H-10207 00 Cja 00-101F Dc-Unit Lcu Cubicle Fat Procedure - A
H-10207 00 Cja 00-101F Dc-Unit Lcu Cubicle Fat Procedure - A
H-10207 00 Cja 00-101F Dc-Unit Lcu Cubicle Fat Procedure - A
Comments
SigN Date
SigN.
SigN.
SigN.
SigN.
SigN.
SigN.
VIETNAM ELECTRICITY
TRI AN HYDROPOWER COMPANY
LOT NO.5:“DESIGN,MATERIAL,EQUIPMENT SUPPLY AND
TECHNICAL SERVICES”
CONTRANT NO:99/HD-TDTA/ALSTOM
PURCHASER: SUPPLIER:
ALSTOM-HYDRO
UNIT LCU
CUBICLE FAT PROCEDURE
SCALE SIZE
SUBSUPPLIER:
A4
1 PURPOSE ..................................................................................................................4
- Mechanical Test
- Electrical Test
- Function Test
- FAT Report
2 REFERENCE DOCUMENTS
- Multimeter
- Communication Computer with CCAD and firmware as well as its documents
- Protection test tools
- 500V DC mega ohmmeter
- Signal generator (4~20mA, RTD etc.)
- Other necessary wire connection tools
For each cubicle materials will be checked according equipment drawing; the
assembly , quality and type of each material have to be the same as the drawing.
YES NO
General remarks :
All electronic components shall be disconnected from external circuits and not
supplied with power。
All circuits AC/DC power and control circuits are short circuited at the terminal
blocks.
The measurement shall be carried out with a 500V DC mega ohmmeter between
earth circuit in the cubicle and the common point of the cubicle electrical circuit:
Earthing continuity is checked for door, frame, components and earth busbar.
The continuity between any points with all the looped points to be checked as
per electrical circuit drawing and the wiring list.
YES NO
General remarks :
The functional TEST shall be carried out according to the electrical diagram
and the most important and critical functions will be tested such as:
⑴ Cubicle facilities
⑵ Polarity
⑶ LCU HMI availability
⑷ EPL field bus test
⑸ Controller redundancy test
⑹ Controller module points test
⑺ Pushbutton, indicator ,alarm and trip circuit test
⑻ Measurement circuits test
⑼ Synchronization Circuit test
⑽ Communication with external systems
In conformity
No Description of test Expected Result Remark
YES NO
- Heating ON /OFF
2 As above
Polarities
As above
Power redundancy check-1
by incoming 1
(220V DC )
- Power supply ON
/OFF detected in
PLC
- Temperature
increase normal
4 EPL E8000 network test
- All the controllers
- Check all the CE1000 in are on the bus
normal operation with EPL
ring network by IE - HMI can get
information from
- >3 days heat running each controller.
6
Controller I/O check
value
- >3 days heat running
YES NO
General remarks :
REPORT DATE:
Qualitative appraisal:
Remarks:
Company: Company:
Name: Name:
Position: Position:
Signature: Signature: