0. FOREWORD
1. SCOPE
2. GENERAL
3. MATERIAL
4. MANUFACTURE
4.1 Mould
4.2 Stretching of wire
4.3 Mixing & consolidation of concrete
4.4 De-tensioning
4.5 Curing
4.6 Supervision
4.7 Finish
4.8 Stacking
4.9 Lot
Page 1 of 34
5.3.8 Measurement of Electrical resistance
5.4 Competency certificate
8 GUARANTEE
Page 2 of 34
INDIAN RAILWAY SPECIFICATION FOR
FOR PRE-TENSIONED PRESTRESSED CONCRETE SLEEPERS
(BROAD GAUGE AND METRE GAUGE)
SERIAL NO. T-39
(SIXTH REVISION – AUGUST OCTOBER 2020)
0. FOREWORD
0.2 The last revision (Fifth Revision) was adopted by the Indian
Railways in February 2016.
0.3 The present revision (Sixth Revision) has been taken up with a
view to incorporate modifications found necessary as a result of
use of the specification both by the manufacturer and user.
0.4.2 Guarantee Clause has been revised to make it applicable for all
type of line sleepers plying on Indian Railways.
0.4.3 List of specifications (IS/IRS codes) needed for daily use and
referred to in this specification has been updated in Annexure-
VI.
0.4.7 Annexure-III has been revised to make it applicable for all type
of line sleepers plying on Indian Railways.
Page 3 of 34
1. SCOPE
2. GENERAL
3. MATERIALS
3.1.1 High tensile steel in the form of plain wire or strand shall
conform to IS: 1785 Part-I and IS: 6006 respectively. It shall be
procured only from BIS approved manufacturers who shall
furnish the proof of approval by BIS with the first consignment
during the currency of approval and for each fresh approval.
Each consignment of high tensile steel must be accompanied by
a test certificate showing the serial no. of coils. Each coil shall
carry a tag in accordance with the IS specifications mentioned
above. In addition to the normal tests stipulated in the IS
specifications for every consignment, results of “relaxation test”
shall also be furnished once in six months. In case of change
of source the first test certificate shall include “relaxation test”
results also.
The steel shall be used for production only after ascertaining
that it meets the provisions of relevant specifications.
3.2.2.1 The Inspecting Officer has the right to have the cement in stock
tested at any time at the cost of manufacturer.
3.2.3 The cement content of the mix shall not be less than 350 kg/cu.
m. and not more than 450 kg/cu.m.
3.3 Admixture
3.3.1 Super Plasticizer conforming to IS: 9103 may be used with the
prior approval of RDSO. At this stage the revised concrete mix
design shall also be submitted to RDSO for approval. However,
following shall be observed:
Page 5 of 34
3.3.6 The admixture containing Cl and SO3 ions shall not be used.
Admixtures containing nitrates shall also not be used.
Admixture based on thiocynate shall be prohibited.
3.4 Aggregates
3.4.1 The aggregates shall conform to IS: 383 - 2016 (third revision)
and shall, before use, be got tested through an approved testing
institute, and results submitted in accordance with Appendix ‘A’
of IS: 383 - 2016 (third revision) to the Inspecting Officer for
approval. These tests shall be got done at the manufacturer’s
cost once in a year or at the time of approval/review of mix
design or as desired by inspecting official. The aggregates shall
have maximum 30% abrasion and maximum 30% impact value
suitable for wearing surfaces when tested in accordance with
IS:2386 (Part-IV) - 1963. The flakiness index and elongation
index shall not exceed 30% when tested in accordance with IS:
2386 (Part-I) - 1963.
3.5 Water
3.5.1 Water to be used in making and for curing concrete shall
conform to IS: 456. However use of sea water is prohibited.
3.5.2 If water needs any treatment before use, adequate storage of
treated water for daily requirement shall be made. Facilities for
testing treated water shall be provided in the plant. Treated
water shall be tested daily or as directed by the Inspecting
Officer.
3.5.3 The total water content per batch shall be regulated with
conform with the ratio by weight of free water to cement
required for the particular design mix as established by
preliminary tests. The total water content of a batch includes:
(a) Absorbed water in the aggregates;
(b) Free water in the aggregates; and
(c) Free water added to the mix.
