Net Case Study
Net Case Study
Net Case Study
The external facades display earthy colours with splashes of yellow and brown along with grey
basalt stone which is locally available. The planning considers the contour topography, terrain and
eco-systems giving maximum benefits to users. The efficiency in construction is maintained by
reducing the cost of construction with volume and weight of materials. Apart from basalt, other
regional materials like natural stones like Kadappah, granite, marble, sandstone, Gokak stone,
Alkud sand are used which are low energy intensive materials. Pre cast frames with fly ash are
used in interiors for WC and baths whilst as natural stones for flooring are used over 80% of the
HOSTEL BUILDINGS area further reducing the cost.
The external facades display earthy
colours with splashes of yellow and
HOSTEL PLAN
Renewable Energies are put to optimum use in project where for general lighting, 15W CFL
brown along with grey basalt stone
which is locally available. The planning lamps are provided with wind generator and hybrid power pack system is used, whilst as
considers the contour topography, for street lighting solar modules backed with solar batteries are provided.
terrain and eco-systems giving For cooking purpose in mess and staff quarters for 700 persons, the biomass and fuels cells
maximum benefits to users. The are generated by applying biogas plant which is absolutely based on renewable energy
efficiency in construction is maintained
principles. Reduction of water usage is achieved by recycling of water and air pollution and
by reducing the cost of construction
reduced by plantation of green trees.
with volume and weight of materials.
MESS BULIDING
Apart from basalt, other regional Cadets, for their physical training have been provided with ample
materials like natural stones like grounds for badminton, hockey, volleyball and khokho with athletic
Kadappah, granite, marble, sandstone, track which surrounds a football ground. For the recreation of
Gokak stone, Alkud sand are used which cadets an auditorium and an open amphitheater is provided along
are low energy intensive materials. Pre with a shopping centre is provided to cater to their day to day needs.
cast frames with fly ash are used in The residential area is situated at one corner of site
interiors for WC and baths whilst as which has staff quarters, Principal and Vice Principals residences.
natural stones for flooring are used over The area is surrounded by beautiful plantations and lawns.Student’s
80% of the area further reducing the hostel and office buildings are near to ground areas. BIOGAS PLANT USE OF RECYCLED WATER
cost.
POLICE TRAINING CENTRE,TURCHI SANGLI
The project has a relatively modest low budget of Rs. 14000 / sqm. The
comfort conditions are optimised and energy savings are also done with the
effective use of nature. The campus is environmentally responsible, profitable
& healthy to live & work.
Designer in the said project has successfully met with occupants need for
thermal and visual comfort at low level of energy and resource consumption.
After neglecting the ecology we have started realizing the importance
of surroundings and their ill effects on our comfort level and our
planet earth. Energy is consumed in all processes of constructions.
The materials and construction technique used in process of building
affects the ecological balance. Need for energy and environment
conscious building design has become a need of hour which is
fulfilled in the said project.
SCHOOL BUILDING
Landscapes for Courtyards and Internal pathwatys BUILDINGS GROUNDS
Firing range is provided at the other corner of the plot, adjacent to lagoon created by rain 1)Police Training School Building = 1716 sq.m 1)Parade Ground (120 X 90mtr)
water harvesting and other artificially created lake which add in beautifying and purifying (500 people = 50 in each class such 10 2)Short Range Firing (560 sq.m)
the surroundings. Several ancillary buildings as classrooms, health centre, and mess are classrooms) 3)Running Track
situated at convenient distance from hostel buildings for the comfort of cadets.
2)Administration Building = 569.43 sq.m 4)Football Ground
3)Kitchen & Dining Hall = 1064.81 sq.m 5)Hockey Ground
4)Health Care = 350 sq.m 6)Volley Ball, Basket Ball,
5)Arms & Ammunitions Storage Builiding = 438.50 Badminton Ground
sq.m 7) Obstacles
6)Security Office = 36 sq.m 8)Swimming Pool
7)Hostel Building (500 people Accom.) = 7299 sq.m 9)Kabaddi, KhoKho Ground
8)Staff Quarters = 10455.7 sq.m 10) Drill Shed (560 sq.m)
9)Shopping Centre = 465 sq.m 11)Open Theatre
10)Cultural Hall = 1403.92 sq.m
11)M.T. Work Shop = 1350 sq.m
STAFF QUARTERS 12) Bank
13)Post Office