Ant.
Proposed
Outlay
Expdr
Outlay
B.E.
R.E.
B.E.
0.80
0.72
0.70
0.40
6.00
0.16
0.09
1.00
15.35
7.00
9.00
4.03
1.00
1.00
1.00
0.90
10.00
4.00
6.25
0.00
6.25
2.00
0.00
35.06
38.62
0.00
1.91
1.00
0.75
8.75
14.32
1.12
0.75
6.00
9.00
2.00
3.61
2.41
2.00
3.18
3.99
1.97
33.65
2.00
5.00
5.00
7.50
5.25
0.70
4.00
0.76
6.18
1.00
5.17
1.87
14.45
5.39
4.54
9.97
25.62
1.78
2.41
30.56
3.97
8.87
22.50
14.34
0.00
0.92
3.00
0.16
0.63
1.67
10.33
3.41
NAME OF THE
PROJECT/MINE.
53
54
55
56
57
58
59
60
61
62
62
63
64
36
64
65
66
67
68
69
70
71
72
73
74
75
76
R.K.-5 INCLINE.
R.K.-6 INCLINE.
R.K.-7 INCLINE.
SRP-1 INCLINE.
SRP-2 INCLINE.
SRP-2A INCLINE.
R.K.-8 INCLINE.
R.K.-1A INCLINE.
SRP-3 & 3A INCLINES.
R.K.-5 MARGINAL SCHEME.
R.K. NEW TECH.
CHINNUR-1 & 1A.
CHINNUR-2.
SRP-1 OCP
J.K.-5 INC.
YC. OC BLOCK-A
YC. OC BLOCK-B
J.K.-3 OC BLOCK-C.
YC.OC-II.
YD. OC BLOCK-D.
KOYAGUDEM OCP -I. (PHASE-I).
YLD OCP BLOCK-E
NO.21 INC. BG.
(INCL. MARGINAL SCH)
MARGL. SCHEME
77
78
78
79
80
81
82
CAP
(mtpa) SANC.
0.189
0.291
0.422
0.190
0.250
0.212
0.250
0.180
0.300
0.125
0.640
0.416
0.312
0.600
0.669
2.70
3.37
7.33
1.96
6.04
6.04
9.08
29.78
10.46
2.98
33.82
34.94
28.33
48.93
54.64
16.00
19.28
19.24
19.43
28.18
25.84
12.17
27.05
19.67
7.47
4.32
11.61
3.16
4.22
6.00
3.13
8.59
7.94
10.37
19.58
15.36
2.98
33.82
27.93
10.47
48.93
54.64
12.37
19.75
19.45
19.43
28.18
7.81
5.10
27.05
23.24
7.47
4.32
11.95
0.614
3.55
12.50
21.85
2.26
12.50
21.85
3/2004
3/2004
2004-05
3/2004
3/2006
2005-06
2.45
10.33
2.39
2.45
10.33
2.39
11.76
11.76
2004-05
2005-06
4.85
4.85
0.180
9.67
9.67
2005-06
2005-06
0.00
0.00
9.16
24.27
9.16
24.27
2005-06
2005-06
2005-06
2005-06
5.48
28.52
5.48
28.52
0.500
0.500
0.500
0.700
0.450
0.285
ANT.
DATE OF COMPLETION.
X Plan (2002-07)
Org.
Latest
NOW Cumulative Cumulative
Approved Rev.
ANT.
Exp.
Exp.
during
upto
X Plan
X Plan
2002-2007 31.03.2007
3/81
3/86
12.11
33.46
3/84
3/87
10.71
26.33
3/84
3/86
3/86
19.49
38.44
3/82
3/86
6.59
17.05
3/87
3/90
2.15
18.33
3/86
3/90
1.51
16.01
3/87
3/91
3.15
18.17
3/91
3/92
6.83
29.73
3/91
3/93
9.96
35.94
3/96
3/2000
0.00
2.46
3/2003 3/2003 3/2003
13.67
32.20
3/95
3/2005 Sep.04
5.37
32.47
3/94
3/2006 Sep.04
8.47
20.68
2007-08
2007-08
16.40
16.40
3/87
3/91
3/91
2.43
73.88
3/87
3/87
0.00
15.83
3/90
3/90
0.00
18.38
3/94
3/93
0.11
15.38
3/94
3/96
0.37
24.79
3/2000
3/2000
0.09
9.33
3/2004
3/2004
12.82
18.15
3/2002
3/2004
1.67
6.50
3/2004
3/2006
24.73
27.75
3/94
3/94
0.00
0.00
3/99
Foreclosed
3/98
3/2001
0.00
3.61
3/2004
3/2004
0.30
0.30
141
(RS. CRS.)
2009-10
2010-11
Apprvd.
Ant.
Proposed
Outlay
Expdr
Outlay
B.E.
R.E.
B.E.
2006-07
(ACT.)
EXP.
2007-08
(ACT.)
EXP.
2008-09
(ACT.)
EXP.
2.99
3.09
3.37
0.77
1.09
1.67
6.25
1.16
1.74
2.22
2.87
0.37
1.00
0.50
1.00
0.80
1.00
0.20
2.00
0.50
0.35
1.20
1.00
0.50
0.06
3.52
3.26
0.43
1.34
4.19
0.36
0.16
2.07
0.90
0.50
2.00
0.30
0.06
0.20
0.40
0.40
1.00
2.89
1.00
4.40
10.00
6.00
5.00
1.37
0.00
2.50
0.75
2.70
2.00
3.00
0.00
1.04
16.16
0.04
17.05
0.90
0.32
0.12
1.69
0.15
0.15
0.13
1.29
2.00
1.50
0.01
0.00
0.20
2.00
8.32
4.00
8.00
83
84
85
86
87
88
89
b)
C
i)
a)
1
2
b)
1
2
ii)
a)
1
2
b)
1
2
iii)
a)
1
2
3
b)
1
2
NAME OF THE
PROJECT/MINE.
CAP
(mtpa) SANC.
ANT.
DATE OF COMPLETION.
X Plan (2002-07)
Org.
Latest
NOW Cumulative Cumulative
Approved Rev.
ANT.
Exp.
Exp.
during
upto
X Plan
X Plan
2002-2007 31.03.2007
15.02
15.02
2005-06
2005-06
14.20
14.20
29.84
29.84
2005-06
2005-06
9.34
9.34
22.68
4.45
3.50
3.30
3.03
22.68
4.45
2005-06
2005-06
2007-08
2007-08
2006-07 2007-08
2006-07 2007-08
2007-08 2007-08
3.19
1.58
0.00
0.00
0.00
0.00
3.19
1.58
0.00
0.00
0.00
0.00
690.44
0.00
0.00
0.00
11.60
0.74
0.00
0.00
0.00
12.35
0.00
0.00
13.69
0.00
0.00
0.00
0.00
38.24
0.00
0.00
59.99
26.46
0.00
0.00
0.00
0.00
141.71
4293.71
0.00
0.00
0.00
27.45
0.81
0.00
0.00
0.00
28.26
0.00
0.00
13.83
0.18
0.00
0.00
0.00
48.96
0.00
0.00
59.99
27.06
0.00
0.00
0.00
0.00
145.33
29.90
33.12
41.54
47.13
74.73
47.46
47.29
29.90
33.12
41.54
47.13
74.73
47.46
47.29
3/97
3/97
3/2002
3/2005
3/2004
3/2005
3/2005
3/2005
3/2008
3/2006
3/2008
3/2008 3/2008
3/2010 3/2010
3/2008
142
3/2008
3/2006
3/2006
2006-07
(ACT.)