3.5.3.1 The water to be mixed at the mixer shall be free water content
required per batch less the amount of free water in the
aggregates, if wet, or plus the amount of water the aggregates
will absorb, if dry. Free moisture content shall be determined at
least once a day.
3.6 Concrete
Page 7 of 34
iii) Percentage of cubes with strength Not more than
less than the characteristic strength 2.5%
as per mix design/statistical analysis
3.6.3.1 Zonal railways shall review the concrete mix design themselves
whenever the source of cement or water or admixture is
changed as per guidelines in IS: 10262: 2019 (or latest version)
provided the quantity of cement is not reduced. All new
ingredients must be got tested before hand from reputed
laboratory to ascertain whether they are suitable to be used as
per relevant standards/ specifications. The copy of test report of
all ingredients, mix design calculations, record of trial cube
testing and records of modification should be communicated to
RDSO for information and should be available with zonal
railway as well as with CSP, so that the same can be inspected
during oversight inspection by RDSO official. However, if the
source of aggregate changes, RDSO should be approached by
the zonal railways for approval of the source and also for
reviewing/revising the mix design.
Zonal Railway or RDSO will check and verify the revised mix
design at the sleeper plant by testing of trial cubes as per para
3.6.4 and complying design parameters as per para 3.6.2.
3.6.4.1 All the 40 cubes cured according to the proposed steam curing
cycle shall attain the specified minimum release strength.
Page 8 of 34
3.6.4.2 The statistical analysis of the compressive strength values of the
40 water cured cubes shall satisfy the design parameters of
clause 3. 6.2 (ii), (iii) & (iv).
4. MANUFACTURE
4.1 Moulds
Moulds shall be of steel with minimum plate thickness of 10
mm in Rail seat area as well as for end plates. For other
locations minimum plate thickness is to be 6 to 8 mm. Moulds
shall be of rigid construction so as to prevent any in-service
distortions. Moulds shall not allow any appreciable leakage of
cement mortar in casting. The holes in the end plates shall be
accurately drilled for correct placement of prestressing wires.
Page 9 of 34
4.3.3 Modern high speed mixer, pan, turbine or any other suitable
type, approved by the Inspecting Officer shall be used for mixing
concrete. Concreting shall commence within 2 hours of
stressing of wires, failing which the HTS wires shall be checked
and re-tensioned, if necessary.
4.3.5 Freshly cast sleepers shall be protected during the first stage of
hardening from adverse weather conditions.
4.5 Curing
4.5.1 Initial curing of concrete sleeper shall be done by steam at
atmospheric pressure till the concrete attains a compressive
strength of 40 N/sq.mm. Pre-steaming period shall not be less
than the initial setting time of cement.
Total steam curing cycle duration can vary from 10 to 12 hours
depending on time taken in the steam curing stages e.g.
presteaming, temperature rising (heating), constant temperature
duration, cooling etc. Total cycle time depends on ambient
temperature.
4.6 Supervision
Page 11 of 34
4.6.2 Supervisor so engaged shall maintain records as directed by the
Inspecting Officer and shall present them for scrutiny when
demanded.
4.7 Finish
4.7.1 All sleepers shall be free from surface defects such as water
retaining pockets, air holes or honey combed formations. The
underside of the sleeper coming in contact with ballast shall be
left rough but the unevenness shall not exceed 5mm. The ends
of the prestressing wires shall be cut close to the surface of the
sleeper in such a way that there is minimum damage to end
plate and the wire in no case shall project more than 3 mm from
the concrete surface. Two coats of suitable ISI mark anti
corrosive paint, approved by Inspecting Officer, shall be applied
at the ends of the sleepers in the following manner:
ii) Second coat after taking out the sleepers from submerged water
curing tank in the above manner, ensuring that surface to be
painted is completely dry and clean of dirt etc.
4.7.3 Such sleepers which are not found acceptable due to surface
defects, shall be accepted up to a ceiling of 1% of the supplies
made any time during the currency of the contract provided
such sleepers are adequately treated with epoxy compounds to
the satisfaction of the Inspecting Officer. However, epoxy
treatment of rail seat area is not acceptable. These sleepers
shall be marked as shown in Drawing No.RDSO/T-2466 before
dispatch. The rectified sleepers shall be paid for at the rates
fixed by the Purchaser.
