1) Which of the following is the term used for medium range capacity planning with a time
horizon of three to eighteen months?
A) material requirements planning
B) short-range planning
C) strategic planning
D) aggregate planning
E) none of the above
2) The objective of aggregate planning is to meet demand while __________ over the planning
period.
A) minimizing cost
B) maximizing service level
C) minimizing stock out
D) minimizing fixed cost
E) all of the above
4) Which of the following is not one of the four things needed for aggregate planning?
A) a logical overall unit for measuring sales and output
B) a method for determining costs, such as hiring, layoffs, and inventory costs, associated with
production schedules
C) a mathematical model that will minimize costs over the intermediate planning period
D) an aggregate demand forecast for an intermediate planning period
E) All of these are needed for aggregate planning.
5) Planning tasks associated with loading, sequencing, expediting, and dispatching typically fall
under
A) short-range plans
B) intermediate-range plans
C) long-range plans
D) mission-related planning
E) strategic planning
1
6) The planning tasks associated with staffing, production, inventory, and sub-contracting levels
typically fall under
A) short-range plans
B) intermediate-range plans
C) long-range plans
D) demand options
E) strategic planning
10) Which of the following would most likely fall under the scope of only an operations
manager?
A) research and development
B) new product plans
C) capital investments
D) facility location and expansion
E) setting inventory levels
11) Disaggregation
A) breaks the aggregate plan into greater detail
B) transforms the master production schedule into an aggregate plan
C) calculates the optimal price points for yield management
D) converts product schedules and labor assignments to a facility-wide plan
E) is an assumption required for the use of the transportation model in aggregate planning
2
12) Aggregate planning would entail which of the following production aspects at BMW for a 12
month period?
A) number of cars with a hi-fi stereo system to produce
B) number of two-door vs. four-door cars to produce
C) number of green cars to produce
D) total number of cars to produce
E) B, C, and D
13) Which of the following inputs helps an aggregate planner select the rate of output for a
facility over the next 3 to 18 months?
A) facility capacity
B) inventory on hand
C) workforce size
D) demand forecasts
E) all of the above
15) Dependence on an external source of supply is found in which of the following aggregate
planning strategies?
A) varying production rates through overtime or idle time
B) subcontracting
C) using part-time workers
D) back ordering during high demand periods
E) hiring and laying off
17) Which of the following aggregate planning strategies might direct your client to a
competitor?
A) using part-time workers
B) subcontracting
C) changing inventory level
D) varying production rates through overtime or idle time
E) varying work force size by hiring or layoffs
3
18) Which of the following aggregate planning strategies is a "capacity option"?
A) influencing demand by changing price
B) counterseasonal product mixing
C) influencing demand by extending lead times
D) changing inventory levels
E) influencing demand by back ordering
19) Which of these aggregate planning strategies adjusts capacity to match demand?
A) back ordering
B) using part-time workers
C) counterseasonal product mixing
D) changing price
E) None of the above is a capacity option.
20) Which of the following aggregate planning strategies is known to lower employee morale?
A) yield management
B) counterseasonal product and service mixing
C) changing inventory levels
D) varying work force size by hiring or layoffs
E) back ordering during high demand periods
21) Which of the following is not associated with manipulation of product or service demand?
A) price cuts or discounts
B) promotion
C) subcontracting
D) counterseasonal products or services
E) advertising
4
24) In aggregate planning, which one of the following is not a basic option for altering demand?
A) promotion
B) subcontracting
C) back ordering
D) pricing
E) All are demand options.
25) Which choice below best describes the counter seasonal demand option?
A) producing such products as lawnmowers and sunglasses during the winter
B) developing a mix of products that smoothes out their demands
C) lowering prices when demand is slack
D) using subcontractors only when demand is excessive
E) the breaking of the aggregate plan into finer levels of detail