The document outlines the fabrication of multiple NKM screens over three weeks in November and December 2021 at a fabrication shop. It details the arrival of materials, fabrication of frames, testing of screens, delivery of completed screens to installations, and ongoing fabrication of additional screens. A total of 6 screens were fabricated with 2 people staffing the project. Carbon testing was performed on one screen during fabrication.

Uploaded by

J
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
154 views19 pages

NKM Screen

The document outlines the fabrication of multiple NKM screens over three weeks in November and December 2021 at a fabrication shop. It details the arrival of materials, fabrication of frames, testing of screens, delivery of completed screens to installations, and ongoing fabrication of additional screens. A total of 6 screens were fabricated with 2 people staffing the project. Carbon testing was performed on one screen during fabrication.

Uploaded by

J
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 19

NKM Screen

Date November 10, 2021


Activities Manpower: 0
1 Arrival of NKM Screen sheet at the fabrication shop

Date November 11, 2021


Activities Manpower: 2
1 Fabricate a working frame / jig frame for the fabrication of NKM Screens
Date November 12, 2021
Activities Manpower: 2
1 Fabricate the NKM screen

Fabrication Shop

Date November 13, 2021


Activities Manpower: 2
1 Continue fabricating of NKM screen
2 Carbon testing proves the loss of carbon shown below

Date November 14, 2021


Activities Manpower: 2
1 Deliver to CIP complex the 1st fabricated NKM screen 2 Fabricate 2nd NKM Screen
Date November 15, 2021
Activities Manpower: 2
1 Continue fabricate 2nd NKM screen

Date November 16, 2021


Activities Manpower: 2
1 Finished fabricate 2nd NKM screen 2 Assemble NKM screen for installati
Date November 18, 2021
Activities Manpower: 2
1 Deliver to CIP complex the 2nd fabricated NKM screen 2 Restoring of worn out NKM Screen

CIP Complex Fabrication Shop


Date November 19-20, 2021
Activities Manpower: 2
1 Continue restoring of worn out NKM Screen flange to be recyled on the fabricating new NKM screen
Date November 26-27, 2021
Activities Manpower: 2
1 Fabricating 3rd NKM screen

Date November 28, 2021


Activities Manpower: 2
1 Complete fabrication of the 3rd NKM Screen 2 Fabrication of 4th NKM Screen
Date November 29, 2021
Activities Manpower: 2
1 Complete fabrication of the 4th NKM Screen 2 Fabrication of 5th NKM Screen on

Date November 30, 2021


Activities Manpower: 2
1 Deliver the 3rd and 4th NKM at the CIP Complex
2 Continue fabricate 5th NKM screen

Date December 1, 2021


Activities Manpower: 2
1 Complete fabrication of the 5th NKM Screen
Date December 2- 4, 2021
Activities Manpower: 2
1 Fabrication and completed the 6th NKM Screen

Date December 6, 2021


Activities Manpower: 2
1 Deliver the 5th and 6th NKM at the CIP Complex
2nd NKM Screen
NKM screen for installation at ADT #4
of worn out NKM Screen flange to be recyled on the fabricating new NKM screen

tion Shop
n of 4th NKM Screen
n of 5th NKM Screen on progress