EXP.
2007-08
(ACT.)
EXP.
2008-09
(ACT.)
EXP.
(RS. CRS.)
2009-10
2010-11
Apprvd.
Ant.
Proposed
Outlay
Expdr
Outlay
B.E.
R.E.
B.E.
0.00
5.00
1.45
10.18
1.58
197.75
360.67
245.17
80.60
133.80
105.37
2.90
0.04
4.93
4.81
9.00
3.00
2.80
2.95
4.93
4.81
9.00
3.00
2.80
6.14
0.05
6.14
0.05
0.00
0.00
0.00
0.00
50.80
12.20
2.52
24.44
11.69
17.07
5.00
10.00
5.00
6.79
29.00
1.00
4.00
63.00
26.96
28.76
20.00
35.79
5.00
NAME OF THE
PROJECT/MINE.
iv)
a)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
b)
1
2
D
1
2
3
4
CAP
(mtpa) SANC.
Drivage of Inter-seam tunnels & Sinking of return Air shaft in GDK-10 & 10A.
0.700
0.700
2.000
0.400
1.500
0.600
2.144
8.09
48.68
47.67
63.43
70.80
49.08
39.48
1.167
2.285
3.000
4.000
0.454
2.000
JK 5 OCP
RG OC III EXPANSION
RG OC I EXPANSION (PHASE-II)
KTK OC
MNG. OCP.
IK OC
VAKILPALLI BG
NARGUNDKAR KHANI. (KONDAPURAM)
0.190
KTK LONG WALL
2.150
AMRs
AMRs sanctioned by Competent authority. - Nil
AMRs yet to be sanctioned by Competent authority. - Nil
TOTAL-C(iv):
SUB-TOTAL-C:
NEW PROJECTS - X PLAN & XI PROJECTS.
i) Formulating Awaiting Approval.
SHAFT BLOCK-I MNG.
1.800
KHAIRAGURA UG.
0.900
JVR OC-II (SATHUPALLI)
4.000
PEDDAMPET SHAFT PROJECT (GDK-6B BG-II).
1.483
ANT.
8.09
48.68
47.67
63.43
70.80
49.08
39.48
435.14
DATE OF COMPLETION.
X Plan (2002-07)
Org.
Latest
NOW Cumulative Cumulative
Approved Rev.
ANT.
Exp.
Exp.
during
upto
X Plan
X Plan
2002-2007 31.03.2007
0.00
0.00
0.00
0.00
2005-06
2005-06
4.05
4.05
2007-08
2007-08
0.86
0.86
2007-08
2007-08
0.00
0.00
2010-11
2010-11
20.51
20.51
2008-09
2008-09
0.00
0.00
2008-09
2008-09
0.00
0.00
2008-09
2008-09
0.95
0.95
1.43
1.43
299.52
525.42
0.00
0.00
0.00
0.00
25.94
0.00
0.00
0.00
0.00
0.00
0.00
0.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.66
0.00
0.00
0.63
0.63
0.00
0.05
0.00
0.00
0.00
152.91
345.21
0.00
0.00
0.00
0.00
0.06
1.26
0.00
0.00
0.00
152.95
375.51
0.00
0.00
0.59
0.05
0.06
1.26
83.30
44.21
24.66
76.15
2007-08
2008-09
2008-09
2009-10
2007-08
2008-09
2008-09
2009-10
28.50
398.58
582.40
180.00
493.48
359.11
143
(RS. CRS.)
2009-10
2010-11
Apprvd.
Ant.
Proposed
Outlay
Expdr
Outlay
B.E.
R.E.
B.E.
2006-07
(ACT.)
EXP.
2007-08
(ACT.)
EXP.
2008-09
(ACT.)
EXP.
2.56
0.21
20.51
1.05
34.38
1.78
0.49
0.23
1.12
0.00
6.92
0.00
14.72
1.69
20.22
56.51
5.45
0.05
9.72
3.00
15.00
10.00
5.00
20.00
14.00
10.00
80.00
3.00
10.00
10.00
4.51
3.99
10.00
5.00
40.00
3.00
1.75
15.00
2.25
3.98
10.00
5.00
30.00
34.53
0.00
40.00
25.00
4.00
15.00
30.00
10.00
1.00
10.60
40.00
2.00
2.50
6.72
45.00
24.00
6.27
47.98
31.00
2.00
22.00
6.49
9.00
0.47
8.83
2.00
105.00
35.00
2.00
2.00
10.00
15.00
6.18
40.00
354.60
383.60
291.14
329.93
384.38
392.18
10.00
50.00
0.00
0.36
0.03
11.98
0.18
0.00
0.00
65.57
0.18
0.29
0.00
0.25
7.48
57.00
88.94
216.86
250.43
0.66
0.63
25.94
98.02
0.06
0.02
0.00
0.00
0.87
4.00
3.00
5.00
45.00
15.00
5.00
12.60
3.00
8.00
3.00
5.00
NAME OF THE
PROJECT/MINE.
CAP
(mtpa) SANC.
ANT.
DATE OF COMPLETION.
X Plan (2002-07)
Org.
Latest
NOW Cumulative Cumulative
Approved Rev.
ANT.
Exp.
Exp.
during
upto
X Plan
X Plan
2002-2007 31.03.2007
5
6
7
360.00
360.00
28.52
45.00
45.00
144
2006-07
(ACT.)
EXP.
2007-08
(ACT.)
EXP.
2008-09
(ACT.)
EXP.
2.54
2.54
2.54
3.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.55
0.00
0.03
0.00
0.00
0.00
0.00
0.00
2.60
0.00
0.92
0.00
0.06
1.85
0.00
3.86
1166.31
0.03
4.58
5195.55
0.00
2.60
324.00
0.00
0.00
471.27
84.30
84.30
201.74
201.74
30.79
30.79
33.51
33.51
(RS. CRS.)
2009-10
2010-11
Apprvd.
Ant.
Proposed
Outlay
Expdr
Outlay
B.E.
R.E.
B.E.
0.00
80.00
85.00
0.00
90.00
135.00
0.75
0.75
2.60
502.57
0.00
0.00
475.20
0.00
90.00
557.13
0.00
135.00
635.93
124.89
124.89
15.00
15.00
42.91
42.91
71.00
71.00
NAME OF THE
PROJECT/MINE.
C
a)
1
2
3
4
5
ON-GOING PROJECTS.
As per Sabc. Capital.
EXPANSION OF K.CHP MNG.
CISF.
MODERNISATION OF KGM,PH.
ESPS FOR 18 MW POWER HOUSE.
Housing at RGM(2110 Nos.), MNG (500 Nos.)
6
7
132 KV SUB-STATION.
CONSTN. OF HOUSES TO IMPROVE
HOUSING.
PROTECTED WATER SUPPLY, MNG.
PROTECTED WATER SUPPLY TO CENT. OCP
AND SECT. IV,RG.
REGIONAL WORKSHOP,MNG.
UPGRADATION OF RLY.TRACK
MODERNISATION OF 18 MW PH
CENTRAL WORKSHOP OC,RGM.
