SL ACTIVITY/ OPERATION CHARACTERISTICS CLASS OF TYPE OF CHECK QUANTUM REFERENCE DOCUMENT ACCEPTANCE NORMS FORMAT OF RECORD REMARKS
No. CHECK OF CHECK
1 2 3 4 5 6 7 8 9 D* 10
IMPORTANT INSTRUCTIONS:-
1. Head FQA and head of executing dept at site shall ensure the following before start of Mechanical work & periodically thereafter:-
a) Setting of FQA lab by contractor with necessary & essential testing equipment in good working condition.
b) Calibration of all measuring and testing equipment to be used by contractor.
c) Deployment of contractor’s FQA manpower with prior approval of client FQA.
2. Non-conformity:- in case of any non-conformity, site FQA shall ensure proper dispositioning and NC no. Shall be recorded in the respective log sheet/ protocol.
3. The contractor shall intimate concerned authority in writing well in advance as per procedure mutually agreed with site FQA & site execution for witnessing of class “a & b” checks identified in standard field quality
plan.
4. Record of quality checks shall be maintained in enclosed formats to provide necessary evidence of having carried out the work satisfactorily. Wherever format is not identified, records shall be maintained in a
mutually agreed format to record all checks and tests.
5. For checks where log sheet is not called for, record shall be maintained in a suitable protocol. The format of protocol shall be mutually agreed by head FQA and head of the executing dept. At site.
6. After completion of activity, the contractor shall submit records of quality documents (two sets of hard copy & one set of soft copy) as identified in standard field quality plan in column ‘d’.
7. Contractor shall submit monthly schedule of tests to be carried out by 5th of every month.
8. This document should be read in conjunction with technical specification, construction drawing and bill of quantity.
9. It is necessary & essential to carry out surveillance checks of 20% of each item of check by authorized executives as identified in note 2 of FQP record shall be maintained.
SL ACTIVITY/ OPERATION CHARACTERISTICS CLASS OF TYPE OF CHECK QUANTUM REFERENCE DOCUMENT ACCEPTANCE NORMS FORMAT OF RECORD REMARKS
No. CHECK OF CHECK
1 2 3 4 5 6 7 8 9 D* 10
Chemical & Review of batch test AIIL/QA/Welding/01 AIIL/QA/Welding/01 batch test Only Adani Appd. Welding
1.3 Welding Consumable A Each batch √
Mechanical properties certificate (Latest Revision) (Latest Revision) certificate consumable to be Used.
1.Welding procedure
specifications established
Welding Procedure with supporting procedure
1.4 Specification(WPS)/Proc Welding parameters A Review 100% ASME SEC IX & WPS ASME SEC IX WPS,PQR √ qualification record shall be
edure Qualification submitted for review and
approved by AEL
SL ACTIVITY/ OPERATION CHARACTERISTICS CLASS OF TYPE OF CHECK QUANTUM REFERENCE DOCUMENT ACCEPTANCE NORMS FORMAT OF RECORD REMARKS
No. CHECK OF CHECK
1 2 3 4 5 6 7 8 9 D* 10
Appd.WPS/
Rootgap,Cracks,Overla Visual & Dimension Appd.WPS/Project
2.5 Fitup B 100% Project spec./ IR √
p & Starightness Appd. WPS spec./Appd Drg.
Appd Drg.
Surface defects,
Project spec/
2.6 Welding reinforcement, B Visual & Dimension 100% Project spec/Appd. Drg. IR √
Appd. Drg.
Undercut
Visual and As per
Surface profile to Sa Project spec./
2.7 measureme Random 100% SSPC/DRG/approved Protocol √
2.5 Appd.painting procedure
nt painting procedure.
As per
Surface preparation Visual Inspection for Project spec./
Visual 100% 100% SSPC/DRG/approved Protocol √
blasting & Painting workmanship, (DFT) Appd.Drawings
painting procedure.
