Guides in Securing Denr Discharge Permit

This document provides instructions for securing a discharge permit from the Department of Environment and Natural Resources (DENR) in the Philippines. It outlines the application process, which involves 1) completing the application form and submitting duplicate copies along with supporting documents, 2) paying the application fee, and 3) submitting the application and receipt for review. The application will be processed within 30 days. The required supporting documents include an engineer's report, facility drawings, environmental compliance documents, and wastewater sampling results depending on if the application is new or for renewal.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
323 views1 page

Guides in Securing Denr Discharge Permit

This document provides instructions for securing a discharge permit from the Department of Environment and Natural Resources (DENR) in the Philippines. It outlines the application process, which involves 1) completing the application form and submitting duplicate copies along with supporting documents, 2) paying the application fee, and 3) submitting the application and receipt for review. The application will be processed within 30 days. The required supporting documents include an engineer's report, facility drawings, environmental compliance documents, and wastewater sampling results depending on if the application is new or for renewal.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GUIDES IN SECURING DENR DISCHARGE PERMIT FROM DENR

INSTRUCTIONS
1. Fully accomplish this form and complete all the supporting documents indicated hereunder. Submit all
documents in duplicate copies to our Air & Water Permitting Section of the Clearance and Permitting
Division for screening and assessment of fees.
2. Proceed to the Accounting Section for the issuance of “Order of Payment”. Thereafter, pay to the Cashier
Section the corresponding amount indicated in the “Order of Payment”
3. Submit your application together with the official receipt to the Records Section and ask for your receiving
copy.
Your application shall be acted upon within thirty (30) working days and you shall be informed of our action
accordingly.

Types of Application Documents Required


 New Item Nos. , , , , , & 
 Renewal Item Nos. , , ,  & 

Supporting Documents
 Engineer’s Report with at least containing the following:
 Nature of project or business;
 Brief description of manufacturing process involved;
 Production capacity, quality or volume and the generic name of the products;
 The nature and character of the applicant’s wastewater and its physical and chemical composition;
 Total daily volume of discharge of raw wastewater;
 Treatment process and estimated treatment efficiency; The expected quality of the effluent and other
discharge shall meet the Effluent standards of the DENR;
 The total daily volume of water consumption and discharge of final treated wastewater effluent;
 The name of receiving body of water and its official water classification and in case of land discharge,
the nearest receiving body of water and its official water classification;
 Information on flow measurement equipment and procedure;
 Pollution prevention/Environmental Management System plan or program;
 DENR ID Number as hazardous waste generator (if applicable); and
 State the cost incurred in the installation and maintenance of wastewater treatment facility; if any.

 Drawing requirements in 50cm x 90 cm paper signed by the President/General Manager and


duly signed and sealed by a Registered Chemical or Sanitary Engineer.
 Vicinity Map of the Plant;
 The wastewater line layout from the wastewater sources to the WTF; and
 Plan and elevation drawings of the WTF as built with complete specifications. 

 Copy of the Certificate of Accreditation of the Pollution Control Office, or appointment/ designator
as such by the Managing Head.

 Environmental Compliance Certificate (ECC) or Certificate of Non-Coverage (CNC) copy.


 Official receipt for the payment of applicable fees.
 Water billing statement for the whole year.
 Copy of the latest Wastewater Discharge Permit;
 Copy of the results of sampling analysis of the establishment’s wastewater characteristics for 4
quarters in the previous year together with the Self Monitoring Report;

 Proof of compliance to permit conditions (if required).