CONSTN. OF 4600 NOS. FABRICATED
HOUSES.
MINES RESCUE SERVICES.
GODAVARI WATER SUPPLY SCHEME,
BPA.,REGION.
PAYMENT TO NAC,KGM. FOR WATER
SUPPLY.
RG.OC-I SCHEME FOR CONSERVATION OF
DIESEL OIL.
COAL MUSEUM.
600 mm Pipe line at Mng(2 Range).
Singareni Advanced Mechanisation Training
Institute (SAMTI)/UMTI, RGM.
Corporate Housing (NB-18,NC-84,C2-154,T2154).
SPECIAL WELFARE AMENITIES.
Modification of GDK-1 CHP.
Modification of SRP CHP.
Modification of RKP CHP.
Modernisation of CHPs (EOL)
20 MW Captive Power Plant
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
CAP
(mtpa) SANC.
2610
Nos.
ANT.
DATE OF COMPLETION.
X Plan (2002-07)
Org.
Latest
NOW Cumulative Cumulative
Approved Rev.
ANT.
Exp.
Exp.
during
upto
X Plan
X Plan
2002-2007 31.03.2007
0.00
0.00
0.00
0.00
8.47
34.10
0.10
13.53
0.00
2.93
0.00
2.37
101.88
101.88
30.04
11.69
2.00
3.00
75.00
30.04
11.69
3.18
4.99
75.00
18.00
18.00
0.12
24.82
11.14
38.59
4.40
5.00
4.40
5.00
0.00
0.00
2.22
3.90
9.63
4.80
5.00
19.39
32.15
9.63
4.80
6.48
19.39
32.15
0.00
0.00
0.66
0.00
0.00
2.50
5.83
5.16
1.04
12.99
5.65
12.25
5.65
13.85
9.99
0.00
15.91
12.13
2.00
2.00
0.00
1.50
11.00
12.65
0.00
11.77
1.25
0.38
0.69
0.00
0.51
0.69
0.00
26.50
19.01
19.01
16.40
3.81
0.00
3.06
5.60
0.00
26.27
3.81
0.00
3.06
5.60
0.00
5.20
8.40
8.00
90.00
3/97
3/96
3/97
3/97
3/95
3/97
2005-06
2007-08
92.10
2009-10
2009-10
145
(RS. CRS.)
2009-10
2010-11
Apprvd.
Ant.
Proposed
Outlay
Expdr
Outlay
B.E.
R.E.
B.E.
2006-07
(ACT.)
EXP.
2007-08
(ACT.)
EXP.
2008-09
(ACT.)
EXP.
6.25
0.01
1.48
0.02
6.99
38.87
11.32
0.88
1.20
1.09
0.09
12.54
1.14
0.40
17.70
0.18
1.00
2.15
0.18
1.00
12.82
6.97
1.00
3.81
3.06
5.60
8.25
3.03
6.62
5.04
0.00
0.57
1.50
0.40
0.00
5.00
1.00
1.00
1.00
2.00
60.00
1.45
5.00
0.90
0.00
0.00
0.00
0.00
0.00
85.00
29
b)
D
i)
1
4
5
7
8
ii)
E
NAME OF THE
PROJECT/MINE.
ERP
TOTAL (a)
AMR - Nil
SUB-TOTAL-C:
NEW SCHEMES (X PLAN PROJECTS):
Formulated awaiting approval.
Proposed Scattered renewals of track in ELECT. OF RLY. SIDINGS
SK CHP SIDING
RKP-I CHP SIDING
RKP-II CHP SIDING
MNGR. CHP SIDING.
CTR WORKS FOR EMPTIES
PLACEMENT YARD FROM CH.
13/5 TO 14/3 KMS. AT
RG.I AREA (PHASE-II)
RENEWAL WORKS FOR
MAIN LINE FROM CH.9/1
TO 14/3, AT RG.I.
MNGR. CHP SIDING.
RENEWAL WORKS AT GDK-1 SIDING.
RENEWAL WORKS AT STRUTPIT SIDING.
RENEWAL WORKS AT K.K.-1 SIDING.
RENEWAL WORKS MM SIDING.
CTR WORKS FOR TRACK NO.1
& 2 AND EXTENSION OF
TRACK NO. 1 & 2 FOR
ACCOMMODATION FULL RAKE
AT I CHP.
ENERGY CONSERVATION SCHEME.
600 MW POWER HOUSE
SUB-TOTAL-D:(i)
Yet to be formulated Projects. - Nil
SUB-TOTAL-D:(i) & (ii)
EXPLORATION.
TOTAL NON-MINING (A+B+C+D+E):
GRAND TOTAL:(I+II+III)
CAP
(mtpa) SANC.
ANT.
DATE OF COMPLETION.
X Plan (2002-07)
Org.
Latest
NOW Cumulative Cumulative
Approved Rev.
ANT.
Exp.
Exp.
during
upto
X Plan
X Plan
2002-2007 31.03.2007
0.00
0.00
0.00
0.00
0.00
0.00
194.98
338.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.12
0.00
2.04
0.00
1.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.00
284.28
1450.59
146
5.69
0.00
5.69
116.48
662.35
5857.90
2006-07
(ACT.)
EXP.
90.26
(RS. CRS.)
2009-10
2010-11
Apprvd.
Ant.
Proposed
Outlay
Expdr
Outlay
B.E.
R.E.
B.E.
2007-08
(ACT.)
EXP.
2008-09
(ACT.)
EXP.
11.00
66.55
7.82
19.30
6.00
81.87
0.00
7.35
0.00
85.00
66.55
19.30
81.87
7.35
85.00
0.00
0.00
1.00
1.00
0.11
1.41
1.00
0.69
0.37
0.00
2.10
1.70
2.18
5.50
24.05
24.05
540.00
540.00
0.00
3.58
124.63
448.63
2.10
0.54
102.70
573.97
2.18
1.50
147.87
650.44
5.50
3.00
105.37
580.57
24.05
2.50
76.81
633.94
540.00
3.00
699.00
1334.93
2.50
1. INTRODUCTION:
Neyveli Lignite Corporation Limited is an integrated Complex comprising of three
opencast mines with a total Lignite Production Capacity of 24 Million Ton (MT) per
annum linked to Pit Head Thermal Power Stations with a total installed Capacity of
2490 Mega Watt (MW).
The capacity of the various units is as under:
o Mine-I - 10.5 MT/ annum.
o Mine-IA - 3.0 MT / annum
o Mine-II - 10.5 MT/ annum.
Thermal Power Station-I (linked to Mine-I) - 600 MW
Thermal Power Station-I Expansion (linked to Mine-I) - 420 MW
Thermal Power Station-II (linked to Mine-II) - 1470 MW
In addition to the above following projects are under implementation
Mine II expansion 4.5 MT/ annum liked to Thermal II expansion 500 MW.
Barsingsar Mine 2.1 MT/annum liked to Barsingsar TPS 250 MW.
Coal based Power Station of 1000MW capacity at Tuticorin.
2.0 PRODUCTION PROGRAMME
The Production programme proposed for BE 2009-10, RE 2009-10 and BE 2010-11
are given in the following table.