2.8
As per
Project spec./
Adhesion test Visual At random 100% SSPC/DRG/approved Protocol √
Appd.Drawings
painting procedure.
3.0 Non Destructive Testing
Penetrant testing (PT) As per tech ASME SEC VIII Div-1
3.1 NDT A Visual ASME SEC V Protocol
on fillet welds spec Appendix-8
Penetrant testing (PT)
ASME SEC VIII Div-1
3.2 on butt welds after back ROOT PASS DPT A Visual 100% ASME SEC V Protocol √
Appendix-8
gouging
Welder performance joints
Interpretation of RT ASME SEC VIII Div-1 & 2
As per tech (First production) shall be
3.3 RT/UT on butt welds NDT A film, Witness of ASME SEC V Clause 7.5 UT & AppendiX- Protocol √
spec covered.100% UT shall be
RTreport & UTreport 4
cover for all Butt weld.
Marking i.e.
Project spec/ Project spec/
4 elevation,centerline,Mar Visual B Visual 100% √
Appd. Drg. Appd. Drg.
k No., etc
5.Field erection
Dimension
Dimension
5.1 Column/Beam check,alignment B Visual 100% Drg. Appd. Drg. √
Report
check
Dimension
5.2 Column assembly check,alignment B Visual 100% Appd. Drg. Appd. Drg. Appd. Drg. √
check
Alignment, levels, alignment,
5.3 B Visual & Dimension 100% Appd. Drg. Appd. Drg. IR √
marking& fit up etc. level,marking etc.
Page 4 of 7
SL ACTIVITY/ OPERATION CHARACTERISTICS CLASS OF TYPE OF CHECK QUANTUM REFERENCE DOCUMENT ACCEPTANCE NORMS FORMAT OF RECORD REMARKS
No. CHECK OF CHECK
1 2 3 4 5 6 7 8 9 D* 10
surface
Weld visual
5.4 Field welding defect,reinforcement, A Visual 100% WPS,Appd. Drg. WPS,Appd. Drg. √
report or IR
undercut etc.
Other Attachment
surface
welding,stair Weld visual
5.5 defect,reinforcement, B Visual 100% WPS,Appd. Drg. WPS,Appd. Drg. √
case,pipes,structure,brac report or IR
undercut etc.
ing etc.
Dimension Check,
Dimension
Support,Allignment
5.6 R & P Type Elevator A Measurment, Visual 100% Appd. Drg. Appd. Drg. Report/Protoco √
check,Functional
l
Check,Load check
Dimension Check,
Dimension
Allignment
5.7 Telescopic Chute A Measurment, Visual 100% Appd. Drg. Appd. Drg. Report/Protoco √
check,Functional
l
Check
Dimension Check,
Allignment Measurment,
5.8 All Types of Gates A 100% Appd. Drg. Appd. Drg. IR √
check,Functional Visual,Noise,vibration,
Check
Dimension Check,
Hydraulic Power Pack
Allignment Measurment,
5.9 ,Cylinder & its assembly A 100% Appd. Drg. Appd. Drg. IR √
check,Functional Visual,Noise,vibration,
system
Check
SL ACTIVITY/ OPERATION CHARACTERISTICS CLASS OF TYPE OF CHECK QUANTUM REFERENCE DOCUMENT ACCEPTANCE NORMS FORMAT OF RECORD REMARKS
No. CHECK OF CHECK
1 2 3 4 5 6 7 8 9 D* 10
Mounting &
Approved Drg./Erection Approved Drg./Erection
5.11 Dust Supression System allignment of pumps A Visual/Measurment 100% Protocol √
Manual Manual
with drives
Location,Orientation,Fi
Air Blaster Assembly xing,Erection,Capacity,
5.12 B Visual 100% Approve Drg & datasheet Approve Drg & datasheet IR √
with Acessories Leakage, functional
etc.
