FIRE RATING REQUIREMENT OF

N
STEEL CONSTRUCTION
O
I
T 1. Objective:
The objective of this paper is to provide its user with adequate technical knowledge and
C

guidance on standard fire rating requirement of steel construction in RMG industries of


U

Bangladesh.
R
T

2. Building classification & definitions:


S
N

a) Existing Buildings- Buildings which are constructed and occupied prior 24 November
O

2013.
C

b) Interim Construction or Buildings- Buildings which are constructed and occupied from
24 November 2013 to prior 11 February 2021.
L

c) New Construction or Buildings- Buildings which are constructed and occupied with
E

approved design from the appropriate building approval authority from 11 February
E

2021.
T
S
F
O

Buildings and construction


T

Existing building
N

Constructed & occupied


E

prior 24 November 2013


M
E

Interim building
R

Constructed & occupied from


24 November 2013 to prior
I

11 February 2021
U
Q
E

New building
Approved design, constructed
R

and occupied from 11 February 2021


G
N
I
T
A

Figure 1: Building classification


R
E
R
I
F

01

Fire Rating Requirement of Steel Construction_Version 1.0_November 2021


3. Protection of existing buildings:

N
According to the RSC Technical Guidelines (Standard), all existing buildings with non- rated

O
constructions shall follow the below table considering per floor area and building height.
I
T
Existing building (occupied prior to 24 November 2013)
C
U

Per floor area <22,000 sq. feet Per floor area >22,000 sq. feet
R

No requirement of sprinkler No requirement of sprinkler


T

No requirement of passive No requirement of passive fire


S

2 Storeys or fire protection protection.


N

less Mixed occupancy separation according to BNBC 2006 Part 3 table 3.2.1.
O

(Separation wall and floor/ ceiling assemblies)


C
L

No requirement of passive No requirement of passive


E

fire protection. fire protection.


E

More than 2 Active fire protection required- Active fire protection required-
Standpipe system when building sprinkler and standpipe system
T

storeys up to
occupied level >33 feet.
S

building
height 65 ft Mixed occupancy separation according to BNBC 2006 Part 3 table 3.2.1.
F

(Separation wall and floor/ ceiling assemblies)


O

Passive fire protection required. Passive fire protection required.


T

building
N

height more Active fire protection-Standpipe Active fire protection required-


system Sprinkler and standpipe system
E

than 65 feet
but less than
M

75 feet. Mixed occupancy separation according to BNBC 2006 Part 3 table 3.2.1.
E

(Separation wall and floor/ ceiling assemblies)


R
I

Passive fire protection required.


U

Active fire protection required- sprinkler and standpipe system.


Building
Q

height more
Mixed occupancy separation according to BNBC 2006 Part 3 table 3.2.1.
E

than 75 feet
(Separation wall and floor/ ceiling assemblies)
R
G

Table 1: Fire protection requirement of existing buildings in terms of height and floor area.
N
I
T
A
R
E
R
I
F

02

Fire Rating Requirement of Steel Construction_Version 1.0_November 2021


4. Protection of interim buildings:

N
As per the RSC Technical Guidelines (Standard) Part 3 Section 3.3.6- all RMG factories

O
will be considered as occupancy G2. (See BNBC 2006 Part 3 Section 2.1.7)
I
T
All RMG factories must be of type 1 or type 2 construction (See BNBC 2006 Part 3
C

Section 2.4.3 & Section 3.2.4)


U

For type 2 construction, the maximum permissible height of the building shall be 4
R

storeys or 14 meters. (See BNBC 2006 Part 3, Table 3.1.9)


T

Interior bearing walls, bearing partitions, girders, trusses & framings must have
S

minimum fire resistance rating: 2 hr. in type 2 construction & 4 hr. in type 1
N

construction. (See BNBC 2006 Part 3, Table 3.3.1)


O
C

Floor construction including beams must have a minimum 1.5 hr. fire resistance rating
in type 2 & 3 hr. fire resistance rating in type 1. (See BNBC 2006 Part 3, Table 3.3.1)
L
E
E

3 hr.
T

4 hr. 1.5 hr.


S

4 hr. 2 hr.
F

4 hr. 2 hr.
O

4 hr. 2 hr.
T
N

Figure 2: Type 1 building schematic Figure 3: Type 2 building schematic


E

diagram for fire rating of structural diagram for fire rating of structural
M

elements elements
E
R

Depending on the distance from the building to the property line the fire resistance
I

rating of the exterior wall must meet BNBC 2006 Table 3.2.2.
U

If the floor assembly is also a separation between occupancies, then BNBC 2006 Table
Q

3.2.1 must also be considered.


E
R
G
N
I
T
A
R
E
R
I
F

03

Fire Rating Requirement of Steel Construction_Version 1.0_November 2021


Follow table 2 for the fire protection requirement of interim buildings.

N
Interim building (occupied from 24 November 2013 to prior 11 February 2021)

O
I
T Type- 1 construction (fire rated) Type- 2 construction (fire rated)
>14 meter of building height. Permissible height up to 14 meter or
C

4 stories.
U

Fire rating requirement- Floor including Fire rating requirement- Floor including
R

beam- 3 hours; Interior bearing walls, beam- 1.5 hours; Interior bearing walls,
T

bearing partitions, girders, trusses & bearing partitions, girders, trusses &
framings must have minimum fire framings must have minimum fire
S

resistance rating- 4 hours. resistance rating- 2 hours.


N

Active fire protection required- Active fire protection required-


O

Standpipe- occupied level >33 feet. Standpipe- occupied level >33 feet.
C

Sprinkler & standpipe- occupied Sprinkler & standpipe- occupied


level>75 feet. level>75 feet.
L

Mixed occupancy separation according to BNBC 2006 Part 3 table 3.2.1.


E

(Separation wall and floor/ ceiling assemblies)


E

Proximity between group of occupancies and exterior wall rating shall be ensured
T

according to BNBC 2006 Part 3 Table 3.2.2


S

Table 2: Fire protection requirement of interim buildings in terms of height and


construction type.
F
O

5. Protection of new buildings:


According to BNBC 2020 Table 3.2.4; group- I: non- combustible construction is
T

permitted for RMG industries.


N

Group I: Noncombustible, subdivisions are followings-


E

Type I-A: 4-hour fire protected


M

Type I-B: 3-hour fire protected


E

Type I-C: 2-hour fire protected


R

Type I-D: 1 hour fire protected


Type I-E: Unprotected
I
U
Q

According to BNBC 2020 Table 3.1.7; building height and number of storey for non-
combustible construction group shall be complied with respect to road width and front
E

open space requirement.


R

For Type I-D and I-E of Group I construction, the maximum permissible height of the
building shall be 3 storeys or 11 m for values of two times the sum of the width of the
G

front road and the front open space not less than 13.6 m.
N

For exterior wall rating and proximity to surrounding occupancies group, BNBC 2020
I

Table 3.2.2 shall apply.


T
A

Fire rating requirement of opening protectives in exterior wall shall be in accordance


with BNBC 2020 Table 3.2.3.
R

Fire resistance rating requirements for barrier walls and floor/ceiling assemblies
E

between separated occupancies (hours) i.e. mixed occupancies separation follow BNBC
2020 Part 3 Table 3.2.1.
R
I

Fire rating for structural and non- structural elements of group- I construction shall
F

be in accordance with BNBC 2020 Table 3.3.1 (a).


In all new buildings, standpipe system shall be required if the highest occupied floor is
greater than 10 m height from grade level, and a sprinkler system is required where
the highest occupied floor is greater than 23 m.

04

Fire Rating Requirement of Steel Construction_Version 1.0_November 2021