4.8 Stacking
After the sleepers have been cured in terms of clause 4.5.2 and
checked both dimensionally and visually they shall be stacked
Page 12 of 34
at convenient place in lots. The stacking of sleepers shall be
done on leveled and consolidated ground, one over another up
to 25 layers. Each layer shall be separated by wooden/concrete
battens of 50mm x 50mm size of suitable lengths to avoid any
damage.
4.9 Lots
All sleepers cast in one shift shall form one lot.
5.2 Inspecting Officer and the Purchaser shall have free access at
all reasonable times to the works in which the sleepers are
manufactured. They shall be at liberty to inspect the
manufacture of sleepers at any stage and to reject any material
supplies not conforming to the terms of the specifications and to
reject sleepers not manufactured according to approved
manufacturing process. They shall be provided with necessary
assistance for inspection by the manufacturer.
Page 13 of 34
5.3.1.1 Visual and Dimensional Check
The cubes shall be surface dry at the time of testing. The rate of
loading shall be about 400 KN/minute.
These cubes shall not be steamed but shall be water cured for
14 days after de-moulding. Two number of samples per lot (one
sample comprises of 3 cubes) shall be taken.
Further, if mean of two test results of two samples is < fck and /
or minimum of the two test results of two samples is < fck – 5
N/mm2, the lot shall also be rejected. Where, fck is characteristic
strength of concrete i.e. 55 N/mm2 for M55 and 60 N/mm2 for
M60 grade of concrete.
Page 15 of 34
5.3.6 Test for 15 day modulus of rupture of concrete
5.3.7.1.2 The sleepers shall be loaded gradually (30-40 KN/min) upto the
specified load, which will be retained at this level for three
minutes for observing cracks, if any. For the purpose, a crack
is defined as one which is barely visible to the naked eye and is
at least 15mm long from the tension edge of the sleeper.
However, if crack appears at a load smaller than the specified
load, that value shall be recorded.
Page 16 of 34
5.3.7.2.2 Moment of resistance (MR) test (Rail seat bottom, centre
top, centre bottom)
ii) Wherever mean of two test results of two samples is < fck
+ 3 N/mm2 or fck + 0.825 x established standard
deviation whichever is greater but ≥ fck or minimum of
the of the two test results is < fck - 3 N/mm2 but ≥ fck -
5 N/mm2 or both and the lot is not rejected as per the
criteria given in para 5.3.5 – two sleeper per lot
iii) In case, mean of two test results of two samples is < fck
and /or minimum of the two test results of two samples
is < fck – 5 N/mm2, the lot shall be rejected and no
testing for moment of resistance or moment of failure will
be conducted.
Note:
a. Prior to stabilization of production technique: Sleeper to
be tested shall be subjected to rail seat bottom, centre top
and centre bottom tests.
b. After stabilization of production technique: Sleeper to be
tested shall be subjected to rail seat bottom and centre
top tests only.
Table -1: Acceptance / Rejection Criteria of Concrete and No. of
Sleepers for SBT Test per Lot
5.3.7.3.2 If the sleeper fail in any of the tests conducted as per clause
5.3.7.2.2 (i), the lot shall be subjected to ‘retest’ as per clause
5.3.7.4.
5.3.7.4 RETEST
5.3.7.4.3 For acceptance of the lot, all the sleepers tested in ‘retest’ must
pass all the tests conducted. However, sleepers failing in any
static bending tests shall not be paid for.
NOTE:
(ii) Three/four sleepers from next one batch will also be got tested
for Static Bend Test (SBT) and Moment of Failure (MF) test as
above from RDSO or at testing facilities available with Zonal
Railways such as ‘Bridge Workshops/‘Soil Testing Lab’ or any
other Lab of Open line / Construction Unit of Zonal Railways. In
case of failure of sleeper in any of the test as per clause 5.3.7.1,
Page 19 of 34
two sleepers from the same batch shall be subjected to retest as
per clause 5.3.7.4. In case failure of sleepers from next one
batch, the concerned batch shall be rejected and further
production shall be suspended. The detailed enquiry of the
concerned sleeper plant is to be ordered by PCE of Zonal
Railway. In addition, the quality audit is to be ordered by an
Officer not below the rank of JAG.
