List of As-Built Drawings (Mech.) : S/N Doc. / Dwg. No. Doc. / Dwg. Title

This document provides a list of 127 as-built mechanical drawings for the Benghazi Combined Cycle Project. The drawings include lists, diagrams, and piping and instrumentation diagrams related to systems like steam, cooling water, fuel, compressed air, and fire protection. They cover various buildings like the central control building, gas turbine building, and steam turbine building.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views4 pages

List of As-Built Drawings (Mech.) : S/N Doc. / Dwg. No. Doc. / Dwg. Title

This document provides a list of 127 as-built mechanical drawings for the Benghazi Combined Cycle Project. The drawings include lists, diagrams, and piping and instrumentation diagrams related to systems like steam, cooling water, fuel, compressed air, and fire protection. They cover various buildings like the central control building, gas turbine building, and steam turbine building.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

LIST OF AS-BUILT DRAWINGS (MECH.

)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE

1 BP-M-MG-11-100 List of Heat Balance Diagrams

2 BP-M-MG-11-101 Heat Balance Diagram - FG(2+2+1) GT Base Load, 37C

3 BP-M-MG-11-102 Heat Balance Diagram - FG(2+2+1) GT 75% Load, 37C

4 BP-M-MG-11-103 Heat Balance Diagram - FG(2+2+1) GT 50% Load, 37C

5 BP-M-MG-11-104 Heat Balance Diagram - FG(1+1+1) GT 100% Load, 37C

6 BP-M-MG-11-105 Heat Balance Diagram - FG(1+1+1) GT 50% Load, 37C

7 BP-M-MG-11-106 Heat Balance Diagram - FG(2+2+1) GT Base Load, 1C

8 BP-M-MG-11-107 Heat Balance Diagram - FG(2+2+1) GT Base Load, 50C

9 BP-M-MG-11-108 Heat Balance Diagram - FO(2+2+1) GT Base Load, 37C

10 BP-M-MG-11-109 Heat Balance Diagram - FO(2+2+1) GT 75% Load, 37C

11 BP-M-MG-11-110 Heat Balance Diagram - FO(2+2+1) GT 50% Load, 37C

12 BP-M-MG-11-111 Heat Balance Diagram - FO(1+1+1) GT 100% Load, 37C

13 BP-M-MG-11-112 Heat Balance Diagram - FO(1+1+1) GT 50% Load, 37C

14 BP-M-MG-11-113 Heat Balance Diagram - FO(2+2+1) GT Base Load, 1C

15 BP-M-MG-11-114 Heat Balance Diagram - FO(2+2+1) GT Base Load, 50C

16 BP-M-MG-12-001 List of Flow Diagrams

17 BP-M-AC-12-001 Flow Diagram - Aux. cooling water system

18 BP-M-AS-12-001 Flow Diagram - Aux. Steam System

19 BP-M-CA-12-001 Flow Diagram - Compressed Air System

20 BP-M-CC-12-001 Flow Diagram - Closed Cooling Water System

21 BP-M-CC-12-002 Flow Diagram - Fan Cooling System for GT Lube Oil and Generator

22 BP-M-CD-12-001 Flow Diagram - Chemical Dosing System

23 BP-M-CN-12-001 Flow Diagram Condensate System 1/2

24 BP-M-CN-12-002 Flow Diagram Condensate System 2/2

25 BP-M-CW-12-001 Flow Diagram - Circulating Water System(1/2)

26 BP-M-CW-12-002 Flow Diagram - Circulating Water System(2/2)

27 BP-M-DW-12-001 Flow Diagram - Demi. Water Supply System

28 BP-M-DW-12-002 Flow Diagram - GT Demi. Water Supply System

29 BP-M-FF-12-001 Flow Diagram - Fire Water System

30 BP-M-FG-12-001 Flow Diagram - Fuel Gas Supply System

31 BP-M-FO-12-001 Flow Diagram - Fuel Oil Forwarding System

32 BP-M-FO-12-002 Flow Diagram - Fuel Oil Drain System

33 BP-M-FW-12-001 Flow Diagram - Feed Water System

34 BP-M-MS-12-001 Flow Diagram - Main Steam System

35 BP-M-NY-12-001 Flow Diagram - N2 Gas System

Page 1 of 4
LIST OF AS-BUILT DRAWINGS (MECH.)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE

