PEB Structure To Commence After 1.3 Mtr. High Brick Construction All Around From Plinth Level

The document provides specifications for designing and erecting a pre-engineered building structure for a small-scale millets processing centre in Andhra Pradesh. The factory shed will measure 24 meters by 15 meters with a 5 meter clear height. It will have four partitioned sections for millets cleaning, rava/flour/flakes production, biscuit making, and a male change room. The pre-engineered building fabricator must provide structural design parameters according to the specifications.

Uploaded by

ap
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
113 views4 pages

PEB Structure To Commence After 1.3 Mtr. High Brick Construction All Around From Plinth Level

The document provides specifications for designing and erecting a pre-engineered building structure for a small-scale millets processing centre in Andhra Pradesh. The factory shed will measure 24 meters by 15 meters with a 5 meter clear height. It will have four partitioned sections for millets cleaning, rava/flour/flakes production, biscuit making, and a male change room. The pre-engineered building fabricator must provide structural design parameters according to the specifications.

Uploaded by

ap
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

PEB Structure Requirements

1) Nature of Work: Designing, Fabrication and Erection of Pre Engineered Building (PEB) Structure on
Turnkey Basis for establishing a small scale Millets Processing Centre (MPC)

2) Location: Survey No. 117-3, Rega (V), L Kota Mandal of Vizianagaram District in Andhra Pradesh

3) Factory Shed Dimensions: 24 X 15 X Clear Height 5 Mtrs.

4) Partitions:

1 Millets Cleaning Section 15.0 x 05.4 Mtrs.

2 Rava, Flour, Flakes etc., Section 15.0 x 05.4 Mtrs

3 Biscuit Making Section 15.0 x 05.4 Mtrs

4 Male Change Room 05.5 x 02.8 Mtrs.

4) Structural Design Parameters (to be indicated by fabricator)

PEB structure to commence after 1.3 Mtr. high Brick construction all around from plinth level.

Sl. No. Building Parameter Details and Specifications

1 Structural Design

1.1 Type of structural frame

1.2 Lean-to Rafters

1.3 Column Canopy Rafters

1.4 Interior Columns

1.5 Bearing Frame Rafters

1.6 Corner Columns

1.7 End wall Wind Columns

1.8 Base Plates

1.9 Anchor Bolts

2 Building Dimensions

2.1 Length (Mtrs.)

2.2 Width (Mtrs.)

Page 1 of 3
Sl. No. Building Parameter Details and Specifications

2.3 Eave Height (Mtrs.)

2.4 Eave Strut

2.5 Bay Spacing

2.6 Roof Slope

2.7 End Wall Column Spacing

2.8 End Wall Bearing Frame

3 Design Loads (in accordance with IBC


specifications)

3.1 Dead Load

3.2 Moving Load

3.3 Wind Load

3.4 Seismic Load

3.5 Impact Load

3.6 Auxiliary Load

4 Roofing

4.1 Sheeting

4.2 Panelling

4.3 False Ceiling

4.4 Expansion Joints

5 Walls

5.1 Sheeting (including height of sheeting


on all four sides)

5.2 Panelling

5.3 Fascia

6 Accessories

6.1 Personnel Doors

6.2 Windows with Fly-proof screen

Page 2 of 3
Sl. No. Building Parameter Details and Specifications

6.3 Industrial Louvers

6.4 Ventilators

6.5 External Manually operate Rolling


Shutters

6.6 Flashing, Trims, Closures

6.7 Eave Gutter and Down Spouts

7 Provision for Lighting

7.1 Ceiling Lights

7.2 Fans & Exhaust Fans

8 Ventilation

9 Fire Protection

Page 3 of 3
ENTRY RAMP
A

MILLET PROCESSING CENTER - FLOOR PLAN

DISPOSALS STOCKING AREA


UTENSILS WASHING &

FOOTING EXCAVATION UP TO HARD


UTENSILS WASHING &

STRATA
DISPOSALS STOCKING AREA

R.S

PEB STRUCTURAL
PROCESSING AREA -3

RCC 1:1.5:3
PROVISION FOR SS TROLLEYS, PALLETS, METAL

W
(BISCUIT SECTION) DETECTORS, INKJET PRINTERS ETC.

SHED

PCC 1:3:6
15.00M X 5.40M
PACKING MACHINE & LABELLING

225MM THK BRICK WALL


PROVISION FOR DUST COLLECTION AND OTHER EQUIPMENT RESTING PLATFORM
W
PLANETARY BISCUIT MIXTURE PLC CONTROLLER COOKIES MIXTURE OVEN

PROCESSING AREA -2

W
(RAVA OR FLOUR & FLAKES,VERMICELLI SECTION)
15.00M X 5.40M

PANELL WORKS.
3.00M TO 3.60M HT SPAN COVERED WITH
VERMICELLI FLAKES LINE POPPING LINE OVEN DEPOSITOR

W
ROASTING LINE PULVERIZED RAVA RIBBON BLENDER VIBRO SIFER PACKING MACHINE

SECTION AT-AA'
PROPOSED COLD STORAGE (RM) PACKING MACHINE ELEVATOR-4 No.s MICRO PULVERIZER TRAY DRYER

22.54M X 23.00M

W
PROCESSING AREA -1
(WHOLE CLEANED MILLETS SECTION)

W
15.00M X 5.40M ASPIRATOR GRADER DE HULLER POLISHER
DE STONER

R.S/ AIR CURTAIN

DISINFECTION D MALE DRESS MALE DRESS

LOCKERS
HAND WASH AREA CHANGE ROOM & LOCKERS CHANGE ROOM & LOCKERS
5.45M X 2.77M 5.45M X 2.77M
D2

GENTS TOILET D1 LOCKERS LOCKERS

D2
JANITOR

LOCKERS
D FEMALE DRESS CHANGE ROOM FEMALE DRESS CHANGE ROOM
LADIES TOILET
& LOCKERS & LOCKERS
D1
D2 D2 D2 5.45M X 2.77M 5.45M X 2.77M
TOILET
1.20M X 1.08M
TOILET
1.20M X 1.08M
TOILET
1.20M X 1.08M
5.00m
LOCKERS LOCKERS

R.S

CM(1:6)
WALL
BRICK
WORKING PLATFORM ENTRANCE RAMP WORKING PLATFORM
A'

NOTES :
1) THE STRUCTURE WILL HAVE 1.35M HEIGHT 225mm THICK BRICK WALL
PLAN PROCESSING AREA
ALL-AROUND
2) PANELLING TO START ABOVE THE BRICK WORK.
15.00M X 24.00M
3) PROVISION FOR FLYPROOF UPVC WINDOWS IN PANELLING REQUIRED.
4) INTERNAL PARTITIONS OF 100mm THICK 0.90M HEIGHT - FOR 3 DIFFERENT
PROCESSING SECTIONS.
DATED : 25-06-2020