Manhour Statistic: 13/MOC/PDR/039P Contract No: B170030Tpp

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 10

MANHOUR STATISTIC

REHABILITATION OF CORRODED INFRASTRUCTURE IN UNITS 4300/4500/4600 &


PROVISION OF SECURED ACID HANDLING SYSTEM

13/MOC/PDR/039P
CONTRACT NO: B170030TPP

AUGUST 2022
TABLE OF CONTENTS
1.0 INTRODUCTION........................................................................................................................................................................................... 3
2.0 PURPOSE........................................................................................................................................................................................................ 4
3.0 TERMS AND DEFINITION........................................................................................................................................................................... 4
4.0 PERSONNEL NAMES AND DESIGNATION..............................................................................................................................................5
5.0 NUMBER OF DAYS WORKED....................................................................................................................................................................6
6.0 PROJECT CATEGORY MANHOUR STATISTIC........................................................................................................................................7
6.1 OVERALL MAN HOUR STATISTIC............................................................................................................................................................ 7

6.2 PROJECT MANAGEMENT MAN HOUR STATISTIC.................................................................................................................................8

6.3 PROCUREMENT MAN HOUR STATISTICS...............................................................................................................................................9

6.4 ENGINEERING MAN HOUR STATISTICS................................................................................................................................................10

DRINKING, DEMINERALIZED & SERVICE WATER PLANTS UPGRADE


PROJECT (CONTRACT NO: B170030TPP)

LOCATION: BONNY
PLANT: LNG COMPLEX PROJECT NO: 13/MOC/PDR/039P
ISLAND, NIGERIA
UNIT: NIGERIA LNG LTD PAGE 2 of 10
4300/4500/
PROJECT HSE MANHOUR STATISTIC
4600
1.0 INTRODUCTION
The NLNG water treatment facility was commissioned in 1999, to produce potable water for use in the Residential Area (RA) and
Industrial Area (IA), and also generate high purity process water (demineralized water) for use within the plant. The facility is currently
capacity constrained due to increase in demand for potable and process water coupled with deterioration in the equipment packages as
result of corrosion.
The facility presently has only one storage tank for storage of potable water (2,253m 3) and one for demineralized water (351m 3). Over the
years, the water demand has increased significantly due to plant expansion from a three (3) Trains to six (6) Trains operation and
population growth in both Residential Area (RA) and Industrial Area (IA). The single storage tank for potable and process water also
makes it impossible to shut-down, carry out mandatory inspection and maintenance activities on these tanks.
In addition, manual dosing / transferring of acid within the units as a result of the prolonged outage of the Hydrochloric Acid Package Unit
(A-4370) with attendant corrosive fumes has led to the corrosion of the packages and the piping within the acid handling area.
In the event of leakage / failure of these storage tanks or piping infrastructure within the water treatment facility, both LNG production and
potable quality water supply will be greatly impacted.
As part of the plant asset rejuvenation program in order to address the integrity, safety and environmental concerns and increase the water
storage capacity, this project was initiated to install two additional storage tanks and also upgrade the treatment facilities.
This Contract scope is limited to engineering, Procurement, Construction and Commissioning works for Rehabilitation of Corroded
Infrastructure in Units 4300/4500/4600 and Provision of Secured Acid Handling System with the following details:

Decommissioning of corroded package Equipment’s, structural steel, gratings, cable trays and piping system

Replacement of corroded steel supports, hand rails & gratings, piping system, pipe supports and cable trays

Replacement of obsolescent Control Valves, KBS Valves and field Instrument and accessories

Procurement and site erection of Package Equipment’s (Hydrochloric Acid Package Unit and Acid/Alkali Regeneration Vessels)
and integration into existing system
DRINKING, DEMINERALIZED & SERVICE WATER PLANTS UPGRADE
PROJECT (CONTRACT NO: B170030TPP)

LOCATION: BONNY
PLANT: LNG COMPLEX PROJECT NO: 13/MOC/PDR/039P
ISLAND, NIGERIA
UNIT: NIGERIA LNG LTD PAGE 3 of 10
4300/4500/
PROJECT HSE MANHOUR STATISTIC
4600
 Procurement of 5Nos 17,000litres Horizontal lined offshore Tanks (ISO Container) filled with 35% Aqueous HCL and supplied
with hose accessories required for connection to Instrument air and Hydrochloric Acid Package Unit (A-4370)
 Construction of Equipment concrete saddle support/repair of pitted Concrete pavement/Equipment support
 Commissioning & As-built documentation.