PARTICULARS
BE
2009-10
RE
2009-10
BE
2010-11
OVERBURDEN LM3
1526.00
1396.00
1581.00
217.50
217.50
241.40
LIGNITE
(LAKH TONNES)
POWER GROSS
(MILLION UNITS)
Unit wise Overburden Removal, Lignite Production, Power Generation (Gross) and
other details such as capacity utilisation etc. for BE 2009-10, RE 2009-10 and BE
2010-11 are furnished in Annexure I
147
3.0
PLAN OUTLAY
The Plan Outlay proposed for BE 2009-10, RE 2009-10 and BE 2010-11 are indicated
below:
(Rs. Crores)
Sector
BE 2009-10
RE 2009-10
BE 2010-11
Coal Sector
524.09
386.40
313.94
Power Sector
1369.75
844.94
1669.52
Total
1893.84
1231.34
1983.46
BE 2009-10
RE 2009-10
BE 2010-11
Internal Resources
673.46
397.08
662.03
720.38
834.26
1321.43
500.00
1893.84
1231.34
1983.46
Total
Detailed sector wise Outlay and Funding are furnished in Annexure II-A & II-B.
148
4.0
FINANCIAL PROGRAMME:
Financial forecast such as Total Income, Operating Cost, Profit after Tax (PAT),
dividend payout proposed for BE 2009-10, RE 2009-10 and BE 2010-11 are furnished
below:
(Rs. Crores)
Particulars
BE 2009-10
Total-Income
RE 2009-10
BE 2010-11
3624.68
3656.31
4386.42
Employee Remuneration
945.17
1103.24
1181.29
Maintenance Cost
708.82
616.65
689.01
Other Cost
470.69
457.52
463.33
2124.68
2177.41
2333.62
505.47
458.12
630.40
Interest on Borrowings
174.31
51.82
314.31
820.22
968.96
1108.08
236.85
312.21
365.46
583.37
656.75
742.62
392.56
392.56
392.56
Retained Earnings
190.81
264.19
350.06
Operating Cost
Total-Operating Cost
149
4.1
INTERNAL RESOURCES
The details of Gross and Net Internal Resources estimated to be generated during BE
2009-10, RE 2009-10 and BE 2010-11 are as under:
(Rs. Crores)
Particulars
BE 2009-10
RE 2009-10
BE 2010-11
190.81
264.19
350.06
505.47
458.12
630.40
Total
696.28
722.31
980.46
21.71
22.31
22.68
300.00
300.00
300.00
150.00
150.00
150.00
0.00
71.92
193.31
-103.20
-103.20
-103.20
Total
368.51
441.03
562.79
327.77
281.28
417.67
4569.84
5452.20
5336.40
4224.15
5336.40
5092.04
673.46
397.08
662.03
500.00
0.00
0.00
Rupee Loan/Bonds
720.38
834.26
1321.43
1893.84
1231.34
1983.46
Plan Outlay
1893.84
1231.34
1983.46
2. Utilisation (IR)
Repayment of Loans (KFW)
4.2
DIVIDEND
The estimated dividend payout for BE 2009-10, RE 2009-10 and BE 2010-11 is as per
the details below:
150
(Rs. Crores)
BE
2010-11
BE
2009-10
RE
2009-10
20%
20%
20%
Dividend Payment
335.54
335.54
335.54
Dividend Tax
57.02
57.02
57.02
Total-Dividend
392.56
392.56
392.56
Dividend Details
(Cash Basis)
Dividend (%)
5.0
5.1
ON-GOING PROJECTS:
The following are the on-going projects for NLC:
Mine II Expansion
Thermal II Expansion
Rajasthan Mines
Rajasthan Thermal
Tuticorin Power Project
Revised Cost Estimate for Mine II Expansion and Thermal II Expansion was
approved by GOI and RCE for Rajasthan Mines and Thermal projects have been sent
to GOI for approval.
The following Budget provisions are proposed to meet the expenditure in connection
with commissioning activities for the Mine II Expansion, TPS II Expansion,
Rajasthan Mines & Thermal projects.
151
Rs. Crores
Name of
Project
Mine IIExpn
TPS-II
Expan
Rajasthan
Mines
Actuals
Upto
March
09
Comm.
Date
BE
200910
RE
200910
BE
201011
2295.93
1510.54
Feb 2010
320.00
323.57
224.11
389.00
301.81
327.63
50.00
27.71
37.73
216.85
231.36
147.16
730.00
307.35
826.13
Sanctioned Anticipated
Capacity
Cost
Cost
4.5
MTPA
2161.28
500 MW
2030.78
2453.57
Unit I:
May
.2010
1662.47
Unit II:
Nov.2010
2.1
MTPA
254.07
254.60
193.88
TPS at
Rajasthan
250 MW
1114.18
1626.09
1156.96
Tuticorin
Thermal
1000
MW
4909.54
4909.54
230.70
10469.85
11539.73
4754.55
Total
Oct. 2009
Unit I:
Nov. 09
Unit II:
Jan.
2010
Unit I:
April. 12
Unit II
Nove. 12
Thermal II Expansion is also in completion stage and the provision in RE is for supply and
erection work in Main Plant Package and erection works in LHS, AHS. In BE 2010-11
152
provision is sought for balance work in Main Plant Package, LHS, Water Treatment Plant,
Cooling Towers, chimney, Erection of Turbine and Generator including Electrical works of
Unit I & II. Boiler etc.
For Rajasthan Mines, and Thermal commissioning of main plant equipments and major
electrical equipments are going on. Major requirement in the Miness provision is mainly for
electrical equipments. In thermal it is for payment against erection activities in the main
plant package and LHS.
As regards Tuticorin project, tendering activities for SG & TG packages, Coal Handling
System, Power Transofrmers are completed. For Ash handling system, CWS package, DM
Plant package, Chimeney, Cooling Tower etc. are in progress. Provision made is mainly for
supply and erection activities relating to SG, TG and CHS etc.
5.2
5.3
NEW PROJECTS
The following new projects are envisaged during 2010-11. In order to meet certain
preliminary expenses such as preparation of Feasibility report, obtaining clearances
from authorities, etc., provision has been made in the Annual Plan 2010-11.
Rs. Crores
Sl.No
Paticulars
BE
2009-10
RE
2009-10
BE
2010-11
0.05
0.01
0.02
83.90
0.47
0.23
0.50
0.05
0.18
COAL PROJECTS
1
153
Sl.No
Paticulars
BE
2009-10
RE
2009-10
BE
2010-11
0.24
0.16
0.18
0.51
1.37
0.35
0.02
0.03
8.10
0.01
0.37
COAL PROJECTS
4
6
7
8
1.00
3.63
5.50
1.35
0.00
0.00
95.49
4.86
7.88
POWER PROJECTS
1.00
0.10
1.00
0.40
0.05
0.40
12.50
0.45
12.35
5.10
0.70
5.60
1.30
0.40
1.85
5.00
1.00
12.53
1.50
0.15
1.30
Riri TPS
0.00
0.00
0.10
3.00
0.65
2.65
10
2.00
0.10
1.70
11
Jarkand TPS
1.00
0.10
1.00
12
1.00
0.10
1.00
13
0.25
325.00
14
Misc.New schemes
0.27
4.32
9.18
2.02
368.50
376.38
Total
TOTAL
33.80
129.29
154
NLC has a Center for Applied Research and Development (CARD), which carry out various
studies relating to the utilisation of Lignite and other chemical products of the company.
order to carry out the R&D projects, a sum of
In
2009-10 and Rs. 2.85 crores in BE 2010-11 respectively. The details of the Project are in
Annexure III A.