Capacity,Pressure
Air Compressor, Receiver Appd. Drg.,MTC & Appd. Drg.,MTC &
5.13 test,Gauge B Visual 100% IR/Protocol/TC √
& Dryer Datasheet Datasheet
calibration,MTC etc
Dimension,Orientation,
5.14 Accumulator Erection A Measurment, Visual 100% Appd. Drg., Datasheet Appd. Drg., Datasheet - √
Fixing,Alignment etc.
SL ACTIVITY/ OPERATION CHARACTERISTICS CLASS OF TYPE OF CHECK QUANTUM REFERENCE DOCUMENT ACCEPTANCE NORMS FORMAT OF RECORD REMARKS
No. CHECK OF CHECK
1 2 3 4 5 6 7 8 9 D* 10
6.0 Non Destructive Test (NDT)-Field Joints
As per tech Project spec/ ASME sec VIII Div.1, Appn. DP %age should be as per
6.1 DPT on fillet welds NDT A Visual NDT REPORT √
spec Appd. Drg. 8 agreed QAG.
Project specn./Appd.
Post Weld Heat For Weld joints min 1hr per 25MM Hardness test shall be
6.4 A 100% Drg.Project specn./Appd. AWS D1.1 IR √
Treatment (ABOVE 30MM) thickness required after PWHT
Drg./ASMESec V
Torque testing (if Project specn./ Project specn./
7 Bolt torque B Visual 100% IR √
applicable) Appd. Drg. Appd. Drg.
Correctness of
Erection, Project specn./ Project specn./
8 supports,anchors,guides B Visual & Dimension 100% IR √
alignment,welding etc. Appd. Drg. Appd. Drg.
etc.
Project specn./ Project specn./
final inspection for alignment, Appd. Drg./ Appd. Drg./
9 A Visual & Dimension 100% IR √
completion as per Drg. level,marking etc. Appd. Procedure Appd. Procedure
Project specn./
Surface As per
Surface/Intermedeate/Fi Appd. Drg./
10 profile,debris,Rust,dirt B Visual check,DFT 100% SSPC/DRG/approved IR √
nal Painting Appd. Procedure
etc check painting procedure.
Project specn./
All
Appd. Drg./ Document
11 Final Documentation IR,protocols,procedure A Review 100% As per FQP/procedure √
Appd. Procedure Dosier
s,Films,Graphs, etc
Page 7 of 7
SL ACTIVITY/ OPERATION CHARACTERISTICS CLASS OF TYPE OF CHECK QUANTUM REFERENCE DOCUMENT ACCEPTANCE NORMS FORMAT OF RECORD REMARKS
No. CHECK OF CHECK
1 2 3 4 5 6 7 8 9 D* 10
LEGEND :
1) D*: Records identified with ‘TICK’ (√) shall essentially be included by Supplier in QA Documentation.
2) Legend used for Class of check are A, B & C
• ‘A’ class of check shall be witnessed by AEL/FQA, Surveillance by Head AEL (FQA)
• ‘B’ class of check shall be witnessed by AEL’S Executing Dept and Surveillance by AEL/ FQA Engineer
• ‘C’ class of check shall be witnessed by Contractor’s FQA and Surveillance by Concerned Executing Engineer for the respective work package
NOTE:-
1)‘A’ and ’B’ class of checks shall be AEL’s Customer Hold Points to be witnessed and work shall not proceeded till it is witnessedand cleared by AEL.
2) It is necessary and essential to carry out surveillance checks of minimum 20% of each class of check by the authority identified
for surveillance check and suitable records/protocols shall be maintained.
Abbreviation to be used in column -9 of Field Quality Plan :-
SR=Site Register, TR=Test Report, TC=Manufacturer’s Test Certificate, LR=Lab Report, LB=Log Book. LS= Log sheet (specify the log sheet no.)
CONTRACTOR - QA/QC AEL - FQA
Sign
2) One sport RT in each longitudinal joint of Conical section-1, i.e., Randomn 15 nos spot RT in longitudinal joint of Conical section-1
7) Circumference joint of mother plate to insert plate root DPT and Final DPT to be done