Quiz 2
Quiz 2
PPR 142
This Quiz no. 2, is TRUE or FALSE. Select the right answer for each of the following items by shading and
identifying the corresponding answer of your choice for each number in the answer sheet.
2. In Project Administration - the Architect scope of works my include from Project Schematic
Design Phase until the completion of Construction Phase (Project delivery).
o TRUE
FALSE
3. In Project Management - the Architect role is to monitor and check the Budget, Time Program
and Quality Control.
TRUE
O FALSE
MODULE 2.0
PPR
142
5. In Construction Services - the Architect role being the Prime Consultant in a given project, can
also perform as the Main Contractor at the same time?
TRUE
O FALSE
8. Architects who seriously take Architecture as his/her chosen career and apply “Professional
Practice” to the highest level represent integrity and prestige.
TRUE
O FALSE
9. An Architect who decided to become a Contractor and seriously take Construction as his/her
means of legitimate job to build projects and ultimately earned profits are called
businessman/businesswoman.
O TRUE
FALSE
10. In Design-Build Services with guaranteed maximum project Construction Cost. The
Owner/Client are given estimated cost of the Project, and upon completion,
if there is realized savings from the Project Construction Cost, it is all goes to Architect’s personal
bank account.
O TRUE
FALSE
Prepared by: