Tabel Standar Kerja Kombinasi (TSKK) : Standardized Work Combination Table (SWCT)
Tabel Standar Kerja Kombinasi (TSKK) : Standardized Work Combination Table (SWCT)
Tabel Standar Kerja Kombinasi (TSKK) : Standardized Work Combination Table (SWCT)
自動送り
T.Tの WAKTU ( Detik ) Operation Time ( Detik )
待ち時間
NO NAME OF WORK REMARK
VALUE NON VALUE AUTO JALAN
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 570 580 590 600 610 620 630 640 650 660 670 680 690 700
TIME 291,00 2,00 0,00 0,00 Remark : NO. REVISION ITEM REVISION DATE SIGN APPROVED CHECKED PREPARED
TOTAL TIME 293,00 - Manual
STANDARD 600,00 - Auto
PRESENTASE 99% 1% 0% - Jalan
NO IT EM R EV ISIO N D A TE S IG N P AR T NA M E B Y 366 LM T M P R O D /D P AG E 1
PT. GKD
PRODUCTION DEPT
ASSEMBLING SECT
TABEL STANDAR KERJA KOMBINASI ( TSKK ) PA R T N O T A C K T IM E 600 D AT E 25/08/2008
自動送り
T.Tの WAKTU ( Detik ) Operation Time ( Detik )
待ち時間
NO NAME OF WORK REMARK
VALUE NON VALUE AUTO JALAN
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 570 580 590 600 610 620 630 640 650 660 670 680 690 700
1 Kembalikan hanger ke posisi semula 14,00
20 Setting side rail pada stopper meja pre assy 2 siap angkat 6,00
TIME 393,00 2,00 0,00 0,00 Remark : NO. REVISION ITEM REVISION DATE SIGN APPROVED CHECKED PREPARED
TOTAL TIME 395,00 - Manual
STANDARD 600,00 - Auto
PRESENTASE 99% 1% 0% - Jalan
PT. GKD NO ITEM REV IS IO N D AT E SIG N P ART N AM E B Y 366 L M TM P RO D/D PAG E 1
PRODUCTION DEPT
ASSEMBLING SECT TABEL STANDAR KERJA KOMBINASI ( TSKK ) PAR T NO TA C K T IM E 600 DA TE 25/08/2008
Standardized Work Combination Table (SWCT) M ES IN /PR O S ES P RE A SSY 1 & 2 RH LINE A SSY B LA ST D O C Agust-08
自動送り
T.Tの WAKTU ( Detik ) Operation Time ( Detik )
待ち時間
NO NAME OF WORK REMARK
VALUE NON VALUE AUTO JALAN
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 570 580 590 600 610 620 630 640 650 660 670 680 690 700
1 Tarik side rail ke meja pre assy 1 14,00
8,00
2 Ambil inner front 6,00
Ambil bracket absorber rear dan stiff frame setting pada Inner
17 rear 4,00
8,00
18 Ambil bracket spring no 2 dan plate taruh pada area inner front 8,00
33 Setting side rail pada stopper meja pre assy 2 siap angkat 6,00
TIME 608,00 10,00 0,00 28,00 Remark : NO. REVISION ITEM REVISION DATE S IGN APPROVED CHECKED PREPARED
TOTAL TIME 646,00 - Manual
STANDARD 600,00 - Auto
PRESENTASE 94% 2% 4% - Jalan
PT. GKD
NO ITEM R EV IS IO N DA TE S IG N PA R T NA M E BY 366 L M T M P RO D/D PA G E 1
PRODUCTION DEPT
ASSEMBLING SECT TABEL STANDAR KERJA KOMBINASI ( TSKK ) P A RT N O T AC K T IM E 600 D AT E 25/08/2008
Standardized Work Combination Table (SWCT) M ES IN /P RO SES PRE AS SY 1 & 2 R H LIN E AS SY B LA S T DO C Agust-08
自動送り
T.Tの WAKTU ( Detik ) Operation Time ( Detik )
待ち時間
NO NAME OF WORK
VALUE NON VALUE AUTO JALAN
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 570 580 590 600 610 620 630 640 650 660 670 680 690 700
REMARK
Ambil brac ket absorber rear dan stiff frame setting pada Inner
17 rear 4,00
8,00
18 Ambil brac ket spring no 2 dan plate taruh pada area inner front 8,00
25 Ambil brac ket spring no 3 dan sertting pada side rail 2,00
TIME 506,00 10,00 0,00 28,00 Remark : NO. REVISION ITEM REVIS ION DATE SIGN APPROVED CHECKED PREPARED
TOTAL TIME 544,00 - Manual
STANDARD 600,00 - Auto
PRESENTASE 93% 2% 5% - Jalan
