0% found this document useful (0 votes)
249 views

Manual Invoice Format

This document is a tax invoice from Sigma Engineering Works to Abu Dhabi Company for Petroleum Operations for work providing casing, cold cutting, and welding services. It details charges for equipment hire from March 8th to April 11th including cold cutting machines, welders, and operators. The total charges listed are AED 29,010.50 with a 5% retention of AED 1,450.53, bringing the net amount due to AED 28,937.97. Payment is due within 30 days.

Uploaded by

Junaid Usman
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
249 views

Manual Invoice Format

This document is a tax invoice from Sigma Engineering Works to Abu Dhabi Company for Petroleum Operations for work providing casing, cold cutting, and welding services. It details charges for equipment hire from March 8th to April 11th including cold cutting machines, welders, and operators. The total charges listed are AED 29,010.50 with a 5% retention of AED 1,450.53, bringing the net amount due to AED 28,937.97. Payment is due within 30 days.

Uploaded by

Junaid Usman
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

TAX INVOICE

Customer TRN No: 100229459100003 TRN : 100586140400003


Customer Code : 27135 Invoice No. : 1100000XXXX
Customer Name : ABU DHABI COMPANY FOR Invoice Date : 29-Jun-2020
Address : OFFSHORE
P.O. Box 303 Invoice Due Date : 29-Jul-2020
PETROLEUM OPERATIONS LIMITED
WORLD TRADE CENTER, Abu Dhabi, Date of Supply : 27-May-2020
United Arab Emirates Work Order No. : 160475 Call Out No.: 10290-1121
Attention : Contract No. : 463482
Telephone : Customer PO No. : 463482
Fax : Sales Person :
Email : Currency : UAE Dirhams
Ship to : P.O. Box 303 Exchange Rate : 1
WORLD TRADE CENTER, Abu Dhabi, Payment Terms : Net due in 30 Days
United Arab Emirates Page : 1 of 2

Sr. Unit Amount VAT VAT Net Amt Net Amt


Description UOM Qty
No. Price Excl. VAT Rate % Amount. AED
Provision of Casing, Cold Cutting / Bevelling & Welding
Rig: AD-67 ETTOUK ISLAND
Well: ROW#4, SLOT#70, SLOT#73
Job: Cold Cutting and welding of 30" and 20" pipe
1 Hire charges-Cold Cutting Machine (26-32")
    Stand by days: March 8 to March 13, March 15 to March 31 &
Days 17 484.50 8,236.50 5 411.83 8648.33 8648.33
April 2 to April 11
2 Hire charges - Cold Cutting Operator - Unni S.
    Stand by days: March 9 to March 22 Days 09 731.00 6,579.00 5 328.95 6907.95 6907.95
3 Hire charges - Cold Cutting Operator - Unni S.
    Stand by days: March 9 to March 22 Days 06 731.00 4,386.00 5 219.30 4605.30 4605.30
4 Hire charges - Cold Cutting Helper - Shibu V.
    Stand by days: March 9 to April 6 Days 06 577.00 3,462.00 5 173.10 3635.10 3635.10
5 Hire charges - Cold Cutting Helper - Shibu V.
    Stand by days: March 9 to April 6 Days 04 577.00 2,308.00 5 115.40 2423.40 2423.40
6 Hire charges - Cold Cutting Helper - Shibu V.
    Stand by days: March 9 to April 6 Days 07 577.00 4,039.00 5 201.95 4240.95 4240.95

Page 1 of 6
Job Total 29,010.50

7 Provision for ICV (5%) retention billing


    Client withheld value to be invoiced upon ICV audit approval Ea -01 (1,450.53) 5 (72.53) ### ###

Net Amount After ICV Deduction: ### ###


Net Amount After ICV Deduction ### ###
Net Amount AfterAED:
Tax: ### ###

Net Amount in Wor: AED Twenty Eight Thousand Nine Hundred Thirty Seven And Ninety 7/100 Only

Enclosures : Work Material Equipment/Personnel Order


Sigma DO 1106 & 1106-1 (8 Mar) and RLN 1480 & 1480-1 (11 Apr)
Equipment Timesheet signed by DS
Personnel Booking Request and Original Time Sheet for hire of Crew signed by DS
Job Evaluation/Performance Tracker and Photocopy of Contract Price List

Remit to ACCT NAME :