8.0
Particulars
a.
c.
b.
d.
e.
R.E.
2009-10
BE
2010-11
Para 5.1
1705.85
1192.05
1887.76
Para 5.2.
51.89
16.62
36.67
Para 5.3
129.29
15.80
51.38
Para 6
3.81
6.15
4.80
Para 7
3.00
0.72
2.85
1893.84
1231.34
1983.46
Total
*****
155
ANNEXURE I
PRODUCTION PLAN
ANNUAL PLAN 2010-11
Production
OVERBURDEN (LM3)
Mine I
Mine 1A
Mine II including expansion
Barsingsar Mines
Total
Lignite (LTs)
Mine I
Mine 1A
Mine II including expansion
Barsingsar Mines
Total
Capacity Utilization %
(All Mines)
Power (G)-MU
TPS I
TPS II
TPS I E
TPS II E
Barsingsar TPS
Total
PLF All Power Stations
TPS I
TPS II
TPS I EXPN
TPS II E
BARSING TPS
Power (N)-MU
TPS I
TPS II
TPS I E
TPS II E
Barsingsar TPS
Total
Capacity
Actual
2008-09
BE
2009-10
RE
2009-10
BE
2010-11
501.54
200.11
659.65
0.00
1,361.30
490.00
195.00
750.00
91.00
1,526.00
490.00
195.00
620.00
91.00
1,396.00
540.00
200.00
750.00
91.00
1,581.00
90.40
30.56
91.09
1.02
213.07
88.84
90.00
25.50
97.00
5.00
217.50
83.33
90.00
25.50
97.00
5.00
217.50
83.33
88.00
25.50
110.00
17.90
241.40
78.89
105
30
150
21
306
5256
12877.20
3679.20
4380
2190
156
ANNEXURE II-A
ANNUAL PLAN 2010-11 PLAN OUTLAY
Sl.No
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
16
Actual
200809
PARTICULARS
COAL SECTOR
Projects under Implementation
Mine II Expansion (RCE)
Barsingsar Mine (RCE)
Projects under Formulation
Mine III AAP
Jayamkondam Mine AAP
Bithnok Mines Project AAP
Hadla Mines Project AAP
Palana Lignite Mine
Gujarat (Valia) Mines AAP
Expansion for existing Mine I & IA- AAP
Talabira II & III AAP
Riri Mine
Science & Technology (S&T)
Geological Investigation
Other Completed projects
Total - Coal Sector
POWER SECTOR
Projects under Implementation
Thermal II Expansion
Barsingsar Thermal Power Station
Tuticorin Thermal Power Station
Projects under Formulation
Orissa Thermal - AAP
Thermal station III - AAP
Jayamkondam Thermal - AAP
Bithnok Power Project- AAP
Hadla Power Project- AAP
Uttarpradesh Thermal - AAP
Gujarat Thermal - AAP
Riri Thermal
Thermal at Existing NLC TPS I site -AAP
Madhya Pradesh Thermal Power station
Jarkand Thermal Power Station with SECL
Chattisgarh Power project with CCL
Wind Energy Project
Other. New Schemes
Completed Projects
Total - Power Sector
TOTAL COAL & POWER SECTOR
157
Rs. crores
BE
BE
RE
2009-10
2009-10
2010-11
320.77
53.21
320.00
50.00
323.57
27.71
224.11
37.73
0.00
1.24
2.08
0.91
0.05
83.90
0.50
0.24
0.04
0.00
0.12
0.00
0.71
9.15
11.82
400.05
0.35
8.10
1.00
1.35
3.00
3.81
51.79
524.09
0.01
0.47
0.05
0.16
0.51
0.02
0.01
3.63
0.00
0.72
6.15
23.39
386.40
0.02
0.23
0.18
0.18
1.37
0.03
0.37
5.50
0.00
2.85
4.80
36.57
313.94
507.52
428.31
222.42
389.00
216.85
730.00
301.81
231.36
307.35
327.63
147.16
826.13
1.00
0.40
12.50
5.10
1.30
5.00
1.50
0.00
3.00
2.00
1.00
1.00
0.00
0.10
0.05
0.45
0.70
0.40
1.00
0.15
0.00
0.65
0.10
0.10
0.10
0.25
0.27
0.10
844.94
1231.34
1.00
0.40
12.35
5.60
1.85
12.53
1.30
0.10
2.65
1.70
1.00
1.00
325.00
2.02
0.10
1669.52
1983.46
0.10
0.08
0.67
1159.10
1559.15
0.10
1369.75
1893.84
ANNEXURE-II-B
SECTOR WISE FUNDING PATTERN
(Rs. Crores)
Sl.No
Actual
BE
RE
BE
2008-09
2009-10
2009-10
2010-11
Paticulars
COAL SECTOR
Internal resources
146.05
238.80
140.50
130.65
254.00
185.29
245.90
183.29
Budgetary Support
400.05
524.09
386.40
313.94
Total
II
POWER SECTOR
Internal resources
763.10
434.66
256.58
531.38
396.00
535.09
588.36
1138.14
400.00
Budgetary Support
1159.10
1369.75
844.94
1669.52
Total
III
Internal resources
909.15
673.46
397.08
662.03
650.00
720.38
834.26
1321.43
500.00
Budgetary Support
1559.15
1893.84
1231.34
1983.46
Total
158
FORMAT 2
LIGNITE PRODUCTION
(IN Mill Ton)
S.No
Project
2009-10
2006-07
(Actual)
2007-08
(Actual)
2008-09
(Actual)
BE
RE
2010-11
(Proposed)
2011-12
(Target)
10.55
8.78
9.04
9.00
9.00
8.80
8.93
6.66
9.44
9.11
9.70
9.70
11.00
12.75
Mine-IA
3.80
3.33
3.06
2.55
2.55
2.55
2.55
Barsingsar Mine
0.00
0.04
0.10
0.50
0.50
1.79
1.79
Bithnok Mine
0.00
0.00
0.00
0.00
0.00
0.00
1.03
21.01
21.59
21.31
21.75
21.75
24.14
27.05
TOTAL
159
FORMAT 3
LIGNITE DEMAND SUPPLY PLAN - Sourcewise Break-up
S.No
Project
2006-07
(Actual)
2007-08
(Actual)
2008-09
(Actual)
BE
RE
2009-10
5.76
5.30
5.12
5.35
5.35
5.47
5.69
3.31
3.31
3.18
2.82
3.00
3.00
2.81
9.31
11.40
10.16
10.59
10.59
10.59
10.59
0.00
0.00
0.00
0.00
0.00
1.00
3.36
0.00
0.00
0.00
0.51
0.51
1.53
1.75
0.00
0.00
0.00
0.00
0.00
0.00
1.03
1.77
1.87
1.83
1.74
1.90
1.90
1.76
OUTSIDE SALES
0.29
0.43
0.36
1.25
0.30
0.30
0.30
20.44
22.31
20.65
22.25
21.65
23.79
27.29
TOTAL
160
161
0.33
FORMAT-16
(Million Tonnes)
AP
2011-12
AP
2010-11
Proposed
2009-10
BE
Target
Antici
6
7
8
9
1.24
0.98
1.08
1.43
9.04
9.11
3.06
0.10
0.00
21.31
9.00
9.70
2.55
0.50
0.00
21.75
9.00
9.70
2.55
0.50
0.00
21.75
8.80
11.00
2.55
1.79
0.00
24.14
8.93
12.75
2.55
1.79
1.03
27.05
5.12
3.18
10.16
0.00
0.00
0.00
18.46
1.83
5.35
2.82
10.59
0.00
0.51
0.00
19.26
1.74
5.35
3.00
10.59
0.00
0.51
0.00
19.45
1.90
5.46
3.00
10.59
1.00
1.53
0.00
21.59
1.90
5.69
2.81
10.59
3.36
1.75
1.03
25.23
1.76
0.36
20.65
0.98
1.25
22.25
0.74
0.30
21.65
1.08
0.30
23.79
1.43
0.30
27.29
1.19
2008-09
ACTUAL
Format -17
(in tonnes)
Sl. No.