PT. GKD
NO ITEM REVISIO N DATE SIG N PART NAM E BY LM TM PRO D/D PAG E 1
PRODUCTION DEPT
ASSEMBLING SECT
TABEL STANDAR KERJA KOMBINASI ( TSKK ) PART NO TAC K TIM E 600 DATE 19/08/2008
Standardized Work Combination Table (SWCT) M ESIN/PRO SES M A IN A S S Y LH LINE ASSY B LAST DO C Agust-08
自動送り
T.Tの WAKTU ( Detik ) Operation Time ( Detik )
待ち時間
NO NAME OF WORK
VALUE NON VALUE AUTO JALAN
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 570 580 590 600 610 620 630 640 650 660 670 680 690 700
REMARK
TIME 341,00 24,00 0,00 11,00 Remark : NO. REVISION ITEM REVISION DATE SIGN APPROVED CHECKED PREPARED
TOTAL TIME 376,00 - Manual
STANDARD 600,00 - Auto
PRESENTASE 91% 6% 3% - Jalan
HARI PURWANTO SUKIDI SARJITO
PT. GKD NO IT EM R EV ISIO N D AT E SIG N PA R T NA M E B Y LM T M PR O D /D PAG E 1
PRODUCTION DEPT
ASSEMBLING SECT TABEL STANDAR KERJA KOMBINASI ( TSKK ) P A RT N O TA C K T IM E 600 DA T E 19/08/2008
自動送り
T.Tの WAKTU ( Detik ) Operation Time ( Detik )
待ち時間
NO NAME OF WORK
VALUE NON VALUE AUTO JALAN
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 570 580 590 600 610 620 630 640 650 660 670 680 690 700
REMARK
28 Setting side rail pada stopper meja pre assy 2 siap angkat 7,00
TIME 452,00 24,00 0,00 11,00 Remark : NO. REVI SION ITEM REVISION DATE SIGN APPROVED CHECKED PREPARED
TOTAL TIME 487,00 - Manual
STANDARD 600,00 - Auto
PRESENTASE 93% 5% 2% - Jalan
HARI PURWANTO SUKIDI SARJITO
NO ITEM REV IS IO N D ATE SIG N PA RT NA M E BY L M T M PR O D /D PA G E 1
PT. GKD
PRODUCTION DEPT
ASSEMBLING SECT
TABEL STANDAR KERJA KOMBINASI ( TSKK ) P ART NO T AC K TIM E 600 DA TE 19/08/2008
Standardized Work Combination Table (SWCT) M ESIN/P RO SES P R E A S S Y 1 & 2 LH LIN E A SS Y B LAST D O C Agust-08
自動送り
T.Tの WAKTU ( Detik ) Operation Time ( Detik )
待ち時間
NO NAME OF WORK
VALUE NON VALUE AUTO JALAN
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 570 580 590 600 610 620 630 640 650 660 670 680 690 700
REMARK
Ambil bracket absorber rear dan stiff frame setting pada Inner
17 11,00
rear
7,00
18 Ambil bracket spring no 2 dan plate taruh pada area inner front 7,00
33 Setting side rail pada stopper meja pre assy 2 siap angkat 7,00
TIME 635,00 16,00 0,00 27,00 Remark : NO. REVISION ITEM REVISION DATE SIGN APPROVED CHECKED PREPARED
TOTAL TIME 678,00 - Manual
STANDARD 600,00 - Auto
PRESENTASE 94% 2% 4% - Jalan
HARI PURWANTO SUKIDI SARJITO
PT. GKD
NO ITEM REV ISIO N D AT E SIG N P AR T N AM E B Y L M TM PR O D/D PA G E 1
PRODUCTION DEPT
ASSEMBLING SECT TABEL STANDAR KERJA KOMBINASI ( TSKK ) PA RT NO T AC K TIM E 600 DA TE 19/08/2008
Standardized Work Combination Table (SWCT) M ES IN/P RO SES P R E A S S Y 1 & 2 LH LIN E A SS Y B LAST D O C Agust-08
自動送り
T.Tの WAKTU ( Detik ) Operation Time ( Detik )
待ち時間
NO NAME OF WORK
VALUE NON VALUE AUTO JALAN
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550 560 570 580 590 600 610 620 630 640 650 660 670 680 690 700
REMARK
Ambil bracket absorber rear dan stiff frame setting pada Inner
17 rear 11,00
7,00
18 Ambil bracket spring no 2 dan plate taruh pada area inner front 7,00
TIME 524,00 16,00 0,00 27,00 Remark : NO. REVISION ITEM REVISION DATE SIGN APPROVED CHECKED PREPARED
TOTAL TIME 567,00 - Manual
STANDARD 600,00 - Auto
PRESENTASE 92% 3% 5% - Jalan
HARI PURWANTO SUKIDI SARJITO