6.1 All the sleepers shall have legible permanently inscribed and
painted markings on the top as per drawing No.RDSO/T-2466.
6.2 The accepted sleepers shall bear the passing marks of the
Inspecting Officer in indelible paints. Sleepers which have been
6.3 All sleepers fit for use in track circuited area shall bear the
mark ‘FTC’ at the center of the sleeper.
6.5 All markings mentioned in para 6.1 to 6.3 shall be done with
enamel paint of ISI mark and shall be such as to last for at least
3 years under normal weather conditions. Colour and quality of
the paint used shall be got approved by the Inspecting Officer.
All such markings shall be done by the manufacturer at his
cost.
7.1 Only those sleepers which have been passed, properly marked
and accepted by the Inspecting Officer shall be loaded for
despatch.
8. GUARANTEE
Page 21 of 34
ANNEXURE-I
ANNEXURE-I (CONTD.)
Note:
Page 22 of 34
3. The proving rings should be got calibrated from a reputed
organization like the IITs, NCCBM or NPL etc.
4. The record of calibration of all the above equipments should be
maintained in a manner that previous records can be easily
connected.
Page 23 of 34
Page 24 of 34
Annexure – IIA
130
80
8
DST- IV ASHWANI KUMAR
HANDLE
13
R 5R
DDST-II S.K.AWASTHI
27
INSERT DRG. No. TO
20 mmDIA: PIN BE STAMPED HERE.
75mm LONG WELD OF SUITABLE SIZE OR SCREWED
RT-
HEEL
13 12
IA: T0E
20D C
50
50
APPD: A:
Y
A: DI
5
DI 20
X
TRC: COMPUTER
20
R25
5
3
35 50 10 75
10mm THICK
PLATE.
ELEVATION SIDE ELEVATION
CH:
K.J.SINGH
130
TABLE
10
INSERT TO DIMENSIONS mm
DRG. No. x y
DRG:
CH:
RDSO/T-381 17 7
RDSO/T-4847 9.5 7
CAL: M.BOTKE
75
RDSO/T-3705 21,70 7.00
CH:
20 20 20
R. D. S. O.
PAGE n/55 TO 57 PAGES
CT/FD/2/CI CR.No.
PLAN
±1
±1 STAN D
Page 25 of 34
Annexure-IIB
Page 26 of 34
ANNEXURE-III
Note:- The testing arrangement is for guidance purpose only. Testing shall be
conducted as per test loads mentioned in the relevant RDSO’s drawings
of PSC sleepers. The dimensions A & B mentioned in above testing
arrangement shall be referred from relevant RDSO’s drawing of PSC
sleepers.
2. The load ‘P’ will be applied at centre line of Rail Seat through pressure
distributing M.S. Plate with 1 in 20 slope and size 145X25mm, covering
the full width of sleeper.
Page 27 of 34
3. One rail seat bottom shall be tested at a time. It shall be ensured that
the other end is not restrained in upward direction. The rate of loading
is 30-40KN per minute.
Page 28 of 34
Page 29 of 34
ANNEXURE-IV (Contd.)
T-1 RT-2
Page 30 of 34
ANNEXURE-V
3. The 230 volts AC supply will be passed through a not less than 300 W
test lamp in series with the pairs of inserts being tested. For the sake
of comparison, another comparator bulb of the same wattage directly
connected to the 230 volts AC supply will be fitted along side.
4. Since the testing is being done at a higher voltage, removal of the rust
layer by grinding shall not be necessary.
6. If the test lamp emits light dimmer than the comparator lamp in the
sleeper, the sleeper shall be accepted and marked ‘FTC’ ( Fit for Track
circuit). If it emits light with the same brightness as the comparator
lamp, the sleeper will be rejected and marked ‘NFTC’ (Not fit for track
circuit). In case the test lamp does not emit light at all, it indicates that
the circuitry is defective and should be rechecked.
Page 31 of 34
Page 32 of 34
ANNEXURE-VI
Page 34 of 34