Company
2006-07
2007-08
2008-09
Actuals
Actual
Actual
Target
AP2009-10
2010-11
XI Plan
Antici
BE
2011-12
NLC Limited
1
Mine I
(OB+Lignite )
106.8
109.01
116.36
91.91
91.91
112.04
91.25
Lignite
10.56
9.05
9.62
7.73
7.73
8.44
8.07
122.65
123.11
120.06
112.99
147.86
139.21
124.52
7.5
9.96
9.68
9.01
8.87
10.21
8.43
(OB+Lignite )
284.87
235.22
208.83
186.19
186.19
182.26
185.00
Lignite
21.16
16.74
14.81
11.43
11.43
10.92
11.35
(OB+Lignite )
129.10
127.17
127.17
109.66
117.72
131.46
115.79
Lignite
10.16
10.18
10.16
8.62
9.06
8.38
8.52
Mine II
(OB+Lignite )
Lignite
Mine IA
Total-Mines
162
1 Mine I
Norm
Availiability
Utilisation
Availiability
Utilisation
3 Mine-IA
Availiability
Utilisation
4 Barsingsar Mine
5 Bithnok Mine
TOTAL
2006-07
(Actual)
-
85.00
85.00
85.00
100.46
63.45
126.80
2007-08
(Actual)
83.63
89.88
110.90
2008-09
(Actual)
86.10
86.75
101.87
FORMAT 18
2009-10
BE
RE
85.00
85.00
85.00
2010-11
(Proposed)
-
85.00
85.00
85.00
85.00
85.00
85.00
Availiability
Utilisation
Availiability
Utilisation
87.56
89.77
88.36
85.00
85.00
163
85.00
85.00
85.00
2011-12
(Target)
85.00
85.00
85.00
85.00
85.00
85.00
164
2009-10(RE)
Cap.
Prod. Util.
Mtpa
Mtpa
%
2010-11(BE)
Cap.
Prod. Util.
Mtpa
Mtpa
%
FORMAT-19
2011-2012 (Proj)
Cap. Prod.
Util.
Mtpa Mtpa
%
10.50
9.00
86
10.50
8.80
84
10.50
8.93
85.00
10.50
9.70
92
10.50
11.00
105
15.00
12.75
85
3.00
2.10
2.55
0.50
85
71
3.00
2.10
2.55
1.79
85
85
26.10
21.75
83
26.10
24.14
92
3.00
2.10
2.25
32.85
2.55
1.79
1.03
26.02
85
85
46
79
600 MW 3,707
71
600 MW 3,784
72
600 MW 3942
75
1470 MW 9,658
75
1470 MW 9,658
75
1470 MW 9658
75
420 MW 2,944
80
420 MW 2,944
80
420 MW 2759
75
500MW
22
500MW 3285
75
250MW 1,424
65
3240MW 18758
66
250MW 1643
1000MW 3833
250MW 958
4490MW 26077
75
44
44
66
250MW
475
22
2740MW 16784 70
948
X Plan
2006-07
Actual
Approved
Target
38723.00
5.08
5.08
2007-08
Actual
2008-09
Actual
2009-10
Proposed
34596.70
16610.90
8000.00
FORMAT-20
2009-10
Anticipated
2011-12
Proj
Cumulative
Achivement
47378.00
7.04
7.04
165
6.71
6.71
5.92
5.92
3.81
3.81
5700.00
5.95
5.95
5000.00
3.00
3.00
FORMAT- 21
Annual Plan 2010-11.
Name of the PSU: NLC Limited
Agency
2008-09
Actual
1
1.DRILLING (mts)
GSI
CIL
SCCL
NLC
7,487
7,963
Sub-total GSI
7,487
7,963
MECL *
CIL
SCCL
NLC
37,863
54,454
Sub-total MECL
37,863
54,454
CMPDIL
CIL:
Sub-total CMPDIL
GRAND TOTAL
45,350
62,417
II.
FINANCIAL (Rs.Cr)
Financial Details are available with CMPDIL as they are payment authority.
166
(in metres)
XI Plan
2011-2012
2009-10
BE
2009-10
RE
2010-11
Proposed
5
12,100
12,100
8,050
8,050
8,650
8,650
65,000
65,000
69,050
69,050
71,700
71,700
90,000
90,000
77,100
77,100
80,350
90,000
FORMAT-24
Reserves
Proved
Indicated
Inferred
Total
Recoverable
as on
M.T
M.T
M.T
M.T
M.T.
Geoligical Reports(GR's)
No.of GR's
Recoverable
Feasibility Reports(FR's)
No.of FR's
Resources M.T. #
0
1.1.2006 (Actual)
4177
20259
13838
38274
1.1.2007 (Actual)
4177
26694
7885
38756
1.1.2008 (Actual)
4824
26073
8032
38929
1.1.2009 (Actual)
5363
25535
8176
39074
1.1.2010 (Target)
4830
27000
8000
39830
1.1.2011 (Target)
Mineable
Reserves M.T./pa
10
Note
# Recoverable reserves are not assessed.
** Lignite exploration in different parts of country is being carried out by different State and Central agencies; Hence reserve target has not been arrived for 2011-12.
