INSPECTION AND TEST PLAN
Installation of Earthing & Bonding System
Area: NA ITP No.: TIPP6A-KIC-MS-E-05

Discipline: Electrical Rev.: 0

Inspection/
Verifying Documents/
Activity No.

Verification
Demonstrated Evidence
Activity/Description Frequency Specification Criteria

CAPITAL
Report Checklist

KABRI
(Reference Number)

1 Approval/Preliminaries
Preparation of: H H
Material approval Via MA
1. Material Approval
1.1
2. Drawing Approval
Prior to starting the work Approved for construction H H Via DS
Quality control procedure H H Via QCP
3. Quality Document

2 Material Inspections

Material inspection at site Upon Arrival of the material in Approved Material Submital H R MIR - Material Inspection
2.1
Storage the Site Project Specification section H S Report

3 Installation

Project safety plan H S


Civil/safety Clearance for Via IR
3.1
installation
N/A Site inspection request H S Via IR
As per the drawing H S

4 Cleaning & Protection

Cleanliness of the inspection


activity protection ( if required )
4.1
against possible damage till
Upon Completion of Work Method of Statement H S Via MS 018
commissioning and handing over.

5 Documents Review
sign and approved H R
Test certificates ( if applicable)
Upon submission of From third parties H R Via IR
5.1 Inspection Test report
Documents sign and approved H R Via IR
Electrical Identification
sign and approved H R

Legend: H- HOLD FOR INSPECTION / W- WITNESS INSPECTION / S-SURVELLANCE INSPECTION / R- REVIEW / CL-CHECKLIST
Note: Particular ITPs to be prepared and submitted along with Method Statements ahead of site activities.