Saudi Aramco Typical Inspection Plan

This document outlines a typical inspection plan for magnetic particle testing (MPT) on projects for Saudi Aramco. It details the inspection responsibilities and assignments between Saudi Aramco and contractors. The plan includes reviewing MPT procedures and personnel qualifications, ensuring proper equipment and materials, applying the testing during production using various techniques, and controlling the process including demagnetization and repairs. Compliance with Aramco and international standards is required.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
203 views10 pages

Saudi Aramco Typical Inspection Plan

This document outlines a typical inspection plan for magnetic particle testing (MPT) on projects for Saudi Aramco. It details the inspection responsibilities and assignments between Saudi Aramco and contractors. The plan includes reviewing MPT procedures and personnel qualifications, ensuring proper equipment and materials, applying the testing during production using various techniques, and controlling the process including demagnetization and repairs. Compliance with Aramco and international standards is required.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016) Rev. 2016.06.

00 30-Jun-16

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Magnetic Particle Testing (MPT) on IK Projects SATIP-NDE-MPT-01 15-Nov-17 MECHANICAL- NDE


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW SPECIAL PROCESS (NDE) REQUIRES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS IN PROCEDURES. PROPOSE BEST METHODS.

MPT Procedures (Technique) SAIC-MPT- SAIC-MPT-


1.1 RH RH MPT is per approved Technique Procedures.
2001 2001

SAIC-MPT- SAIC-MPT-
1.2 MPT Personnel Qualification Review RH RH Maintain Current Roster/CVs for NDE Techs.
2002 2002

SAIC-MPT-
SAIC-MPT-
1.3 NDE Process Control Procedure* 2010 RH RH *Combine all NDE Methods applicable
2010

SAIC-MPT- NDE Kickoff Meeting Item. Agreement shall be reached on


SAIC-MPT-
1.5 NDE Kickoff Meeting 2010 H H all items related to NDE Specs, Process Control & any
2010
NDE related checklist.

2.0 EQUIPMENT

Visual Insp & Verification of MPT mat'ls SAIC-MPT- SAIC-MPT- Use SATR-NDE-2010
2.1 W* S
and Equipment 2003 2003 Each day checked against In-Process work.

Storage, Handling & Preservation of MPT *Safety Checks are done for each In-Process application
2.2 See Remarks See Remarks W* S
materials (*See Safety Check) listed below

3.0 APPLICATION IN-PROCESS VERIFICATION = DAILY SUPERVISION BY CONTRACTOR* (*Prime/Sub) OF NDT SERVICE PROVIDERS, & SAEP-1160 DATABASE UPDATES

Use SATR-NDE-2003 & SATR-NDE-2010


In-Process Inspection of MPT using SAIC-MPT- SAIC-MPT-
3.1 W* S * Prime Contractor & any Subcontractor
Yoke Method (Most Common) 2004 2004
** Notification as shown. See Notice.

In-Process Inspection of MPT using Prod Same as above The prod technique should not be used
SAIC-MPT- SAIC-MPT-
3.2 Technique [As per SAEP 1144 page 10 W* S on highly polished or machined surfaces due the
2005 2005
para 1.3 Prods should be avoided] possibility of arc damage to the surface.

In-Process Inspection of MPT using Use SATR-NDE-2002 & SATR-NDE-2010


SAIC-MPT- SAIC-MPT-
3.3 Direct Contact and Coil W* S * Prime Contractor & any Subcontractor
2006 2006
Methods ** Notification as shown. See Notice.

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016) Rev. 2016.06.00 30-Jun-16

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Magnetic Particle Testing (MPT) on IK Projects SATIP-NDE-MPT-01 15-Nov-17 MECHANICAL- NDE


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

SAIC-MPT- SAIC-MPT-
3.4 Demagnetization & Post Cleaning W S
2007 2007

NDE Process Control incl. Repairs:


SAIC-MPT- Complete W Series Checklists (Repairs). Inform SA Insp
A) SAIC-W Checklists in Item 1.5 SAIC-MPT-
3.5 2010 H/R R on 100% of repairs that require MPT. Perform req'd
B) Database Entry for LPT 2010
Database entry & Reporting using SATR-NDT-2011.
Results & Status & Backlog Reporting

GENERAL NOTES

NOTICE (SAEP-1160, Section 9.2): Use of Welding and NDT SAICS 9.2.1 One SAIC per day per activity is required for production welding on a daily or continual basis, e.g., fit-up, in-process, and final
inspection. Applicable weld numbers must be entered in Remarks Box on the appropriate SAIC. 9.2.2 Special welding activities such as branch connections, tie-ins, sleeve installation, hot-tap welding, and
temperature tie-ins will require a separate IR per weld per activity in accordance with the applicable SATIP. 9.2.3 NDT subcontractors must complete NDT Checklists on a daily basis per above but not as an IR
with the exception of the start of NDT activities. SAIC-W-2008 details SAEP-1160 Data Reqmts for Welding with NDE Control per SAIC-MPT-2010.

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels
1
of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
3
organization representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization
4
representative in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND

H Hold Point for QC Inspection/ Test R Review of Documents


W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016)

Saudi Aramco: Company General Use


Rev. 2016.06.00

###

Saudi Aramco: Company General Use


30-Jun-16

Saudi Aramco: Company General Use


### ###

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016)

Saudi Aramco: Company General Use


Rev. 2016.06.00

###

Saudi Aramco: Company General Use


30-Jun-16

Saudi Aramco: Company General Use


### ###

Saudi Aramco: Company General Use