167
FORMAT - 25
COST OF PROUDCTION
2007-08
2008-09
Actual
Actual
Actual
BE
RE
BE
OC
1485.09
1645.41
2337.51
1828.47
1911.97
2306.28
UG
---
1485.09
1645.41
2337.51
1828.47
1911.97
2306.28
1655.14
2284.00
2704.84
2262.40
2211.53
2414.67
Sl No
Company
2009-10
2010-11
Cost of Production
Overall
2
Rs.Crores
Overall Realisation :
NLC
168
Company
0
1
1 NLC (Mines)
2007-08 (Actual)
2008-09 (Actual)
BE 2009-10
RE 2009-10
BE 2010-11
2 NLC (S&T)
2007-08 (Actual)
2008-09 (Actual)
BE 2009-10
RE 2009-10
BE 2010-11
3 NLC (Exploration)
2007-08 (Actual)
2008-09 (Actual)
BE 2009-10
RE 2009-10
BE 2010-11
NLC(coal & Lignite)
2007-08 (Actual)
2008-09 (Actual)
BE 2009-10
RE 2009-10
BE 2010-11
2 NLC(Power)
2007-08 (Actual)
2008-09 (Actual)
BE 2009-10
RE 2009-10
BE 2010-11
3 TOTAL : (Power &
Lignite)
2007-08 (Actual)
2008-09 (Actual)
BE 2009-10
RE 2009-10
BE 2010-11
Existing &
Completed
Proposal
2
3.11
10.88
-
GROUPWISE INVESTMENT
Ongoing Projects
Major
Board Level
Total
Proposal
Proposal
Proposal
(3+4)
3
4
5
FORMAT - 26
Total Mining
Proposal
(5+6)
7
Washery
Proposal
Exploration
Proposal
Non-Mining
Proposal
10
Total
Non-Mining
Proposal
(8+9+10)
11
Total
Outlay
(7+11)
12
561.07
373.97
370.00
351.28
261.84
561.07
373.97
370.00
351.28
261.84
0.79
4.39
95.49
4.86
7.88
564.97
389.24
465.49
356.14
269.72
6.57
0.94
51.79
23.39
36.57
6.57
0.94
51.79
23.39
36.57
571.54
390.18
517.28
379.53
306.29
6.71
9.15
3.81
6.15
4.80
0.29
0.71
3.00
0.72
2.85
-
0.29
0.71
3.00
0.72
2.85
6.71
9.15
3.81
6.15
4.80
3.11
10.88
-
561.07
373.97
370.00
351.28
261.84
561.07
373.97
370.00
351.28
261.84
0.79
4.39
95.49
4.86
7.88
564.97
389.24
465.49
356.14
269.72
6.71
9.15
3.81
6.15
4.80
6.86
1.65
54.79
24.11
39.42
6.57
0.94
51.79
23.39
36.57
578.54
400.05
524.09
386.40
313.94
4.91
0.67
0.10
0.10
0.10
1,183.12
1,158.25
1,335.85
840.52
1,300.92
1,183.12
1,158.25
1,335.85
840.52
1,300.92
0.14
0.18
33.80
4.32
368.50
1,188.17
1,159.10
1,369.75
844.94
1,669.52
1,188.17
1,159.10
1,369.75
844.94
1,669.52
8.02
11.55
0.10
0.10
0.10
1,744.19
1,532.22
1,705.85
1,191.80
1,562.76
1,744.19
1,532.22
1,705.85
1,191.80
1,562.76
0.93
4.57
129.29
9.18
376.38
1,753.14
1,548.34
1,835.24
1,201.08
1,939.24
6.71
9.15
3.81
6.15
4.80
6.86
1.65
54.79
24.11
39.42
6.57
0.94
51.79
23.39
36.57
1,766.71
1,559.15
1,893.84
1,231.34
1,983.46
169
FINANCING PATTERN
IR
2
153.14
337.53
490.67
BONDS/
SUPPLIER`S
Rupee Loan
CREDIT
3
F.E.
LOANS
5
355.00
835.00
1,190.00
146.05
763.10
909.15
254.00
396.00
650.00
238.80
434.66
673.46
185.29
535.09
720.38
140.50
256.58
397.08
245.90
588.36
834.26
130.65
531.38
662.03
183.29
1,138.14
1,321.43
91.54
687.30
778.84
180.03
1,583.94
1,763.97
70.40
15.64
86.04
TOTAL
IEBR
EAP
DBS
GBS
10
11
578.54
1,188.17
1,766.71
578.54
1,188.17
1,766.71
400.05
1,159.10
1,559.15
400.05
1,159.10
1,559.15
524.09
1,369.75
1,893.84
524.09
1,369.75
1,893.84
386.40
844.94
1,231.34
386.40
844.94
1,231.34
313.94
1,669.52
1,983.46
313.94
1,669.52
1,983.46
271.57
2,291.00
2,562.57
271.57
2,291.00
2,562.57
100.00
400.00
500.00
19.76
19.76
170
OTHERS
(Diversn. From
CPA)
6
Format-27
( Rs.Crore)
TOTAL
171
Format-28 Contd..
(Rs.Crores)
PART-II (GENERATED INTERNAL & EXTRA BUDGETARY RESOURCES FOR PLAN SCHEME )
SL
X Plan
2007-08
2008-09
Actuals
Actual
Actual
12
3019.21
669.74
624.81
2072.72
454.49
424.41
5091.93
1124.23
1049.22
DESCRIPTION
No.
0
2009-10
BE
2010-11 2011-12
Total
RE
BE
Target
190.81
264.19
350.06
468.29 2377.10
505.47
458.12
630.40
736.10 2703.52
696.28
722.32
12
3 Deduct
i ) Total Loan Repayment
- Of Which to KFW
577.75
69.65
22.02
21.71
22.31
22.68
577.75
69.65
22.02
21.71
22.31
22.68
18.90
155.56
187.5
375.00
375.00
937.50
393.90 1093.06
-2727.02
-4.04
-103.20
150.00
62.50
-125.00
82.25
-87.49
300.00
200.00
200.00
250.00
903.81
71.92
193.31
0.00
343.23
0.00
0.00
0.00
510.74
174.66
79.15
-1540.37
0.00
78.00
400.00
0.00
vi ) Investments
2,590.77
-103.20
78.00
-103.20
-103.20
Total ( 3 )
-188.12
137.07
153.97
368.51
441.03
562.79
467.07 1761.94
5280.05
987.16
895.25
327.77
281.28
417.67
737.32 3318.68
iv ) Others(Equity)
v ) Repayment of Bond
373.69
4253.06
5452.20
4569.84
5452.20
4,253.06
4749.56
5452.20
4224.15
5336.40
1400.68
490.66
895.25
673.46
397.08
662.03
659.99
1190.00
802.65
720.38
834.26
1321.43
254.55
86.05
500.00
600
0.00
0.00
0.00
0.00
763.84 2506.22
0.00
4148.34
0.00
86.05
1763.97 2363.97
0.00
0.00
19.76
19.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
914.54
1276.05
1402.65
1220.38
834.26
2315.22
1766.71
2297.90
1893.84
1231.34
2315.22
1766.71
2297.90
1893.84
1231.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Ongoing Projects
New Projects
Additions/Modifications & Replacements
(AMR)
Resource Cap (9-8)
10 i ) Budgetary support from Govt. for Plan
Schemes
ii ) External Assistance through Budget
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4253.06
4749.56
5452.20
4224.15
5336.40
172
173
FORMAT 29
2009-10
2010-11
RE
BE
Cumulative
Expenditure
Upto X Plan
(31.03.07)
2007-08
Actuals
180.58
261.52
9.03
451.13
1.27
1.84
6.57
9.68
4.81
6.07
0.95
11.83
51.79
51.79
23.39
23.39
36.57
36.57
626.87
65.59
7.70
2.61
702.77
497.20
63.87
6.71
0.29
568.07
320.76
53.21
9.15
0.71
383.83
320.00
50.00
3.81
3.00
376.81
323.57
27.71
6.15
0.72
358.15
224.11
37.73
4.80
2.85
269.49
0.12
0.12
-
0.34
0.57
-
0.10
0.10
0.56
1154.46
2008-09 2009-10
Actual Approved
Outlay
BE
14
0.79
578.54
1.24
2.08
0.91
0.05
83.90
1.35
0.50
0.24
4.39
400.05
0.02
0.23
-
0.35
1.00
8.10
0.05
0.16
0.51
0.02
3.63
0.01
0.18
0.18
1.37
0.03
5.50
0.37
95.49
524.09
4.86
386.40
7.88
313.94
0.04
0.12
0.01
0.47
Nil
WASHERIES:
NON-MINING:
A. EXISTING (AMRs)
Sub-Total A
B. COMPLETED PROJECTS:
1. MODERNISATION OF TPS-I (CEA)
2.MODERNISATION OF TPS-I (NLC)
Nil
Nil
40.06
12.30
53.39
33.52
315.23
213.98
638.95
1590.58
258.32
548.42
1279.76
1423.47
Nil
Nil
Nil
0.00
TOTAL- (B )
3/99
1/88
6/93
4/83
6/89
Feb-01
Unit II Sept-03
0.00
Cumulative
Expenditure
Upto X Plan
1154.46
Nil
2007-08
Actuals
2008-09
Actuals
Contd.