2.0 PURPOSE
To monitor the amount of work that can be done by one person in an hour in the Drinking, Demineralized & Service Water Plants
Upgrade Project.

3.0 TERMS AND DEFINITION


P.O.B - Personnel on Board
Cum. - Cumulative
Hrs. - Hours
OMH - Overall Man Hour Statistic
PMHS - Procurement Man Hour Statistics
EMHS - Engineering Man Hour Statistics
PMMHS - Project Management Man hour Statistic

DRINKING, DEMINERALIZED & SERVICE WATER PLANTS UPGRADE


PROJECT (CONTRACT NO: B170030TPP)

LOCATION: BONNY
PLANT: LNG COMPLEX PROJECT NO: 13/MOC/PDR/039P
ISLAND, NIGERIA
UNIT: NIGERIA LNG LTD PAGE 4 of 10
4300/4500/
PROJECT HSE MANHOUR STATISTIC
4600
4.0 PERSONNEL NAMES AND DESIGNATION

S/N NAMES PROJEC HSE PROCUREME QA/AC ENGINEERIN DOCUMENT


T NT G CONTROL
MGT.
1. UMEOKE COLLINS  
2. JUDE CHIKEKA  
3. KINGSLEY AMAEHULE 
4. PELE ANTHONY 
5. STANLEY OKONKWO 
6. CHUKWUDI 
OMENOGOR
7. NNAMDI UGWA 
8. EZE EDWIN 

DRINKING, DEMINERALIZED & SERVICE WATER PLANTS UPGRADE


PROJECT (CONTRACT NO: B170030TPP)

LOCATION: BONNY
PLANT: LNG COMPLEX PROJECT NO: 13/MOC/PDR/039P
ISLAND, NIGERIA
UNIT: NIGERIA LNG LTD PAGE 5 of 10
4300/4500/
PROJECT HSE MANHOUR STATISTIC
4600
5.0 PROJECT CATEGORY MANHOUR STATISTIC

5.1 OVERALL MAN HOUR STATISTIC (OMH)

MONTH PROJECT CATEGORY


August PMMHS PMHS EMHS TOTAL
Week 1 160 40 160 360

DRINKING, DEMINERALIZED & SERVICE WATER PLANTS UPGRADE


PROJECT (CONTRACT NO: B170030TPP)

LOCATION: BONNY
PLANT: LNG COMPLEX PROJECT NO: 13/MOC/PDR/039P
ISLAND, NIGERIA
UNIT: NIGERIA LNG LTD PAGE 6 of 10
4300/4500/
PROJECT HSE MANHOUR STATISTIC
4600
5.2 PROJECT MANAGEMENT MAN HOUR STATISTIC (PMMHS)

Month P.O.B Hrs Worked Week 1 Week 2 Week 3 Week 4 Week 5 Cum. Target
Man-hour
March 5 8hrs 176 184 188 176 - 724 1,200
April 5 8hrs 144 160 156 176 - 636 1,200
May 5 8hrs 148 114 184 156 - 602 1,200
June 5 8hrs 160 200 152 192 - 704 1,200
July 5 8hrs 200 200 184 118 188 890 1,500
August 5 8hrs 156 152 192 200 - 700 1,200
September 5 8hrs 160 168 152 168 160 808 1,500
October 5 8hrs 196 184 160 140 - 680 1,200
November 5 8hrs 184 192 184 172 - 732 1,200
December 5 8hrs 168 144 128 104 - 544 1,200
January 5 8hrs - 184 184 176 - 544 900
February 4 8hrs 160 160 104 96 - 520 1,200
March 4 8hrs 144 160 160 152 152 768 1,500
April 4 8hrs 128 128 160 152 - 568 1,200
May 4 8hrs 96 156 144 156 - 552 1,200
June 4 8hrs 160 152 104 144 - 560 1,200
July 4 8hrs 156 152 88 144 144 684 1,500
August 4 8hrs 160 160 300
Total 25,414 40,470

DRINKING, DEMINERALIZED & SERVICE WATER PLANTS UPGRADE


PROJECT (CONTRACT NO: B170030TPP)