36 BP-M-PP-12-002 Flow Diagram - Sump Pump(2)

37 BP-M-RW-12-001 Flow Diagram - Distillate Water Supply System

38 BP-M-SW-12-001 Flow Diagram - Portable & Service Water System

39 BP-M-VC-12-001 Flow Diagram - HVAC System

40 BP-M-MG-12-200 List of Water Balance Diagrams

41 BP-M-MG-12-201 Water Balance Diagram

42 BP-M-MG-13-100 List of Piping & Instrument Diagram

43 BP-M-MG-13-001 P&ID - Symbol & Legend(1/4)

44 BP-M-MG-13-002 P&ID - Symbol & Legend(2/4)

45 BP-M-MG-13-003 P&ID - Symbol & Legend(3/4)

46 BP-M-MG-13-004 P&ID - Symbol & Legend(4/4)

47 BP-M-MS-13-001 P&ID - Main Steam System

48 BP-M-AS-13-001 P&ID - Aux. Steam System

49 BP-M-LD-13-001 P&ID - Line Drain System

50 BP-M-CN-13-001 P&ID - Condensate System(1/2)

51 BP-M-CN-13-002 P&ID - Condensate System(2/2)

52 BP-M-VW-13-001 P&ID - Valve Sealing Water System

53 BP-M-FW-13-001 P&ID - Feed Water System

54 BP-M-CW-13-001 P&ID - Circulating Water System(1/2)

55 BP-M-CW-13-002 P&ID - Circulating Water System(2/2)

56 BP-M-AC-13-001 P&ID - Aux. Cooling Water System

57 BP-M-CC-13-001 P&ID - Closed Cooling Water System

58 BP-M-CC-13-002 P&ID - Fan Cooling System for GT Lube Oil And Generator

59 BP-M-CA-13-001 P&ID - Compressed Air System

60 BP-M-IA-13-001 P&ID - Instrument Air Distribution System

61 BP-M-SA-13-001 P&ID - Service Air Distribution System

62 BP-M-FG-13-001 P&ID - Fuel Gas Supply System

63 BP-M-FG-13-002 P&ID - Ignition Gas Supply System

64 BP-M-FO-13-001 P&ID - Fuel Oil Forwarding System

65 BP-M-FO-13-002 P&ID - Fuel Oil Drain System

66 BP-M-NY-13-001 P&ID - N2 Gas System

67 BP-M-RW-13-001 P&ID - Distillate Water Supply System

68 BP-M-DW-13-001 P&ID - Demi. Water Supply System

69 BP-M-DW-13-002 P&ID - Demi. Water Supply System for GT

70 BP-M-SW-13-001 P&ID - Potable & Service Water System

Page 2 of 4
LIST OF AS-BUILT DRAWINGS (MECH.)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE

71 BP-M-CD-13-001 P&ID - Chemical Dosing System

72 BP-J-SM-13-001 P&ID - For Sampling System(1/5)

73 BP-J-SM-13-002 P&ID - For Sampling System(2/5)

74 BP-J-SM-13-003 P&ID - For Sampling System(3/5)

75 BP-J-SM-13-004 P&ID - For Sampling System(4/5)

76 BP-J-SM-13-005 P&ID - For Sampling System(5/5)

77 BP-M-FF-13-001 P&ID - Fire Water System(1/3)

78 BP-M-FF-13-002 P&ID - Fire Water System(2/3)

79 BP-M-FF-13-003 P&ID - Fire Water System(3/3)

80 BP-M-FF-13-004 P&ID - Fire Water Spray System(1/2)

81 BP-M-FF-13-005 P&ID - Fire Water Spray System(2/2)

82 BP-M-VC-13-001 P&ID - Gas Turbine Building HVAC System

83 BP-M-VC-13-002 P&ID - Steam Turbine Building HVAC System


84 BP-M-VC-13-003 P&ID - Central Control BLDG. HVAC System
85 BP-M-VC-13-004 P&ID - Auxiliary Building HVAC System
86 BP-M-PP-13-001 P&ID - Sump Pump(1)
87 BP-M-PP-13-002 P&ID - Sump Pump(2)

