4003 Rev.5 - FS For Navigational Aids System in Wellhead & Process Platform
4003 Rev.5 - FS For Navigational Aids System in Wellhead & Process Platform
4003 Rev.5 - FS For Navigational Aids System in Wellhead & Process Platform
Functional Specification
For
Navigational Aids System
(Well Platform and Process Platform)
PK KR AS 6 14-09-2015 5
1.0 SCOPE
2.1 All applicable standards and maintenance regulations, such as those published
by the International Association of Lighthouse Authorities (IALA) and the
supplied equipment shall meet local laws.
2.2 Apart from “IALA”, codes / standards specified in design criteria form a part
of this specification.
3.1 The scope of supply through, this speciation shall include, but not limited to
the following:
(2) Junction Boxes and Nickel / Chromium plated brass double compression
type cable glands and tinned copper lugs as required.
3.2 Nav aid system cables shall be fire resistant type as per electrical design
criteria.
The obstruction lights and junction boxes shall be suitable for Class I, Division
I, Group D Hazardous area. The surface temperature of these equipment shall
be limited to 2000C, T3 class maximum and shall be certified by UL or any
other equivalent testing authority from the country of origin for use in this area.
The obstruction lights shall be placed in such a way to ensure that at least one
light is visible upon approaching the structure from any direction. However
minimum one light shall be provided on each corner of the platform. Bridge
shall be provided with two obstruction lights to cater to vessels approaching
from opposite sides. Flare jacket shall also be provided with one obstruction
light.
The lights shall have a range of at least 10 Nautical miles 360 degree circuit.
All the lights on the platform, the interconnecting bridges shall be
synchronized to flash the Morse letter “U” in unison at an interval of 15
seconds. The flash cycle shall be as given below:
0.4 Sec. - ON
0.4 Sec. - ON
1.2 Sec. - ON
12 Sec. - OFF
4.2 The load requirement per day shall be determined considering the following:
All tests shall be carried out as per relevant standards at Vendor’s works.
Company reserves the right to witness all tests and carry out inspection or
authorize his representative to witness tests and carry out inspection. For this
purpose, vendor shall notify the company at least 20 days in advance giving
exact details of tests, dates and addresses of location where the tests would be
carried out.
6.0 SPARES
6.1 Vendor shall recommend and provide spare parts needed for startup. In
addition vendor shall furnish a separate price list of recommended spares for
one (1) year of normal operation and maintenance. Recommended spares shall
take into account the related factors of equipment reliability, effect of
downtime upon production, safety, cost of parts and the availability of
equipment service facility.
7.0 WARRANTY
Vendor shall have final and total responsibility for the design and performance
of all equipment supplied under this specification. Warranty/Guarantee shall be as
covered in Vol-I of Bid documents.
8.1 General
8.1.10 Interconnection diagram for various equipments along with cable sizes
8.2.3 Maximum and Minimum current demand for the estimated limit of voltage and
ambient temperature.
8.2.5 Certificate to indicate temperature rise limits and suitability for area
classification
9.0 CERTIFICATION