LOCATION: BONNY
PLANT: LNG COMPLEX PROJECT NO: 13/MOC/PDR/039P
ISLAND, NIGERIA
UNIT: NIGERIA LNG LTD PAGE 7 of 10
4300/4500/
PROJECT HSE MANHOUR STATISTIC
4600
5.3 PROCUREMENT MAN HOUR STATISTICS (PMHS)

Month P.O.B Hrs Week 1 Week 2 Week 3 Week 4 Week 5 Cum. Target
Worked Man-hour
March 2 8hrs 80 80 80 72 - 312 400
April 2 8hrs 80 64 80 72 - 296 400
May 2 8hrs 64 48 80 80 - 272 400
June 2 8hrs 64 80 56 56 - 256 400
July 2 8hrs 80 80 80 48 80 368 500
August 2 8hrs 80 80 72 80 - 312 400
September 2 8hrs 80 80 80 80 56 376 500
October 2 8hrs 80 80 64 80 - 304 400
November 2 8hrs 80 40 80 80 - 280 400
December 2 8hrs 80 80 80 64 - 304 400
January 2 8hrs - 80 64 80 - 224 300
February 2 8hrs 80 80 80 80 - 320 400
March 2 8hrs 80 64 80 72 80 376 500
April 1 8hrs 80 64 80 40 - 264 400
May 1 8hrs 24 40 40 40 - 144 400
June 1 8hrs 40 40 40 40 - 160 400
July 1 8hrs 40 40 24 40 40 184 500
August 1 8hrs 40 40 100
Total 9,320 13,300

DRINKING, DEMINERALIZED & SERVICE WATER PLANTS UPGRADE


PROJECT (CONTRACT NO: B170030TPP)

LOCATION: BONNY
PLANT: LNG COMPLEX PROJECT NO: 13/MOC/PDR/039P
ISLAND, NIGERIA
UNIT: NIGERIA LNG LTD PAGE 8 of 10
4300/4500/
PROJECT HSE MANHOUR STATISTIC
4600
5.4 ENGINEERING MAN HOUR STATISTICS (EMHS)

Month P.O.B Hrs. Week 1 Week 2 Week 3 Week 4 Week 5 Cum. Target
Worked Man-hour
March 6 8hrs 240 240 240 240 - 960 1,200
April 6 8hrs 192 152 208 232 - 784 1,200
May 6 8hrs 184 144 240 216 - 784 1,200
June 6 8hrs 192 208 192 220 - 812 1,200
July 6 8hrs 224 224 224 144 240 1,056 1,500
August 6 8hrs 240 240 232 240 - 952 1,200
September 6 8hrs 224 240 192 240 192 1,088 1,500
October 6 8hrs 240 236 192 240 - 908 1,200
November 6 8hrs 208 224 240 240 - 912 1,200
December 6 8hrs 216 200 240 192 - 848 1,200
January 5 8hrs - 176 200 200 - 576 900
February 4 8hrs 160 152 152 160 - 624 1,200
March 4 8hrs 160 160 160 160 160 800 1,500
April 4 8hrs 160 112 160 160 - 592 1,200
May 4 8hrs 96 160 160 160 - 576 1,200
June 4 8hrs 160 160 160 152 - 480 900
July 4 8hrs 160 160 72 120 112 624 1,500
August 4 8hrs 160 160 300
Total 26,214 9,900

DRINKING, DEMINERALIZED & SERVICE WATER PLANTS UPGRADE


PROJECT (CONTRACT NO: B170030TPP)

LOCATION: BONNY
PLANT: LNG COMPLEX PROJECT NO: 13/MOC/PDR/039P
ISLAND, NIGERIA
UNIT: NIGERIA LNG LTD PAGE 9 of 10
4300/4500/
PROJECT HSE MANHOUR STATISTIC
4600
DRINKING, DEMINERALIZED & SERVICE WATER PLANTS UPGRADE
PROJECT (CONTRACT NO: B170030TPP)

LOCATION: BONNY
PLANT: LNG COMPLEX PROJECT NO: 13/MOC/PDR/039P
ISLAND, NIGERIA
UNIT: NIGERIA LNG LTD PAGE 10 of 10
4300/4500/
PROJECT HSE MANHOUR STATISTIC
4600

You might also like