88 BP-M-VC-14-000 HVAC Duct Drawing List

89 BP-M-VC-14-001 HVAC Duct Symbol & Legend

90 BP-M-VC-14-002 Central Control Building HVAC Equipment Schedule(1/2)

91 BP-M-VC-14-003 Central Control Building HVAC Equipment Schedule(2/2)

92 BP-M-VC-14-004 Central Control Building HVAC Air Flow Schematic Diagram

93 BP-M-VC-14-005 Central Control Building HVAC Duct Plan for HVAC Room

94 BP-M-VC-14-006 Central Control Building Underground Floor HVAC Duct Plan

95 BP-M-VC-14-007 Central Control Building Ground Floor HVAC Duct Plan(1/2)

96 BP-M-VC-14-008 Central Control Building Ground Floor HVAC Duct Plan(2/2)

97 BP-M-VC-14-009 Central Control Building First Floor HVAC Duct Plan(1/2)

98 BP-M-VC-14-010 Central Control Building First Floor HVAC Duct Plan(2/2)

99 BP-M-VC-14-011 Central Control Building HVAC Duct Section

100 BP-M-VC-14-012 Central Control Building HVAC Duct Fixture Typical Detail(1/2)

101 BP-M-VC-14-013 Central Control Building HVAC Duct Fixture Typical Detail(2/2)

102 BP-M-VC-14-014 Gas Turbine Building Ground Floor HVAC Duct Plan

103 BP-M-VC-14-015 Gas Turbine Building HVAC Duct Support Location DWG

104 BP-M-VC-14-016 Gas Turbine Building HVAC Duct Section DWG

105 BP-M-VC-14-017 Gas Turbine Building HVAC Duct Support Detail

Page 3 of 4
LIST OF AS-BUILT DRAWINGS (MECH.)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE

106 BP-M-VC-14-018 Gas Turbine Building HVAC Duct Fixture Typical Detail

107 BP-M-VC-14-019 Central Control Building C.C.A.C Refrigerant Pipe DWG(Ground Floor)

108 BP-M-VC-14-020 Central Control Building C.C.A.C Refrigerant Pipe DWG(First Floor)

109 BP-M-VC-14-021 Central Control Building C.C.A.C Refrigerant Pipe DWG(Roof Floor)

110 BP-M-VC-14-022 Central Control Building C.C.A.C Refrigerant Piping Detail DWG

111 BP-M-VC-14-023 Steam Turbine Building Ground Floor HVAC Duct Plan(1/2)

112 BP-M-VC-14-024 Steam Turbine Building Ground Floor HVAC Duct Plan(2/2)

113 BP-M-VC-14-025 Steam Turbine Building HVAC Duct Section Drawing

114 BP-M-VC-14-026 Steam Turbine Building HVAC Duct Support Location DWG(1/2)

115 BP-M-VC-14-027 Steam Turbine Building HVAC Duct Support Location DWG(2/2)

116 BP-M-VC-14-028 Steam Turbine Building HVAC Duct Support Detail

117 BP-M-VC-14-029 Steam Turbine Building HVAC Duct Support & Fixture Detail

118 BP-M-VC-14-030 Fire Pump Station HVAC System Ventilation Fan Unit Location Drawing

119 BP-M-VC-14-031 Fuel Oil Forwarding Pump Station Ventilation Fan Unit Location DWG

120 BP-M-VC-14-032 Generator Circuit Breaker PAC & Outdoor Unit Location DWG

121 BP-M-FF-17-001 Central Control Building Fire Extinguisher Location DWG(Underground Floor)

122 BP-M-FF-17-002 Central Control Building Fire Extinguisher Location DWG(Gorund Floor)

123 BP-M-FF-17-003 Central Control Building Fire Extinguisher Location DWG(First Floor)

124 BP-M-FF-17-004 Gas Turbine Building Fire Extinguisher Location DWG

125 BP-M-FF-17-005 Steam Turbine Building Fire Extinguisher Location DWG(Basement Floor)

126 BP-M-FF-17-006 Steam Turbine Building Fire Extinguisher Location DWG(Ground Floor)

127 BP-M-FF-17-007 Steam Turbine Building Fire Extinguisher Location DWG(Mezzanine Floor)

128 BP-M-FF-17-008 Steam Turbine Building Fire Extinguisher Location DWG(Operating Floor)

129 BP-M-FF-17-009 Fire Fighting Pump Station Extinguisher Location DWG

130 BP-M-FF-17-010 Fuel Oil Forwarding Pump Station Extinguisher Location DWG

131 BP-M-FF-17-011 Generator Circuit Breaker Fire Extinguisher Location Drawing

132 BP-M-GE-71-003 Technical Description for the Overall Plant

133 BP-M-GE-78-001 Plant Start-up & Shutdown Procedure

134 BP-M-MG-82-001 Equipment List