2009-10
BE
2009-10
RE
Rs. Crs
2010-11
BE
578.54
400.05
524.09
386.40
313.94
Nil
Nil
Nil
Nil
Nil
355.54
4.91
0.67
0.10
0.10
0.10
0.00
355.54
4.91
0.67
0.10
0.10
0.10
419.61
734.89
507.52
389.00
301.81
327.63
287.60
440.56
428.31
216.85
231.36
147.16
C. ONGOING PROJECTS:
1. TPS-II EXPANSION
500 mw
2030.78
2453.57
2. TPS at Rajasthan
250 mw
1114.18
1626.09
1000 mw
4909.54
4909.54
TOTAL- (C)
0.51
7.67
222.42
730.00
307.35
826.13
707.72
1183.12
1158.25
1335.85
840.52
1300.92
0
0
4.32
0.40
1.00
0.10
12.35
5.60
1.85
1.70
1.30
1.00
1.00
12.53
2.65
325.00
2.02
368.50
1063.31
1188.17
1159.10
1369.75
844.94
1669.52
2217.77
1766.71
1559.15
1893.84
1231.34
1983.46
1000 mw
2000 mw
500 mw
1000 mw
250 mw
250mw
1000mw
1000 mw
1000 mw
2000mw
2000mw
1000 mw
50mw
0
0
0
0
0
0
0
0
0
0
0.00
0.02
0.03
0.05
174
0.03
0.05
0.06
0.14
0.10
0.08
0.18
0.40
1.00
12.50
5.10
1.30
2.00
1.50
1.00
1.00
5.00
3.00
33.80
0.05
0.10
0.45
0.70
0.40
0.10
0.15
0.10
0.10
1.00
0.65
0.25
0.27
FORMAT - 33
STATEWISE EXPENDITURE
1
2
3
4
1
2
3
4
5
6
7
8
Name of the
State
1
COAL SECTOR
Tamil Nadu
Rajasthan (Barsingsar, Bithnok and Riri)
Gujarat
Orissa (Talabira )
Total -COAL SECTOR
POWER SECTOR
Tamil Nadu
Rajasthan (Barsingsar, Bithnok and Riri)
Orissa
Madhya Pradesh
Gujarat
Jarkand
Chattisgarh
Uttarpradesh
Total -POWER SECTOR
TOTAL COAL & POWER SECTOR
Cumulative
X Plan
2002-2007
2007-08
Actual
Expd
2008-09
Actual
Expd
(Rs.in Crores)
2010-11
BE
2009-10
BE
RE
1,095.00
66.16
0.10
-
514.00
64.44
0.10
-
343.69
56.20
0.04
0.12
470.65
52.09
0.35
1.00
354.32
28.43
0.02
3.63
268.95
39.46
0.03
5.50
1,161.16
578.54
400.05
524.09
386.40
313.94
1,261.25
535.62
0.09
0.06
1,797.02
2,958.28
747.52
440.56
0.03
0.06
1,188.17
1,766.71
730.71
428.39
1,159.10
1,559.15
1,135.00
223.25
1.00
2.00
1.50
1.00
1.00
5.00
1,369.75
1,893.84
610.93
232.46
0.10
0.10
0.15
0.10
0.10
1.00
844.94
1,231.34
1,496.28
154.71
1.00
1.70
1.30
1.00
1.00
12.53
1,669.52
1,983.46
175
FORMAT - 34
Annual Plan 2010-11.
Name of the PSU : NLC Limited
Programme/
Cumulative
Scheme
Expenditure
X Plan
2002-07
1
2
2008-09
Actual
Expd
2009-10
Approved
Outlay
BE
4
Energy Conservation Measures are Part of Routine Activities in the production & Service Units
No Seperate Outlay is Proposed
Expenditure is met out of Revenue and Non -Plan as the Case may be
176
Anticipated
Expenditure
RE
5
2010-11
Proposed
Outlay
BE
6
FORMAT - 37
Name of PSU : NLC Limited
2009-10
Sl
No
Company
2006-07
Actual
2007-08
Actual
2008-09
Actual
2010-11
2011-12
Target
Anticipated
Proposed
Proposed
NLC Limited
1 Fatality Rate (per MT of
Lignite produced)
0.286
0.046
0.14
0.00
0.00
0.00
0.00
0.00063
0.000115
0.00
0.00
0.00
0.00
21825
21825
21825
21825
21825
21825
21825
Manpower
19115
18940
18688
18952
18952
18347
18347
Housing Satisfaction
100%
100%
100%
100%
100%
100%
100%
4 No. of Hospitals
No. of Beds
369
369
369
369
369
369
369
12
12
12
12
12
12
12
160,000
160,000
200,000
200,000
200,000
200,000
200,000
3 Number of houses
(Estimated %)
No. of Dispensaries
5 Water supply - Total
Population covered
177
COMPANY
1
FORMAT 38
2007-08
Actual
3
2008-09
Actual
4
2009-10
Target
Antici.
5
6
2010-11
Proposed
7
2011-12
Proposed
8
MINES
8229
8019
7978
7978
7873
7873
POWER
4243
4116
4095
4095
4041
4041
OTHERS
6468
6553
6519
6519
6433
6433
TOTAL NLC
18940
18688
18592
18592
18347
18347
178
FORMAT - 39
(Rs.in.Crs)
Outstanding Dues
Outstanding Dues
Outstanding Dues
Mar-08
Mar-09
Mar-10
Actual
Actual
Anticipated
48.16
51.73
51.73
b. TNEB
588.43
646.25
646.25
c. KPTCL
163.19
235.87
235.87
d. KSEB
59.70
78.23
78.23
d. PED
8.55
2.36
2.36
868.03
1,014.44
1,014.44
SEBs
1
a. APTRANSCO
Total
179
FORMAT - 40
STATEWISE ROYALTY/ CESS PAYMENT MADE BY COAL COMPANIES
Name of the PSU: NLC Limited
(Rs. Crore)
Company
State
1
Tamil nadu
2006-07
Actuals
3
Cumulative X Plan
2002-07
2007-08
Actual
4
2008-09
Actual
4
2009-10
BE
5
RE
6
2010-11
Proposed
7
105.13
507.92
126.59
137.37
137.81
137.24
144.22
0.00
0.00
0.00
0.11
3.29
2.89
8.71
NLC
Rajasthan
180