SIGMA ENGINEERING WORKS
ACCT. NO. :
010490724718
BANK :
Mashreq Bank Psc
BRANCH :
Abu Dhabi Main
P. O. Box 858
United Arab Emirates
SWIFT CODE : BOMLAEAD
IBAN No. : AE290330000010490724718

----------------------------------------------- -------------------------------------------
For Sigma Engineering Works Customer Signature

Page 2 of 6
Page 3 of 6
28,937.97 28937.97

1 ONE 0 TEN 2 TWENTY


2 TWO 1 ELEVEN 3 THIRTY
3 THREE 2 TWELVE 4 FORTY
4 FOUR 3 THIRTEEN 5 FIFTY
5 FIVE 4 FOURTEEN 6 SIXTY
6 SIX 5 FIFTEEN 7 SEVENTY
7 SEVEN 6 SIXTEEN 8 EIGHTY
8 EIGHT 7 SEVENTEEN 9 NINETY
9 NINE 8 EIGHTEEN
0 ZERO 9 NINETEEN

2893797
28,937.00
28,937.00 97

0 0 0 0 0 2 8 9 3 7

TWENTY EIGHT NINE HU THIRTY SEVEN

Y Y
Twenty Eight Thousand Nine Hundred Thirty Seven And Ninety 7/100 Only

Twenty Eight Thousand Nine Hundred Thirty Seven And Ninety 7/100 Only
9 7

NINETY 7
159998-74508 ND-130/68
A EQUIPMENT CHARGES (CALL-OUT) DATE INCLUSIVEHIRE DAYS RATE TOTAL
A.1 COLD CUTTING MACHINE 20" 20-Sep 3-Oct 14 1,993.00 27,902.00
A.1 COLD CUTTING MACHINE 30 20-Sep 3-Oct 14 1,993.00 27,902.00
A.2 WELDING MACHINE 454/830 13-Sep 30-Oct 48 408.00 19,584.00
A.3 HEAT TREATMENT MACHINE 454/830 13-Sep 30-Oct 48 462.00 22,176.00
A.2 WELDING MACHINE 457/833 20-Sep 3-Oct 14 408.00 5,712.00
A.3 HEAT TREATMENT MACHINE 457/833 20-Sep 3-Oct 14 462.00 6,468.00
B PERSONNEL CHARGES (CALL-OUT)
B.1 COLD CUTTING MACHINE OPERATOR SAM MATHEW 25-Sep 30-Sep 6 765.00 4,590.00
B.1 COLD CUTTING MACHINE OPERATOR HUMAYOON 25-Sep 30-Sep 6 765.00 4,590.00
B.2 COLD CUTTING MACHINE HELPER -
B.3 WELDER DICKSON BROS 11-Sep 30-Oct 50 838.00 41,900.00
B.3 WELDER BHIMA RAO 14-Sep 30-Oct 47 838.00 39,386.00
B.3 WELDER ESWARA 10-Oct 30-Oct 21 838.00 17,598.00
B.4 HEAT TREATMENT TECHNICIAN KAMALAKANA 14-Sep 10-Oct 27 1,246.00 33,642.00
C AUXILLARY
C.1 AIR COMPRESSOR 600.00 -
C.2 ELECTRICAL POWER GENERATOR CC2G08423 20-Sep 3-Oct 14 960.00 13,440.00
E EQUIPMENT CHARGES (CALL-OUT)
E.1 STAND BY RATE FOR COLD CUTTING MACHINE 1,993.00 -
E.2 STAND BY RATE FOR WELDING MACHINE 408.00 -
E.3 STAND BY RATE FOR HEAT TREATMENT MACHINE 462.00 -
E.4 STAND BY RATE FOR AIR COMPRESSOR 552.00 -
E.5 STAND BY RATE FOR ELECTRICAL POWER GENERATOR 883.00 -
F PERSONNEL - STAND BY CHARGES
F.1 STAND BY RATE FOR COLD CUTTING MACHINE OPERATOR 765.00 -
F.2 STAND BY RATE FOR COLD CUTTING MACHINE HELPER 564.00 -
F.3 STAND BY RATE FOR WELDER 838.00 -
F.4 STAND BY RATE FOR HEAT TREATMENT TECHNICIAN 1,246.00 -
F.5 STAND BY RATE FOR HELPER 592.00 -

TOTAL ###

You might also like